HomeMy WebLinkAboutBLD2023-00129 Garage - BLD Inspections - 8/1/2024 ` \ 615 W.Alder St.Bldg 8,SHELTON,WA 98584
ry \ MASON COUNTY SHELTON:360-427-9670, EXT 352
COMMUNITY SERVICES BELFAIR: 360-275-4467, EXT 352
Budding,Planmmnq,[nvironmentaltkwlth,Communityllejlth ELMA:360-482-5269, EXT 352
`L-
- www.co.mason.wa.us
INSPECTION CARD AND CERTIFICATE OF OCCUPANCY**
To schedule an inspection call or visit http://www.co.mason.wa.us/community-services/bid-inspection. hp
Permit Number BLD2023-00129 Date Issued 02/10/2023 Issued By
Project DETACHED GARAGE/SHOP
Site Address 160 E Shady Valley Ln
Applicant SHARER RONALD J & BEVERLY A
Contractor
Contractor Phone
Primary Code UPC IBC, IRC,IFC, IEC,IMC,8, Type
Permit Type GARAGE/STORAGE Occupancy
-APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS.
-DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED.
-THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION, FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY.
-ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION.
-OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION.
**THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.—
PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET
Public Works Access/Driveway Other
Health Septic Well
Deptartment
Planning Site Inspection
Department
Fire Marshall Fire Apparatus Access Fire Sprinkler
Auto Fire Alarm Hood and Duct
Other Final
Building
Department Building Official: Community Services Designee
Concrete Setbacks -Z,Z.Z Slab ZS-Z fJL
Footing Perimeter �Lty 2 _ Point load Footing
Footing Interior Footing Decks/Porches
Foundation Stem Walls Other
Rough-In Groundwork Plumbing Framing
Groundwork Mechanical Plumbing
Groundwork Gas Pipe Mechanical
Gas Piping Shear Wall Nailing
Underfloor
Other
Insulation Slab Ceiling
Floor Vaulted Ceiling
Walls Vapor Barrier
Other
Wallboard Interior Wall Brace Panels Fire Walls
Nailing
Other
Final Building $-1_2 , G JCS
Manufactured Setbacks Setup
Home
Concrete Foot/Runners Final
Other
Metl(ew (-7to .. d,rf �s ht
/Af j2c-t v/r•.
Z-3 1-T 3 J7Z c�'�1-) . �Z3 Z�( 1ICO 7er,-t-,'4_ (Gt'
f i t,4,1 �iFu
�dA,VJS, "Tc%OK-T avrprovw (74d 7-( e 6 -'
MASON COUNTY 360-427-9670 Shelton ext.352
360-275-4467 Belfair ext.352
COMMUNITY SERVICES 360-482-5269 Elma ext.352
Building,Planning,Environmental Health,Community Health
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.co.mason.wa.us
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: i D 74Z3_
ADDRESS/LOCATION: n jtF7 S A4A/L t/a 11.e
FINDINGS•
i -P v — H ta-s o✓ h a 4-k u
�a�C`u�� -f (✓� ,H 1/7- w a 4 Iru f
41
N?�t�✓i4
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
all for re-inspection when corrections are made before proceeding with any further work.
Make corrections, items will be checked on the next inspection.
❑ OK to
Date: '7 3 l—2-; ❑ Please contact our office regarding possible
Department: uLD structural damage incurred by recent
Inspector: J 7L "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
a 40L
MASON COUNTY 360-427-9670 ext.352
COMMUNITY DEVELOPMENT www.masoncountywa.gov
Permit Assistance Center, Building,Planning
CORRECTION/INSPECTION REPORT
PERMIT/CASE NUMBER: BLD2023-00129
ADDRESS/LOCATION: 160 E SHADY VALLEY LN, ALLYN
FINDINGS•
1) PROVIDE ENGINEERS OR GEO-TECH APPROVAL FOR FOOTING/STRUCT
PLACEMENT WITH 3 5- FROM ADJACENT DESCENDING SLOPE REFERNCE[
SLOPE HAS BEEN CREATED USING IMPORTED FILL MATERIAL
2) PROVIDE COMPACTION REPORTS FOR ALL IN-PLACE FILL MATERIAL.
