HomeMy WebLinkAboutSHX2016-00044 JARPA Cancelled - SHX Permit / Conditions - 7/6/2016 P�Or1-STA MASON COUNTY E
DEPARTMENT OF COMMUNITY DEVELOPMENT
N
�t o 7
o A N Planning Division
>- o N z 615 W Alder St, Shelton, WA 98584
T
N y ti (360)427-9670
OJ �O
1864
Exemption from Shoreline Management Act
Case No.: SHX2016-00044 Substantial Development Permit Requirement
The Proposal By: JERRY LADD
P O BOX 800
ALLYN, WA 98524
Parcel Number: 122321400070
Site Address: 540 E CRONQUIST RD ALLYN
To undertake the following development:
SHORELINE EXEMPTION SUBMITTED FOR LADD EXISTING MOORING BUOY
Within CASE INLET and/or its associated wetlands is exempt from the requirement of substantial development
because the development is categorized under WAC 173-27-040(2) as being category
A-does not exceed dollar threshold
Please contact Kell McAboy at ext 365 if you have any questions.
Issued:7/6/2016
Authorized Local Government Official
COUNTY
COMMMUNITYSERVICES RECEIVED
Building 8—615 W.Alder Street JUN 13 2016
Shelton,WA 98584
(360)427-9670—Ext.357 615 W. Alder Street
SHORELINE PERMIT APPLICATION
PERMIT NO. 6NX M I 0- 00044 SHORELINE SUBSTANTIAL DEVELOPMENT
SHORELINE VARIANCE*
DATE RECEIVED . 19104V SHORELINE CONDITIONAL USE-
SHORELINE EXEMPTION �—
The Washington State Shoreline Management Act (RCW 90.58) requires that substantial developments within
designated shorelines of the state comply with its administrative procedures(WAC 173-14)and the provisions of the
Mason County Shoreline Management Master Program.The purpose of this Act and local program is to protect the
state's shoreline resources. The program requires that substantial development(any development of which the total
cost or fair market value exceeds $5,718.00 or materially interferes with the normal public use of the water or
shorelines of the State be reviewed with the goals, polices, and performance standards established in the Master
Program.
Answer all questions completely. Attach any additional information that my further describe the�jToposed
development. Incomplete applications will be returned. n (p h&rKar`�O 7e.J2_@.,"
Sho'relMk Variances and Conditional aces haVe additibul pages th9t Shall be attached to this application.
APPLICANT: Jerry Ladd
ADDRESS: Po Box 800
Allyn (street) WA. 98524
(city) (state) (zip)
TELEPHONE: 303 710 1970
(home) (business)
AUTHORIZED REPRESENTATIVE: LaVeta Arnold
ADDRESS: 280 Griel Rd.
(StrCe6nalaska WA. 98570
TELEPHONE:
(City) 360 978 5157 (ate) (zip)
PROPERTY DESCRIPTION:
General location(include property address,water body and associated wetlands—identify the name of the
shoreline): 540 E Cronquist Rd. Allyn WA. 98524
Case Inlet
Legal description (include section, township, and range to the nearest quarter, quarter section or latitude and
longitude to the nearest minute. Projects located in open water areas away from land shall provide a longitude
location)—include all parcel numbers:
122 32 1 L4 CCU
OWNERSHIP: X Contract
Applicant Owner Lessee Purchaser (Identify) Other
Owner:
Jerry Ladd
540 Cronquist
Allyn (street) WA 98524
(city) (state) (zip)
DEVELOPMENT DESCRIPTON
Development(identify and describe the proposed project,including the type of materials to be used,construction
methods,principle dimensions,and other pertinent information):
(2) SS175 Helix embedment anchors (8' apart), each connected to a 6' x 1'/4" double
braided nylon rope with thimbles at each end attached to 7/8" shackles to 7/8" swivel to 45'
1 W double braided nylon pennant line with thimbles at each end with two midline floats
attached to 7/8" shackle attached to 7/8" swivel attached to 7/8" shackle connected to 6'
5/ galvanized ong length chain, which passes through a 24" hardshell buoy with
retrieval near ring
Use(identify current use of property with exist improvements:
Single family waterfront home in good condition
Reason for requesting development:
Shoreline exemption WAC 197-11-800(24)(f)
for existing mooring buoy for residential waterfront property.
