RESIDENTIAL BUILDING PERMIT BLD93-00999
OWNER: JAMES KILLIAN RECEIVED: 6/30/1993
CONTRACTOR: LICENSE: EXP: ISSUED: 8/27/1993
SITE ADDRESS: 120 E SNOWCREST LN SHELTON EXPIRES: 4/29/2004
PARCEL NUMBER: 221337690034
LEGAL DESCRIPTION: TR 3-D OF SURVEY 4/113 TR D OF SP #532 SEE SURVEY 6/114 CANULLED
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
Residence North on Hwy 3, Rt on Pickering Rd, Rt on Phillips Lk Rd, Left on Snowcres Ln,
Top of hill, 1st drive on right, past cul-de-sac.
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: 3 Type of Constr.: ?
Type of Use: ? Insp. Area: 2 No. of Bathrooms: 3 Occ. Group: ? Lot Size:O Deck: 410
Type of Work: NEW Fire Dist.: 5 No. of Stories: 2 Occ. Load: 0 Building:3,577 528
Valuation: Building Height: 0 Occ. Status: Basement:0
Manufactured Home Information Setback Information Shoreline& Planning Information
Make:? Length: 0 Ft. Front: N 5.0 Ft. Shoreline: 0.0 Ft. Water Body:
Rear: S 5.0 Ft. Slope: Ft. SEPA?: No
Model:? Width: 0 Ft. Side 1: E 5.0 Ft. Shoreline Desig.:
Year: Serial No.: ? Side 2: W 5.0 Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Building Permit Fee NJP 10/22/200 $226.50 61000
Canceled Permit/Plan Check KS 10/19/200 $226.50 S12004
Building permit....' KS $453.00 33733
Building plan check' KS $226.50 33733
Radon Kit KS $8.00 33733
~ Plumbing Fee KS $60.00 33733
Mechanical Fee KS $39.00 33733
Building State Fee KS $4.50 33733
Total $1,244.00
BLD93-00999 Please referto the following pages for conditions of this permit. 1 of 3
CASE NOTES FOR
BLD93-00999
CONDITIONS FOR
BLD93-00999
1) The use, handling and storage of hazar/lo pterials or flammable and combustible liquids in excess of 10 gallons is not allowed without the approval of
the Mason County Fire Marshal, X
2) Proposed structure or any portion tl er of reater than 30" in height from grade line, must maintain a minimum of 5' setback from all property lines,
easements and right of ways. X
3) Den will have to be recordf with✓the deed as non-occupancy. Total number of bedrooms cannot exceed_3_unless sewage disposal system is
upgraded. X izf>� _ 11�\
4) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-09, ,Theperson signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X '
5) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prier iQ an further inspections being performed or approvals granted.
X /1
6) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that
require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the
access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background.
Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted
by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting
inspections.
X
7) The internationnl code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150'from an approved
access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where
such road c e t with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road.
X 44,
6LD93-00999 Please referto the following pages for conditions of this permit. 2 of 3
8) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
'Mason Q u r nances and building regulations.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended fora period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owneror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to,
the above described property and structure for review and inspection. ,�
OWNER OR AGENT: Div � c _� DATE: 19 k��-
LD93-00999 Please referto the following pages for conditions of this permit. 3 of 3
coo !
w CONCRETE 14'IECHANICAL MANUFACTURED HOME
o Footings / Setbacks Date By Ribbons
co
co
Date By Gas Piping Date By
Foundation Walls Date B y Set-up
D ate B y INSULATION Date B y
B G / Slab Insulation Floors Final
Date By Date By Date Bv
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date B y
Date By �YALLBOARD NAILING
D.W.V. Date By
Date By FINAL INSPECTION
Water Line Date B y
Date By Date By
v
a fang Qo arc S13 It-7 MPf 4106,3 - dj ye ti I ns�.laf�tl V7
s
a
Cn
v rC
r
8 � �
o�
o
�a
ti
t
w CONCRETE MECHANICAL MANUFACTURED HOME
o Footings / Setbacks Date By Ribbons
Date By Gas Piping Date By
Foundation Walls Date B y Set-up
Date By INSULATION Date By
B G 1 Slab Insulation Floors Final
Date By Date By Date By
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date By �_ (1�
Date By WALLBOARD NAILING 8� STr�C���fwc—�SL�,
D.W.V. Date By
Date By FINAL INSPECTION �t�xT a �v `11�
Water Line Date By
Date ' � By
B � _ t���8 � y 7/ S .
y
Y�
� 03 � ss � .. �s h . 's Rcs o Z 03
rk
y3�/� � zc�-� Q-✓ .�i�� / can--- y � � �.-1-�s
C
Z
� ct�s�.r
a
Mrl �
e� o co, /1K s /7 2, I c
-ft) ,�1 S C-.-- /L
( c �y
7 �J iz �-llr rS t"D
/
sioi�-
11�77C � /&
IJGr 2 —
MASON COUNTY 360-427-9670 Shelton ext.352
360-275-4467 Belfair ext.352
COMMUNITY SERVICES 360-482-5269 Elma ext.352
Inspection Hotline 360-427-7262
Building, Planning,Environmental Health,Community Health
GO 615 W. Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: —Z IZ/3- x?7 9
ADDRESS/LOCATION: /020 E S4&k-)lCr-eS+-LNSkeI1 kt
FINDINGS:
j ookzr h,¢S (d &Ai4ie o mare pyrwrosits akS
V G z0a
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
❑ Call for re-inspection when corrections are made before proceeding with any further work.
,,OMake corrections, items will be checked on the next inspection.
❑ OK to
Date: ^Z- 7 ❑ Please contact our office regarding possible
Department: structural damage incurred by recent
Inspector:_ M/ta,J "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
Q
17-September-2008 R]E vE��E D
SEP 19 2008
Debbera Coker
Mason County Building Department MASON CO U NM*S( ►y COUNTY
Lead Plans Examiner
Debbera,
As per our telephone conversation today(17-Sep-08), I am writing you to request an
extension of Permit No, BLD93-00999. As has been the case since the inception of this
project, my wife and I have done all of the construction. Since we both work regular
jobs the only time we have to work on the building is on the weekends and some
evenings. However, since the permit was amended in January 2008, we have made
progress. Demolition to provide space for the spiral staircase to access the attic has been
done. Structural members to support the attic floor and the new walls have been framed.
We have also continued with the installation of the house's exterior trim and siding.
As to the fees owed. We, my Wife and 1, honestly thought we had paid all fees this past
January. After researching our bank account records, we discovered that we were in
error. Please accept our apologies.
Thank you for your time and understanding.
James W. Killian
Brenda K. Killian
Page 1 of 1
James W. Killian
From: "Debbera Coker" <Dlc@co.mason.wa.us>
To: <killianjw@hotmail.com>
Cc: 'Bryan Adams" <BryanA@co.mason.wa.us>
Sent: Wednesday, September 17, 2008 8:41 AM
Attach: Debbera Coker.vcf
Subject: Request an extension on the permit
Hi Mr. Killian,
In order to keep your permit active our office will require a letter from you requesting that permit number
BLD93-00999 be extended along with an explanation. Please keep in mind that permits remain active for 6-
months which means that inspections must be performed at least every 6-months. The last activity that
occurred on your permit was January 8, 2008 when the stairway revisions were approved. During that time you
were also told that a re-activation fee would be due when an inspection was scheduled. Based upon your
explanation that the power outage was causing a hardship it appears that staff believed you would pay the fee
within a reasonable time.
