For a Stormwater Plan G�5
Instructions:
This checklist is intended to assist Staff in the review of a Stormwater Plan. The Stormwater Plan is
reviewed for completeness with respect to the 2005 Department of Ecology Stormwater Manual. If an
item is found to be not applicable, the Plan should explain the basis for the conclusion. The Plan is also
reviewed for clarity and consistency. If the drawings, discussion, or recommendations are not
understandable, they should be clarified. If they do not appear internally consistent or consistent with the
application or observations on site, this needs to be corrected or explained. If resolution is not achieved
with the author, staff should refer the case to the Planning Manager or Director.
Applicant's Name: �In TC �/1 Vt,�'V1p1\, 2cJe--1
Permit# r�� 0(-+ Parcel# 11 .104 - 1-K - OO CG RO
Date(s)of the Document(s) reviewed: ��/1
SECTION I-Construction SWPPP Narrative
(1) Construction Stormwater Pollution Prevention Elements:
(a) Describe how each of the Construction Stormwater Pollution Prevention Element has been
addressed through the Construction SWPPP.
OK? Comment:
(b) Identify the type and location of BMP's used to satisfy the required element.
OK? Comment:
(c) Written justification identifying the reason an element is not applicable to the proposal.
OK? Comment:
(d) 12 Required Elements-Construction Stormwater Pollution Prevention Plan
(1) Mark Clearing Limits. 3
OK? ✓ Comment: ` 5�AI�
(2) Establish Construction Access.
OK? ✓ Comment: 3
(3) Control Flow Rates.
OK? Comment:
(4) Install Sediment Controls.
OK? Comment:
(5) Stabilize Soils.
OK? Comment:
(6) Protect Slopes.
OK? Comment:
(7) Protect Drain Inlets.
OK? Comment:
(8) Stabilize Channels and Outlets.
OK? Comment:
(9) Control Pollutants.
OK? Comment:
(10)Control De-Watering.
OK? Comment:
(11)Maintain BMP's.
OK? Comment:
(12)Manage the Project.
OK? Comment:
Page 1 Form Effective May 2009
(2) Project Description.
(a)Total project area (acres/square feet).
OK? ✓ Comment: _,,16 ti,
(b)Total Proposed impervious area (acres/square feet).
OK? Comment:
(c)Total proposed area to be disturbed, included off-site borrow and fill areas(acres/square feet):
OK? ✓ Comment:
(d)Total volumes of proposed cut and fill(cubic yards). r V K,r
OK? V Comment: fCArw3
(3) Existing Site Conditions.
(a) Description/of the existing topography. I
OK? �f Comment:
(b) Description of the existing vegetation.
OK? ✓ Comment:
(c) Description of the existing drainage.
OK?_ Comment:
(4)Adjacent Areas.
(1) Description of adjacent areas which may be affected by the site disturbance
(a) Streams
OK? Comment: 2-
(b) Lakes
OK? Comment: /V/
(c)Wetlands
OK? ✓ Comment: ) Z.-
(d) Residential Areas
r? OK? Comment:
(e) Roads
OK? Comment:
(f) Other
OK? Comment:
(II) Description of the downstream drainage path leading from the site to the receiving body of water
(minimum distance of 400 yards).
OK? ✓ Comment: �—
(5) Critical Areas:
(a) Description of critical areas that are on or adjacent to the site.
OK? i Comment: P i
(b) Description of special requirements for working in or near critical areas.
OK? ✓ Comment: Yy /A DVS ZGJ
--r
(6) Soils: Description of on-site soils.
(a) Soil name
OK? Comment:
(b) Soil mapping unit
OK? J Comment:
(c) Erodibility
OK? Comment:
(d) Settleability
OK? Comment:
(e) Permeability /
OK? V Comment: C V 1
(f) Depth
OK? Comment:
(g) Texture
OK? '� Comment:
Page 2 Form Effective May 2009
(h) Soil Structure
OK? V Comment:
(7) Erosion Problem Areas.
(a) Description of potential erosion problems on site
OK?,_Comment:
(8) Construction Phasing.
(a) Construction sequence. �, Z
OK? / Comment:
(b) Construction phasing (if proposed).
OK? Comment:
(9) Construction Schedule.
Z I. Provide a proposed construction schedule
OK? Comment:
II. Wet Season Construction Activities
(a) Proposed wet season construction activities.
OK? 'Comment:
(b) Proposed wet season construction restraints for environmentally sensitive/critical areas.
OK? Comment:
(10)Engineering Calculations. Provide design calculations.
7 (a) Sediment Ponds/Traps.
OK? Comment:
-� (b) Diversions.
` OK? Comment:
rl (a) Waterways.