Installed March 14, 2010 for a 58' vessel
ACKOWLEDGEMENT
I hereby declare,to the best of my knowledge and belief,the forgoing information and all attached information is
true and correct.
6 7 l"�� Lf OA= fc--�
(Applican or authorized representative (Date)
--------------------------------------
AGENCY USE ONLY
Date received:
U
WASHINGTON STATE S Army Corps
of Engineers i i
Joint Aquatic Resources Permit Agency reference#:
Application (JARPA) Form',' [he Tax Parcel#(s):
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW.
-------------------------------
i
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples:Smith's Dock or Seabrook Lane Development) [belpj
Ladd Existing Mooring
Part 2—Applicant
The person and/or organization responsible for the project. [help]
2a. Name (Last, First, Middle)
Ladd, Jerry
2b. Organization (If applicable)
2c. Mailing Address (street or PO Box)
PO Box 800
2d. City, State, Zip
Allyn, WA 98524
2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail
(303) 710-1970 ( ) ( ) Jdl@doorwaysinc.com
Additional forms may be required for the following permits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Speck Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
ham://www.nws.usace.arTny.mil/Missions/C ivilW orks/Regulatory/PermkGuidebook/EndangeredSpecies.aspx.
• Not all cities and counties accept the JARPA for their local Shoreline permits. If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
htt�://www.epermitting.wa.gov/site/alias resourcecenterharpa iarpa form/9984flarpa form.aspx.
For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or helpaloria.wa.gov.
JARPA Revision 2015.1 Page 1 of 12
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) [
3a. Name (Last, First, Middle)
Arnold, LaVeta
3b. Organization (If applicable)
3c. Mailing Address (street or Po Box)
280 Grief Rd.
3d. City, State, Zip
Onalaska, WA 98570
3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail
(360) 978-5157 ( ) ( ) alphamarineoffice@gmail.com
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies) where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [
Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
El Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know,
contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete
to apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
4b. Organization (If applicable)
4c. Mailing Address (street or Po Box)
4d. City, State, Zip
4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail
JARPA Revision 2015.1 Page 2 of 12
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. LheM
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) hel
Private
❑ Federal
❑ Publicly owned (state,county, city, special districts like schools, ports, etc.)
❑ Tribal
❑ Department of Natural Resources (DNR)— managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) [helA
540 E. Cronquist Rd.
5c. City, State, Zip (if the project is not in a city or town, provide the name of the nearest city or town.) hf eM
Allyn, WA 98524
5d. County hel
Mason
5e. Provide the section, township, and range for the project location. heI
'/. Section Section Township Range
NE 32 22N 01 W
5f. Provide the latitude and longitude of the project location. pLeipj
• Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees -NAD 83)
N 47.353380 N lat / -122.8238° W long
5g. List the tax parcel number(s)for the project location. hel
• The local county assessors office can provide this information.
12232-14-00070
5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) [help]
Name Mailing Address Tax Parcel # (if known)
Valluzzo, Robert& Janis 8900 NE 16th St. 12232-10-02061
Clyde Hill, WA 98004
Nelson, Vernon & Susan PO Box 160 12232-10-02070
Grapeview, WA 98546
JARPA Revision 2015.1 Page 3 of 12
5i. List all wetlands on or adjacent to the project location. hem
N/A
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. [help]
Case Inlet
5k. Is any part of the project area within a 100-year floodplain? [Leipj
Yes ❑ No ❑ Don't know 5301150150C
51. Briefly describe the vegetation and habitat conditions on the property. hei
Type of substrate at anchor location: Sand, mud mix over tight glacial till
Vegetation: No Vegetation
5m. Describe how the property is currently used. !ei
Private, residential waterfront home.
