Loading...
HomeMy WebLinkAboutCOM2016-00066 Cancelled Remodel Admin Annex - COM Permit / Conditions - 9/30/2016 " MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT � one: (36 )42 9670, ext. 352 PSon �optiT Phone: (360)427-9670, ext. 352 t Mason County 615 W Alder St Shelton, WA 98584 COMMERCIAL BUILDING PERMIT COM2016-00066 OWNER: NORTH MASON SCHOOL DISTRICT RECEIVED: 4/27/2016 CONTRACTOR: LICENSE: EXP: ISSUED: 9/30/2016 SITE ADDRESS: 200 E CAMPUS DR BELFAIR EXPIRES: 3/30/2017 PARCEL NUMBER: 122082260000 CANCELLED LEGAL DESCRIPTION: NW NW EX VACATED PART OF LAKEWOOD PLAT K PROJECT DESCRIPTION: DIRECTIONS TO SITE: REMODEL THE EXISTING HIGH SCHOOL ADMINISTRATION FOLLOW ST RT 3 TO NORTH MASON SCHOOL RD, THEN R ON CAMPUS ANNEX TO BECOME THE SCHOOL DISTRICT DR ADMINISTRATION BLDG General Information Construction&Occupancy Information No. of Units: Type of Constr.: VB Type of Use: EDUCATION Insp.Area: No. of Bathrooms: Occ. Group: B &A-3 Type of Work: ALT Fire Dist.: 2 Valuation: $ 1,615,608.80 No. of Stories: Exit Design. Load: 371 Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: 13,165 Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline& Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Not Applicable Side 1: Ft. SEPA?:No Comp. Plan Desig.: Rural Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Y Emergency Key Box?: Y Standpipe?: N Auto Fire Sprinkler System?: N Access Road?: Y Fire Extinguishers?: Y Fixed Fire Suppression System?: N Fire Hydrants?: ? Fire Lanes?: ? COM2016-00066 Please refer to the following pages for conditions of this permit. Page 1 of 8 Plumbing Fixtures mecnanlcal rlxtures rr-_a Type Qty. Type Qty. Type By Date Amount Receipt Dishwasher 1 EH Minor Plan Review rnnnn d/77/7n1F 0*1nn nn S97n1Fnn Drinki4ig Fountain 2 Planning Review Fee (-nenn d/97/9n1F Tz�sn nn v99n1Fnn Floor,Sink 1 Plan Check Fee T)A/ g/15t/9n1F tl;1n7 1F C9?n1Fnn Kitchen Sink 1 IFC Plan Check Fee TIN Q/13/gn1F a7 FFs F7 Cnnirnn Lavatories 6 Building State Fee TIA/ Q/1'i/7n1F �a Fn S79n1rnn Urinal 2 Building Permit Fee TIN gn3/9n1F -t7 R57 1F R9?n1Fnn Water Closets (Toilets) 8 Plumbing Base Fee TIA/ Q/1i/gn1F 10a 7n g77n1Fnn Water Heaters 1 Mechanical Base Fee TtAI Q/1,wgn1F q9.9 Fn S79n1Fnn Plumbing Permit Fee T1A/ Q/1,i/7n1F It1g1 an G99n1Fnn Total $16,196.97 CASE NOTES FOR COM2016-00066 CONDITIONS FOR COM2016-00066 1) Fire Alarm and Sprinkler system will need seperate permit applications. Fire lines can be identified at a later time, but should include the area around the structure and be painted red with white lettering "NO PARKING FIRE LANE". X 2) A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at(360) 427-9670, ext. 450. The building permit will not be"Pinaled" until the permit holder can show proof that the access permit from Public s has been "finaled" and approved. X ) 3) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-098Z.> he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 4) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour wUL be charged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. X 5) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 6) THE F - ATION SYSTEM SHALL BE PLACED ON UNDISTURBED, FIRM-NATIVE SOIL. X COM2016-00066 Page 2 of 8 7) The approved site plan is required to be on-site for inspection purposes. If inspection is called for and the site plan is not on site, Approval WILL NOT be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collected by the Mason County Building Department prior to any further inspections being performed or approvals granted. - _ X _ 8) A conc ncased grounding electrode must be installed and used at each new building or structure that is built upon a permanent concrete foundation. In Mason County the electrical code is regulated by Washington State Department of Labor& Industries (L&I). For more information contact L&I for additional information. In Olympia call (360)902-6350 and in Bremerton call (360)415-4000. X (�) 9) Ina n to the inspections required in IBC, Section 109, the owner, the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed under Chapter 17 and as specified by the design professional. The special inspectors duties & responsibilities shall be as specified in Chapter 17. Special inspection reports shall be submitted to the Mason County Building Department, 615 W Alder St, Shelton WA 98584 and available for inspection. Inspection reports shall be completed and submitted to the dept. in a timely manner and shall be submitted prior to the framing and final os upancy inspections. X 10) Any anges in construction shall be reviewed by engineer of record and submitted in writing to the Mason County Building Department prior to construction. All engineering documents are a part of the approved set of plans and must remain attached thereto. If engineering documents are removed, approval will not be granted. In addition, a reinspection fee, based on the current fee schedule, minimum one-hour will be charged and collecte the Mason County Building Department prior to any further inspections being performed or approvals granted. X 11) ALL C RUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE O E OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 12) Changes to approved building plans that affect compliance to the current Washington Sta a Energy Code (WSEC), ventilation requirements), Buildi /Plumbing/Mechanical Codes and/or Mason County Regulations shall be approved prior to construction. X 13) CO' UCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Maso unty Building Inspector shall be made prior to requesting additional inspections. X COM2016-00066 Page 3 of 8 14) New and replaced heating equipment shall meet the requirements of the internation tnergy conservation uoae as amenaea vvasnington jtate Energy Code (WSEC), and applicable sections of the IBC and IMC. All new or replaced heating equipment shall meet the efficiency requirements of WSEC C403.2.3. Those parts of heating systems that are altered or replaced shall comply with the current Washington State Energy Code (WSEC), Section C101.4.3.2. When a space-conditioning system is altered by the installation or replacement of space conditioning equipment (including replacement of the air handler, outdoor condensing unit of a split system air conditioner or heat pump, cooling or heating coil, or the furnace heat exchanger), the duct system that is connected to the new or replacement space-conditioning equipment shall be installed and sealed in accordance with C403.2.7. All new and replaced heating equipment shall comply with WSEC Section C403. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted practice, including infiltration and ventilation. Provide design calculations during inspection. Referencing WSEC C403.2.7 and IMC Chapter 6, all new ducts, air handlers, filter boxes, and building cavities shall be sealed. All joints of duct systems and seams shall be made substantially air tight by means of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Closure systems used with rigid fibrous glass ducts shall comply with UL181A and shall be marked 181A-P for pressure-sensitive tape, 181A-M for mastic or 181 A-H for heat-sensitive tape. Closure systems used with flexible air ducts and flexible air connectors shall comply with UL181 B and shall be marked 181 B-FX for pressure-sensitive tape or 181 B-M for mastic. Duct connections to flanges of air distribution system equipment or sheet metal fittings shall be mechanically fastened. Mechanical fasteners for use with flexible nonmetallic air ducts shall comply with UL 181 B and shall be marked 181 B-C. Crimp joints for round metal ducts shall have a contact lap of at least 1-1/2 inches (38 mm) and shall be mechanically fastened by means of at least three sheet-metal screws or rivets equally spaced around the joint. Closure systems used to seal metal ductwork shall be installed in accordance with the manufacturer's installation instructions. Duct tape is NOT permitted as a sealant on any new duct systems. When new ducts