When I spoke with you on the telephone I was in error when I told you that a fee was not due. In order to re-
activate the permit 50% of the original permit fee, $226.50 ($453.00 x 50%), shall be required along with the
request to extend the permit. Since a progress inspection has not occurred since June 5, 2006 the fee and
request must be received within 21-days from September 16, 2008 or by October 7, 2008.
Once the extension is granted you will need to keep the permit active by requesting progress inspections every
6-months.
Debbera Coker
Mason County Building Department
Lead Plans Examiner
Phone: (360)427-9670 ext 510
FAX: (360) 427-7798
e-Mail: dlc@co.mason.wa.us
9/17/2008
(9/19/2008) Debbera Coker- Permit renewal, permit# BLD93-00999 Page 1
From: Debbera Coker
To: killianjw@hotmail.com
Date: 9/19/2008 10:04 AM
Subject: Permit renewal, permit # BLD93-00999
Attachments: Debbera Coker.vcf
Hi Mr. Killian,
Our office has received your request to extend and permit renewal fee of$226.50. Your permit is extended until March 19, 2009.
In order to keep your permit active and to avoid renewal fees,be sure to request a progress inspection by March 19,2009 and
request inspections every 6-months thereafter.
Debbera Coker
Mason County Building Department
Lead Plans Examiner
Phone: (360)427-9670 ext510
FAX: (360)427-7798
e-Mail: dlc(abco.mason.wa.us
Page 1 of 1
t ,
Debbera Coker - Request an extension on the permit
From: Debbera Coker
To: killianjw@hotmail.com
Subject: Request an extension on the permit
CC: Adams, Bryan
Hi Mr. Killian,
In order to keep your permit active our office will require a letter from you requesting that permit number
BLD93-00999 be extended along with an explanation. Please keep in mind that permits remain active for 6-
months which means that inspections must be performed at least every 6-months. The last activity that
occurred on your permit was January 8, 2008 when the stairway revisions were approved. During that time you
were also told that a re-activation fee would be due when an inspection was scheduled. Based upon your
explanation that the power outage was causing a hardship it appears that staff believed you would pay the fee
within a reasonable time.
When I spoke with you on the telephone I was in error when I told you that a fee was not due. In order to re-
activate the permit 50% of the original permit fee, $226.50 ($453.00 x 50%), shall be required along with the
request to extend the permit. Since a progress inspection has not occurred since June 5, 2006 the fee and
request must be received within 21-days from September 16, 2008 or by October 7, 2008.
Once the extension is granted you will need to keep the permit active by requesting progress inspections every
6-months.
about:blank 9/17/2008
5/8/2014
Case Activity Listing 10:42:32AM
Case#: BLD2008-00031 �e, /Dor6
t goueei b
Assigned Done
Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA010 Application Received 1/8/2008 1/9/2008 None DONE CMH 1/9/2008 CMH
REACTIVATED PERMIT.
BLD13007 Plan Revisions Submitted 1/9/2008 None DONE CMH 1/9/2008 CMH
Revision submitted changing stairway from pulldown to spiral.
BLDB400 Building Review Revision 1/9/2008 1/9/2008 None DONE LAW LAW 1/9/2008 LAW
BLDA100 Approved for Issuance 1/9/2008 None DONE CMH 1/9/2008 CMH
BLDA505 Issue Revisions 1/11/2008 None DONE KS 1/11/2008 KS
BLDA540 Print Inspection Card 1/11/2008 None DONE KS 1/11/2008 KS
BLDA985 LTR-Notice Final Inspection 11/12/2008 None DONE RTB, 11/12/2008 RTB
letter sent due to inactivity 11-12-08 RTB
BLDA910 Meeting 11/17/2008 None DONE RTB 11/17/2008 RTB
orig.permit b1d93-00099 was reinstated fee was paid final letter sent in error 11-17-08 RTB
BLDC105 Progress Inspection 3/19/2010 None DONE TW 3/19/2010 GMM
insulation installed.
BLDA560 Permit Cancelled 11/20/2013 None DONE GMM 11/20/2013 GMM
NOTICE TO OBTAIN FINAL INSPECTION WAS MAILED 11/12/2008.PERMIT WAS CANCELLED DUE TO OVER 180 DAYS OF INACTIVITY. TO OBTAIN A FINAL INSPECTION PLEASE
CONTACT THE PERMIT CENTER 1.360.427.9670 EXT.352.
Page 1 of 1 �� /CaseActivity..rpt
5/3/2017
Case Activity Listing
2:53:46PM
Case #: BLD2008-00031
P14
Parcel #: 221337690034
Description: REACTIVATED PERMIT-original building permit number: BLD93-00099 See old permit for additional information.
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA010 Application Received 1/8/2008 1/9/2008 None DONE CMH 1/9/2008 CMH
REACTIVATED PERMIT.
BLD13007 Plan Revisions Submitted 1/9/2008 None DONE CMH 1/9/2008 CMH
Revision submitted changing stairway from pulldown to spiral.
BLDB400 Building Review Revision 1/9/2008 1/9/2008 None DONE LAW LAW 1/9/2008 LAW
BLDA100 Approved for Issuance 1/9/2008 None DONE CMH 1/9/2008 CMH
BLDA505 Issue Revisions 1/11/2008 None DONE KS 1/11/2008 KS
BLDA540 Print Inspection Card 1/11/2008 None DONE KS 1/11/2008 KS
BLDA985 LTR-Notice Final Inspection 11/12/2008 None DONE RTB 11/12/2008 RTB
letter sent due to inactivity 11-12-08 RTB
BLDA910 Meeting 11/17/2008 None DONE RTB 11/17/2008 RTB
orig.permit bld93-00099 was reinstated fee was paid final letter sent in error 11-17-08 RTB
BLDC105 Progress Inspection 3/19/2010 None DONE TW 3/19/2010 GMM
insulation installed.
BLDA560 Permit Cancelled 11/20/2013 None DONE GMM 11/20/2013 GMM
NOTICE TO OBTAIN FINAL INSPECTION WAS MAILED 11/12/2008.PERMIT WAS CANCELLED DUE TO OVER 180 DAYS OF INACTIVITY. TO OBTAIN A FINAL INSPECTION PLEASE
CONTACT THE PERMIT CENTER 1.360.427.9670 EXT.352.
Page 1 of 2 CaseActivity..rpt
Case Activity Listing 5/3/2017
2:53:46PM
Case #: BLD2008-00031
Parcel #: 221337690034
Description: REACTIVATED PERMIT- original building permit number: BLD93-00099 See old permit for additional information.