5n. Describe how the adjacent properties are currently used. hei
Residential
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition. hey
Single family residential home
5p. Provide driving directions from the closest highway to the project location, and attach a map. h� eiPl
yt,
Q 17734 E WA-3, Allyn, WA 98524 O
17734 E WA-3,
Allyn,WA 98S24
,�, Depart E Grapeview loop Rd toward E Gills
Cove Dr
2 1 nu c
Bear left onto E Cronquist Rd
06Ml
Arrive at E Cronquist Rd
Soo E Cronquist
Tre ast rtersect.or is E Graperew Loop Rd Rd.Allyn,WA 98524
0 540 E Cronquist Rd,Allyn,WA 98524
E Cronquist
WA 98'S24
JARPA Revision 2015.1 Page 4 of 12
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. hel
An existing, permanent helical embedment anchor with suspended pennant line, used as a recreational
mooring buoy in front of private residential owned waterfront property.
I
6b. Describe the purpose of the project and why you want or need to perform it. [
DEPTH OF WATER AT MEAN LOWER LOW TIDE: 29 ft.
157 yds off HWM
For secure boat mooring in front of waterfront residence
Boat Length: 58 Feet
6c. Indicate the project category. (Check all that apply) [help]
❑ Commercial Residential ❑ Institutional ❑ Transportation Recreational
❑ Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam /Weir (upland)
❑ Floating Home
❑ Boat House ❑ Dike / Levee / Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock / Pier ❑ Marina / Moorage
❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining
❑ Stormwater facility
❑ Bulkhead ❑ Fence ❑ Outfall Structure
❑ Swimming Pool
Buoy ❑ Ferry Terminal ❑ Piling/Dolphin
❑ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
JARPA Revision 2015.1 Page 5 of 12
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. hel
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
A permanent embedment helical anchor and mooring buoy ball centered off property.
(2) SS175 Helix embedment anchors (8' apart), each connected to a 6' x 1'/4"double braided nylon rope with
thimbles at each end attached to 1 1/8" shackles to 7/8" swivel to 45' 1 '/4" double braided nylon pennant line
with thimbles at each end with two midline floats attached to 7/8"shackle attached to 7/8" swivel attached to 7/8"
shackle connected to 6' 5/8" galvanized long length chain, which passes through a 24"hardshell buoy with 3/4"
retrieval pear ring on top.
Maintained and cleaned by Alpha Marine Installation
6f. What are the anticipated start and end dates for project construction? (Month/Year) hem
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: End date: 3/14/2010 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. n[ elp)
$2200.
6h. Will any portion of the project receive federal funding? hel
• If yes, list each agency providing funds.
❑ Yes 0 No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)[hel
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hem
Not applicable
7b. Will the project impact wetlands? [hel
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? heI
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? hel
• If Yes, submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? [hel
• If Yes, submit the wetland rating forms and figures with the JARPA package.
JARPA Revision 2015.1 Page 6 of 12
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? h[ ell
• If Yes, submit the plan with the JARPA package and answer 7g.
• If No, or Not applicable, explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Not applicable
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. hem
71h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. hf eld
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact3 mitigation mitigation area
flood, etc.) rating ft. or type (sq. ft. or
category2 Acres) acres)
If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such
as a wetland delineation report.
2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland
rating forms with the JARPA package.
3Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
`Creation(C),Re-establishment/Rehabilitation(R), Enhancement(E),Preservation(P),Mitigation Bank/In-lieu fee(B)
Page number(s)for similar information in the mitigation plan, if available:
7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic
yards that will be used, and how and where it will be placed into the wetland. h[ elal
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. LLeld
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) nel
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hem
❑ Not applicable
Helical anchor has minimal foot print and suspended line avoids drag circles to sea bed.
JARPA Revision 2015.1 Page 7 of 12
8b. Will your project impact a waterbody or the area around a waterbody? [heipl
Yes ❑ No 24" Buoy
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? hel
• If Yes, submit the plan with the JARPA package and answer 8d.
• If No, or Not applicable,explain below why a mitigation plan should not be required.
❑ Yes ❑ No 0 Not applicable
Has no impact on surrounding environment
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used
to design the plan.