are located in unheated spaces the ducts shall be insulated to R-8 X 15) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliaD th Mason County ordinances and building regulations. X 16) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permi der have prevented action from being taken. No more than one extension may be granted. X COM2016-00066 Page 4 of 8 jl7) An inspection performed by a representative of the geologist, their authorized representative, or engineer of record, snail be completed on-site prior to the footing pour to verify that earthwork and foundation installation activities comply with the Geotechnical report or assessment recommendations. In addition a final inspection report, prepared by a representative of the geologist, their authorized representative, or engineer of record shall be required to verify that erosion control, drainage and final work is completed in accordance to the Geotechnical report or assessment recommendations. Reports shall be submitted to the Mason County Building Dept., PO Box 186, Shelton, WA 98584, prior to the footing and final inspections and avail spection. X 18) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, co ectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 19) Recycla aterials & Solid Waste Storage: Space shall be provided for the storage of recycled materials and solid waste. The storage area shall be design eet the needs of the occupancy, efficiency of pick-up, and shall be available to occupants and haulers.X 20) No building or structure shall be used or occupied, and no change in the existing occupancy classification of the building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the codes or ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. X 21) The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code, or any other code or ordinance of Mason County. Permits presuming to give authority to violate or cancel the provisions of the building code or other ordinances of the jurisdiction shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of this code or of any other ordinances of this jurisdiction. X X4) 22) A full, NFPA ompliant fire alarm system shall be installed throughout the building under a separate permit issued by Mason County. Complete permit applications shall be submitted with ample time for review and approval, prior to the installation of any component of the required fire protection systems. Fire alarm permit final inspection and approval shall be obtained prior to requesting a final inspection. X 23) In accor e with IBC 703.6, fire barriers shall be effectively and permanently identified with signs or stenciling within the space above the ceiling grid. X COM2016-00066 Page 5 of 8 • 24) Fire extinguishers are required for this occupancy. Minimum rating of 2-H:1 u-tt:U requirea. Tire extinguisner snail oe iocatea along a patn or egress and spaced such that not more than 75 feet of travel distance exists between any point inside the building and an extinguisher. Extinguishers shall be located not higher than 5 feet above the finished floor. Indoor fire extinguisher cabinets shall not be equipped with locks. Extinguishers shall have a service tag verifying they have been serviced by a professional extinguisher company. If extinguisher is recently purchased, the tag inside the box may be affixed to the extinguisher with "NEW" and the date of purchase. X 25) Third- r y Special Inspection is required in accordance with IBC Sections 1704 & 1705 for the items identified in the Statement of Special Inspections (as required by IBC Section 1704.3). In accordance with IBC Section 1704.4, each contractor responsible for the construction of the work listed in the statement of special inspections shall submit a written statement of responsibility to the building official and the owner prior to the commencement of work on the system or component. The contractor's statement of responsibility shall contain acknowledgment of awareness of the spec I requirements contained in the statement of special inspections. X 26) Plan eview Requirements: And any identified corrections, along with the Energy Code Compliance Worksheet(when applicable) are part of the approved plans and must remain attached thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. All proposed changes to "APPROVED" building plans that affect compliance with the Codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by the Building and Planning Departments prior to construction. Failure to comply and/or removal of attached clocuments,,will result in failure of required building inspections. X 27) Storage racks greater than 69" and up to 60" in height shall be installed in accordance to manufacturer specifications for seismic attachment. When seismic attachment is not provided by the manufacturer an engineered design and attachment details shall be required. Installation specifications or engineer's design shall be available during inspections performed by the Mason County Building Department. Storage racks greater than 8-ft in height shall require an engineer's design addressing seismic conditions and attachment. In addition, storage racks 8-ft tall or more shall require special inspection performed by the design professional or an approved representative. The special inspection report and engineered design shall be provided to the Mason County Building Department for approval prior to the final occupancy inspection. X- /00;5) 28) The stru ure is subject to inspection by the Mason County Fire Marshal. All corrections deemed necessary by the Fire Marshal, to assure the minimum fire and life safety requirements as adopted by Mason County and Washington State may be required. X COM2016-00066 Page 6 of 8 OWNER/ BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s) for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. 1?3 / f Si atare---- Date egL e— ..� OWNER - EPRESENTATIVE - CONTRACTOR Print Name Circle on ate► COM2016-00066 Page 7 of 8 n O Z N CONCRETE MECHANICAL MANUFACTURED HOME O Footings 1 Setbacks Date By Ribbons Gas Piping _ p Interior Date By Interior.Date By Date By � rn Exterior Date By Exterior-Date B Set-up > Point Load/Isolated Footings INSULATION Date By Z BG l SLAB INSULATION Date By Data By. FIRE DEPARTMENT n Foundation Walls Floors Date By = Date By Data By DECKS O FRAMING Wails Date By 0 Date By Data By PROPANE TANKS 0 PLUMBING VaultDate By Date By OTHER Groundwork Attic n Typo —I Date By Date By Date By D-W.v DRYWALL Type 0O Int Brace Wall Date By Date By w_�. � M___ 9 Date By FINAL INSPECTION N Water Line [Date ire Seperation Date By By Date By fA O Pass or Request Inspect. o T of in Fail Date Date Dane By Comments CANUELLLU -7- --� ,v 00 0 00 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 426 West Cedar Street ♦ PO Box 279 ♦ Shelton,WA 98584 (360)427-9670 EXT. 352 FAX (360)427-7798 HOME PAGE—www.co.mason.wa.us Special Inspection Authorization Project Owner: North Mason School District Building Permit Number O.OrY1 26 Ito -coo(0(0 Project Address: 200 E. Campus Dr, Beifair,WA 98528 Engineer/Architect of record: Raymond Mow, AIA In addition to the inspections required by International Building Code (IBC) Section 109, the owner or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide special inspections during construction on the types of work listed under IBC Section 1704. This form must be completed by the owner or the engineer or architect of record, prior to permit issuance, indicating who will perform the required special inspections for this particular project. The specified special inspector(s) shall perform the required special inspections during construction of the project, submit all inspection reports to the Building Department and provide a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance to the approved plans and specifications and the applicable workmanship provisions of the IBC. The following checked items require special inspection: 1. Concrete. During the taking of test specimens and placing of reinforced concrete. (IBC 1704.4) 2. ' is installed in concrete. Pn ;creases permitted by Table 1912.2 and-section 1912.5 are utilized. (IBC 1704.4) 3. Erection of precast concrete members. Periodic inspection per ACI 318: Ch 16. (IBC 1704.4) 4. Shotcrete. Continuous inspection per ACI 318: 5.9, 5.10 and IBC Chapter 19. (IBC 1704.4) 5. Reinforcing steel and prestressing steel tendons. Inspection of reinforcing steel including prestressing tendons. (IBC 1704.4) 6. Welding of reinforcing steel. Inspection of the welding of reinforcing steel according to AWS D1.4, ACI 318: 3.5.2, and IBC 1903.5.2. (IBC 1704.4) 7. Structural welding. Welding inspection shall be in compliance with AWS D1.1. (IBC 1704.3.1) 8. High-strength Bolting. The installation of high-strength bolts shall be periodically inspected in accordance with AISC LRFD Section M2.5. (IBC 1704.3.3) 9. Structural Masonry. Masonry construction shall be inspected and evaluated with the requirements of IBC section 1704.5. 