Loading...
HomeMy WebLinkAboutCOM2015-00073 Cancelled Play Shed - COM Application - 4/23/2015 MASON COUNTY PERMIT NO. Cj)m z o DEPARTMENT OF COMMUNITY DEVELOPMENT �� i BUILDING•PLANNING•FIRE MARSHAL WWW.CO.MASON.WA.US (360)427-9670 Shelton ext.352 t Mason County Bldg. III,426 West Ce qar Street (360)275-4467 Belfair ext. 3R 1854 PO Box 279, Shelton,WA 98584 (360)482-5269 Elma ext.3 E C E I V E D �1CLi 1'l� I c/ (._BUILDING PERMIT APPLICATION APR 2 3 2015 426 OWNER INFORMATION: CCU CONTRACTOR INFORMATION: W. CEDAR T. NAME: Dana Rosenbach,North Mason School District NAME: TBD MAILING ADDRESS: 71 E. Campus Dr MAILING AD SS: CITY: Belfair STATE: WA ZIP: 98528 CITY: It STATE: ZIP: PHONE: 360-277-2300 CELL:N/A PHONE: AIN CEL `: EMAIL: dosenbach(a,northmasonschools.org, EMAIL: eric-hainline.net L&I REG# EXP. / PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER) 12208 22 60000, se\att ent I add'1 parcels FIRE DISTRICT CMF/MCF #2 LEGAL DESCRIPTION(ABBREVIATED) : See attached proimpt inf atio SITE ADDRESS 200 E. Cam us Drive X X JF CITY Belfair,WA 98528 DIRECTIONS TO SITE ADDRESS Near the intersection of Stat oute Wand State Route 3 see attached project information IS PROPERTY WITHIN 200 FT: SALTWATER❑ LAKE❑ RIVER/CREEK❑ O ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM ❑ DOES PROPERTY HAVE SLOPE(S)WIT 00 F F HE OTECT-GREATER THAN 14% YES✓ NO ❑ TYPE OF JOB: NEW ❑ ADDIT N ✓ TION✓ REPAIR ❑ OTHER ❑ USE OF STRUCT (RESID CE,G E ETC.)Middle School IS USE: PRIMARY ✓ SEAS NU EROFBEDROOMS N/A NUMBER OF THROOMS 15 (32 stalls) DESCRIBE WORK Re el th exist,n ecome the new middle school for North NWn School District. S U A MSADOTA E: '� 1 �t d 1ST OOR: 5 ,658 sq D LOOR: sq.ft. 3RD FLOOR sq ASEMENT 9 sq.ft. CO RED DECKS . ST E sq.ft. OTHER(Mec ca la rm):2 107 q. ft. G GE sq. ft. TT BED ❑ DETACHED ❑ PLA D 4 0 ATTACHED ACHED ✓ FACTURED H ME INFO I MAKE EL N WIDTH OOMS BATHS ERIAL OWNER/BU nowledges submission of inaccurate informat may result' a sto 0 o it revocation. Acknowledgement of such is by signature below. I declare that I am the ner, own s legal re entati contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I h e obtained p ssion from all the necessary parties, including any easement holder or parties of interest regarding this project. he o h ed agent represents that the information provided is accurate and grants employees of Mason County access t h ove des a roperty and structure(s)for review and inspection. This permit/application becomes null &void if work or authol constructio is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CON ATION O WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INV T HE APPLICATION. X - 20 - Signature of App nt Date X Raymond Mow, nncipal, Erickson McGovern Architects OWNER/REPRESENTATIVE/CONTRACTOR Print Name (CIRCLE TO INDICATE) DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT PLANNING DEPARTMENT FIRE MARSHAL �oU� 1 J1 1 G Cori0 MASON COUNTY � � - °' I� � PERMIT NO. DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING• PLANNING•FII � 4L�L+T WWW.CO.MASON.y ,,�", 168)427-9670 Shelton ext.352 t Mason County Bldg. III,426 West Cedar Street (360)275-4467 Belfair ext.3 L ie�.t PO Box 279, Shelton,WA 98584 q�q 2 3 2015(360)482-5269 Elma ext.3 E C E I VE D �1'11�-IC'(. -BUILDING PERMITAPOLICATION APR 2 3 2015 OWNER I. FORMATION: CONTRACTOR INFORMATION^.` W C E DAIR . T. NAME: Dana Rosenbach,North Mason School District NAME: TBD MAILING ADDRESS: 71 E. Campus Dr MAILING ADDRESS: CITY: Belfair STATE: WA ZIP: 98528 CITY: STATE: ZIP: PHONE: 360-277-2300 CELL:N/A PHONE: CELL: EMAIL: drosenbachanorthmasonschools.ore, EMAIL: eric@hainline.net m L&I REG# EXP. / PARCEL INFORMATION: PARCEL NUMBER(12 DIGIT NUMBER) 12208 22 60000,see attachment for add'lparcels FIRE DISTRICT_CMF/MCFD#2 LEGAL DESCRIPTION(ABBREVIATED): See attached project information SITE ADDRESS 200 E. Campus Drive CITY Belfair.WA 98528 DIRECTIONS TO SITE ADDRESS Near the intersection of State Route 302 and State Route 3, see attached project information IS PROPERTY WITHIN 200 FT: SALTWATER❑ LAKE ❑ RIVER/CREEK❑ POND ❑ WETLAND ❑ SEASONAL