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA920 Miscellaneous Action 5/8/2014 None DONE DLC 5/8/2014 DLC
Met with Mrs.K who was told that letter was mailed concerning the project.We agreed that they would pay 50%of permit fee(453.@50%)$226.50 no later than 6.1.2014 and request an inspection. If not
re-instated by 6.1.2014 the permit expires and a new permit would be required.-dlc5.8.2014
BLDA900 Telephone Call 6/4/2014 None DONE MKW 6/4/2014 MKW
Spoke to Brenda.Asked if we could reschedule onsite progress inspection until 6-17-14 due to booking issues on her scheduled date of 6-5-14. Brenda agreed and appointment was rescheduled for that date
and was noted in the file as well as Tidemark.(6-4-14 MKW)
BLDC105 Progress Inspection 6/17/2014 None DONE MAU 6/19/2014 MKW
Insulation work and upper stairs.
BLDC105 Progress Inspection 12/1/2014 12/1/2014 None DONE AMP 12/1/2014 AMP
PROGRESS AT THE COUNTER.INSULATION COMPLETED
BLDC105 Progress Inspection 6/1/2015 6/1/2015 None DONE AMP 6/1/2015 AMP
Progress/Phone:Continued progress with insulation,framing in a stairway to the attic.
BLDC105 Progress Inspection 11/13/2015 None DONE AMP 11/13/2015 AMP
Progress/Phone-More insulation in,stairs roughed in for attic.
BLDC105 Progress Inspection 5/12/2016 5/12/2016 None DONE AMP 5/12/2016 AMP
Progress/Phone:Stairs complete in attic
BLDC105 Progress Inspection 11/4/2016 11/4/2016 None DONE MLW 11/4/2016 MLW
PHONE/PRORESS:PUTTING MORE INSULATION IN THE KITCHEN CURRENTLY
Page 2 of 2 CaseActivity-rpt
Case Activity Listing 9/17/2008
8:43:29AM
P14
Case #: BLD93-00999
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA985 LTR-Notice Final Inspection 11/29/2007 None DONE TFR 11/29/2007 TFB
BLDB007 Plan Revisions Submitted 1/8/2008 None DONE CMH 1/9/2008 CMH
Revision submitted changing stairway from pulldown to spiral.
BLDM500 Hold 1/8/2008 Hold DONE CMH 1/8/2008 CMH
Permit re-activated-applicant will pay reactivation fee's once revision is complete since there was a power outage when revision was submitted. cmh 01-8-2008
BLDB400 Building Review Revision 1/8/2008 1/8/2008 None DONE LAW 1/8/2008 LAW
BLDA510 Reprint Building Permit 1/11/2008 None DONE KS 1/11/2008 KS
BLDA987 LTR-Reinstate/Final 9/16/2008 None DONE BTA 9/16/2008 BTA
A drive by was conducted by MAL and a"Final Notice to Comply"letter was left on site with the owner.They will have 21 days to comply and a$68 fee will be due prior to each inspection until final pass.
BLDA920 Miscellaneous Action 9/17/2008 None DONE DLC 9/17/2008 DLC
The following e-mail was sent to Mr.Killian at"killianjw@hotmail.com"on 9/17/2008:
Hi Mr.Killian,
In order to keep your permit active our office will require a letter from you requesting that permit number BLD93-00999 be extended along with an explanation. Please keep in mind that permits remain
active for 6-months which means that inspections must be performed at least every 6-months. The last activity that occurred on your permit was January 8,2008 when the stairway revisions were approved.
During that time you were also told that a re-activation fee would be due when an inspection was scheduled. Based upon your explanation that the power outage was causing a hardship it appears that staff
believed you would pay the fee within a reasonable time.
When I spoke with you on the telephone I was in error when I told you that a fee was not due. In order to re-activate the permit 50%of the original permit fee,$226.50($453.00 x 5001a),shall be required
along with the request to extend the permit. Since a progress inspection has not occurred since June 5,2006 the fee and request must be received within 21-days from September 16,2008 or by October 7,
2008.
Once the extension is granted you will need to keep the permit active by requesting progress inspections every 6-months.
Debbera Coker
Page 5 of 5 CaseActivity..rpt
9/17/2008
8:f6AM
Fees Associated With
IP14
Case #: BLD93-00999
Due
Type Description Revenue Account Number Date Paid By Fees Paid History
PRMT Building Permit Fee 001.125.140322.10.00.0000 10/22/200p!, NJP 226.50 226.50 0.00
Building Permit Fee 001.125.140.322.10.00.0000 10/22/200'n NJP 0.00 0.00
CPPC Canceled Permit/Plan Check 001.125.140.345.83.00.0000 10/19/200. KS 226.50 f 226.50 0.00
Canceled Permit/Plan Check . 00,1.125.140.345.83.00.0000 10/19/20 KS 0.00 0:00
( EXPR Final Expired Permit 001.125.140.322.80.00.0000 9/16/2008 BTA 68.00 0.00 68.Odti
PRMT Building permit....* 001.125.140.322.10.00.0000 8/27/1993 KS 453.00 453.00 0.00
Building permit....* 001.125.140.322.10.00.0000 8/27/1993 KS 0.00 0.00
PLCK Building plan check* 001.125.140.345.83.00.0000 8/27/1993 KS 226.50 226.50 0.00
Building plan check* 001.125.140.345.83.00.0000 8/27/1993 KS 0.00 0.00
RADN Radon Kit 341.70 8/27/1993 KS 8.00 8.00 0.00
Radon Kit 341.70 8/27/1993 KS 0.00 0.00
PLM Plumbing Fee 001.125.140.322.10.00.0000 8/27/1993 KS 60.00 60.00 0.00
Plumbing Fee 001.125.140.322.10.00.0000 8/27/1993 KS 0.00 0.00
MCH Mechanical Fee 001.125.140.322.10.00.0000 8/27/1993 KS 39.00 39.00 0.00
Mechanical Fee 001.125.140.322.10.00.0000 8/27/1993 KS 0.00 0.00
STFE Building State Fee 650.170.010.386.00.05.0000 8/27/1993 KS 4.50 4.50 0.00
Building State Fee 650.170.010.386.00.05.0000 8/27/1993 KS 0.00 0.00
EHFE EH review charge$25 ? 8/27/1993 KS 0.00 0.00 0.00
Total Fees: $1,312.00 Paid: $1,244.00 TOTAL REMAINING DUE: $68.00
Page 1 of 1 CaseFees.rpt
Case Activity Listing 9/17/2008
8:05:29AM
Case #: BLD93-00999
Assigned Done
Activity Description Date] Date 2 Date 3 Hold Disp To By Updated Updated By
BLDB400 Building Review Revision 1/8/2008 None LAW 1/8/2008 CMH
BLDA010 Application received 6/30/1993 None 6/30/1993 FVC
BLDB129 Sent to Planning 6/30/1993 None 6/30/1993 FVC
BLDB130 Planning Review 7/1/1993 7/1/1993 None DONE MMS 7/1/1993 MMS
BLDB110 Structural Plan Review 7/1/1993 8/13/1993 None DONE DH 8/13/1993 WLC
BLDB120 WSEC Compliance Review 8/13/1993 8/16/1993 None FINI DLF 8/16/1993 DF
BLDB200 Environmental Health Review 8/16/1993 8/20/1993 None DONE MMT 8/20/1993 MMT
Per condition
BLDB210 Water Adequacy 8/20/1993 8/20/1993 None HOLD MMT 8/20/1993 MMT
Need water adequacy. sent letter on 8/20
BLDB210 Water Adequacy 8/24/1993 8/24/1993 None DONE MMT 8/24/1993 MMT
BLDA100 Approved For Issuance 8/25/1993 None DONE KS 8/25/1993 KS
BLDA500 (F) Issue building permit 8/27/1993 None DONE KS 8/27/1993 KS
Page 1 of 5 CaseActivity..rpt
9/17/2008
Case Activity Listing M
8:05:29A05:29M
��
Case #: BLD93-00999
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC100 Inspection 2/4/1994 2/4/1994 2/4/1994 None DH 2/4/1994 DWH
update doing work them self 180 day ext
BLDC100 Inspection 8/10/1994 8/10/1994 8/10/1994 None DONE DH 8/15/1994 CKR
PROGRESS ONLY PRE-FRAMING INSPECTION FIRST FLOOR AT THIS TIME NOT PLUMBING
BLDC100 Inspection 2/27/1995 3/1/1995 None NSA DPB 3/1/1995 DPB
Progress inspection. Progress is being made.