DO NOT POUR CONCRETE UNTIL APPROVAL HAS BEEN SUBMITTED TO COUNTY FOR REVIEW AND APPROVAL.
Items listed above must be corrected to gain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
✓❑ Call for re-inspection when corrections are made before proceeding with any further work.
Make corrections, items will be checked on the next inspection.
❑ OK to
Date: 7/31/23 ❑Please contact our office regarding possible
Department:BUILDING structural damage incurred by recent
Inspector:JOSHUA LUCK "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
vvNti ,d 23— D o 2.(:f%
Y
Evuv'rotech EwgLweenoO, T>c__.Lrc. RECEIVEI`:
ceotechw�cal Evt,v�rcwvuev.ta��pra%wage�Roadway
APR 19 2024
615 W. Alder Streei
April 18,2024
Ronald Sharer
160 E Shadey Valley Lane
Allyn,Washington 98524
Reference: Geotechnical Evaluation of fill slope
160 E Shadey Valley Lane,Allyn,Washington
BLD 2023-00129
Dear Mr. Sharer,
Envirotech Engineering, PLLC has completed a site inspection of a fill slope for a proposed garage. The
foundation and slab is currently in place.A site visit was conducted by Envirotech on April 17,2024.
The minimum distance from the concrete foundation/slab was about 6.5 feet from the top of fill slope.The
slope grade of the fill was generally inclined at 2:1. Some of the surface soils of the fill were measured to
be loose. However, Envirotech measured the foundation supporting soils beneath the surface soils to be
dense to very dense.
We conclude that the fill slope is stable with relation to foundation support. All exposed soils should be
permanently stabilized with vegetation in order to prevent surface erosion.
Thank you for the opportunity to work on this project. If you have any questions or need any further
assistance,please contact Michael Staten at 360-275-9374.
Sincerely,
Envirotech Engineering
yeti CLvap sr
w Asf,
43(WS i
Michael Staten,P.E.
Project Director
too gox984
', get fa%r, wasl�%wgtow y8.s28
Celt: 360-/o8y-6o45
ewvi.rotech@geotectiw%callv,,fo.covu
MASON COUNTY 360-427-9670 Shelton ext.352
360-275-4467 Belfair ext.352
COMMUNITY DEVELOPMENT 360-482-5269 Elma ext.352
Building,Planning,Fire Marshal
615 W.Alder St. Bldg.8 - Shelton,WA 98584 www.masoncountywa.gov
CORRECTIONANSPECTION REPORT
PERMIT/CASE NUMBER: AVz0z3-001Z?
ADDRESS/LOCATION: /`OO ✓
FINDINGS•
ft4C, Lot& �-- M414 AlOr il�oS y C�
Ald
OGL
reSS
Items listed above must be corrected to tiain compliance.
❑ THIS IS NOT A COMPLETE INSPECTION
❑ This structure has been inspected by Mason County Building Department and the items listed
above are in VIOLATION of Mason County laws and/or ordinances.
❑ Call for re-inspection when corrections are made before proceeding with any further work.
❑ Make corrections, items will be checked on the next inspection.
❑ OK to
Date: 7—1 7—Z [ Please contact our office regarding possible
Department: L structural damage incurred by recent
Inspector: "natural/man made"disasters.This is NOT a
CORRECTION NOTICE.