RUNOFF ❑ STREAM ❑ DOES PROPERTY HAVE SLOPE(S)WITHIN 300 FT OF THE PROJECT-GREATER THAN 14% YES✓ NO ❑ TYPE OF JOB: NEW ❑ ADDITION ✓ ALTERATION✓ REPAIR❑ OTHER ❑ USE OF STRUCTURE(RESIDENCE,GARAGE ETC.)Middle School IS USE: PRIMAKZY ✓ SEASONAL ❑ NUMBER OF BEDROOMS N/A NUMBER OF BATHROOMS 15 (32 stalls) DESCRIBE WORK Remodel the existine NMHS to become the new middle school for North Mason School District. SQUARE FOOTAGE: ?I ct' <�5�1k- 1ST FLOOR: 53,658 sq.ft. 2ND FLOOR sq. ft. 3RD FLOOR sq.ft. BASEMENT 9.349 sq.ft. COVERED DECK sq.ft. STORAGE sq.ft. OTHER(Mechanical Platform):2,107 sq.ft. GARAGE sq. ft. ATTACHED ❑ DETACHED ❑ PLAYSHED 4,050 sq.ft. ATTACHED ❑ DETACHED ✓ NL NUFACTURED HOME INFO IO x4 COPIES OF THE FLOOR PLAN MAKE EL NGTH WIDTH ROOMS BATHS ERIAL NUMBER OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project.The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null &void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. X q Signature of App nt Date X Raymond Mow, nnciaal. Erickson McGovern Architects OWNER/REPRESENTATIVE/CONTRACTOR Print Name (CIRCLE TO INDICATE) DEPARTMENTAL REVIEW APPROVED DATE DENIED DATE TAGS/NOTES/CONDITIONS BUILDING DEPARTMENT A703It 3i' t 5" -rnc ow-o C; PLANNING DEPARTMENT FIRE MARSHAL • PLANNING: ALL SETBACKS ARE MEASURED FROM THE FURTHEST PROJECTION OF THE APR 2 3 2015 PLANNOW CEDAR S'� East Alta Dr EXISTING HAWKINS GYM APPROVED �p NFw...�:QW.� MASON COUNTY DCDJAPPVAL NfJ! O MAS N HIC;I SITE PLAN REQUIRED TOSIT G S Flnn CHANGE b SUBJECT TO � EXISTING ANNEXY Date W o c�S EXISTING NORTH MASON HIGH SCHOOL/ - HAWKINS MIDDLE S HOOL - LOGY►2015 Com zo 15-a�o`73 STATE ROUTE 302 Deveraux Lake VICINITY MAP NORTH SCALE: NTS ERICKSON • MCGOVERN HAWKINS MIDDLE SCHOOL SKETCH NUMBER _ ® NORTH MASON SCHOOL DISTRICT NO.403 1 SKETCH TITLE SHEET REFERENCE DATE 6icksT MaGavem P.L.L.C. VICINITY MAP AO.00 15 APRIL 15 120 131st Sheet South Tacoma.WA 98444 PLANNING : ALL SETBACKS ARE MEASURED FROM THE FURTHEST PROJECTION OF THE , ED APR 2 3 2015 4261N. CEDAR ST PLANNING East Alta Dr EXISTING HAWKW� APPROVED GYM MASON COUNTY DCD PLA SITE PLAN REQUIRED TO BE ON. CHAN ES SUBJECT TOAPPrC FW BY Date O MAS s EXISTING ANNEX O EXISTING NORTH MASON HIGH SCHOOL/ HAWKINS MIDDLES HOOL Corn�►5-oc>�72 Ic.� Shy Com 20 I s-a�o73 STATE ROUTE 302 Deveraux Lake VICINITY MAP NORTH SCALE: NTS '11�v ERICKSON • MCGOVERN HAWKINS MIDDLE SCHOOL SKETCH NUMBER I II ! ® NORTH MASON SCHOOL DISTRICT NO.403 SKETCH TITLE SHEET REFERENCE DIVE Erickson MaG.—F.I..I.C. VICINITY MAP AO.00 15 APRIL 15 120 131 st Street South Tacoma.WA 98444 CODEPROs Plan Review Comments July 2, 2015 North Mason School District Dana Rosenbach, Superintendant 71 E. Campus Dr. Belfair, WA 98528 d rose nbach(�northmasonschools.org Re: 71 E. Campus Dr. Belfair WA PROJECT DATA: Project Manager: Engineer of Record: Eric Nelson Jack J. Pinkard, P.E., S.E. Hainline &Associates PCS Structural Solutions 1215 Fourth Ave. Suite 1200 1250 Pacific Ave., Suite 701 Seattle, WA 98161 Tacoma, WA 98402 206-382-9263 253-383-2797 eric(a_)hainline.net Contractor: Architect of Record: TBD Raymond C. Mow, AIA -- - Erickson McGovern, PLLC East 26"'St. Suite 300 Tacoma, WA 98421 253-531-0206 ray(a-)-ericksonmcgovern.com Project Architect: Laura Wade Jensen wade(a-)-ericksonmcgovern.com PROJECT DESCRIPTION: School Remodel &Addition OCCUPANCY GROUP: E TYPE OF CONSTRUCTION: II-B, Sprinkled NUMBER OF STORIES: 2 CODE EDITIONS: 2012 International Building Code (WAC 51-50); and 2012 International Mechanical Code (WAC 51-52); 2012 Uniform Plumbing Code (WAC 51-56); 2012 Washington State Energy Code (WAC 51-11R, WAC 51-11C); Dear Mr. Rosenbach, The building design documents for the permit referenced above have been reviewed for conformance with the locally adopted codes along with the Washington State amendments. This review letter contains only those comments related to the Building Department's review and does not Call'J'm us Page 1 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com reflect any additional needs of any other division or County department. Please review the project data above, and