10. Soils. Inspections for fills 12 inches or greater to be performed in accordance with IBC Section 1704.7. 11. Pile foundations. Inspector to be present when pile foundations are being installed and during tests. (IBC 1704.8) 12. Pier foundations. Special inspection of pier foundations for buildings are required in seismic Zone D. (IBC 1704.9) 13. Spray-applied fire resistant materials. Inspections shall be in accordance with sections 1704.11.1 through 1704.11.5. 14. Exterior insulation finish system (EIFS). Special inspection shall be required for all EIFS systems. (IBC 1704.12) Continued on reverse side 15. Smoke-control system. Smoke control systems shall be tested by a special inspector per IBC Section 1704.14. 16. Special cases. Special inspection shall be required for proposed work that is, in the option of the building official, unusual in its nature such as alternative methods and material of construction, unusual design applications, and materials and systems required to be installed in accordance with additional manufacturer's instructions that prescribe requirements not contained in the IBC or referenced standards. Installation of structural epoxies A Installation of "high-load shear panels" Structural Observation (IBC1709) AOther: Anchors post installed in hardened concrete Special Inspector Selection: The special inspection agency and special inspector shall be registered by the Washington Association of Building Officials (WABO)for the particular type of construction or operation requiring special inspection. Such inspector(s) shall be selected by the owner or the owner's agent and approved by the Building Official prior to issuance of the building permit. The owner's agent shall not be acting as, or employed by the special inspection agency or the contractor for this project. Name of Special Inspector or Agency: Type of Inspection: Registration Number: Materials Testing&Consulting, Inc. (MTC) 601-651-312 Authorization: I hereby state that I am the legal owner of the project property, or that I am the legal owner's agent who is not employed by a special inspection agency or contractor associated with this project. In addition, I agree to comply with the special inspection requirements established by Chapter 17 of the International Building Code as adopted by Mason County. Raymond Mow Sig atur Printed Name A Owner A t Date PURPOSE OF SPECIAL INSPECTION Special inspection is the monitoring of materials and workmanship which are critical to the integrity of the building structure to assure that the approved plans and specifications are being followed and that relevant codes are being observed. Special inspections are in addition to those conducted by the county building inspector and by the engineer or architect of record. Special inspectors furnish inspection at all times that their presence is required by the code, the plans and specifications, and the enforcing jurisdiction. Good communication between the special inspector and the designer, contractor, and building department is essential. DUTIES AND RESPONSIBILITIES OF THE SPECIAL INSPECTOR: Special inspectors are individuals with highly developed, specialized skills who observe those critical building or structural features which they are qualified to inspect. Duties of special inspectors and/or inspection agencies include the following: 1. General Requirements Special inspectors shall review approved plans and specifications for special inspection requirements. Special inspectors shall comply with the special inspection requirements of the enforcing jurisdiction. 2. Signify Presence at Job Site Special inspectors should notify contractor personnel and the enforcing jurisdiction of their presence and responsibilities at the job site. 3. Observe All Work for Which They Are Responsible Special inspectors shall inspect all work and perform or observe all tests requiring inspection and testing for conformance with the building-department-approved (stamped) drawings, specifications and applicable provisions of the code. 4. N'otification of Discrepancies Special inspectors shall bring all nonconforming items to the immediate attention of the contractor. If any such item is not resolved in a timely manner or is about to be incorporated in the work, the engineer'or architect of record and the building official should be notified immediately by telephone or in person, and the item noted in the special inspector's written report. The special inspector shall write a separate report to be posted at the job site regarding noted discrepancies which should contain, as a minimum, the following information about each nonconforming item: • Description and exact location, • Reference to applicable detail of approved plans/specifications, • Name and title of each individual notified and method of notification, and • Resolution or corrective action. 5. Reports A. Inspection reports The special inspector should complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. These reports should be organized on a daily format and may be submitted weekly at the option of the building official. In these reports, special inspectors should: • Describe inspections and tests made with applicable locations; • List all nonconforming items; • Indicate how nonconforming items were resolved; • List unresolved items, parties notified, and time and method of notification; and • Itemize changes authorized by the architect/engineer of record and approved by the building department, if not included in the nonconformance items. B. Final reports Special inspectors or inspection agencies shall submit a final, signed report to the building department stating that all items requiring special inspection and testing were fulfilled and reported and, to the best of their knowledge, in conformance with the approved design drawings, specifications, approved change orders and the applicable provisions of the code. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e., missed inspections, periodic inspections when continuous was required, etc.)should be specifically itemized in this report. DUTIES AND RESPONSIBILITIES OF THE CONTRACTOR: The contractor's duties include responsibility for notifying the special inspector or agency regarding individual inspections required by the Building Department, or required by the International Building Code, Chapter 17. Adequate notice shall be provided so that the special inspector shall have appropriate access to the approved plans at the job site prior to the required inspection. The contractor shall not perform any work that requires special inspection without the special inspector present. Completion of this form, and the performance of special inspections does not relieve the contractor's responsibility to schedule required inspections by the Mason County Building Department prior to concealing any work. DUTIES AND RESPONSIBILITIES OF THE ENGINEER OR ARCHITECT OF RECORD: The engineer or architect of record is responsible for identifying which special inspections are necessary, developing a schedule of required special inspections, and assisting the owner in the selection of the special inspector. The engineer or architect or record shall review the special inspection reports to determine that all required special inspections have been performed and that all discrepancies (if any) have been resolved. DUTIES AND RESPONSIBILITIES OF THE PROJECT OWNER: The project owner, or the engineer or architect of record acting as the owner's agent, is responsible for the funding of all required special inspection activities in accordance with International Building Code Section 1704. t Materials Testing & Consulting, Inc. ETC . Geotechnical Engineering&Consulting•Special Inspection•Materials Testing•Environmental Consulting Y"•�u�k a.r�'w November 3, 2016 North Mason School District Attn: Eric Nelson 71 East Campus Drive Belfair, WA 98528 Sent via email: enelsonna,hainline.net Re: Final Letter Hawkins Renovation Project—Adinin Building— PO 2001400053 200 E. Campus Drive, Belfair, WA I LDG Per ' 16-00066 Mr.Nelson, Materials Testing &Consulting, Inc. (MTC) provided materials testing and special inspection services during construction of the above-referenced project. This letter is a statement declaring the actual work inspected by MTC itemized below was found to be,to the best of the inspector's knowledge, in accordance with project plans, specifications,engineer approved revisions, and the International Building Code. The following is the scope of inspections performed on this project. / Reinforced Concrete / ♦ Proprietary Anchors Special Inspection The results of our services were provided to the local building department for review. Only WABO Certified special inspectors were utilized to perform those specific inspections as required by the Special Inspection Agreement. Any items that were found to be in noncompliance with the approved construction documents were repaired or replaced, and re-inspected for acceptance. To the best of our knowledge, items that were observed by Materials Testing & Consulting, Inc. during continuous or part time inspections for the noted project are compliant with approved plans and specifications. LIMITATIONS The services provided as described in this report include professional opinions and judgment based on the data collected and our field observations. These services have been performed according to the specified codes, industry standards, and generally accepted engineering practices. No warranty, express or implied, is provided. Representatives of Materials Testing & Consulting, Inc. did not supervise, direct, alter, amend or change project specifications or contractor activity. Our statement of conformance pertains to only those items inspected and tested by Materials Testing& Consulting, Inc.for the subject project during the time period when we were on-site. This report may be used only by the client and only for the purposes stated, within a reasonable time from its issuance. Any party other than the client who wishes to use this report shall notify Materials Testing& Consulting, Page I of 2 Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia, WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 805 Dupont S1, Suite 5 • Bellingham, WA 98226 • Phone 360.647,6061 • Fax 360.647.8111 Kitsap Region • 5451 N.W. Newberry Hill Road, Suite 101 • Silverdale, WA 98383 • Phone 360.698,6787 • Fax 360.692.1919 Visit our website: www.mtc-inc.net 1 , Materials Testing & Consulting, Inc. Gtadx Geotechnical Engineering&Consulting•Special Inspection•Materials Testing•Environmental Consulting arracrr+�'"" Inc. of such intended use. Based on the intended use of the report, Materials Testing& Consulting, Inc. may require that additional work be performed and that an updated report be issued. Non-compliance with any of these requirements by the client or anyone else will release Materials Testing & Consulting, Inc. from any liability resulting from the use of this report by any unauthorized party. We sincerely appreciate the opportunity to be of service to you on this project and look forward to offering our services again. If you should have any questions concerning this report, please contact the undersigned at your convenience. Respectfully Submitted, MATERIALS TESTING & CONSULTING,INC. Tim Macke S.W. Region General Manager/WABO Technical Director Page 2 of 2 Corporate • 777 Chrysler Drive• Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 SW Region • 2118 Black Lake Blvd. S.W.• Olympia, WA 98512 • Phone 360.534.9777 • Fax 360.534.9779 NW Region • 805 Dupont St, Suite 5 • Bellingham, WA 98226 • Phone 360.647.6061 • Fax 360.647.8111 Kitsap Region • 5451 N.W. Newberry Hill Road, Suite 101 • Silverdale, WA 98383 • Phone 360.698.6787 • Fax 360.692.1919 Visit our website: www.mtc-inc.net sr 'err Mason County Department of Community Development � Mason County Bldg. 8,615 W.Alder Street MAN Shelton,WA 98584 360-427-9670 www.co.mason.wa.us Inspection Request Form Request Taken By: ✓❑ Marissa, ❑ Ariane, ❑ Jahanel, ❑ Date: 11-01-2016 Permit Number: COM2016-00066 HResidential, ✓ Commercial New Const. ✓ Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, ✓❑N/A Has Planning been scheduled for final inspection? e Yes, ❑ No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Mechanical and building final Phone Number: 360-791-6328 Project Address: 200 E. Campus Dr. Admin Date and Time of Inspection: Inspection Results / Comments 4:00pm Friday 11-04-2016 ❑ AP(Approved) ❑✓ DA(Disapproved) Type of Inspection: ❑Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) 1. Caulk around ducts in rated corridors ❑Shear(Exterior Nailing & Holddowns) 2. Replace insulation in rafters ❑Plumbing Underground ❑Plumbing Exterior(Sewer/Backwater) 3. Clean air handlers and remove debris ❑Plumbing Exterior(Water Supply) 4. Faint gas piping ❑Plumbing Rough-In ❑Mechanical Rough-In ❑Gas Piping (Pressure Test) 6 no vent registel's in corridnr naeri rlamTerc? ❑Framing 7. Firecaulk room side above ceilings where a-Fire Has L&I Approved the Electrical?) Resistive Penetrations (Commercial) orange foam was used in corridors ❑Wall Insulation ❑Ceiling and/or Floor Insulation UK or temp occupancy ❑Drywall Nailing [:]Re-Roof, Roofing Final p []Other Date: 11-4-16 ❑✓ Final (48 hr notice for PW, TIF) Rick Pope Inspected By: Mason County Department of Community Development i Mason County Bldg. 8,615 W.Alder Street cogEPROS Shelton,WA 98584 360-427-9670 " - www.co.mason.wa.us Inspection Request Form Request Taken By: ✓❑ Marissa, ❑ Ariane, ❑ Jahanel, ❑ Date: 10-28-2016 Permit Number, COM2016-00066 HResidential, ✓ Commercial New Const. ✓ Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, ✓❑N/A Has Planning been scheduled for final inspection? B Yes, ❑ No, ❑./ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Mechanical Final for Admin. Building Phone Number: Requester canceled. 360-791-6328 Project Address: 200 E Campus Dr. Belfair (Admin) Date and Time of Inspection: Inspection Results / Comments Monday 10-31-2016 ❑ !kp-{Aweved) T pe of Inspection: ❑ 8A(D ) Footings/Setbacks El []Foundation Wall/Stem Wall ❑ ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) Shear(Exterior Nailing & Holddowns) Plumbing Underground []Plumbing Exterior(Sewer/Backwater) ❑Plumbing Exterior(Water Supply) ❑Plumbing Rough-In ❑Mechanical Rough-In []Gas Piping (Pressure Test) ❑Framing O-Has L&I Approved the Electrical?) Fire Resistive Penetrations (Commercial) Wall Insulation []Ceiling and/or Floor Insulation []Drywall Nailing []Re-Roof, Roofing Final QOther Mechanical Final Date: ❑Final (48 hr notice for PW,TIF) Inspected By: c1111 Mason County Department of Community Development Mason County Bldg. 8,615 W.Alder Street ��OSShelton,WA 98584 360-427-9670 www.co.mason.wa.us Inspection Request Form Request Taken By: EZI Marissa, ❑ Ariane, ❑ Jahanel, ❑ Date: 10-27-2016 Permit Number: COM2016-00066 HResidential, ✓ Commercial New Const. ✓ Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, 0 N/A Has Planning been scheduled for final inspection? e Yes, ❑ No, 0 N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Phone