DO NOT REMOVE THIS TAG
MCC14.12
Mud Bay Geotechnical Services, llC
1001 Cooper Point Road SW,Suite 140,PMB#108 1 Olympia,WA 98502 1 360.481.9784 i CHeathman@MudBayGeotech.com
September 16, 2023 Project No: 2434-MAS
Page 1
Subject: Foundation Repair Report
160 Shady Valley Lane
Allyn, WA 98524
Mason County Parcel #12208-52-07038
Dear Ron Sharer,
Per your request, Mud Bay Geotechnical Services, LLC performed a site reconnaissance at the
site on August 22, 2023. The purpose of the site reconnaissance was to investigate the
compaction and side slopes and foundation subgrade within a fill pad already constructed on site
to support a new shop with a footprint approximately 30' x 40'. It is our understanding that the
original slightly sloping native ground was filled in to level the area where the shop is located. The
fill varies in height from little to no fill where it meets the existing grade up to as much as 10 to 12
feet at the southeast corner. The southeast corner coincides with where there was a natural dip
locally in the topography making it higher then the rest of the fill pad area. The more typical
maximum fill height elsewhere in the fill pad is in the range of approximately 6 to 8 feet. At the
time of the site visit the fill pad had already been placed to final height, and the forms and rebar
were in place for constructing the shop foundation and slab.
The fill material generally consists of moist, light brown, well-graded sand with gravel (SW). While
on site we did not observe any signs of groundwater or any drainage concerns that would
compromise the stability of the fill pad and side slopes. The top of the fill to the east of the structure
contains approximately 6 feet of level ground before transitioning to a side slope, with as little as
4 feet from the top of slope at the nearest point. The top of slope to the south of the structure is
as close as 6 feet from the footprint(near the SE corner) and widens to approximately 20 moving
west toward the existing parking area. As part of the site investigation, we probed the entire
subgrade at evenly spaced intervals using a Humboldt Manufacturing model H-4188 12 inch
2 4 3 4 - M A S 160 E Shady Valley Lane , Allyn WA 98524
inspection probe by putting the entire upper body weight onto the probe and measuring the depth
of penetration. The level bench area between the edge of the structure and the top of fill pad side
slope was found to be firm and unyielding at all locations.
GEOTECHNICAL RECOMMENDATIONS
Foundation Subgrade
Based on our observations and the results from the probe inspection, the fill has been placed and
compacted in a manner resulting in firm conditions throughout the fill pad. The foundation and
slab subgrade is suitable to support the typical loading from a single story shop structure. Due to
the wetter fall months coming in the near future, we recommend placing concrete as soon as
possible to reduce the potential for softening of the subgrade and pooling of water within the
foundation area.
Slope Stability
The side slopes of the embankment fill pad are currently greater than a 2H:1 V, and are
approaching 1 H:1 V in many locations. On a long term basis, the slopes will be stable at a slope
angle of 2HA V and additional fill will need to be placed on the outside to flatten the current slopes.
However, given the lack of indications of existing slope instability and erosion during this dry time
of the year, in our opinion the fill pad is stable at this time and we recommend proceeding with
construction of the shop foundations and slab, provided that temporary erosion control measures
are implemented as recommended below. Prior to November 1, 2023 when the wet season
begins, we recommend that all side slopes be flattened with new fill to 2H:1V on the outside to
ensure a long term stable slope configuration. Since the sloped portion of a fill is the most critical
for achieving proper compaction, we recommend that Mud Bay Geotechnical Services, LLC be
retained to ensure that the fill is placed and compacted properly for long term stability. The fill
should consist of a well-graded material (USCS soil classifications SW and GW) placed and
compacted in 6-inch lifts toercent of the maximum dry density of the material. The soil
material used for the current fill pad is a considered to be a suitable material. Prior to construction
of the fill, we recommend lab testing a sample of the material to determine the maximum dry
density and optimum moisture content to consider when verifying the condition of the placement
and compaction during construction.
2 1 P a g e
2434 - MAS : 160 E Shady Valley Lane , Allyn WA 98524
Temporary Erosion Control
Vegetation should be maintained where it currently exists on slopes where disturbance is not
necessary as part of construction. The fill side slopes and other disturbed slope areas should
receive jute placement as a temporary erosion protection measure.
and be hydroseeded to help reduce erosion potential. The jute should be anchored into the fill
slope using 9-inch landscaping staples at a 16-inch spacing.