BLDC100 Inspection 4/21/1995 4/24/1995 None NSA DPB 4/24/1995 DPB
Courtesy insp only.
BLDC110 Footing inspection 7/14/1995 7/17/1995 7/17/1995 None PASS DH 7/18/1995 DWH
changed footing for garage.
BLDC100 Inspection 8/19/1996 8/19/1996 8/19/1996 None DONE DH 8/19/1996 DWH
Progress only.
BLDC250 Permit Extension 3/21/1997 8/27/1997 3/24/1997 None EXTD TLG 3/24/1997 TLG
Roofing installed. Financial,medical and weather related reasons necessitate request for extension
.� BLDC250 Permit Extension 9/6/1997 3/6/1998 2/6/1998 None EXTD TLG 2/6/1998 TLG
Extended per letter request.Next extension must be by PROGRESS Inspection
BLDC251 Notification of Expiration 2/6/1998 2/6/1998 None TLG 2/6/1998 TLG
sent copy of print out to owner. Noting next inspection must be by propzre5 on site
4 BLDC250 Permit Extension 8/31/1998 9/8/1998 None DONE SKM 9/8/1998 SKM
RECIVED REQUEST FOR PERMIT EXTENTION,ASKED BY WARREN TO ADD.
BLDB007 Plans Revisions Submitted 9/8/1998 None DONE SKM 9/8/1998 SKM
REVISIONS COMPLETE,I DO NOT KNOW IF THERE IS ADDED SQ.'LEFT MESSAGE WITH APPLTCANT,PLANS ARE IN MY OUTSIDE BOX.
r
Page 2 of 5 CaseActivity..rpt
9/17/2008
Case Activityg Listin M
8:05:29A05:29M
I4 Case #: BLD93-00999
i
Assigned Done
Activity Description Date I Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA560 Permit cancelled 3/9/1999 None DONE KW 3/9/1999 KW
BLDC100 Inspection 6/3/1999 6/3/1999 6/3/1999 None DONE TFR 6/17/1999 KW
PERMIT CANCELLED HAVE OWNER REINSTATE PERMIT AND SCHEDULED NEW INSPECTIO .
BLDC100 Inspection 6/10/1999 6/10/1999 6/10/1999 None PASS TFR 6/17/1999 KW
BLDC100 Inspection 4/6/2000 '/6/2000 None PASS TFR 4/7/2000 KW
!�r,-BLDA900 Telephone call 4/26/2000 4/26/2000 None WC DLC 4/26/2000 DLC
Exempt from 1.6 gal water closet requirements as it became effective on 7/1/93. killian's applied for permit on 6/30/93. 3.0 gallon is OK.-DC A6100
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/19/2000 KLW
SUPPLY ON SERVICES DWV TESTED W/WATER WILL REQ RETEST AFTER ELECTRIC INSTALL
SUPPLY INSTALLATION INSTRUCTION ON PEX RADIANT TUBING,TEST AT 15 LBS,WITNESSED.
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/21/2000 KLW
J
ACCORDIG TO THE INSTALLER THE PEX IS NOW A 100 PSI,I INFORMED HIM THAT WE COULD NOT INSPECT UNTIL NEXT LOOK,SO I REQUESTED THAT HE PROVIDES A LETTER
OF-CERTIFICATION AND THAT HE AND THE HOMEOWNER SIGN,DANA HERRON
OK TO POUR FLOOR AT OWN RISK.
BLDC050 Pre-Site Inpection 7/20/2000 None DONE DWH 7/20/2000 DWH
aCCORDING TO THE INSTALLER HE INCREASED THE PRESSURE TO 100 PSI ON THE PEX TUBING.I INFORMED HIM THAT WE WOULD NOT BE ABLE TO INSPECT UNTIL NEXT
•WEEK,SO I REQUESTED THAT HE SEND A LETTER OF CERTIFICATION THAT THE PRESSURE IS ON AND TO HAVE IT SIGNED BY THE HOMEOWNER ALSO WHO IS ON SITE.
BLDC100 Inspection 7/20/2000 7/20/2000 None PASS TFR 7/21/2000 KLW
int gas test pass
BLDA920 Miscellaneous Action 4/9/2003 None RNEW PIB 4/9/2003 PIB
PERMIT REIN D 10-22-0 P 1/2 ORIGINAL FEE-RECEIPT#61000. C9 E50
----------------------------------------------------
Page 3 of 5 CaseActivity..rpt
Case Activity Listing 9/17f2008
8:05:29AM
NP14 Case#: BLD93-00999
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA510 Reprint Building Permit 4/9/2003 None DONE PIB 4/9/2003 PIB
BLDC105 Progress Inspection 4/4/2003 4/10/2003 None PASS RLS 4/I1/2003 KLW
PROGRESS PASS,PHOTOS IN FILE.
BLDC105 Progress Inspection 10/29/2003 10/29/2003 None PASS LDK 10/31/2003 KLW
PROGRESS PASS,ELECTRICAL,SKIRT BOARDS AND SOME TRIM(EXT)
BLDA540 Print Inspection Card 10/19/2004 None DONE KS 10/19/2004 KS
BLDA510 Reprint Building Permit 10/19/2004 None DONE KS 10/19/2004 KS
L/
BLDC140 Framing/Plumbing/Mechanical 4/4/2005 4/13/2005 None FAIL TFR 4/14/2005 KLW
FPMP FAIL, 1.PUT DWV UNDER TEST,2.HAVE ALL ZONE ON RADIANT HEAT ON NEXT INSP,3.INSTALL SECONDARY AQUASTAT ON BOILED,4.INSTALL FIRE BLOCKING AT
STAIR AND ALL CHASES,5.INSTALL ANCHOR BOLTS WAN 12"OF ALL SPLITS IN PLATES,6.INSTALL Y OF WEB IN FILL BOTH SIDE AT I JOIST ALTERED BY PLUMBER AT DOWN
STAIRS TOILET,7.COMPLETE TOP PLATE PENETRATION DRAFT STOPPING.
BLDC100 Inspection 4/25/2005 4/25/2005 None DONE LAW 4/26/2005 LAW
I met with the owner to go over the items left on the last correction notice.