• If you already completed 7g you do not need to restate your answer here. [hel
N/A
8e. Summarize impact(s)to each waterbody in the table below. neI
Activity (clear, Waterbody Impact Duration Amount of material Area (sq.ft. or
dredge, fill, pile name' location of impact3 (cubic yards)to be linear ft.) of
drive, etc.) placed in or waterbody
removed from directly affected
waterbody
Helical /Puget Sound LAT: N Permanent None N/A Embedment
Embedment 47.353380 Anchor
Anchor LONG: W
-122.82380
'If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided.
2Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. h[ eip
N/A
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hl elal
None. No soil or vegetation was removed. No dredging.
Helical anchor screws in substrate without disturbing environment, soil lays back around anchor site
leaving 1 3/4 inch foot print.
JARPA Revision 2015.1 Page 8 of 12
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. Lbgid
Agency Name Contact Name Phone Most Recent
Date of Contact
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? Lhel
• If Yes, list the parameter(s)below.
• If you don't know,use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.gov/programs/wq/303d/.
❑ Yes ❑ No
NIA
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? h[ eM
• Go to http://cfpub.epa.gov/surf/locatelindex.cfm to help identify the HUC.
17110019
9d. What Water Resource Inventory Area Number(WRIA#) is the project in? heI
• Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#.
WRIA# 14
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hel
• Go to http://www.ecv.wa.aov/programs/wa/swgstcrkeria.html for the standards.
❑ Yes ❑ No Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? LbLeM
`` ,i�
• If you don't know,contact the local planning department. V`r hav,,.
• For more information,go to: http://www.ecv.wa.gov/programs/sea/smaAaws rules/173-26/211 designations.html.
Rural 00 Urban ❑ Natural Aquatic ❑ Conservancy ❑ Other
9g. What is the Washington Department of Natural Resources Water Type? [ ell
• Go to http://www.dnr.wa.govtforest-practices-water-typing for the Forest Practices Water Typing System.
Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
91h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? hti
• If No, provide the name of the manual your project is designed to meet.
JARPA Revision 2015.1 Page 9 of 12
❑ Yes ❑ No N/A
Name of manual:
9i. Does the project site have known contaminated sediment? LLeipj
• If Yes, please describe below.
❑ Yes M No
9j. If you know what the property was used for in the past, describe below. hel
Waterfront home
9k. Has a cultural resource (archaeological)survey been performed on the project area? t,� PM
• If Yes, attach it to your JARPA package.
❑ Yes M No
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. LheM
N/A No effect
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. hf !-M
N/A No effect
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.oria.wa.gov/opas/.
• Governor's Office for Regulatory Innovation and Assistance at(800) 917-0043 or help(&-oda.wa.gov.
• For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act(SEPA). (check all that apply.) [be
I
• For more information about SEPA,go to www.ecy.wa.gov/programs/seatsepa/e-review.html.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
❑ A SEPA determination is pending with (lead agency). The expected decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in 10b.)[held
This project is exempt (choose type of exemption below).
Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
WAC 197-11-800(24)(fl
❑ Other:
❑ SEPA is pre-empted by federal law.
JARPA Revision 2015.1 Page 10 of 12
10b. Indicate the permits you are applying for. (Check all that apply.) [helpl
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
Shoreline Exemption Type (explain): �kWt wC\ ��LoVAS
Other City/County permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption For,
You must submit a check for$150 to Washington Department of Fish and Wildlife, unless your project qualifies
for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes:
❑$150 check enclosed. Check#
Attach check made payable to Washington Department of Fish and Wildlife.
❑My project is exempt from the application fee. (Check appropriate exemption
❑ HPA processing is conducted by applicant-funded WDFW staff.
Agreement#
❑ Mineral prospecting and mining.
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use.)
❑ Project is a modification of an existing HPA originally applied for, prior to July 10, 2012.
