Loading...
HomeMy WebLinkAboutFIR Inspections - 1/17/2018 TO BE KEPT IN THE " PARCEL FILE Mason County Community Services Building Division SPECIAL INSPECTION & 615 WAtderStreet Shelton, WA 98S84 TESTING AGREEMENT 360•427,s67o ext. 35z www.Co.Mason.wa..us (All references are per the 2015 International Building Code) Project Name: _Phil Pugh Stadium Concessions Building Project Address: _200 East Campus Drive, Beifair, VVA 98528 Building Permit Number; Date Issued BEFORE A PERMIT CAN BE ISSUED: The registered Design Professional in responsible charge shall fill out the Agreement and include the name and address of the company or inspector. Two (2) copies of this form are to be submitted to the County prior to the issuance of a building permit. If changes are made as to who will perform the special inspections a new form shall be submitted and turned into the Building Permits&Inspections Division for approval. STATEMENT OF SPECIAL INSPECTIONS: In addition to this Agreement, a "Statement of Special inspections" shall be provided per IBC 1704.3, This Statement shall be made as part of the approved plans, and be placed in a conspicuous location,such as the first page of the construction plans or the first page of the structural sheets. SPECIAL INSPECTORS: All special inspectors shall be approved by the Building Division prior to performing any duties, The special Inspector shall provide proof of certification as a special inspector for each inspection item and be licensed by the State of Washington. SPECIAL INSPECTION;REPORTS: Special inspection reports are to meet the requirements of i8C 1704.2.4. Copies of each report are to be sent to the address listed in the letterhead noting the Project Address and Permit Number. A final report shall be submitted stating that all special inspection and structural testing items were completed and are in conformance with the approved design drawings and specifications. Items not in conformance, unresolved items,or any discrepancies in Inspection coverage(i.e. missing inspections, periodic inspections when continuous was required, etc.) shall be specifically itemized in the final report. Materials Testing &Consultants, Inc. (MTC) Areas requiring special inspection: Name of Agency: Address&Contact information IN Unapproved Fabricators(IBC 1704,151 MTC 601-651-312 Other than Structural Steel(IBC Table 1705.2.2) El Steel floor&roof decks ❑ Welding of reinforcement ❑ Coid-formed steel MTC 601-651-312 Structural Steel it welding(Per N5.4 of AiSC 360.10) 0 Details(Per N5.7 of AISC 360-10) ❑ High-strength bolts(Per N5,6 of AISC 360-10) MTC 601-651-312 Concrete Construction (per IBC Table 1705.3) it Reinforcement,embeds,anchors 6 Formwork IN Materials ❑ shotcrete ❑ Post-tensioned/Pre-stressed Concrete Erection of precast concrete MTC 601-651-312 Page 1 of 3 Mason County Community Services Building Division 615 W Alder Street SPECIAL INSPECTION & Shelton, WA 98584 TESTING AGREEMENT 360.427.9670 ext. 352 www.co.mason.wa.us Areas requiring spe ial inspection: Name of Agency: Address$Contact Information Masonry Construction(IBC 1705.4) El Prior to Construction(Article 1.15,TMS-602) As Construction Begins(Article 1.19.2,TMS-402) LS Prior to Grouting(Table 1.19.2,TMS-402) During Construction(Per TMS-402&TMS-602) MTC 601-651-312 Wood Construction ❑ High-load Diaphragms(IBC 1705.5.1) ❑ Wood Trusses>60ft(IBC 1705.5.2) It Soils(IBC Table 1705.6) MTC 601-651-312 ❑ Driven Deep Foundations(IBC Table 1705.7) ❑ Cast-in-place Deep Foundations(IBC Table 1705.8) Helical Pne Foundations(IBC 1705.9) ❑ Sprayed Fire-Resistant Materials(IBC 1705.13) ❑ Mastic&Intumescent Coatings(IBC 1705.14) D EIFS 118C 1705,15) ❑ Fire-Resistant Penetrations(IBC 1705.16) ❑ Smoke Control(IBC 1705.17) Structural Steel(IBC 1705.12.1&AISC 341-10) Structural Wood(IBC 1705.12.2) v Page 2 of 3 Moson County Community Services Building Division SPECIAL INSPECTION & 615 WAlder Street Shelton, WA 98584 TESTING AGREEMENT 360.427.9670 ext. 352 WWW.co.moson.wa.us ❑ Cold-formed Steel(IBC 1705.12.3) Mechanical&Electrical Components(170S.12.4) MTC 601-651-312 ❑ Architectural Components(IBC 1705.12.5) ❑ Storage Racks(19C 1705.12.7) ❑ other (18C 1705.1.1) Structural Observations % S�`R t� r<2'ro P/tG�i�rC_k�tt� S�.> rot-, 1_1 Declaration by Architect/Engineer 1, the design professional in responsible charge for this project, declare that the above listed special inspection and strul3oral Wsting items are required for this project in accordance with IBC Chapter 17. 1h:415 Signature(Engt er) Date Signature!'"(Architect) Date d f/� f{.....• Signature (Geologist) Date Declaration by Owner 1,the Owner of the project,declare that the above listed firm(s)or individual(s)are hired by me to perform special inspections and s ct 1 testing the project pursuant to ISC 1704.2. i 7 ", Signature + Date CONTRACTOR RESPONSIBILITY: Each contractor involved with the construction of wind or seismic force-resisting systems shall comply with the requirements of IBC 1704A. The contractor is responsible for providing the special inspector access to approved plans and contract documents at the job site. All special inspection records shall be retained at the job site by the contractor and shall be made available to the Building Department upon request. Declaration by General Contractor 1,the General Contractor of the project,agree to comply with the"Contractor Responsibility"items noted above. Signature Date Page 3 of 3