HomeMy WebLinkAboutMEP2012-00021 Cancelled - MEP Permit / Conditions - 7/20/2012 ypN"STA?-, MASON COUNTY
lk A o (A DEPARTMENT OF COMMUNITY DEVELOPMENT
o N 2E Planning Division
y7 N Y ti P O Box 279, Shelton, WA 98584
1864 (360)427-9670
MASON ENVIRONMENTAL PERMIT
July 20, 2012
TIMOTHY VANNORMAN
6673 E GRAPEVIEW LOOP RD
ALLYN WA 98524
Parcel No.: 122322190000
Issued: 7/20/2012
Case No.: MEP2012-00021
Project Description:
Mason Environmental Permit for buffer average proposal to construct new residence
within 50 ft. by 50 ft.area setback at 85 feet from wetland to the west; and mitigate
with buffer restoration with native trees and shrubs.
The following critical areas are present on this property:
Long-Term Commercial Forest FWHCA
Ch. 17.10.060; Ch. 17.01.110;
Mineral Resource Lands Frequently Flooded Areas
Ch. 17.01.066; Ch. 17.01.090;
Inholding Lands Landslide Hazard Areas
Ch. 17.01.062; Ch. 17.01.100;
XX Wetlands Seismic Hazard Areas
Ch. 17.01.070; Ch. 17.01.102;
Critical Aquifer Recharge Erosion Hazard Areas
Ch. 17.01.080; Ch. 17.01.104.
This permit, with conditions, is granted pursuant to the Mason County Resource Ordinance
(Chapter 17.01 MCC.) Nothing in this permit shall excuse the applicant from compliance with
any other federal, state, or local statutes, ordinances, or regulations applicable to this project.
This permit may be rescinded if the permitee fails to complete the project as proposed or fails
to comply with the standards of this ordinance.
ALAW 1 b-7V-di�u - Y 2"Ol et 2,
Authorized Local Government Official Date
Mason Environmental Permit
7/20/2012 Case No.: MEP2012-00021
Conditions:
1.) Approved per dimensions of structures and setbacks on submitted site plan; the May 21,
2012 plan has the configuration of new residence, demolished structures, buffer
distances, and native planting areas.
X
2.) The applicant acknowledges that the project will be completed as proposed, so that the
project will be consistent with all applicable standards of the Mason County Resource
Ordinance.
3.) All construction and demolition debris must be removed from the shore area after project
completion. Proper disposal of construction debris must be on land in such a manner that
debris cannot enter or cause water quality degradation of State waters.
X
4.) Temporary erosion control measures must be implemented to prevent water quality
degradation of adjacent waters or wetlands. Silt fencing must be installed and maintained
until upland vegetation has become established.
X
5.) All upland areas disturbed or newly created by construction activities shall be seeded,
vegetated or given an equivalent type of erosion protection (silt fencing or straw matting).
X
6.) The Wetland Corps prepared a wetland report(dated July 2011) that included delineation,
buffer averaging, and native planting restoration. The Applicant shall have monitoring of
the native plant vegetation performed annually for three years following installation.
Monitoring will entail inspection of each planted species for survival and vigor, and
replacement of species that have not survived.
X
7/20/2012 Page 2 of 2 MEP2012-00021
1
MASON ENVIRONMENTAL PERMIT($630 G$38H other permit) Mason County Permit Center Use:
❑ CONDITIONAL USE($1520) MEP Z,Q I-:9, - QM;2-
❑ HABITAT MANAGEMENT PLAN REVIEW($445) Date Rcvd 's' ( ( - G,
?Lb- 2�L I-- , 0 0 ??127
MASON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mason County Resource Ordinance(Chapter 17.01 MCC)
ENVIRONMENTAL PERMIT APPLICATION
The purpose of the Resource Ordinance is to protect Mason County's natural resource lands and critical areas and is
under the authority of Chapters 36.32, 36.70A, 39.34, 58.17, 76.09, 84.33, 84.34 and 90.58 RC W.
PLEASE PRINT
1. PROPERTY OWNER
Name: �
�1 r^b
Mailing Address: /
Work Phone: - Email Address:
(J
Home/Cell Phone: _] �0 i _ ; Fax#:
,[fan agent is acting for the property owner during the permit process, complete #2.
2. AUTHORIZED AGENT
Name: RN
Mailing Address:
Work Phone: Email Address:
Home/Cell Phone: f t Fax# i
3. PROJECT SITE
Site Address: 73
9 r
Parcel#: LIS
a - - Legal Description.'p s�
Directions to Site: r�
I �r
Attach a site plan showing the following: Lot Dimensions, Flood Zones, Existing Structures, Fen
Water Lines, Driveways, Drainage Plans,Shorelines, Septic System,Topography, Proposed
Improvements, Easements, North Arrow,and Scale. Also draw a separate topography diagram.
4. State which section requires permit:
❑ Long Term Commercial Forest,Chapter 17.10.060 ❑ Frequently Flooded Areas,Chapter 17.01.090
❑ Mineral Resource Lands,Chapter 17.01.066 ❑ Landslide Hazard Area,Chapter 17.01.100
❑ Aquifer Recharge Area,Chapter 17.01.080 ❑ Seismic Hazard Areas,Chapter 17.01.102
❑ Erosion Hazard Area,Chapter 17.01.104 ❑ Fish& Wildlife Habitat Conservation Areas,Chapter
❑ In-Holding Lands,Chapter 17.01.062 17.01.110
Uf Wetlands,Chapter 17.01.070
5. Identify current use of the property with existing improvements:
ani C — `a C, ,
6. Identify and describe the proposed project, including the type of materials to be used, construction methods,
principle dimensions, and other pertinent information(attach additional sheets, if needed):
F uS !,
4 r - -c
7. Describe why the action requiringtis permit cannot be avoided.
8. Will there be an alte a[ior of a et an( or wetland vegetation area(circle one)? Yes> No
9. Identify any surface water on or adjacent to property ci le one):
Saltwater Lake �Str�ePond Wetland Drainage Ditch
10. 1de 'stingy tic/sewer connection(circle one): if septic is located on project site, include records.
(Connected to Septic Connected to Community Septic
11. Identify existing water supply(circle one): Public Water Supply <Well
11. Type of Job(circle one):
New Add Alteration Repair (Demolitio Other:
Print Name Signature Date