Loading...
HomeMy WebLinkAboutBLD2024-00723 Reroof - BLD Inspections - 7/31/2024 INSPECTION CARD Mason County 615 W. Alder St. Building 8, Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov PERMIT# BLD2024-00723 PROJECT ADDRESS 1960 E Trails End Dr Belfair, WA 98528 PARCEL# 222235104024 PROJECT DESCRIPTION REMOVE COMP ROOF INSTALL NEW COMP ROOF WITH CORRECT VENTILATION OWNER ADDRESS PHONE CONTRACTOR PATRIOT ROOFING LLC ADDRESS 1623 STONE DR NW PHONE 253.857.2420 CONTRACTOR LICENSE PATRIRL884BL LENDER INSPECTION INSP DATE Comments INSPECTION INSP DATE Comments Re-Roof-Final Inspection _31_ `- INSPECTION RESULTS Pagel Department of Community Development MASON COMMUNrrY SERVICES COUNTY 615 W Alder St,Shelton,WA 98584 ------------�^ (360)427-9670 Application# BLD2024-00723 Application REROOF-RESIDENTIAL Application# BLD2024-00723 Ty Parcel# 222235104024 Site Address 1960 E Trails End Dr Belfair,WA 98528 7131/24 N N Nicole Norris RE-ROOF-FINAL INSPECTION 07/31/2024 FAIL 1.SCREEN/SOFFIT DAMAGED.PLEASE FIX HOLE IN SOFFIT AND SEND PHOTOS TO NN OR R IS@MASO NC OU NTY WA.GOV GENERAL OBSERVATIONS `AWAITING INSPECTION Description Status Status Date .......... ...__. _._........................._._... ..__ .. ._._.. _..._...._.. ......... .......... ... .... ................. ............................. .; c Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov B DD2024-00723 REROOF- RESIDENTIAL PROJECT DESCRIPTION: REMOVE COMP ROOF INSTALL NEW ISSUED: 06/12/2024 COMP ROOF WITH CORRECT VENTILATION SITE ADDRESS: 1960 E TRAILS END DR BELFAIR EXPIRES: 12/09/2024 PARCEL: 222235104024 APPLICANT: BECKER JEROME G&NOEMI C OWNER: 1960 E TRAILS END DR BELFAIR,WA 98528 CONTRACTOR: PATRIOT ROOFING LLC 1623 STONE DR NWGIG HARBOR,WA 98312 253.857.2420 GENERAL CONTRACTOR'S LICENSE: PATRIOT ROOFING LLC License: PATRIRL884BL 1623 STONE DR NWGIG HARBOR,WA 98312 Expires: 01/14/2026 253.857.2420 FEES: Paid Due Re-Roof Residential Base Fee $120.00 $0.00 Technology Flat Convenience $5.00 $0.00 Fee State Fee-Residential $6.50 $0.00 Totals : $131.50 $0.00 REQUIRED INSPECTIONS Re-Roof-Final Inspection CONDITIONS Printed by:Anna Schaffran on:06/13/2024 08:49 AM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov REROOF- RESIDENTIAL BLD2024-00723 * Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * Roof Slope: IRC Chapter 9. Roof slope must be indicated to ensure selected roof covering is allowed on designed pitch. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant one or more extension of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicate that circumstances beyond the control of the permit holder prevented action from being taken. * Attic Ventilation: IRC section R806 Enclosed attic and rafter area shall be supplied with cross-ventilation. * All roof structures must be equipped with gutters, downspouts, and splash blocks or other approved conveyance/collection system. * REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. A drip edge shall be provided at eaves and gables of shingle roofs. * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished.Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION UNLESS OTHERWISE APPROVED. * Insulation: R503.1.1 2021 WSEC- Roofs without insulation in the cavity and where the sheathing or insulation is exposed during re-roofing shall be insulated either above or below the sheathing.All attic/roof insulation must comply with section R402.2 and table R402.1.3 of the 2021 WSEC * WIND LOADS- Roof coverings shall be designed and tested to withstand the maximum basic wind speed. The basic wind speed for Mason County is 85 mph with 110 mph gust factor. Printed by:Anna Schaffran on:06/13/2024 08:49 AM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 lop Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov REROOF- RESIDENTIAL BLD2024-00723 Single rafter joist roof replacement shall be insulated to a minimum of R-38 allowing for a minimum of one-inch continuous vented airspace above the level of insulation. CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. " All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/local law regulating construction or the performance of construction. Issued By: . Contractor or Authorized Agent: (Q4 b_f2P. jDri TW O-f) Date: 6to. 1� . 2-02-4 Printed by:Anna Schaffran on:06/13/2024 08:49 AM Page 3of3