BLDC140 Framing/Plumbing/Mechanical 6/9/2005 w 6/9/2005 None FAIL LAW 6/13/2005 KLW
ITEM#5 NOT COMPLETE FROM LAST NOTICE ITEM LOCATED IN CRAWL OK TO INSULATE WALLS
BLDC105 Progress Inspection 12/5/2005 1 12/6/2005 None PASS LDK 12/8/2005 KLW
PROGRESS OK,APPEARS TO HAVE STARTED INSULATING
BLDC105 Progress Inspection 5/31/2006 6/5/2006 None PASS TFR 6/6/2006 KLW
STARTED SIDING
�C9, /
Pa e 4 CaseActivity..rpt
Case Activity Listing 9/1772008
8:05:29AM
11 Case #: BLD93-00999
014
Assigned Done
Activity Description Date I Date 2 Date 3 Bold Disp To By Updated Updated By
BLDA985 LTR-Notice Final Inspection 11/29/2007 None DONE TFR 11/29/2007 TFR
BLDB007 Plan Revisions Submitted 1/8/2008 None DONE CMH 1/9/2008 CMH
Rev n submitted changing stairway from pulldow fo
BLDM500 Hold 1/8/2008 Hold DONE- CMH 1/8/2008 CMH
Permit re-activated 7-applicant will pay reactivation fee's once revision is complete since there was a power outage when revision was submitted. cmh 01-8-2008
LDB400 Building Review Revision 1/8/2008 1/8/2008 None DONE LAW 1/8/2008 W
BLDA510 Reprint Building Permit 1/11/2008 None DONE KS 1/11/2008 KS
BLDA987 instat F' /9/16/2008 None DONE BTA 9/16/2008 BTA
A drive by �coby L d "Final Notice to Comply"letter was left on site with the owner.They will have 21 days to comply and a$68 fee will be due prior to each inspection until final pass.
Page 5 of 5 CaseActivity..rpt
Case Activit Listin 2/4/2005
� y g 4:38:56PM
Case#: BILD93-00999
iT
Assigned Done
ActivitN, Description Date l Date 2 Date 3 l d Disp To By Updated Updated By
BLDA010 Application received 6/30/1993 None 6/30/1993 1"VC
BLDB 129 Sent to Planning 6/30/1993 None 6/30/1993 FVC
BLDB130 Planning Review 7/1/1993 7/1/1993 None DONE MMS 7/1/1993 MMS
BLDB110 Structural Plan Review 7/1/1993 8/13/1993 None DONE DH 8/13/1993 WLC
BLDB120 WSEC Compliance Review 8/13/1993 8/16/1993 None FINI DLF 8/16/1993 DF
BLDB200 Environmental Health Review 8/16/1993 8/20/1993 None DONE MMT 8/20/1993 MMT
Per condition
BLDB210 Water Adequacy 8/20/1993 8/20/1993 None HOLD MMT 8/20/1993 MMT
Need water adequacy. sent letter on 8/20
BLDB210 Water Adequacy 8/24/1993 8/24/1993 None DONE MMT 8/24/1993 MMT
BLDA100 Approved For Issuance 8/25/1993 None DONE KS 8/25/1993 KS
BLDA500 (F)Issue building permit 8/27/1993 None DONE KS 8/27/1993 KS
BLDC100 Inspection 2/4/1994 2/4/1994 2/4/1994 None DH 2/4/1994 DWH
update doing work them self 180 day ext
Page 1 of 4 CaseActivity..rpt
Case ActivityListing 2/4/2
g 4:38:56PMPM
Case #: BLD93-00999
P14
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC100 Inspection 8/10/1994 8/10/1994 8/10/1994 None DONE D11 8/15/1994 CKR
PROGRESS ONLY PRE-FRAMING INSPECTION FIRST FLOOR AT THIS TIME NOT PLUMBING
BLDC100 Inspection 2/27/1995 3/1/1995 None NSA DPB 3/1/1995 D1313
Progress inspection. Progress is being made.
BLDC100 Inspection 4/21/1995 4/24/1995 None NSA D11B 4/24/1995 DPB
Courtesy insp only.
BLDC110 Footing inspection 7/14/1995 7/17/1995 7/17/1995 None PASS DH 7/18/1995 DWH
changed footing for garage.
BLDC100 Inspection 8/19/1996 8/19/1996 8/19/1996 None DONE DH 8/19/1996 DWH
Progress only.
BLDC250 Permit Extension 3/21/1997 8/27/1997 3/24/1997 None EXTD TLG 3/24/1997 TLG
Roofing installed. Financial,medical and weather related reasons necessitate request for extension
BLDC250 Permit Extension 9/6/1997 3/6/1998 2/6/1998 None EXTD TLG 2/6/1998 TLG
Extended per letter request. Next extension must be by PROGRESS Inspection
BLDC251 Notification of Expiration 2/6/1998 2/6/1998 None TLG 2/6/1998 TLG
sent copy of print out to owner. Noting next inspection must be by progress on site
BLDC250 Permit Extension 8/31/1998 9/8/1998 None DONE SKM 9/8/1998 SKM
RECIVED REQUEST FOR PERMIT EXTENTION,ASKED BY WARREN TO ADD.
BLDB007 Plans Revisions Submitted 9/8/1998 None DONE SKM 9/8/1998 SKM
REVISIONS COMPLETE,I DO NOT KNOW IFTHERE IS ADDED SQ!LEFT MESSAGE WITH APPLICANT,PLANS ARE IN MY OUTSIDE BOX.
BLDA560 Permit cancelled 3/9/1999 None DONE KW 3/9/1999 KW
Page 2 of 4 CaseActivity..rpt
Case Activity Listing 2/4/2005
4:38:56PM
11 Case #: BILD93-00999
710
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC100 Inspection 6/3/1999 6/3/1999 6/3/1999 None DONE TFR 6/17/1999 KW
PERMIT CANCELLED HAVE OWNER REINSTATE PERMIT AND SCHEDULED NEW INSPECTION.
BLDC100 Inspection 6/10/1999 6/10/1999 6/10/1999 None PASS "1'FR 6/17/1999 KW
BLDC100 Inspection 4/6/2000 4/6/2000 None PASS TFR 4/7/2000 KW
BLDA900 Telephone call 4/26/2000 4/26/2000 None WC DLC 4/26/2000 DLC
Exempt from 1.6 gal water closet requirements as it became effective on 7/1/93. killian's applied for permit on 6/30/93. 3.0 gallon is OK.-DC 426/00
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/21/2000 KLW
ACCORDIG TO THE INSTALLER THE PEX IS NOW A 100 PSI,I INFORMED HIM THAT WE COULD NOT INSPECT UNTIL NEXT LOOK,SO I REQUESTED THAT HE PROVIDES A LETTER
OF CERTIFICATION AND THAT HE AND THE HOMEOWNER SIGN,DANA HERRON
OK TO POUR FLOOR AT OWN RISK.
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/19/2000 KLW
SUPPLY ON SERVICES DWV TESTED W/WATER WILL REQ RETEST AFTER ELECTRIC INSTALL
SUPPLY INSTALLATION INSTRUCTION ON PEX RADIANT TUBING,TEST AT 15 LBS,WITNESSED.