the plan review comments below. It is important that you then follow the instructions for re-submittal following the plan review comments. PLAN REVIEW COMMENTS: 1. Sheets C4.0, C4.1, C4.3, L1.00 & L1.02. There are several concerns in regard to the proposed location for a new Fire-Department Connection (FDC). The existing FDC at the front of the building is proposed to be demolished and replaced by a new FDC at the rear of the building (accessible via a paved access path). a. IBC & IFC Sections 912.2.1 require that FDCs be located on the street side of the building and that they be fully visible and recognizable from the street or nearest point of fire-department access. The initial fire department access is at the main entry at the front of the building at the north side (which is also consistent with where the addressable fire alarm system panel is proposed to be located.) The FDC should be located at or near the main entry. b. IBC and IFC Sections 912.3 require that "Immediate access to the fire-department connection shall be maintained at all times without obstruction by fixed or moveable objects. Though not shown on the civil drawings, removable bollards are indicated on the Landscaping sheets at the access way from the south to the proposed FDC at the rear of the building. Bollards cannot be installed in any path that provides access to a FDC. (Issue will be moot if FDC is located at the front.) 2. Sheet A2.06 (& A2.01, A0.02). Mechanical/Electrical Room 406 contains 3 boilers, 1 for domestic hot water and 2 to supply the hydronic system. Though the hydronic system boilers are not identified in any schedule, (their size is unknown...See Comment 25 below) the domestic boiler is indicated to be an 850,000 Btu/hr rated boiler. In accordance with IBC 1015.3, Room 406 requires a minimum of 2 exits when containing a boiler in excess of 400,000 Btu/hr rating. Only one exit is provided. (In addition, it may be advisable to check with WA-L&I to see if proposed electrical equipment room will also require the space to be provided with two exits.) Regardless of electrical and hydronic equipment, the) domestic boiler alone exceeds the threshold for a singlet exit allowance. Please clarify and/or correct. 3. Sheet A2.06. Sheet A0.02 identifies a 1-hour fire-barrier between Room 406 and the rest of the lower level, as well as around Rooms 401 and 401A. Sheet A2.06 indicates the walls between 404 and 406, and between 401, 401A, and 405 as being wall Type 1. In accordance with Sheet A5.04, Wall Type 1 is not identified as a fire-resistive rated assembly. It is important for all fire- resistive wall assemblies to be noted as such for the purposes of penetration protection, labeling in accordance with IBC 703.7, etc. Please clarify and/or correct. 4. Sheet A2.02, A2.03, A7.00, &A7.01. Boy's restrooms H4B on Sheet A2.02 and 016 on Sheet A2.03 are depicted without partitions, as is detail 5 on Sheet A7.00, and detail 6B on Sheet A7.01. In accordance with IBC 1210.3.2, partitions with dimensions as described in the code section, are required between the urinals. Please clarify and/or correct. 5. Sheets A2.06 & A7.00. At Toilet Rooms 400D and 402D, the toilet compartment doors are shown to swing into the accessible stalls. In accordance with ICC/ANSI Al 17.1 Section 604.9.3, toilet compartment doors shall not swing into the required minimum area of the compartment. Please clarify and/or correct. In addition, please provide dimensions indicating satisfaction of A117.1, Section 604.9.2 minimum areas. 