September 26, 2016
Kell McAboy, Senior Planner
Mason County
Department of Community Development
Planning Division
PO BOX 279
Shelton, WA 98584
Dear Ms.McAboy:
Thank you for the opportunity to comment on the determination of nonsignificance for the
Catron Rock Bulkhead Replacement Project(SEP2016-00077& SHX2016-00054) located at
701 East Cronquist Road in Allyn as proposed by Josette Catron. The Department of Ecology
(Ecology)reviewed the environmental checklist and has the following comment(s):
WATER QUALITY: Chris Montague-Breakwell (360)407-6364
The following construction activities require coverage under the Construction Stormwater
General Permit:
1. Clearing, grading and/or excavation that results in the disturbance of one or more
acres and discharges stormwater to surface waters of the State; and
2. Clearing, grading and/or excavation on sites smaller than one acre that are part of a
larger common plan of development or sale, if the common plan of development or
sale will ultimately disturb one acre or more and discharge stormwater to surface
waters of the State.
a) This includes forest practices(including,but not limited to,class W conversions)
that are part of a construction activity that will result in the disturbance of one or
more acres, and discharge to surface waters of the State; and
3. Any size construction activity discharging stormwater to waters of the State that
Ecology:
a) Determines to be a significant contributor of pollutants to waters of the State of
Washington.
b) Reasonably expects to cause a violation of any water quality standard.
Kell McAboy, Senior Planner
September 26, 2016
Page 2
If there are known soil/ground water contaminants present on-site, additional information
(including,but not limited to:temporary erosion and sediment control plans; stormwater
pollution prevention plan; list of known contaminants with concentrations and depths found;
a site map depicting the sample location(s); and additional studies/reports regarding
contaminant(s))will be required to be submitted.
You may apply online or obtain an application from Ecology's website at:
http://www.ecy.wa.gov/programs/wq/stormwater/construction/-Application. Construction
site operators must apply for a permit at least 60 days prior to discharging stormwater from
construction activities and must submit it on or before the date of the first public notice.
Ecology's comments are based upon information provided by the lead agency. As such,they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments,please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(CA:16-4942)
cc: Chris Montague-Breakwell, WQ
Josette Catron(Applicant)
oN-STATE MASON COUNTY
C �� Department of Community Services
4 ht O r
S N Planning Division
o } �? 615 W Alder St, Shelton, WA 98584
of �0 (360)427-9670
1864
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-340)
SEP2016-00077
Description of Proposal: CATRON Rock Bulkhead Replacement 160' length, 4' tall
Proponent: JOSETTE CATRON
Location of Proposal: 701 E CRONQUIST RD ALLYN
Parcel Number: 122321092032
Legal Description: TR 3-A OF GOVT LOT 2 TR 2 OF SP #2823 #637285
Directions to Site: ST RT 3, R ON GRAPEVIEW LOOP RD, R ON CRONQUIST RD
TO VERY END
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request.
Please contact Kell McAboy at ext. 365 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must be submitted to Dept. of Community
Development, 615 W Alder St, Shelton WA 98584 by 9/26/2016. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
ico
Authorized Local Gover m t Official Date
17
6t- c1.2�I� 1� �
Revised Introduction and New On-line Guidance RECEIVED
March 2012
AUG 10 2016
SEPA ENVIRONMENTAL CHECKLIST 615 W.Amer Sbwt
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal
are significant. This information is also helpful to determine if available avoidance,minimization or compensatory
mitigation measures will address the probable significant impacts or if an environmental impact statement will be
prepared to further analyze the proposal.
Instructions for applicants: h� elAl
This environmental checklist asks you to describe some basic information about your proposal. Please answer
each question accurately and carefully,to the best of your knowledge. You may need to consult with an agency
specialist or private consultant for some questions. You mU use"not applicable"or "does not apply" only when
you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate
by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with
the SEPA process as well as later in the decision-making process.
The checklist questions apply to all parts of your proposal,even if you plan to do them over a period of time or on
different parcels of land. Attach any additional information that will help describe your proposal or its
environmental effects. The agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be significant adverse impact.