BLDC050 Pre-Site Inpection 7/20/2000 None DONE DWH 7/20/2000 DWH
aCCORDING TO THE INSTALLER HE INCREASED THE PRESSURE TO 100 PSI ON THE PEX TUBING.I INFORMED HIM THAT WE WOULD NOT BE ABLE TO INSPECT UNTIL NEXT
WEEK,SO I REQUESTED THAT HE SEND A LETTER OF CERTIFICATION THAT THE PRESSURE IS ON AND TO HAVE IT SIGNED BY THE HOMEOWNER ALSO WHO IS ON SITE.
BLDC100 Inspection 7/20/2000 7/20/2000 None PASS TFR 7/21/2000 KLW
int gas test pass
BLDA920 Miscellaneous Action 4/9/2003 None RNEW PIB 4/9/2003 PIB
PERMIT REINSTATED 10-22-02. PAID 1/2 ORIGINAL FEE-RECEIPT#61000.
BLDA510 Reprint Building Permit 4/9/2003 None DONE PIB 4/9/2003 PIB
Page 3 of 4 CaseActivity-rpt
Case Activity Listing 2/4/2005
4:38:56PM
Case#: BM93-00999
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC105 Progress Inspection 4/4/2003 4/10/2003 None PASS RLS 4/11/2003 KLW
PROGRESS PASS,PHOTOS IN FILE.
BLDC105 Progress Inspection 10/29/2003 10/29/2003 None PASS LDK 10/31/2003 KLW
PROGRESS PASS,ELECTRICAL,SKIRT BOARDS AND SOME TRIM(EXT)
BLDA540 Print Inspection Card 10/19/2004 None DONE KS 10/19/2004 KS
BLDA510 Reprint Building Permit 10/19/2004 None DONE KS 10/19/2004 KS
Page 4 of 4 CaseActivity..Tpt
4/9/2003
Case Activity Listing 4:07:56PM
' T I D E M A R K Case#: BLD93-00999
COMPUTER SYSTEMS, INC
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated It BJ
BLDA010 Application received 6/301993 None 6/30i1993 FVC
BLDB129 Sent to Planning 6/30/1993 None 6/30/1993 FVC
BLDB130 Planning Review 7/1/1993 7/1/1993 None DONE MMS 7/1/1993 MMS
BLDB110 Structural Plan Review 7/1/1993 8/13/1993 None DONE DH 8/13/1993 WLC
BLDB120 WSEC Compliance Review 8/13/1993 8/16/1993 None FINI DLF 8/16/1993 DF
BLDB200 Environmental Health Review 8/16/1993 8/20/1993 None DONE MMT 8/20/1993 MMT
Per condition
BLDB210 Water Adequacy 8/20/1993 8/20/1993 None HOLD MMT 8/20/1993 MMT
Need water adequacy. sent letter on 8/20 -
BLDB210 Water Adequacy 8/24/1993 8/24/1993 None DONE MMT 8/24/1993 MMT
BLDA100 Approved For Issuance 8/25/1993 None DONE KS 8/25/1993 KS
BLDA500 (F)Issue building permit 8/27/1993 None DONE KS 8/27/1993 KS
BLDC100 Inspection 2/4/1994 2/4/1994 2/4/1994 None DH 2/4/1994 DWH
update doing work them self 180 day ext
Page 1 of 3 CaseAcGvity.apt
Case Activity Listing 4/9/2003
4:07:56PM
T I D E M A R K Case 4: BLD93-00999
COMPUTER SYSTEMS, INC.
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated $y
BLDC100 Inspection 8/10/1994 8/10/1994 8/10/1994 None DONF, DH 8/15/1994 CKR
PROGRESS ONLY PRE-FRAMING INSPECTION FIRST FLOOR AT THIS TIME NOT PLUMBING
BLDC100 Inspection 2/27/1995 3/1/1995 None NW DPB 3/1/1995 DPB
Progress inspection. Progress is being made.
BLDC100 Inspection 4/21/1995 4/24/1995 None NSA DPB 4/24/1995 DPB
Courtesy insp only.
BLDC110 Footing inspection 7/14/1995 7/17/1995 7/17/1995 None PASS DH 7/18/1995 DWH
changed footing for garage.
BLDC100 Inspection 8/19/1996 8/19/1996 8/19/1996 None DONE DH 8/19/1996 DWH
Progress only.
BLDC250 Permit Extension 3/21/1997 8/27/1997 3/24/1997 None EXTD TLG 3/24/1997 TLG
Roofing installed. Financial, medical and weather related reasons necessitate request for extension
BLDC250 Permit Extension 9/6/1997 3/6/1998 2/6/1998 None EXTD TLG 2/6/1998 TLG
Extended per letter request Next extension must be by PROGRESS Inspection
BLDC251 Notification of Expiration 2/6/1998 2/6/1998 None TLG 2/6/1998 TLG
sent copy of print out to owner. Noting next inspection must be by progress on site
BLDC250 Permit Extension 8/31/1998 9/8/1998 None DONE SKM 9/8/1998 SKM
RELIVED REQUEST FOR PERMIT EXTENTION,ASKED BY WARREN TO ADD.
BLDB007 Plans Revisions Submitted 9/8/1998 None DONE SKM 9/8/1998 SKM
REVISIONS COMPLETE,I DO NOT KNOW IF THERE IS ADDED SQ.'LEFT MESSAGE WITH APPLICANT,PLANS ARE IN MY OUTSIDE BOX.
BLDA560 Permit cancelled 3/9/1999 None DONE KW 3/9/1999 KW
Page 2 of 3 CaseActivity-rpt
Case Activity Listing 4/9/2003
4:07:56PM
T I D E M A R K Case#: BLD93-00999
COMPUTER SYSTEMS. INC.
Assigned Done
Activity Description Date 1 Date 2 Date 3 Bold Disp To By Updated Updated By
BLDC100 Inspection 6/3/1999 6/3/1999 6/3/1999 None DONE TFR 6/17/1999 KW
PERMIT CANCELLED HAVE OWNER REINSTATE PERMIT AND SCHEDULED NEW INSPECTION.
BLDC100 Inspection 6/10/1999 6/10/1999 6/10/1999 None PASS TFR 6/17/1999 KW
BLDC100 Inspection 4/6/2000 4/6/2000 None PASS TFR 4/7/2000 KW
BLDA900 Telephone call 4/26/2000 4/26/2000 None WC DLC 4/26/2000 DLC
Exempt from 1.6 gal water closet requirements as it became effective on 7/l/93. killian's applied for permit on 6/30/93. 3.0 gallon is OK.-DC 426/00
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/19/2000 KLW
SUPPLY ON SERVICES DWV TESTED W/WATER WILL REQ RETEST AFTER ELECTRIC INSTALL
SUPPLY INSTALLATION INSTRUCTION ON PEX RADIANT TUBING,TEST AT 15 LBS,WITNESSED.
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/21/2000 KLW
ACCORDIG TO THE INSTALLER THE PEX IS NOW A 100 PSI,I INFORMED HIM THAT WE COULD NOT INSPECT UNTIL NEXT LOOK,SO I REQUESTED THAT HE PROVIDES A LETTER
OF CERTIFICATION AND THAT HE AND THE HOMEOWNER SIGN,DANA HERRON
OK TO POUR FLOOR AT OWN RISK.