OK? Comment:
(b) Runoff/Stormwater Detention C Icullaationns.I G
OK?�_Comment:
(11)Operations and Maintenance
(a). An operation and maintenance schedule shall be provided for all proposed stormwater facilities
'7 and BMPs, and the party (or parties) responsible for maintenance and operation shall be
identified. An operation and maintenance (0 &M) Declaration of Covenant will be required to
cover all privately owned and maintained stormwater facilities. 0& M Declaration of Covenant
forms are available at the Mason County Permit Assistance Center, 426 W. Cedar Street,
Shelton,WA 98584. The proponent shall record a copy of the completed Declaration with the
Mason County Auditors' office. A copy of the recorded document must be submitted to the Permit
Assistance Center together with this completed Checklist.
OK? Comment:
SECTION II— Erosion and Sediment Control Plans
(1) General.
(a) Vicinity Map.
OK? ;/ Comment: ���✓
(b) Clearing and Grading Approval Block.
OK? Comment: /V/,4-
(c) Erosion and Sediment Control Notes.
OK? ✓ Comment: C
(2) Site Plan.
(a) Legal description of subject property.
OK? L_Comment: wX v
(b) North Arrow. �`✓�v
OK? ✓ Comment:
Page 3 Form Effective May 2009
(c) Indicate boundaries of existing vegetation, e.g. tree lines, pasture areas, etc.
OK? L-' Comment: C 3. v
(d) Identify and label areas of potential erosion problems.
OK? Comment:
(e) Identify any on-site or adjacent surface waters, critical areas and associated buffers.
OK? ✓ Comment: CCU'e.i
(f) Identify FEMA base flood boundaries and Shoreline Management boundaries (if applicable).,.
OK? .,Comment: N/
(g) Show existing and proposed contours.
OK? "' Comment: L
(h) Indicate drainage basins and direction of flow for individual drainage areas.
OK? ✓ Comment: L 'Z�.. 0
(i) Label final grade contours and identify developed condition drainage basins.
OK? / Comment: C �'-"
(j) Delineate areas that are to be cleared and graded.
OK?/Comment: C-L}. 0
(k) Show all cut and fill slopes indicating top and bottom of slope catch lines.
OK? v Comment: C `-r G S C]
(3) Conveyance Systems.
(a) Designate locations for swales, interceptor trenches, or ditches.
OK? , Comment: c' a c,
(b) Show all temporary and permanent drainage pipes, ditches, or cut-off trenches.
OK? ✓ Comment: L— S t C'
(c) Provide minimum slope and cover for all temporary pipes or call out pipe inverts.
OK? Comment:
7 (d) Show grades, dimensions, and direction of flow in all ditches, swales, culverts, and pipes.
OK? Comment:
(e) Provide details for bypassing off-site runoff around disturbed areas.
OK? Comment:
(f) Indicate locations and outlets of any dewatering systems.
OK? Comment:
(4) Location of Detention BMP's.
(a) Identify location of detention BMP's.
OK? Comment:
(5) Erosion and Sediment Control Facilities.
(a) Show the locations of sediment trap(s), pond(s), and pipe structures.
OK? / Comment: CS .0
(b) Dimension pond berm widths and inside and outside pond slopes.
OK? ; Comment: /V / /A-
(c) Indicate the trap/pond storage required and the depth, length, and width dimensions.
OK? Comment:
(d) Provide typical section views through pond and outlet structure.
OK? ✓ Comment: C 3. 1
(e) Provide typical details of gravel cone and standpipe, and/or other filtering devices.
OK? Comment:
(f) Detail st ilization techniques for outlet/inlet.
OK? V Comment: G i
(g) Detail control/restrictor device location and details.
OK? Comment:
(h) Specify mulch and/or recommended cover of berms and slopes.
OK? Comment:
(i) Provide rock specifications and detail for rock check dams.
OK? Comment:
(j) Specify spacing for rock check dams as required.
OK? Comment:
Page 4 Form Effective May 2009
'? (k) Provide front and side sections of typical rock check dams.
OK? Comment:
(1) Indicate the locations and provide details and specifications for silt fabric.
OK? Comment:
(m) Locate the construction entrance and provide detail.
OK?_Comment: C -3
(6) Detailed Drawings.
(a) Any structural practices used that are not referenced in the Ecology Manual should be explained
and illustrated with detailed drawings.
OK? Comment:
(7) Other Pollutant BMP's.
(a) Indicated on the site plan the location of BMP's to be used for the control of pollutants other than
sediment, e.g. concrete wash water.
OK? i Comment:
(8) Monitoring Locations.
(a) Indicate on the site plan the water quality sampling locations to be used for monitoring water
quality on the construction site, if applicable.