Instructions for Lead Agencies:
Additional information may be necessary to evaluate the existing environment,all interrelated aspects of the
proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only
source of information needed to make an adequate threshold determination. Once a threshold determination is
made,the lead agency is responsible for the completeness and accuracy of the checklist and other supporting
documents.
Use of checklist for nonproject proposals: hj elpl
Please complete all questions that apply and note that the words "project," "applicant," and "property or
site" should be read as "proposal," "proponent," and "affected geographic area," respectively. ADDITION,
complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). For non project actions.
A. BACKGROUND hf elpl
1. Name of proposed project, if applicable: hf elgl C/41-R.aN goL4444eAp JtEP4_ACeH6NT
2. Name of applicant: hf a s05971V c;4rp,0jj - I-A"1>400#Ja �
MI Yes pVc,LY �'Nfir/N EE tZ
SEPA Environmental checklist(WAC 197-11-960) guidance updaredMarch 1011
1
•7-S 5s71-a c4-[O,,J -O W A EA
*0( CfRoNT ti l sT RD
At-L%r A4 , cv A Is 5-2..4. A t Kw
(340) �-f-6 -4•-2-S-4 221 N E 1 AAJID
3. Address and phone number of applicant and contact person: hf elpl
4. Date checklist prepared: Lhel $1�/� �
%3 rflo) ;Z 7 s-_5 q p
5. Agency requesting checklist: hI elpl A,A Saw Cot1A Y r QJ 1) F
6. Proposed timing or schedule (including phasing, if applicable): hf e
F>"- 201 (."
7. Do you have any plans for future additions, expansion, or further activity related to or connected
with this proposal? If yes, explain. hf elpl
No
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal. hI e
N0NE
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain. ftgm
No
10. List any government approvals or permits that will be needed for your proposal, if known. hf elpl
M A SdN S V L 1-01 si G PEp,N(i T e 3hAPA
11. Give brief, complete description of your proposal, including the proposed uses and the size of the
project and site. There are several questions later in this checklist that ask you to describe certain
aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies
may modify this form to include additional specific information on project description.) Lhel
iZ&Ck- D&c.jGt+e-Afl, -APbwA11D P)24M oVGWI 1601t.O" G, 41 wivE AT
> w Dt AT ?�P� ¢' ftIGrp.( -2. -4 3 Al A),1 Rvc�.
12. Location of the proposal. Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist.
hj elpl
7-a • Q RA p iF V 1 1,00 r R D, sra Z .I tit,r.L�s 70
E. GlLvN <?u,s7^ RD. TURN sT o, - MIl-_s -W 51'V' pAIV6 WAY
SEPA Environmental checklist(WAC 197-11-960) guidance updated March 2012
B. ENVIRONMENTAL ELEMENTS LbLel
1. Earth
a. General d tion of the site h� elpl
(circle one):Qlat, oiling, hilly, steep slopes, mountainous,
other
b. What is the steepest slope on the site (approximate percent slope)? hf elpl
S P�-W-"-Wt4 r
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any prime farmland.
hf elpl 51, -CY SAap 4 cR,aVEL_
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. hf elpl
M3
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill. hI elpl
', av%c 3 MAN Ap= FJQw M cQV-4R- t y
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe.
hf eM Na
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? hf elpl
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: hf e
N o"C-7
2. Air
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors,
industrial wood smoke) during construction and when the project is completed? If any,
generally describe and give approximate quantities if known. h� elpl
EXI+AUG-C PpoM CmNS'I�.vGrt10A1 EQuIpAAE 11 r
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. hf e
No
c. Proposed measures to reduce or control emissions or other impacts to air, if any: JLPjPJ
POUF
SEPA Environmental checklist(WAC 197-11-960) guidance updated March2012
3
3. Water
a. Surface Water: hf elpl
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type
and provide names. If appropriate, state what stream or river it flows into. hf elpl
65e- IN L-ST Oela Ari l-r l 6 V M� C5A 1--T w
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans. hf e
Ver, OUT- ApoViZ OF-Dto -RY H14H WATEA. (aftw
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. hf elpl
None
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known. hf e
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan.
hL elpl ? T!'PA L-
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. hf e
NO
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known. h[ g
ND
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of animals
or humans the system(s) are expected to serve. hf pjp
NINE' - c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection
and disposal, if any (include quantities, if known). Where will this water flow?