Number: 360-791-6328 Project Address: 200 E. Campus Dr. Belfair Date and Time of Inspection: Inspection Results / Comments Friday 10-28-2016 ❑ AP(Approved) 0 DA(Disapproved) Type of Inspection: ❑Footings/Setbacks ❑ See Attached Correction Report []Foundation Wall/Stem Wall ❑ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) Plumbing Final Administration Building Shear(Exterior Nailing & Holddowns) Plumbing Underground 1. Insulate recirculating hot water pipes []Plumbing Exterior(Sewer/Backwater) 2. Replace flex connectors on water heater ❑Plumbing Exterior(Water Supply) QPlumbing Rough-In ❑Mechanical Rough-In ❑Gas Piping (Pressure Test) ❑Framing O-Has L&I Approved the Electrical?) Fire Resistive Penetrations (Commercial) Wall Insulation ❑Ceiling and/or Floor Insulation ❑Drywall Nailing []Re-Roof, Roofing Final []Other Date: 10-28-16 ❑Final (48 hr notice for PW, TIF) Rick Pope Inspected By: Mason County ' Department of Community Development Mason County Bldg. 8,615 W.Alder Street Shelton,WA 98584 360-427-9670 CODEPROS fi www.co.mason.wa.us Inspection Request Form Request Taken By: ❑✓ Marissa, ❑Ariane, ❑ Jahanel, ❑ Date: 10/20/16 Permit Number: COM2016-00066 HResidential, ✓ Commercial New Const. ✓ Existing Building Have all fees been paid (before final inspection)? Yes, ❑ No, ❑✓ N/A Has Planning been scheduled for final inspection? e Yes, ❑ No, 0 N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Re-inspect ceiling (See details e-mailed earlier this week) Phone Number: Gas Piping pressure test. 360-791-6328 Project Address: 200 E. Campus Dr. (Admin) Date and Time of Inspection: Inspection Results / Comments Friday, October 21, 2016 ❑ AP(Approved) T pe of Inspection: ElDA(Disapproved) Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑✓ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) 1. Complete rated tall walls room side of Shear(Exterior Nailing & Holddowns) Plumbing Underground corridor ❑Plumbing Exterior(Sewer/Backwater) 2. Seal penetrations room side with firecaulk, ❑Plumbing Exterior(Water Supply) no orange foam ❑Plumbing Rough-In []mechanical Rough-In QGas Piping (Pressure Test) ❑Framing Q-Has L&I Approved the Electrical?) Fire Resistive Penetrations (Commercial) Wall Insulation ❑Ceiling and/or Floor Insulation ❑Drywall Nailing [_]Re-Roof, Roofing Final ❑✓Other Re-inspect ceiling Date: 10-21-16 ❑Final (48 hr notice for PW, TIF) Inspected By: Rick Pope "F Mason County ' Department of Community Development j Mason County Bldg. 8,615 W.Alder Street Shelton,WA 98584 360-427-9670 ��n,�& www.co.mason.wa.us Inspection Request Form Request Taken By: ❑✓ Marissa, ❑ Ariane, ❑ Jahanel, ❑ Date: 10/13/16 Permit Number: COM2016-00066 HResidential, ✓ Commercial New Const. 14 Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, ❑✓ N/A Has Planning been scheduled for final inspection? B Yes, ❑ No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Requested early am. I agreed we'd do our best to do so. Phone Number: 360-791-6328 Project Address: 200 E. Campus Dr. (Admin) Date and Time of Inspection: Inspection Results / Comments Friday, 10/14/16 (Early am) ❑ AP(Approved) B ❑✓ DA(Disapproved) pe of Inspection:Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab(Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) 1. Need installation guide for ceiling. Does the H Shear(Exterior Nailing & Holddowns)Plumbing Underground grid need wires 8" from wall board room ❑Plumbing Exterior(Sewer/Backwater) 2. Tape joints on flex duct all rooms ❑Plumbing Exterior(Water Supply) i. oom 108, does main runner need wires if I []Plumbing Rough-In ❑Mechanical Rough-In is en wall angle ❑Gas Piping (Pressure Test) a 101; perimeter wires Ayer R" ❑Framing Complete condensate drains PWall Has L&I Approved the Electrical?) Fire Resistive Penetrations (Commercial) 5. Need installation guide for ceiling Insulation 6. Need architect detail for bracing ❑Ceiling and/or Floor Insulation o mud rings In rated wails ❑Drywall Nailing ❑Re-Roof, Roofing Final S. Darriper in 0 ❑✓Other Ceiling Cover (Partial) Date: 10-14-16 ❑Final (48 hr notice for PW, TIF) Inspected By: Rick Pope oN cob *� "h� Mason County Department of Community Development �i Mason County Bldg. 8,615 W.Alder Street CODEPROs Shelton,WA 98584 360-427-9670 www.co.mason.wa.us Inspection Request Form Request Taken By: ❑✓ Marissa, ❑ Ariane, ❑ Jahanel, ❑ Date: 9/8/16 Permit Number: COM2016-00066 HResidential, 14commerciai New Const. ✓ Existing Building Have all fees been paid (before final inspection)? Yes, ❑ No, ❑✓ N/A Has Planning been scheduled for final inspection? ❑Yes, ❑ No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Partial Drywall, please note what sections get approved. Phone Number: Noted: Building Closed at 3:00 p.m. 360-791-6328 Project Address: 200 E. Campus Dr. (Admin) Date and Time of Inspection: Inspection Results / Comments Friday, September 9, 2016 ❑✓ AP (Approved) B pe of Inspection: ❑ DA(Disapproved) Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑✓ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) Administration Shear(Exterior Nailing & Holddowns) Plumbing Underground Room []Plumbing Exterior(Sewer/Backwater) 100, v1, 107, 106, 111, 113, 110, 109, h3, ❑Plumbing Exterior(Water Supply) ok to tape []Plumbing Rough-In ❑Mechanical Rough-in ❑Gas Piping (Pressure Test) ❑Framing AQWall -Has L&I Approved the Electrical?) Fire Resistive Penetrations (Commercial) Insulation ❑Ceiling and/or Floor Insulation QDrywall Nailing []Re-Roof, Roofing Final []Other Date: 9-9-16 []Final (48 hr notice for PW, TIF) Rick Pope Inspected By: Materials Testing 'onsu tin , Inc. 4;.� wvfirikal 1'rrgro+w"r ng A t:nouAinu•Sprcinl in+prction a Mol"14 Te%tinl:►Envirrmmenlal Owmillin F.Wirrawd 4v%nm.nm.Sin..v 1 I at. awkins Renovation Project - Admin Bldg - 16KO02 - Proprietary Anchors: Report #P13718 CLIENT North Mason School District PATE 4. 8/2016 PROJECT LOCATION 200 E.Campus Drive PE IT# Belfair WA Inspection Information: Inspection Date: 09/08/2016 Time Onsite: 7:00 a.m. Weather Conditions: Indoors Inspection Performed: Proprietary Anchors Field Data: Base Material: ®Concrete ® Un-cracked Thickness in inches: unknown Specified Compressive Strength in psi: Unknown Hole Data in inches: Depth: 4" Edge Distance: End Distance: Diameter: 3 4" Spacing: 6" ®Clean OO Drilled O Cored Mechanical Anchor Data: Type: Length in inches: Diameter in inches: Torque(Ft.Ibs.): , ❑ Setting Tool Present Adhesive Anchor Data: Product Name: Hilti Hit HY 20OR Batch#: 101203 Location: Door Bracket Anchors at 9(a?E,A!ir7 and Ftu 1.5 Exp.Date/Shelf Life: 11:2016 Number of anchors: 20 Anchor Length in Inches: Anchor Diameter in inches: 5/8" ® Anchors installed in accordance with manufacturer's instructions,specifications,and corresponding evaluation report(ER-3187) Reason for Inspection: Shown on plans or specs ❑ Intentionally omitted during original placement O Re-inspection* ❑ Needs Engineer's review and acceptance* ®Threaded Rod ®Holes properly cleaned prior to epoxy installation Remarks: Performed a visual inspection of epoxy bar installation procedures within the locations noted above for Door Bracket Anchors at 9(E. A(ai,7 and F(a;1.5 Sheet:S1.00 Details:2.3 and 5 /To the best of my knowledge,all epoxyladhesive installations procedures were in accordance with manufacturer's printed installation instructions,project specifications,and approved contract drawings.Persons doing work were designated capable by contractor, PORTED BY:Kam Binns REVIEWED BY:Deane Ramsdell.Project Manager ss..�o. �a,«*.....rw.w.w..s.w.....< 4...,...+/..,.......*.c•,,,rrr.rrM..+«n...lt.,cvsn.w.c.4.0w.1.,a.,,.+k.•w�, ~n"Wen pop I No�tsalnswA.ewh.+w. .+aes kr�f.3r�ryt wr f'>*•k a+.r..4.xwnt.w...rw49w•.1 4 Saor . MI"a rbt.I.. .