OK? Comment:
Are the Documents signed and stamped?
Type and#of License:
If not approved, what is the next action/recommendation for further action?
Reviewed by on
Time spent in review:
SECOND REVIEW/UPDATE:
Reviewed by on
Time spent in second review:
THIRD REVIEW/UPDATE:
Reviewed by on
Time spent in third review:
Disclaimer: Mason County does not certify the quality of the work done in this Stormwater Plan.
Page 5 Form Effective May 2009
Butch,
I just finished going through N.L. Olson's stormwater and erosion control plan submittal
checklist and I am not able approve the document as complete. For this to make sense
you need to know that we Mason County planners are not engineers, and we rely
exclusively on the submittal checklist review to determine if an engineered stormwater
and erosion control plan is fully compliant with County requirements. We simply are not
qualified to read through the documents and make a determination unaided.
In this case, I see that the engineer left a large number of items unchecked, particularly in
Section II. I realize that many of these items may not apply to your situation and in that
case the engineer needs to provide a written acknowledgment when a checklist item is not
applicable.
Please have the engineer address all of the following items in the form of an addendum
(if needed)and a completed Submittal Checklist.
Here is the list:
Section I
La through c; I can't not certify that this has been done for all elements.
12-point required elements; Items 3 through 12 have not been addressed. The engineer
needs to direct the reader to the location in the Narrative where the element is discussed
or explain why it is not required.
2.(b): Answer was omitted.
4.(d): DNF discussion of adjacent residential areas.
4.(f): Other?
6.(c): and(d): DNF discussion of Erodibility and Settleability.
8.(b): DNF discussion of phasing(if any).
9. I and II: DNF discussion of construction schedule (if any).
10. (a), (b), and(c): DNF
11: Operations and Maintenance: I will attached the O & M Covenant form that is needed
for this item.
LINK
Section II
3.(d), (e), and(f):Needs to be addressed.
4:Needs to be addressed.
5: (a)through(m): Needs to be addressed.
6 through 8: Needs to be addressed.
Also,the checklist isn't stamped. Here is a link to fresh checklist. Please have the
engineer stamp the last page and return it to me.
LINK
One other thing: I noticed on the Submittal Checklist that 2,200 cubic yards of earth will
be cut and filled. This requires a Land Modification Permit. I see that one has not been
r permission, I will
applied for et. I will attached a link for that application. With your e s
pp Y pP Y p
also modify your SEPA checklist to include this in the project description, as over 500
cubic yards of cut and/or fill is subject to SEPA review.
LINK
Let me know if you have any questions.
Michael
��>
i
� ,
j � ,_
� . . .
-$ti
TerraScan TaxSifter- Mason County Washington Page 1 of 2
• z MASON COUNTY
WASHINGTON TAXSIFTER
SIMPLE SEARCH SALES SEARCH REETSIFTER COUNTY HOME PAGE CONTACT DISCLAIMER PAYMENT CART(0)
Melody Peterson
Mason County Assessor 411 N 5TH ST Shelton,WA 98584
Assessor Treasurer Appraisal MapSifter
Parcel
Parcel#: 12108-75-00080 Owner Name: BOLES,GERALD D JR&WENDY
DOR Code: 91 - Undeveloped-Land Addressi: PO BOX 443
Situs: Address2:
Map Number: City,State: ALLYN WA
Status: Zip: 98524
Description: TRACT 8 OF SURVEY 1/115
Comment:
2016 Market Value 2016 Taxable Value 2016 Assessment Data
'Land: $68,880,'Land: $68,880 District: 0080-Tax District 0080
Improvements: $0 Improvements: $0 Current Use/DFL: No
Permanent Crop: $0 1 Permanent Crop: $0
:Total $68,880 Total $68,880 Total Acres: 5.05000'
Ownership
Owner's Name Ownership%
BOLES,GERALD D JR&WENDY 100
Sales History
Sale Sales # I Excise# Grantor Grantee Price
Date Document Parcels
05/29/14 2025292 1 14 20140 HAGMAN MEHAN, KAROL BOLES,GERALD D JR&WENDY $82,000
07/29/11 1977126 3 11-11667 HAGMEN ET AL,JOE L HAGMAN MEHAN, KAROL $0
10/16/07 ;1907741 1 2007005531TRROL HAGMAN MEHAN, KAROL HAGMAN MEHAN $0
�08/14L/07t1903298 1 200791024)BETTE B HAGMAN KAROL HAGMAN MEHAN,TR LV TR BETTE $0
HAGMAN
08/14/07 1903297 1 200791023 KAROL HAGMAN MEHAN, BETTE B HAGMAN,A 1/2 INTEREST $0
09/16/04 1820056 1 200474131 JOE L&BETTE B HAGMAN JOE L HAGMAN&BETTE B HAGMAN,EA 1/2 $0INT
09/16/04 1820057 1 200474136 BETTE B HAGMAN KAROL HAGMAN MEHAN, 1/2 INT,TRSTE* $0
Historical Valuation Info
BilledYear Total
2016 BOLES,GERALD D JR&WENDY $68 880 Impr$O rmCrop Value$0 $68,880 Exempt Taxable
880
2015 BOLES,GERALD D JR&WENDY $61,600; $0�_ $0 $53,200 $0 $61,600
2014 BOLES,GERALD D JR&WENDY $0 $53,200
2013 HAGMAN MEHAN, KAROL $50,400 $01 $0 $50,400 $0 $50,400
2012 HAGMAN MEHAN, KAROL $56,000 $0� $0 $56,000 ;0j'_$56,000
View Taxes
http://172.30.0.3/Taxsifter/Assessor.aspx?key1d=3254805&parcelNumber=12108-75-0008... 3/24/2016
TerraScan TaxSifter- Mason County Washington Page 2 of 2
Parcel Comments
No Comments Available
Property Images
No images found.