BLDC100 Inspection 7/20/2000 7/20/2000 None PASS TFR 7/21/2000 KLW
int gas test pass
BLDC050 Pre-Site Inpection 7/20/2000 None DONE DWH 7/20/2000 DWH
aCCORDING TO THE INSTALLER HE INCREASED THE PRESSURE TO 100 PSI ON THE PEX TUBING.I INFORMED HIM THAT WE WOULD NOT BE ABLE TO INSPECT UNTIL NEXT
WEEK,SO I REQUESTED THAT HE SEND A LETTER OF CERTIFICATION THAT THE PRESSURE IS ON AND TO HAVE IT SIGNED BY THE HOMEOWNER ALSO WHO IS ON SITE.
BLDA920 Miscellaneous Action 4/9/2003 None RNEW PIB 4/9/2003 PIB
RMIT REINSTATED 10-22-02. PAID 1/2 ORIGINAL FEE-RECEIPT#61000.
BLDA510 Reprint Building Permit 4/9/2003 None DONE PIB 4/9/2003 PIB
Page 3 of 3 CaseActivity-rpt
5/8/2014
Case Activity Listing 11:08:02AM
Case #: BLD93-00999
Assigned Donc
Activity Description Date 1 Date 2 Date 3 -.Hold Disp To By 1 11,1ted Updated By
BLDC249 Permit Renewal 9/19/2008 None DONE DLC 9/19/2008 DLC
Fee paid to renew. Extends permit 6 months until March 19,2009. The following e-mail was sent to Mr.K on 9/19/2009:
Hi Mr.Killian,
Our office has received your request to extend and permit renewal fee of$226.50. Your permit is extended until March 19,2009. In order to keep your permit active and to avoid renewal fees,be sure to
request a progress inspection by March 19,2009 and request inspections every 6-months thereafter.
do
BLDC105 Progress Inspection 3/9/2009 3/11/2009 None PASS TFR 3/12/2009 KKK
Building attic stairs.
BLDC105 Progress Inspection 9/1/2009 None DONE TW 9/l/2009 GMM
SIDING IS UP,PROGRESS MADE
BLDC 145 Insulation Inspection 4/20/2011 4/22/2011 None PART LAW 4/25/2011 PIB
TV room above garage only.
BLDA560 Permit Cancelled 5/8/2014 None DONE DLC 5/8/2014 DLC
SEE BLD2008-00031
Page 6 of 6 CaseActivity-rpt
5/8/2014
Case Activity Listing 11:08:02AM
Case #: BLD93-00999
i�
Assigned Done
Activity Description Date 1 Date Date 3 Hold Disp To By Updated
BLDA010 Application received 6/30/1993 None 6/30/1993 FVC
BLDB129 Sent to Planning 6/30/1993 None 6/30/1993 FVC
BLDB130 Planning Review 7/1/1993 7/1/1993 None DONE MMS 7/1/1993 MMS
BLDB110 Structural Plan Review 7/1/1993 8/13/1993 None DONE DH 8/13/1993 WLC
BLDB120 WSEC Compliance Review 8/13/1993 8/16/1993 None FINI DLF 8/16/1993 DF
BLDB200 Environmental Health Review 8/16/1993 8/20/1993 None DONE MMT 8/20/1993 MMT
Per condition
BLDB210 Water Adequacy 8/20/1993 8/20/1993 None HOLD MMT 8/20/1993 MMT
Need water adequacy. sent letter on 8/20
BLDB210 Water Adequacy 8/24/1993 8/24/1993 None DONE MMT 8/24/1993 MMT
BLDA100 Approved For Issuance 8/25/1993 None DONE KS 8/25/1993 KS
BLDA500 (F)Issue building permit 8/27/1993 None DONE KS 8/27/1993 KS
BLDC100 Inspection 2/4/1994 2/4/1994 2/4/1994 None DH 2/4/1994 DWH
update doing work them self 180 day ext
Pagel of 6 CaseActivity..rpt
14
Case Activity Listing 5/8/20
11:o8:o2AM
Case #: BLD93-00999
P14
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC 100 Inspection 8/10/1994 8/10/1994 8/10/1994 None DONE DH 8/15/1994 CKR
PROGRESS ONLY PRE-FRAMING INSPECTION FIRST FLOOR AT THIS TIME NOT PLUMBING
BLDC100 Inspection 2/27/1995 3/l/1995 None NSA DPB 3/1/1995 DPB
Progress inspection. Progress is being made.
BLDC100 Inspection 4/21/1995 4/24/1995 None NSA DPB 4/24/1995 DPB
Courtesy insp only.
BLDC110 Footing inspection 7/14/1995 7/17/1995 7/17/1995 None PASS DH 7/18/1995 DWH
changed footing for garage.
BLDC100 Inspection 8/19/1996 8/19/1996 8/19/1996 None DONE DH 8/19/1996 DWH
Progress only.
BLDC250 Permit Extension 3/21/1997 8/27/1997 3/24/1997 None EXTD TLG 3/24/1997 TLG
Roofmg installed. Financial,medical and weather related reasons necessitate request for extension
BLDC250 Permit Extension 9/6/1997 3/6/1998 2/6/1998 None EXTD TLG 2/6/1998 TLG
Extended per letter request.Next extension must be by PROGRESS Inspection
BLDC251 Notification of Expiration 2/6/1998 2/6/1998 None TLG 2/6/1998 TLG
sent copy of print out to owner. Noting next inspection must be by progress on site
BL15C250 Permit Extension 8/31/1998 9/8/1998 None DONE SKM 9/8/1998 SKM
RECIVED REQUEST FOR PERMIT EXTENTION,ASKED BY WARREN TO ADD.
BLDB007 Plans Revisions Submitted 9/8/1998 None DONE SKM 9/8/1998 SKM
REVISIONS COMPLETE,I DO NOT KNOW IF THERE IS ADDED SQ.'LEFT MESSAGE WITH APPLICANT,PLANS ARE IN MY OUTSIDE BOX.
BLDA560 Permit cancelled 3/9/1999 None DONE KW 3/9/1999 KW
Page 2 of 6 CaseActivity..rpt
5/8/2014
Case Activity Listing 11:08:02AM
IP14 Case#: BLD93-00999
AM Assigned Done
Activity Description A&K Date 1 Date 2 = 'Date 3 Hold Disp To By Updated Updated By=-
BLDC100 Inspection 6/3/1999 6/3/1999 6/3/1999 None DONE TFR 6/17/1999 KW
PERMIT CANCELLED HAVE OWNER REINSTATE PERMIT AND SCHEDULED NEW INSPECTION.
BLDC100 Inspection 6/10/1999 6/10/1999 6/10/1999 None PASS TFR 6/17/1999 KW
BLDC100 Inspection 4/6/2000 4/6/2000 None PASS TFR 4/7/2000 KW
BLDA900 Telephone call 4/26/2000 4/26/2000 None WC DLC 4/26/2000 DLC
Exempt from 1.6 gal water closet requirements as it became effective on 7/1/93. killian's applied for permit on 6/30/93. 3.0 gallon is OK.-DC 426/00
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/21/2000 KLW
ACCORDIG TO THE INSTALLER THE PEX IS NOW A 100 PSI,I INFORMED HIM THAT WE COULD NOT INSPECT UNTIL NEXT LOOK,SO I REQUESTED THAT HE PROVIDES A LETTER
OF CERTIFICATION AND THAT HE AND THE HOMEOWNER SIGN,DANA HERRON
OK TO POUR FLOOR AT OWN RISK.