Will this water flow into other waters? If so, describe. hf elpl
NO CWANeW
SEPA Environmental checklist(WAC 197-11-960) guidance updated March 2012
4
2) Could waste materials enter ground or surface waters? If so, generally describe.
hel
/vD
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
hel
NoN�
4. Plants 1hel
a. Check or circle es of vegetation found on the site: hel
types 9 L�1
✓deciduous tree: alder, maple, aspen, other
✓ evergreen tree: fir, cedar, pine, other
v shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered? h� elpl
,4 PEW, B V5*6_S
c. List threatened or endangered species known to be on or near the site. hf elpl
D oN'r 1<-"O r,J
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation
on the site, if any: hf elpl
No A.IC
5. Animals
a. Circle any birds and animals which have been observed on or near the site or are known to be
on or near the site: hI e
birds: aw �, oth
ffalmo
ngbir , other: mammals:
deer, bear, elk, ea
fish: bass, herring,61fis)hother
b. List an threatened or endangered species known to be on or near the site. hel
Y 9 P �1
p N1' KIN aW
SEPA Environmental checklist AC daied March 2012
(�' 197-11-960) BnidanceuP
5
C. Is the site part of a migration route? If so, explain. hf elpl
Dori 14NOV
d. Proposed measures to preserve or enhance wildlife, if any: hf elpl
NiN LC
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet
the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc. [hel
NO rNNE'ROY AeC9:pT' FUC'L- ftRR Gm/JsTiQVGT70N 'Sd?V 1lP•
b. Would your project affect the potential use of solar energy by adjacent properties? If
so, generally describe. hf elpl
No
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: hf elpl
NONE
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this
proposal? If so, describe. hf elpl
Na
1) Describe special emergency services that might be required. hf e
2) Proposed measures to reduce or control environmental health hazards, if any: h( elpl
b. Noise
1) What types of noise exist in the area which may affect your project(for example: traffic,
equipment, operation, other)? hj elpl
NONE'
2)What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. hf elpl
C, J_-011"047alJ M,AGjf/NEB`{ — S-qm— TPft\
SEPA Environmental checklist(WAC 197-11-960) guidance updated March 2012
6
3) Proposed measures to reduce or control noise impacts, if any: h� elpl
NONO
8. Land and shoreline use
a. What is the current use of the site and adjacent properties? hf elpl --
b. Has the site been used for agriculture? If so, describe. hl elpl Nb
c. Describe any structures on the site. hf g -6w OrL.
d. Will any structures be demolished? If so, what?IL@jpj /VD ro cX
Y
pu
e. What is the current zoning classification of the site? hf elpl /DES (DeAv A
f. What is the current comprehensive plan designation of the site? hf e -? g�,tV4,,J
g. If applicable, what is the current shoreline master program designation of the site? hf elpl
,4r-SMP 17'.5'v• a?LG 15 u1.SA"
h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. hf elpl
ND
i. Approximately how many people would reside or work in the completed project? hf elpl
I
j. Approximately how many people would the completed project displace? hf g.!