Permanent Erosion Control
After the final fill wedge is placed, permanent erosion control measures should be implemented
using a combination of grass or mulch in combination with erosion resistant plantings. If mulch
is used, we recommend that a permanent plastic mesh netting be placed atop the mulch. The
netting can be anchored into the hillside using 8-inch landscaping staples placed at a 18-inch
spacing. In addition to the netting atop the mulch, straw wattles should be installed horizontally
across the slope face. The addition of straw wattles will work to slow the surface velocity of any
water sheeting along the slope while simultaneously providing an additional erosion control
measure and further mitigating the erosion of the permanent ground cover. WaTecom that
VPWF
the straw wattles are place 4-to - oo in ery long the slope. The straw wattles should
be a minimum 8-inch diameter secured with 24-inch wooden stakes installed at a maximum 2-
foot spacing. The ends of the straw wattles should overlap each other by a minimum of 12-
inches and be securely tied together. The performance of the straw wattles should be checked
periodically and any sloughed sediment on the upslope side of the wattle should be removed
when accumulation reaches half of the height of the wattle.
To ensure long-term erosion protection, vegetation should be planted along the slope face. The
slope should be planted with a mixture of deep-rooting, native Pacific northwest vegetation at an
appropriate spacing based on the specific growth requirements of the plants. A good
approximation for shrubs is in the range of 5-to 10-foot spacing, and 4-foot spacing for
groundcover vegetation. The hillside should be planted with enough vegetation to achieve a
dense cover for enhance erosion protection.
3 1 P a g e
2434 - MAS ! 160 E Shady Valley Lane , Allyn WA 98524
We appreciate the opportunity to serve your geotechnical needs on this project and look forward
to working with you in the future. Please contact us at your earliest convenience if you have any
questions or would like to discuss any of the contents of this report.
Sincerely,
Chris Heathman, P.E.
Mud Bay Geotechnical Services, LLC
Q NgASe
9/16/2023
46365 �gv
4 � '
Mason County
.- Mason County - Division of Community Development
615 W. Alder St.
H C Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
B DD2023-00129 GARAGE/ STORAGE
PROJECT DESCRIPTION: DETACHED GARAGE/SHOP ISSUED: 02/10/2023
SITE ADDRESS: 160 E SHADY VALLEY LN ALLYN
EXPIRES: 08/09/2023
PARCEL: 122085208015
APPLICANT: SHARER RONALD J & BEVERLY A OWNER: SHARER RONALD J & BEVERLY A
160 E SHADY VALLEY LN 160 E SHADY VALLEY LN
ALLYN, WA 98524 ALLYN, WA98524
1.360.275.6123
VALUATIONS: FEES: Paid Due
U VB Utility, miscellaneous 1200.00 $79,776.00 Building Permit Fee $931.42 $0.00
State Fee-Residential $6.50 $0.00
Technology Surcharge $30.74 $0.00
Planning Review Fee $240.00 $0.00
Plan Check Fee $605.42 $0.00
Total: $79,776.00 Totals : $1,814.08 $0.00
REQUIRED INSPECTIONS
Setback Inspection Framing Inspection
Footing Inspection BLD-Final Inspection
Foundation Wall-Pre-Pour Inspection
CONDITIONS
* All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor
increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way.
The foundation/footing must be placed on undisturbed, firm-native soil. Proper frost depth shall be observed below grade
in undisturbed soils.
Printed by:Amber Selby on:02/10/2023 11:40 AM
Page 1 of 5
c
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2023-00129
Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries,
Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an
unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either
the homeowner, agent for the owner or a registered contractor according to WA state law.
* All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or
any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
* Concrete encased grounding electrodes must be installed and used at each new building or structure that is built upon a
permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor
& Industries (L&I).
For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-
4000.
* All building permits shall have a final inspection performed and approved by Mason County Building Department prior to
permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property
records on file with Mason County as being non-compliant with Mason County ordinances and building regulations.
* All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as
adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted
classification. Any non-approved change of use or occupancy would result in permit revocation.
* Concrete used for basement walls, foundation walls, exterior walls, porches, carport slabs, steps exposed to the weather,
garage floor slabs and other vertical concrete work exposed to the weather shall have a minimum compressive strength of
3000 psi (IRC Table R402.2).
* REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable
provisions of the current code and the manufacturer's installation instructions.