BLDC100 Inspection 7/18/2000 7/18/2000 None DONE TFR 7/19/2000 KLW
SUPPLY ON SERVICES DWV TESTED W/WATER WILL REQ RETEST AFTER ELECTRIC INSTALL
SUPPLY INSTALLATION INSTRUCTION ON PEX RADIANT TUBING,TEST AT 15 LBS,WITNESSED.
BLDC050 Pre-Site Inpection 7/20/2000 None DONE DWH 7/20/2000 DWH
aCCORDING TO THE INSTALLER HE INCREASED THE PRESSURE TO 100 PSI ON THE PEX TUBING.I INFORMED HIM THAT WE WOULD NOT BE ABLE TO INSPECT UNTIL NEXT
WEEK,SO I REQUESTED THAT HE SEND A LETTER OF CERTIFICATION THAT THE PRESSURE IS ON AND TO HAVE IT SIGNED BY THE HOMEOWNER ALSO WHO IS ON SITE.
BLDC100 Inspection 7/20/2000 7/20/2000 None PASS TFR 7/21/2000 KLW
int gas test pass
BLDA920 Miscellaneous Action 4/9/2003 None RNEW PIB 4/9/2003 PIB
PERMIT REINSTATED 10-22-02. PAID 1/2 ORIGINAL FEE-RECEIPT#61000.
BLDA510 Reprint Building Permit 4/9/2003 None DONE PIB 4/9/2003 PIB
Page 3 of 6 CaseActivity..rpt
5/8/2014
Case Activity Listing 11:08:02AM
Case #: BLD93-00999
P10
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Dis, To By Updated Updated By
BLDC105 Progress Inspection 4/4/2003 4/10/2003 None PASS RLS 4/11/2003 KLW
PROGRESS PASS,PHOTOS IN FILE.
BLDC105 Progress Inspection 10/29/2003 10/29/2003 None PASS LDK 10/31/2003 KLW
PROGRESS PASS,ELECTRICAL,SKIRT BOARDS AND SOME TRIM(EXT)
BLDA540 Print Inspection Card 10/19/2004 None DONE KS 10/19/2004 KS
BLDA510 Reprint Building Permit 10/19/2004 None DONE KS 10/19/2004 KS
BLDC140 Framing/Plumbing/Mechanical 4/4/2005 4/13/2005 None FAIL TFR 4/14/2005 KLW
FPMP FAIL, 1.PUT DWV UNDER TEST,2.HAVE ALL ZONE ON RADIANT HEAT ON NEXT INSP,3.INSTALL SECONDARY AQUASTAT ON BOILED,4.INSTALL FIRE BLOCKING AT
STAIR AND ALL CHASES,5.INSTALL ANCHOR BOLTS W/IN 12"OF ALL SPLITS IN PLATES,6.INSTALL Y OF WEB IN FILL BOTH SIDE AT I JOIST ALTERED BY PLUMBER AT DOWN
STAIRS TOILET,7.COMPLETE TOP PLATE PENETRATION DRAFT STOPPING.
BLDC100 Inspection 4/25/2005 4/25/2005 None DONE LAW 4/26/2005 LAW
I met with the owner to go over the items left on the last correction notice.
BLDC140 Framing/Plumbing/Mechanical 6/9/2005 6/9/2005 None FAIL LAW 6/13/2005 KLW
ITEM#5 NOT COMPLETE FROM LAST NOTICE ITEM LOCATED IN CRAWL OK TO INSULATE WALLS
BLDC105 Progress Inspection 12/5/2005 12/6/2005 None PASS LDK 12/8/2005 KLW
PROGRESS OK,APPEARS TO HAVE STARTED INSULATING
BLDC105 Progress Inspection 5/31/2006 6/5/2006 None PASS TFR 6/6/2006 KLW
STARTED SIDING
BLDA985 LTR-Notice Final Inspection 11/29/2007 None DONE TFR 11/29/2007 TFR
Page 4 of 6 CaseActivity xpt
5/8/2014
Case Activity Listing 11:08:02AM
IP14 Case #: BLD93-00999
Assigned Don
Activity Description Date 1 Date 2 Date 3 Hold Disp To By= Updated z Updated By it
BLDB007 Plan Revisions Submitted 1/8/2008 None DONE CMH 1/9/2008 CMH
Revision submitted changing stairway from pulldown to spiral.
BLDM500 Hold 1/8/2008 Hold DONE CMH 1/8/2008 CMH
Permit re-activated-applicant will pay reactivation fee's once revision is complete since there was a power outage when revision was submitted. cmh 01-8-2008
BLDB400 Building Review Revision 1/8/2008 1/8/2008 None DONE LAW 1/8/2008 LAW
BLDA510 Reprint Building Permit 1/11/2008 None DONE KS 1/11/2008 KS
BLDA987 LTR-Reinstate/Final 9/16/2008 None DONE BTA 9/16/2008 BTA
A drive by was conducted by MAL and a"Final Notice to Comply"letter was left on site with the owner.They will have 21 days to comply and a$68 fee will be due prior to each inspection until final pass.
BLDA920 Miscellaneous Action 9/17/2008 None DONE DLC 9/17/2008 DLC
The following e-mail was sent to Mr.Killian at"killianjw@hotmail.com"on 9/17/2008:
Hi Mr.Killian,
In order to keep your permit active our office will require a letter from you requesting that permit number BLD93-00999 be extended along with an explanation. Please keep in mind that permits remain
active for 6-months which means that inspections must be performed at least every 6-months. The last activity that occurred on your permit was January 8,2008 when the stairway revisions were approved.
During that time you were also told that a re-activation fee would be due when an inspection was scheduled. Based upon your explanation that the power outage was causing a hardship it appears that staff
believed you would pay the fee within a reasonable time.
When I spoke with you on the telephone I was in error when I told you that a fee was not due. In order to re-activate the permit 50%of the original permit fee,$226.50($453.00 x 50%),shall be required
along with the request to extend the permit. Since a progress inspection has not occurred since June 5,2006 the fee and request must be received within 21-days from September 16,2008 or by October 7,
2009.
Once the extension is granted you will need to keep the permit active by requesting progress inspections every 6-months.
Debbera Coker
Page 5 of 6 CaseActivity..rpt
Case Activity Listings/8/20
11:02:38AM
Case #: ENF2003-00318
P10
Assigned Done 1FW
Activity Description , Date 1 Date 2 Date 3 Hold Dis To By Updated Updated By
EN FA010 Complaint Received 9/4/2003 None DONE AH 9/9/2003 TLG
ENFC003 Complaint Invalid 9/9/2003 None DONE TLG 9/9/2003 TLG
Owner has permits. A permit#25729 issued 5/21/90 for temporary living quarters until house is finished and BLD93-00999 for SFR,which is current and most recently inspected on 4/2003. Bldg dept does
not enforce#of water system hookups.
ENFA910 Meeting 9/9/2003 9/9/2003 None DONE TLG 9/9/2003 TLG
Met with Arlene Hyatt and informed her complaint is invalid as far as bldg dept is concerned. Will send complainant a copy of report.