#a i....I,err,in, all rr;Ne n..r1.4. Corporate 777 Cbrgcltr Drive • Burlington, WA 001233 • Phone 360.753.1990• Fes 360.755.1990 SW 1ttolow 21 tx Black I.Ate Blvd S W • Olyrnpl:r, WA 98512 • Phone 360A 4.9777 - 1-at :4611.534.9779 NW Region 005 Unpoul Street, Suitc 3 • Rtiliwtham, WA 98223• Phone 36tl,64'f.6061 • Fan 36t1.647.9111 Yisir our wchsite: wtavr.mic imc_set Hawkins Renovation Project-Admin Bldg-16R002,09/0&2016,#P13718,Page 1 of I Mason County }: Department of Community Development of f Mason County Bldg. 8,615 W.Alder Street PRO Shelton,WA 98584 360-427-9670 7''--"/ www.co.mason.wa.us Inspection Request Form Request Taken By: ✓❑ Marissa, ❑Ariane, ❑ Jahanel, ❑ Date: 8/30/16 Permit Number: COM2016-00066 Residential, H�' Commercial New Const. Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, ❑✓ N/A Has Planning been scheduled for final inspection? B Yes, ❑ No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Phone Number: 360-791-6328 Project Address: 200 E. Campus Dr. (Admin) Date and Time of Inspection: Inspection Results / Comments Wednesday, August 31, 2016 ❑✓ AP (Approved) 3T pe of Inspection: ❑ DA(Disapproved) Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑✓ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) Partial; Drywall complete at: ❑Shear(Exterior Nailing & Holddowns) [)Plumbing Underground 101, 102 (except by south exit door), 103, 104, ❑Plumbing Exterior(Sewer/Backwater) 105,South side of hallway H3, and 108 (which ❑Plumbing Exterior(Water Supply) still needs some additional screws which were []Plumbing Rough-In ❑Mechanical Rough-In being eornpleted while on site). ❑Gas Piping (Pressure Test) QK to tape anri rontiniie ❑Framing Q-Has L&I Approved the Electrical?) Fire Resistive Penetrations (Commercial) Note: Also verified photos of earlier correction Wall Insulation in regard to the need for putty-packs on unrated ❑Ceiling and/or Floor Insulation electrical boxes and penetrations o ODrywall Nailing [:]Re-Roof, Roofing Final fire r sis i ve-Cvi`t "ls-$1 to eo n ti n u e ❑Other Date• 8/31/16 ❑Final (48 hr notice for PW, TIF) Inspected By:M. Barth kT � �u4xF Mason County Department of Community Development f Mason County Bldg. 8,615 W.Alder Street CODEPROs Shelton,WA 98584 360-427-9670 www.co.mason.wa.us Inspection Request Form Request Taken By: ❑Ariane, ❑ Jahanel, ❑ Genie, 0 Marissa Date: 8/25/16 Permit Number: COM2016-00066 Residential, ✓ Commercial New Const. ,/1 Existing Building Have all fees been paid (before final inspection)? Yes, ❑ No, ❑✓ N/A Has Planning been scheduled for final inspection? HYes, [:] No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Admin building, insulation at exterior wall infills, Phone Number: Drywall 360-791-6328 Project Address: 200 E. Campus Dr. (Admin-Bldg) Date and Time of Inspection: Inspection Results / Comments Friday, August 26, 2016 ❑ AP (Approved) ❑Type of Inspection: DA(Disapproved) ❑Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ✓❑ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) K8 -Seall !-rules top ❑Underfloor Framing (Before Floor Sheathing) plate Take photos OK to rock; Roo rn 1-1-5-Seal ❑Shear(Exterior Nailing & Holddowns) ❑Plumbing Underground holes in top plates, take photos, ok to rock; ❑Plumbing Exterior(Sewer/Backwater) Room 116a-ok to tape; Room 117-ok to tape; ❑Plumbing Exterior(Water Supply) [:]Plumbing Rough-In Room 102-add block on gable, foam holes; ❑Mechanical Rough-In Room 104-ok to rock, oam holes In plates; ❑Gas Piping (Pressure Test) Room _ _ [—]Framing (Q-Has L&I Approved the Electrical?) ist lay@r Ceiling 101-0K, ❑Fire Resistive Penetrations (Commercial) Resolve drywall rock to roof deck issue: ❑Wall Insulation Puddy pad non-rated electrical boxes and data ❑Ceiling and/or Floor Insulation ❑Drywall Nailing boxes on all rated walls. Provide Photos. ❑Re-Roof, Roofing Final ❑Other Date•. Rick Pope ❑✓ Final (48 hr notice for PW, TIF) Inspected By:8-26-16 From: Ben Petersen To: mbarth(a)codeoroswa.com Subject: FW:Admin-RFI#023-Full Height Walls To Roof Joists Date: Monday,August 29,2016 10:11:58 AM Attachments: imaoe003.ona RFI #023-Full Heiaht Walls To Roof Joists.pdf Certification .htm Mike- FYI on something that came up on inspection at NMSD Admin on Friday 8/26. Thank you- Ben Petersen Berschauer Group, Inc. 360 791 6328 M From: Ray Mow[mailto:ray@ericksonmcgovern.com] Sent: Monday,August 29, 2016 7:44 AM To: Ben Petersen<ben@berschauergroup.com>; bill@berschauergroup.com; Regan Berschauer <regan@berschauergroup.com> Cc: 'Eric Nelson'<eric@hainline.net>; Projects<projects@ericksonmcgovern.com> Subject: RE: Admin - RFI #023 - Full Height Walls To Roof Joists Raymond Mow, AIA Principal P: 253.531.0206 C: 253.208.3235 This email is confidential and may not be disseminated. CONTRACTOR CORRESPONDENCE-PLEASE NOTE: The contractor must comply with the notice,claims,and dispute resolution procedures of the contract. In discussing this issue with you,the Owner and/or Consultants do not waive any claim or defense under the contract,including but not limited to your failure to follow the contract requirements. From: Ben Petersen [mailto:ben(@berschauergroup.com Sent: Friday,August 26, 2016 1:28 PM To: Ray Mow<rayCcDericksonmcRovern.com> Cc: 'Eric Nelson'<eric(cDhainline.net>; Projects<projects(@ericksonmcgovern.com> Subject: Admin - RFI #023 - Full Height Walls To Roof Joists Ray- Please see attached RFI #23 - inspector asked about this today. Thank you- Ben Petersen Berschauer Group, Inc. 360 791 6328 M REQUEST FOR INFORMATION 1■ Berschauer No.023 344 Cleveland Ave, Suite C Phone: (360) 539-7252 Olympia, WA 98501 Fax: (360) 943-5600 TITLE: Full Height Walls To Roof Joists DATE: 8/29/16 PROJECT: District Administration Building TI JOB: 15100 To: Erickson McGovern Architects REQUIRED: ASAP Attn: Ray Mow Work Impact: Schedule Impact: Cost Impact: Originated By: Number: Ref: A5.00 Question: A5.00 general note 4 indicates full height walls to extend to structural floor/roof deck. Please clarify that full height walls perpendicular to roof joists can run up to bottom of roof joists. Answer: Yes. Full height walls perpendicular to the existing roof structure can terminate at the bottom chord. Ray Mow August 29, 2016 Mason County Department of Community Development Mason County Bldg. 8,615 W.Alder Street C99EPROs Shelton,WA 98584 360-427-9670 www.co.mason.wa.us Inspection Request Form Request Taken By: ❑Ariane, ❑ Jahanel, ❑ Genie, ❑✓ Marissa Date: 8/12/16 Permit Number: COM2016-00066 Residential, ✓ Commercial New Const. v( Existing Building Have all fees been paid (before final inspection)? Yes, ❑ No, ❑✓ N/A Has Planning been scheduled for final inspection? HYes, [:] No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Drywall, Phone Number: Plus, if ready, insulation at exterior wall portions where 360-791-6328 filled in. Project Address: 200 E. Campus Dr. (Admin Bldg) Date and Time of Inspection: Inspection Results / Comments Monday, August 15, 2016 ❑ AP(Approved) ❑ DA(Disapproved) Type of Inspection: ❑Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑✓ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) Wallboard 0 rooms 124 121, 1220 1230 119, ❑Shear(Exterior Nailing & Holddowns) ❑Plumbing Underground 125, 126, 127, 128 & partial 130 & 131 ❑Plumbing Exterior(Sewer/Backwater) ❑Plumbing Exterior(Water Supply) ❑Plumbing Rough-In ❑Mechanical Rough-In ❑Gas Piping (Pressure Test) ❑Framing (Q-Has L&I Approved the Electrical?) ❑Fire Resistive Penetrations (Commercial) ❑Wall Insulation ❑Ceiling and/or Floor Insulation ✓❑Drywall Nailing ❑Re-Roof, Roofing Final ❑Other Date: 8-15-16 ❑Final (48 hr notice for PW, TIF) GSPEARS Inspected By: Mason County Department of Community Development j Mason County Bldg. 8,615 W.Alder Street Shelton,WA 98584 360-427-9670 CHEN& 77/ 'V www.co.mason.wa.us Inspection Request Form Request Taken By: ❑Ariane, ❑ Jahanel, ❑ Genie, 0 Marissa Date: 8/2/16 Permit Number: COM2016-00066 Residential, ✓ Commercial New Const. ,/ Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, ❑✓ N/A Has Planning been scheduled for final inspection? HYes, [—] No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Plumbing (wall cover) Phone Number: 360-791-6328 Project Address: 200 E. Campus Dr. (Admin) Date and Time of Inspection: Inspection Results / Comments Wednesday, August 3, 2016 ✓❑ AP (Approved) Type of Inspection: ❑ DA(Disapproved) ❑Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑Manufactured Home Setup (&Tie Downs) ❑ AE (Approved with exception) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) ❑Shear(Exterior Nailing & Holddowns) Plumbing Rough-In Approved ❑Plumbing Underground ❑Plumbing Exterior(Sewer/Backwater) ❑Plumbing Exterior(Water Supply) ❑✓Plumbing Rough-In ❑Mechanical Rough-In ❑Gas Piping (Pressure Test) ❑Framing (Q-Has L&I Approved the Electrical?) ❑Fire Resistive Penetrations (Commercial) ❑Wall Insulation ❑Ceiling and/or Floor Insulation ❑Drywall Nailing [:]Re-Roof, Roofing Final ❑Other Date: 8/3/16 ❑Final (48 hr notice for PW, TIF) Inspected By:M. Barth Mason County `i Department of Community Development f 1 Mason County Bldg. 8,615 W.Alder Street CODEPROS Shelton,WA 98584 360-427-9670 www.co.mason.wa.us Inspection Request Form Request Taken By: ❑Ariane, ❑ Jahanel, ❑ Genie, ❑✓ Marissa Date: 7/28/16 Permit Number: COM2016-00066 Residential, ✓ Commercial New Const. r,/ Existing Building Have all fees been paid (before final inspection)? Yes, [:] No, ❑✓ N/A Has Planning been scheduled for final inspection? HYes, [:] No, ❑✓ N/A When was your last inspection (If it sounds like it has expired) Requestor-Contact Name: Special Instructions: Ben Permit not yet issued, interior framing alterations. Phone Number: Permit not yet issued, 360-791-6328 ]use file plans. Project Address: 200 E. Campus Dr. (NMSD Admin) Date and Time of Inspection: Inspection Results / Comments Friday, July 29, 2016 ❑ AP (Approved) ❑✓ DA(Disapproved) Type of Inspection: ❑Footings/Setbacks ❑ See Attached Correction Report ❑Foundation Wall/Stem Wall ❑✓ AE (Approved with exception) ❑Manufactured Home Setup (&Tie Downs) ❑Concrete Slab (Commercial Only) Notes: ❑Underfloor Framing (Before Floor Sheathing) ❑Shear(Exterior Nailing & Holddowns) Framing - Structural Alterations - OK ❑Plumbing Underground (cannot formally approve framing until systems ❑Plumbing Exterior(Sewer/Backwater) are completed.) ❑Plumbing Exterior(Water Supply) Plumbing - Disapproved - Must be placed under ✓❑Plumbing Rough-In ❑Mechanical Rough-In test (fittings and arrangement are OK) ❑Gas Piping (Pressure Test) Eleertrical -Being installed will need L&I ❑✓Framing inspection and approval. (Q-Has L&I Approved the Electrical?) 0 ❑Fire Resistive Penetrations (Commercial) OK to continue ❑Wall Insulation (Note: Previously inspected and approved ❑Ceiling and/or Floor Insulation [:]Drywall Nailing underground plumbing.) ❑Re-Roof, Roofing Final [-]Other Date: 7/29/16 ❑Final (48 hr notice for PW, TIF) Inspected By:M. Barth ��aElvrf[IIIlk911�1 .` R Gnattrtfnir.!!}.e�i�e+rrn�d�i'aulaaioG►�ptvlsllin�E 1�� 1�£" tp'�C FWwwrxdsttsaranr Simx1WI Hawkins Renovation Project - Admin Bldg - 16KO02 - Field Report: Concrete: Report #F74779 CLIENT Shelton,City of CF PROJECT LOCATION 200 E.Campus DriveMIT# Belfair WA Inspection Information: Inspection Date: 07/06/2016 Time Onsite: 12:45 Weather Conditions: 70's Sunny Inspection Performed: Concrete Comments: Concrete:Continuous Inspection MTC onsite to perform a visual inspection of concrete placement.No resteel placed. Plan(s):6-23-2016 Sheet(s):A0.01 Detail(s):NA Elevation(s):Subgrade Location(s):Admin.Bldg.Rooms: 111, 113, 116, 117,118 Contractor placed approximately 9 cy of approved Miles Sand and Gravel mix design 07400F,4000 PSI@ 28days. Concrete was placed in the slab by boom pump truck,consolidated by screeding and hand finished. Slump and temperature were tested and 1 set of 5 4"x9"cylinders were cast for compressive strength testing.Reference compressive strength report#C44648 fpr more information. Images: �1 - ©c)01O Cn C o � �y\a�r §< UPL( a�,. ��oa'�— IPLOADED: 07/06/2016 13:30:00 b T�-7 LI� ? se.. vtl t C REPORTED BY:Ro, t` ( y ager Qs o� !k� a�A"p's.!�lxer�.r?I !.�eeN*+�, 4,r..r�:rnMarwne�r:'•,,n.n a�.wrlt¢i' 'taMa+txi+ryy.Atsmx^sNkMtz+l�r�rw+�*tip! .x�TM-wAhwti.«s�*e�!r �RwM�sh: -4► ersnFrwe�.. : wr�e+:.�saerr•a5. �� w:aq�ae+E C 3��! TtIS MNtar6alr Teacf��!r�:�:a+la4��.Igar A11 rid.►ca esrrrr.+aA. Corporate + 771 Chrysler Drive + Harlington, WA #S233 • Phone 3"-733-1006 Fax 3611.79NA S R'talt Region 11$ OlAck I Ate "tvd. $.W',Olympia, WA 91i,1,� • Ptope 3c,It.$$4.gl"t'I * fax NW Region 11t15 Dupon! 3groet, Suitr 3* 3etliagham„ W^ "22$* Phone 160,64,. U41 - Fax 360."741t:t Visit our weltsite: www.mte:_irae.ert Hawkins Renovation Project-Admin Bldg-16g002,07/06/2016,#F74779,Page I of] Materials Testing & 1 Consulting, Inc. G"Archniral F c A ran" linc►Special lnpKtkM o malmial it.;f-�+ "'Vin'nmrntat Caits"dtwe Hawkins Renovation Project -Admin Bldg - 16KO02 - Compression Test: Concrete: rReport#C44648 CLIENT North Mason School District DATE 07/06/2016 PROJECT LOCATION 200 E. Campus Drive PERMIT 7 Belfair WA Inspection Information: Inspection Date: 07/06/2016 Time Onsite: 12:45 Weather Conditions: 70's Sunny Inspection Performed: Compression Test:Concrete Field Data (ASTM C-31): Location of Placement: Rooms: 111,113,116,117,118 Sample Location: 111 Contractor:Oerschauer Subcontractor.INA Supplier/Plant:Kfiles Sand&Gravel/208 Qty Placed,Cu.Yd.: of 9 Slump,Inches(ASTM C-143)or W/C Ratio: 6.6 Concrete Temp,IF(ASTM C-1064): 75 Delivery Ticket#: 162987 Job Spec.Slump: NA Ambient Temp,IF: 70 Truck#: M085 Air Content,%(ATSM C-231): NA Min Temp,IF:a Batch Time: 11:56 Job Spec.Air: NA Max Temp,IF: Sample Time: 12:55 Mix#and Proportions: Cement,lbs.: 295 Coarse Agg,lbs.:115163,3/8 Admixture,oz./cwt:MB POLY 997,324oz-� Flyash,lbs.:11085 Coarse Agg,lbs.: Admixture,ozJcwt: Water,gals.:k5O Coarse Agg,lbs.: Admixture,ozJcwt: Fine Agg,lbs.:113335 Coarse Agg,lbs.: Admixture,ozJcwt: Sample Type & Compression Test Results: Received 07/07/2016 Sample Set 1 of 1 Type of Compression Test: lConcrete(ASTM C-39) Lab Tests: Test Total Sample Dim. Sample Comp. Break ASTM ASTM New Log# Age Date of Test Load Area(Sq. Strength Tested By (Days) (Lbs.) °') In.) (PSI) Type C-617 C-1231 3198 7� 07/13/2016 54,410 4.00 12.57 1 4,330 1 Frank Pooler 0 l7 3199 28 08/03/2016 80,342 4.00 12.57 6,390 Frank Pooler 0 O 0 3200 28 08/03/2016 82,759 4.00 12.57 6,580 Frank Pooler O O 3201 28 08/03/2016 81,779 4.00 12.57 6,510 Frank Pooler 0 O 3202 000�0A OO O 0 REQ'D ® 4000 Remarks: eference concrete field report#F74779 for more information. —71 REPORTED BY:Robert Hopkins REVIEWED BY:Frank Pooler,Lab Manager dAlrr.�/pYseMeMM!xttx►3 ±e,+lr+4:.aa..x+�weeMarw.nw�» «IrnMkeaA �.,.n are+wens�AfIN4tnlFrarttlr�+raraMsexxrpop llaelr.k.pyc .,.. maneAwsxcPr+ FaAralvae,+ir xxarofs+t #tar.tl igasr/-U 2400 :.E12 Nvf4erlale Ttmpp A C"*vl%mj,I" All rgvkie rw"r-4, C orpnrate • 777 Chrysler Drive + Marlin;gtan, WA 9R233 * Phase 3"-733-1998* Fax 3ai.733.19Ri SA keg3iln 211$ Mack Late "tvd, $'Wk 'Olyxnpis, 'A A 98512 - Phone 100.5,14.97,79 '% keglam 903 Dupont Street, Sane 5- Retlingham, lxA 99225 * Phone 3t,6.ta3`.aUtlt Fax 360.647.3111 Visit our wellsite: vrww.mtc inn-met Hawkins Renovation Project-Admin Bldg-16K002,071062016,#C44648,Page l of] x f � e� A.. Vy • • a I* I • s •a •'If �A'-f•k •s iaaat a • i T R s " ;S a � • s f' i r 4, � 9 { v � e v wV. y ........... t 5. z 4 ; j•y"^: +z ., �ei•L y Y J t t t§ � N�Raa��.�s•. • a s i f � I r � a e i i s i i I Permit Number: Type of Permit: Site Address: Belfaif Inspection information: Action Needed: Notes: Need to ,..,11 for-fiaa Both, its fire .,1.,,-ns systems r-eeer-d of a set-up . . 'ion fer-both up&s. have been inspeeted an' cc+i'ivirixv it : elear-whieh aet nl approved on Oetaberr2z2�-9 final/eeetipaney inspeet unit did not have a set up by Dave Salzer, the 1nspowill Flo+o,... ine if the units need fi Ahef inspeetions. Permit Number: Type of Permit: Site Address: Com2016-00066 Administration Annex 200 E Campus Dr, Belfair Inspection information: Action Needed: Notes: Final Inspection Failed on Address corrections and 9.17.18 November 4, 2016 for call for final inspection. Ray Mow contacted the office on September 14" 1)caulk around ducts in regarding scheduling the rated corridors. 2) replace re-inspection final insulation in rafters. 3) clean air handlers and remove debris. 