A drip edge shall be provided at eaves and gables of shingle roofs.
* All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building
Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration.
Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No
more than one extension may be granted.
* WIND LOADS - Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind
speed for Mason County is 85 MPH.
* The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the
approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule,
minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being
performed or approvals granted.
* All property lines shall be clearly identified at the time of foundation inspection.
* The plan review check list and corrections are part of the approved plans and must remain attached. It is the responsibility
of the applicant, owner or contractor to make the required corrections indicated on the plans. Once the plans are marked
"APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is
responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of approved documents will result in failure of required building inspections.
* When parcel development requires direct access to county road(s), a Road Access Permit or Approval must be granted by
the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450 or
100 W Public Works Dr. Shelton. The building permit will not be finaled until the permit holder can show proof that the
access permit from Public Works has been finaled and approved.
Printed by:Amber Selby on:02/10/2023 11:40 AM
Page 2 of 5
t
Mason County
Mason County - Division of Community Development
615 W. Alder St.
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2023-00129
CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING
DEPARTMENT AND THE ADOPTED BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All
construction must be in conformance with the international codes as amended and adopted by Mason County. Any
corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting
additional inspections.
Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance
with Mason County Title 14.28 and 14.17.
The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not
allowed without the approval of the Mason County Fire Marshal.
Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate
building permit and approval prior to construction of the retaining wall.
A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit
application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the
responsibility of the owner/agent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that
Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement
of any development activities. "NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel
Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the
development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of
Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other,
parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is acknowledging that all components of the stormwater
management system have been installed as approved on the stormwater site plan.
Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit
revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or
contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained
permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The
owner or authorized agent represents that the information provided is accurate and grants employees of Mason County
access to the above described property and structure(s) for review and inspection. This permit/application becomes null &
void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of
180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT
APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION.
Printed by:Amber Selby on:02/10/2023 11:40 AM
Page 3 of 5
Y ,
Mason County
Mason County - Division of Community Development
615 W. Alder St.
' Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2023-00129
* Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and
MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either
private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an
existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance
and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting
from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any
construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that
office to review future planned work which may affect your project.
* By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your
"Approved Site Plan" to ensure these structures meet the setback conditions listed.
" All RED stamped approved plans are required to be on-site for inspection purposes. If an inspection is called for and
plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee
schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior to any further inspections
being performed or approvals granted.
The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more
than 150'from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards
for Fire Apparatus Access Roads up to the point where such roads connect with a county maintained public road or to
another fire apparatus access road which connects to a county maintained public road.
Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the
structure.
* Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site
plan. Please check your"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
When parcel development requires direct access to state road(s), a Road Access Permit or Approval must be granted and
approved by the Washington State Department of Transportation. For more information contact Washington State
Department of Transportation, at (206)357-2620, ext. 630.
" Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly
corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of
pressure treated material.
• Setbacks are measured from the furthest projection of the structure.
. This structure is approved as unheated space.
To be considered unheated space the area may be provided with a heating system that does not exceed maxium output of 1
watt per square foot., or 3.4 Btu/h per square foot. A permit and approval is required prior to installation of any heating
system.
When a heating system exceeds 1 watt per sq. ft (or 3.4 btu/h per sq. ft) the heated space shall be insulated in accordance
with the energy code in effect at the time of permit application.
Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to
the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of
the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In
addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the
Building Department prior to any further inspections being performed or approvals granted.
Printed by:Amber Selby on:02/10/2023 11:40 AM
Page 4 of 5
Mason County
Mason County - Division of Community Development
615 W. Alder St.
N`C
Building 8
Shelton, WA 98584
360-427-9670 ext 352
www.masoncountywa.gov
GARAGE/ STORAGE BLD2023-00129
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances go ng this type of work will be complied with whether
specified he4oa
ot. Th granting of it does not presume to give authority to violate or cancel
the provisioy oth r state/loca ulating construction or the performance of construction.
Issued By:
Contract or Authorized Agent: Date:
Printed by:Amber Selby on:02/10/2023 11:40 AM
Page 5 of 5