Loading...
HomeMy WebLinkAboutBLD2021-00906 Cancelled Mechanical - BLD Inspections - 4/16/2024 INSPECTION CARD Mason County 615 W. Alder St. Bldg. 8, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us PERMIT# BLD2021-00906 PROJECT ADDRESS 780 E Stretch Island Rd S Grapeview, WA 98546 PARCEL# 121085102002 PROJECT DESCRIPTION The purpose of this permit is to install a 120gal propane tank OWNER DENNEHY DENIS P. &M. RENNIE C. ADDRESS 462 SW 126TH STREET PHONE 206-708-3458 CONTRACTOR ACME FUEL CO ADDRESS PO BOX 7009 PHONE 1.360.943.1133 CONTRACTOR LICENSE ACMEFFC83506 LENDER INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments Mechanical/Plumbing Final GA M ► Mason County 1 Mason County - Division of Community Development 615 W. Alder St. Bldg.8 \�•�, �/ Shelton, WA 98584 \ - 360-427-9670 ext 352 www.co.mason.wa.us B DD2021-00906 MECHANICAL - RESIDENTIAL PROJECT DESCRIPTION: THE PURPOSE OF THIS PERMIT IS TO ISSUED: 12/15/2021 INSTALL A 120GAL PROPANE TANK SITE ADDRESS: 780 E STRETCH ISLAND RD S GRAPEVIEW EXPIRES: 06/13/2022 PARCEL: 121085102002 APPLICANT: Dennehy, Rennie OWNER: DENNEHY DENIS P. &M. RENNIE C. 780 East Stretch Island Road South 462 SW 126TH STREET Grapeview,WA98546 BURIEN, WA98146 2067083458 DESIGNER: ACME FUEL CO License: ACMEFFC83506 PO BOX 7009OLYMPIA,WA98507 Expires: 09/21/2023 1.360.943.1133 FEES: Paid Due A Mechanical Fees $80.00 $0.00 `V Mechanical Base Fee $30.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee �\ State Fee-Residential $6.50 $0.00 Final Inspection $80.00 $0.00 V Totals : $201.50 $0.00 FIXTURES (sty Mechanical Fixtures 1.0000 Propane Tank(s) REQUIRED INSPECTIONS Mechanical/Plumbing Final Inspection CONDITIONS Printed by:Kate Campbell on:12/16/2021 09:16 AM Page 1 of 3 Mason County "Ir Mason County - Division of Community Development 615 W.Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MECHANICAL - RESIDENTIAL BLD2021-00906 * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA98502, 360.586.1044/800.422.5623 www.orcaa.org * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Printed by:Kate Campbell on:12/16/2021 09:16 AM Page 2 of 3 �OtNV PZ5'�'\ Mason County II � Mason County - Division of Community Development \z� avi 615 W. Alder St. Bldg.8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MECHANICAL - RESIDENTIAL BLD2021-00906 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a per does not presume to give authority to violate or cancel the provisions ny o � •r state/local law ating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Kate Campbell on:12/16/2021 09:16 AM Page 3 of 3