po NE
k. Proposed measures to avoid or reduce displacement impacts, if any: ILgjpj
ICJ/,IN-
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: hf g[
N b N!=
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, mid-
dle, or low-income housing. hf elp] fVlj¢
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. hf elpl
Now
c. Proposed measures to reduce or control housing impacts, if any: hI elpl
NOME
SEPA Environmental checklist(WAC 197-11-960) guidance updated March 2012
7
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal
exterior building material(s) proposed? hf e
NIA- (T6 P c't' bVL**WA p 1 S f 2t.ustf w rT* fi)resT: 4po01J D
b. What views in the immediate vicinity would be altered or obstructed? hf elpl
No tie,
c. Proposed measures to reduce or control aesthetic impacts, if any: h[ elpl
0)0knz
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly occur? hf elpl
"O.'Js
b. Could light,or glare from the finished project be a safety hazard or interfere with views? hel
N�
c. What existing off-site sources of light or glare may affect your proposal? hel
ND ME
d. Proposed measures to reduce or control light and glare impacts, if any: hf � oAAG
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? h) elpl
F3944/06r / SWIAAM l/Va
b. Would the proposed project displace any existing recreational uses? If so, describe. h) elpl
iNa
c. Proposed measures to reduce or control impacts on recreation, including recreation op- portunities to
be provided by the project or applicant, if any: hf elpl
Noll a
13. Historic and cultural preservation
a. Are there any places or objects listed on, or proposed for, national, state, or local preser-
vation registers known to be on or next to the site? If so, generally describe. hl elpl
PO
SEPA Environmental checklist(WAC 197-11-960) guidance updaiedMarch 1011
8
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or
cultural importance known to be on or next to the site. JtpjPJ
NONE
c. Proposed measures to reduce or control impacts, if any: Jhel
N ONc
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to the
existing street system. Show on site plans, if any. hf elpl
G,tAPMV(eW C.-OOP
b. Is site currently served by public transit? If not, what is the approximate distance to the
nearest transit Stop? hf elpl
PO N r KNO>,%1
c. How many parking spaces would the completed project have? How many would the project
eliminate? hI elpl
N'o NLl,
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets, not including driveways? If so, generally describe (indicate whether public or
private). hf e
N00
e. Will the project use(or occur in the immediate vicinity of) water, rail, or air transporta-tion? If
so, generally describe. h) e
fNL-)
f. How many vehicular trips per day would be generated by the completed project? If known,
indicate when peak volumes would occur. hf elpl
Now
g. Proposed measures to reduce or control transportation impacts, if any: hf elpl
AJ0AJ
15. Public services
a. Would the project result in an increased need for public services (for example: fire pro-
tection, police protection, health care, schools, other)? If so, generally describe. hf e
No
b. Proposed measures to reduce or control direct impacts on public services, if any. hf elpl
Ai
SEPA Environmental checklist(WAC 197-11-960) guidance updated March2012
9
16. Utilities
a. Cir utilities current) available at the site: hel electricit natural gas, water,
refuse servic a ephon sanitary sewer septic Sys a other
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate vicinity
which might be needed. hf elgl
NoNe
C. SIGNATURE rHELP1
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature:
Name of signee N1 G�k�L �it� ✓Lw
Position and Agency/Organization W D aNSOLTArJTS L(c
Date Submitted: e�H I
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS hf eM
(IT IS NOT NECESSARY to use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environment in .
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemented. Respond briefly and in
general
terms.
1. How would the proposal be likely to increase discharge to water; emissions to air; pro-
duction, storage, or release of toxic or hazardous substances; or production of noise?
NIA.
SEPA Environmental checklist(WAC 197-11-960) guidance updated March 2012
10
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
ulA
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
NlA
3. How would the proposal be likely to deplete energy or natural resources?
C/A-
Proposed measures to protect or conserve energy and natural resources are:
WIA
4. How would the proposal be likely to use or affect environmentally sensitive areas or areas
designated (or eligible or under study) for governmental protection; such as parks,
wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime farmlands?
IJA
Proposed measures to protect such resources or to avoid or reduce impacts are:
NONE
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
N/A
Proposed measures to avoid or reduce shoreline and land use impacts are:
/VoNF,
SEPA Environmental checklist(WAC 197-11-960) guidance updated March2012
I1
6. How would the proposal be likely to increase demands on transportation or public services
and utilities?
NfA
Proposed measures to reduce or respond to such demand(s) are:
N b DJ't
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
Na0a
SEPA Environmental checklist(WAC 197-11-960) guidance updated March 2012