1.0.5642.25433 TX_RoI Year_Search:2016
http://l72.30.0.3/Taxsifter/Assessor.aspx?keyId=3254805&parcelNumber=12108-75-0008... 3/24/2016
121087690030
\ 121087690020 121089999999
� 121081190040
121087590014
121081190061 7"121081100030
'
1 121081190050 21081190040
121081100030 121081100010
121087590033 1
121087590031 121087590043I121087590041 121087590040
121087600010
121087590032 121087590030 121087590042
121087590013 FQUCk/
121087590012 NGlYI444
121081100010 N
121081100020
E ISLAND CREST RD
121081100100
121081200170
121087500080
T21NR1W
121081200180
121089999999
121087500050
121087500070 Q�
121081200190 z
o �
,Z
J
121089999999 u�
2
v 121089999999
w
F-
121081290060 w 121087500060 121087800010
—121081290061
I 121081190061 121081190050
121087590043 121087590042
121087590014
121087590031
121087590033 I 121087590030 121087590041 121087590040
121087600010 121087590032 121081100010
E ISLAND CREST RD
121087500080
T21NR1W
121089999999
121087500070
121087690030
121087690020 " 1, 121089999999
121081190040
121087590014 12108119006
I
1 121081100030
121081190040
r 121081190050
' v I :; •, ' 121081100010
121081100030
121087590033 121087590031 121087590043 121087590041 121087590040
121087600010 121087590032 121087590030 121087590042
1210875 13
. F
121087590012 BUck�NGNgM
121081100010
121081100020
E ISLAND CREST RD
. -- ' 121081100100
121081200170
121087500080 "
T21NR1W
Hb
121081200180 �
121089999999 -, 121087500050
'087500070
Ha
12108 200 90 Z
Z
gu Hb
121089999999 CO)
..:,, ._„ , .,, , 121089999999
w '
cn
121081290060 w ' 121087500061 Cd
121087800010
12. 081290061
121087590043 121087590042 121081190061 121081190050
121087590014
121087590031
121087590033 121087590030 121087590041 121087590040
121087600010 121087590032 121081100010
E ISLAND CREST RD
------------
121087500080
121089999999
s
121087500070
= PSoe E r, G qbw U AUW � e iGN,OR
wbmw,and bhe Can U -r o uniG
�•` r � ya � �.�,�w+'�' f ..fir•;---1��T'�-� - �-
r
_
? f
� v
,��. $'°� �,,; �'"-�� •pia `.. ,,,q.
y
Fd �.- ��'y}�1y'}•: ,.•L. � ;��. 4e .1.y�1If. 'i."v��.A �IMily��.lw/�'�t�� -R _
r
�' ° "� .fie• . • f n.?�e�,� t ,-: 3 r �`. '� .ham �,� ..� za -'�`;
k�.�.._'� ;PPS I .r:•. �� �'-�.., ems.. *N-•� :.���,:�'•� *• �1 '�i*:�. ��� �.. `:
r _ .
A' *��A' '�T} tL< -�y�4 `43 '�:.:�+• - - Y'1 A`• -FY' e.
°' \ �'L j��.( - _._— }• � . ,� Vr...
M
.: A � ,� ,• - t +� � _ <.�R k. �".!.` .ram, 4.
�"�' �� ,.f t' }'�,`ry{�Y „fY��: y4r��'�, -� .�r �:.. ~�� T�i3'ar*� r �' !'�a - ® •
,-�.r•.,,� '� "'tom r �.{� - ��,�. . . '
OR
Go. 31e earth feet 500
meters 100