4)paint gas piping. 5) seal around �V penetrations at exterior. 6) N do vent registers in O corridor need dampers? 7) fire caulk room side above Z�(/ 23=r'lo ceilings where orange foam was used in corridors. ok for temp. occupancy. N Permit Number: Type of Permit: Site Address: y air Inspection information: Action Needed: Notes: Final Inspection_ 4ridr .ss c2adjjj2nLand call 9.44,1Zxzcehw%Uhe condttiont 9, Stormwater documents for with ire t 1 issu letter ll a " ns er Permit Number: Type of Permit: Site Address: Com2015-00096 Sign 91 E North Mason School Rd, Belfair Inspection information: Action Needed: Notes: Final failed on September Located plans and permit 3, 2016 card to have on site and call for final inspection No plans, talked to school district they will gather info and reschedule Permit Number: Type of Permit: Site Address: Com2016-00102 Greenhouse 90 E North Mason School Rd, Belfair Inspection information: Action Needed: Notes: No inspection found or If structure was built will notes need to comply with inspection requirements. Call for inspection to N L E D determine if final is P F �" achievable without more 1.1(42Z = information. Permit Number: Type of Permit: Site Addr GRD2014-00003-HS phase 1 Grading, filling, excavation Various GRD2015-00005-H4S & stormwater GRD2015-00009-HMS/Pace GRD2016-00010-HS phase 2 Inspection information: Action Needed: Notes: There has not been some Per conditions of permit 9.14.18 email between inspections or reports filed inspections from engineer myself and Ray Mow. He in July of 2014. No permit of record required is working on stormwater number or reference. including as-builts for site. as-built, Operation Assume they are in regard Maintenance, Declaratio to GRD2014-00003. No of Covenant. Still need other reports located. In final inspection and any act, G 016-00010 has outstanding engineers no cked up or reports. issued. Permit Number: Type of Permit: Site Address: 1�[��Jci�s-�e4}�Scl�eel 00 E am'C'pu�"�, e Inspection information: Action c ion ecember 23, 2016 Needed: 1. Room 205 range hood Pxhanst is not blocked from re-circzlating. 1 �.,,�1;� t�-•� L.1 L;.,,Y„lota to rnvPr rP (T�I j, STLIIIVVJ 11LLY V u Vl turn vent holes.) Resolve all 2. Flire-Sea s above ceiling at hallway corrections 1 penetration pr and call for 3. Seal (and/or flash in accordance with damper manufacturer's final install aroun ire dampers at - our - inspection. 4. Clean all debris out of above ceiling return-air plenum. 5. The ductle e data closet (009) by the 9.14.18 -nTe-2-2—an—ine stairway is incomplete. received 6. �ar ing into the Stormwater (Ifoor sinks must have a 1-inch air-gap above the flood level rim of the As-builts still si need 7. All equipment on t e cal mezzanine shall be anchored to the Operation & structure. Maint. Plan 8. Final L&I approval for the chair lift is require and 9. Power operated doors are not yet functional (or are off). Declaration Verify correct operation. of Covenant 10. Lib in addition 14-lerify" that all supply valves supplying trap primers (throughout) to calling for are open. re- 12. cullery, the approved plans included a Type II hood and inspection. exhaust system. m was not installed, and the dishwasher had subsequently (without review roval) been revised to a unit shown as "vent-less". While the dishwas ing may not require a specific exhaust system for the dishwasher, the I ires that the room, as part of a commercial kitchen, with significant vapo produc' equipmen assoc ercial kitc , uires exhaust. Prior to the(non-approved) revision, the proposed e II hood provided the necessary exhaust for the room. Without the Type II hoo an oom is left without the required exhaust system. The room is also provided w=volume which in accordance with the IMC, requires tau e be increased to also exhaust the additiosupply air, as t ' from a commercial kitch 3.2.1 (particul�otnote 03.3.2.3, IMC Table 403.3.1.1, and IMC Table 403.3. n exhaust system for the room is required. 13. Handrails, and rail extensions are required at the gym stairs. 14. Mechanical Room 401, all through penetrations of the 1-hour fire- resistive wall assembly (and top of wall joints) require fire-caulk or some other approved form of penetration/joint protection. 15. Main mechanical /boiler room requires that all penetrations of the 1-hour fire-resistive wall assemblies (and top of wall joints) require fire-caulk or some other approved form of penetration/joint protection. (numerous instances throughout.) 16. Basement level restrooms are not yet completed. 17. The condensate line (and/or drain/pump system) at 403 is incomplete. 18. Gymnasium exterior door seals/thresholds are incomplete. 19. Main restroom at commons has an incompletely sealed masonry control joint. 20. Room 100: verify that a backdraft damper is provided for the range hood exhaust and that the exhaust fan is blocked from re-circulating back into the room. 21. The Girls' lavatory sinks (Area A) do not appear to be functioning correctly. 22. At the restrooms at the commons, not all lavatories are functioning correctly. 23. A sprinkler head is not correctly mounted/secured at Room 103A. 24. Room 111 classroom door requires adjustment to allow for full opening width (and proper closing). 25. The two exits at the east side of the building require (moved or additional) exit signs such that they are visible from within the hallway that they serve. 26. Room 200C, mechanical equipment above the doorway is incomplete. 27. Restroom H10A is not provided with pipe wrap (or boots) at under- sink knee space. 28. Provide copies of the HVAC balancing and commissioning reports. 29. Exterior grounds/grading remains incomplete. (obviously weather dependent) 30. Emergency egress lighting test has not been observed or verified to illuminate upon primary power loss. Has this been tested? If so, please provide a copy of the report. Completed items: Noted that Fire Marshal Jeremy Hicks has approved the fire sprinkler system and fire alarm system installations. Noted that L&I has approved the final electrical systems installations. Noted that the previously outstanding mechanical issue at 002 has been completed. An e-mail was sent to Mason County DCD identifying that Code Pros did not have any objection to issuance of a temporary certificate of occupancy (TCO) while the remaining outstanding items are corrected/completed. Permit Number: Type of Permit: Site Address: Com2014-00111 Play Shed 22900 NE State Route 3, Belfair Inspection information: Action Needed: Notes: Last inspection; final Need report from Condition #19-Compliance failed April 7, 2015; item Stormwater Engineer to with an approved Storm #2 from Feb. 18, 2015 final permit. Water Plan [ESA - (Condition#19 not met, 712112014]shall be subject to need sign-off on an on site inspection or stormwater). inspections, by the engineer of record or authorized representative. Said inspection(s) shall be performed in accordance with the approved plan, and prior to any modification that would make a determination of compliance impossible. Inspection reports shall be submitted to verify all engineering requirements have been completed in accordance with the approved storm water plan. Reports shall be submitted to the Mason County Department of Community ( ' rT Development prior to each _ corresponding inspection and 2 j final permit approval. Copies of all special inspection reports shall be made available at time of inspection. Permit Number: Type of Permit: Site Address: o - i 150 E North Mason School Rd, Be Inspection Information: Notes: 1) provide commissioning o tions and #8 on correction is in report for light in mec . c connection with grading permits. peR.Ptriltinp- 9.1etween myself anW. is w orking tjrate t, 4) Provide e anal is for ontenance, o per floor enant, nort of gym o install. yard raid I headi:eem less, than of- ,� fAF wood rh�h amide-#+real-fed sr-al•4 It on correction n is to 2/15 not do e. *Not - grading on ide to be co pleted after de o is is ina ist o e s ructure. All items combine mplete list