Loading...
HomeMy WebLinkAboutCOM2009-00104 Reroof GymMiddle Shcool - COM Permit / Conditions - 9/22/2009 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext. 352 16 04Shelton,WA 98584 COMMERCIAL BUILDING PERMIT COM2009-00104 OWNER: NORTH MASON SCHOOL DISTRICT RECEIVED: 9/22/2009 CONTRACTOR: LICENSE: EXP: ISSUED: 9/22/2009 SITE ADDRESS: 300 E CAMPUS DR (HAWKINS MS) BELFAIR EXPIRES: 3/22/2010 PARCEL NUMBER: 122082360000 LEGAL DESCRIPTION: SW NW E OF RM/* SEE SURVEY 9/14 PROJECT DESCRIPTION: DIRECTIONS TO SITE: RE-ROOF/ ROOF CLASS A MIDDLE SCHOOL GYM LOW ST RT 3, R ON NORTH MASON SCHOOL RD, R ON CAMPUS DR MIDDLE ROOF SCHOOL GYM, LOW ROOF General Information Construction&Occupancy Information Type of Use: Insp. Area: No. of Units: Type of Constr.: Type of Work: RRF Fire Dist.: 2 No. of Bathrooms: Occ. Group: Valuation: No. of Stories: Occ. Load: Building Height: Pre-Manufactured Unit Information Square Footage Information Make: Length: Lot Size: Model: Width: Building: Year: Serial No.: Basement: Parking Spaces: Setback Information Shoreline& Planning Information Front: Ft. Shoreline: Ft. Rear: Ft. Slope: Ft. Water Body: Shoreline Desig.: Side 1: Ft. SEPA?: Comp. Plan Desig.: Side 2: Ft. Fire Protection System Information Auto Fire Alarm System?: Emergency Key Box?: Standpipe?: Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?: Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?: COM2009-00104 Please refer to the following pages for conditions of this permit. 1 of 4 Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Re-Roof Fee (;nnnn can?nnn4 RiaR Fn si?nngnn Total $168.50 CASE NOTES FOR COM2009-00104 CONDITIONS FOR COM2009-00104 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-6 7-0 82. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to (WA state law. X _ 2) Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14. 11 nne2 3) SINGLE RAFTER JOIST ROOF REPLACEMENT SHALL BE INSULATED TO A MI UM OF R-30 ALLOWING FOR A MINIMUM OF ONE INCH CONTINUOUS VENTED AIRSPACE ABOVE THE LEVEL OF INSULATION. X 4) X This strupture is approved as semi-heated space as identified in the Washington State Energy Code section 1310.2. 5) Per 2003 IIRC-SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 160_ 6WIND SPEED (3-SECOND GUST) the wind speed for Mason County is 85 MPH. X 6) Per IRC -SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in Xc Vwith the applicable provisions of this section and the manufacturer's installation instructions. 7) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND THE INTERNATIONAL CODE REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE O OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x COM2009-00104 2 of 4 8) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in formance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a a my Building Inspector shall be made prior to requesting additional inspections. 9) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The f re to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being nWnt with Mason County ordinances and building regulations. 10) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of rrriit holder have prevented action from being taken. No more than one extension may be granted. This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence f continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of r ress ins tic&evie or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described ro and ructua spection. OWNER OR AGENT: DATE: COM2009-00104 3 of 4