HPA#
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ Private Aids to Navigation (for non-bridge projects)
JARPA Revision 2015.1 Page 11 of 12
Part 11—Authorizing Signatures
Signatures are required before submitting the DARPA package. The DARPA package includes the
JARPA form, project plans, photos, etc. [help]
11 a.Applicant Signature (required) ht el
I certify that to the best of my knowledge and belief, the information provided in this application is true,
complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I
agree to start work or after I have received all necessary permits.
I hereby authorize agent named in Part 3 of this application to act on my behalf in matters related to
this application. (initial)
By initialing here, I state that I have the authont to grant access to,�he property. I also give my consent
to the permitting agencies entering t roped here th project i located to inspect the project site
or any work related to the project. �. ( i ►)
Applicant Pri red Nome Appli nt gnature baie
11 b.Authorized Agent Signature hel
I certify that to the best of my knowledge and belief, the information provided in this application is true,
complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I
agree to start work only after all necessary pe its have been issued.
--C' ,6k -� Z't--U:�'-:_-�71-� -
Authorized Agent Printed Name Authorized Agent Signaturb Date
11 e. Property Owner Signature (if not applicant) [heipl
Not required if project is on existing rights-of-way or easements.
I consent to the permitting agencies entering the property where the project is located to inspect the
project site or any work. These inspections shall occur at reasonable times and, if practical, with prior
notice to the landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United
States knowingly falsifies,conceals, or covers up by any trick,scheme,or device a material fact or makes any false,fictitious,
or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any
false,fictitious, or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than 5 years or
both.
If you require this document in an format,contact the Govemor's office for Regulatory Innovation and Assistance
(ORIA)at(800)917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech
disability can call 03M 833-6341. ORIA publicaUpn ni.n bef FNV-019-09 rev. 09/2015 ___
Cross Section
Jerry Ladd
Existing Mooring Alpha Marine Installations
47.363 N lat
-122.8238'W long Series I Mooring System
Case Inlet
TOP MINIG VESSEL
24"MOOFING BUOrf 157 yds off HWM
61 518"QALVNdZED MLW: 29'
LONG LINK CHAIN
7/8" QALVANOW
SWIVEL AND SHACKLE
(2) ILP MIDUNE FLOAT 45'
25" from I,DOUBLE BRAIDED
anchor NYLON ROPE
<:n 7' from
GALVANIZED THIMBLE AT anchor 718" (3ALVANMM Vegetation: None
EACH END OF NYLON ROPEk 1 .. SWIVEL AND SHACKLE
(2) 11 Galvanized Shackles Substrate: Sand and mud mix
BEA FLOOR r
(2) SS175 8"/10" Double
Helix Anchors
72111111 400now b dw P000MY md comfidaidd Designed by:
pwpmy of
A*k 160dw boo1ldh=4 LLC,7bb d000mmi=my Lot be capK Alpha Marine Installations, LLC
nP0684 of dwdo@4 an whole or In
ft Ofaft w COMM OfA4ft MWIN hUM91adonk=a1sftb*=vd=1y9xdwpmyn e*wwW&fthwbmxuppAW& 280 Griel, Road
---a 7
WA 98570
CMd&0 2OW,2001,20A A4&Ma i hb Onalaska,
m isudocuk UC.
AM d*ft.ww, Phone (360) 978-5157
f
Site Ma Parcel Number: 12232-14-0070
p �'`� Quarter Section: NE
Ladd Section: 32
Township: 22N
Existing Mooring Range: 01W
Position: 47 35338 N lat
122 8238 W long
` Address: 540 E Cronqust Rd
Allyn WA 98524
Mason County
Case Inlet
c
550
c,
Jerry Maf!lo4 I add
W
00070
VeFnon& Susan Nelson
w
`-;
Rd
157 yd O HWM
PALW: 29'
>
J�
N
1
Ladd
Vicinity Map
Existing Mooring
•
%lap Bats f2C16vc
T.rns of Use Repo,-
i
I - -
I
u � �. t: ."a�i�(?'.+' s6kt�iE''" !`.<: _. ... .� .ir '�-Y, ?: � {r #ir 77►►..xa
� ..> is ..'�i: - �. a �,..,.. ..c '�.�•. E a ;r