6. Sheets A8.10, A8.11, A8.12. Many of the construction details depict wood framing members. This building is Type II-B non-combustible construction. Though limited allowances of combustible materials are permitted as described in IBC 603, (such as limited non-bearing partitions) most of the circumstances require the wood to be fire-retardant-treated wood. The plans do not appear to describe the use of fire-retardant-treated wood in these circumstances, nor do the specifications. Please clarify and/or correct. Comm LLC Page 2 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com 7. Sheets A6.01 &A6.06. Though not necessarily required, is it the intent to exclude emergency lighting in the locker rooms 400 and 402? These rooms have no external light source. All other multi- person restrooms within the project have been provided with emergency lighting. As noted, the building code does not require emergency lighting for these rooms as they only require one exit access each and they are not corridors, etc. It just appears inconsistent with what appears to be desired for the rest of the plan. As this is not a code issue, no formal response is required. 8. Sheet A7.00. Detail 10, Part 14, no dimensions are provided to indicate satisfaction of ICC/ANSI A117.1 Section 606.3 and 306 requirements. Please clarify. 9. Sheet A7.00. Detail 10, Part 9 depicts a counter mounted accessible lavatory, however, no details, dimensions, etc. are provided to indicate how the forward approach knee and toe spaces will be provided in accordance with ICC/ANSI A117.1 Sections 606.2 and 306, nor is it detailed if the cabinet doors will swing out to provide access to such clear spaces, etc. Please clarify. 10. Multiple Sheets (& Specification 10 1400). In addition to the exit signs required under IBC Sections 1011.1, 1011.5, and 1011.6, additional signage for accessibility, maximum occupant loads, etc. are required in accordance with IBC Sections 1004.3, (1007.9, 1007.10), 1011.4, 1110 and ICC/ANSI A117.1 Section 703. Specification 10 1400 provides a sign schedule of basic room identification signs, but not maximum occupant load signs, tactile exit signs, etc. Please clarify and provide a full description of all required signage. Structural: 11. In order to complete the structural portion of the review, please provide a copy of the geo- technical report for the project. 12. Sheet S3.03. Detail 2. WSEC Section C402.2.2.6 and Table C402.2 requires that slab insulation "shall extend downward from the top of the slab for a minimum distance as shown in the table [24"] or to the top of the footing, whichever is less, or downward to at least the bottom of the slab and then horizontally to the-interior or exterior for the total distance shown-in the table." While the- architectural sheets depict a code compliant arrangement, the structural detail at 2/S3.03 is inconsistent with the architectural plans and the WSEC requirement. Please clarify and/or correct. 13. Sheet S3.00. At the playshed columns, the plans show main-frame column centerlines at grid lines. At Detail 9/S3.00, is the portal frame column and centerlines depicted correctly? Please clarify. 14. It is understood that the metal building portion of the playshed structure will be bidder designed, and is proposed to be a deferred submittal. The metal building engineering may be deferred, however, it will be critically important to provide the deferred submittal with adequate time for review and approval prior to the proposed start of building erection. No formal response is required at this time. Mechanical: 15. Sheets A4.19, M3.03, M3.04, and M5.02) The arrangement and details of the Class 1 hood and exhaust system are not provided to fully describe satisfaction of IMC 506 requirements, including materials, joining, grease drainage/cleaning, access panels in horizontal runs, duct and penetration protection, etc. Please clarify the Type 1 hood and exhaust system requirements in accordance with IMC 506 and 507 requirements, and ensure all minimum clearances to combustible materials, (including over-roof foam insulation) etc. 16. Sheet P5.01. Sheet P5.01 includes a detail for a "science shut-off valve", however, the plans do not appear to include gas piping to the science rooms. Is gas proposed to be piped to the science rooms? Please clarify. If so, please be sure to show all convenience outlets, valves and any quick- connect outlets and fittings, etc. 00011 O$W; Page 3 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com 17. Multiple Sheets. Gas piping sizes are not indicated. In accordance with the International Fuel Gas Code (IFGC) Section 106.3.1, construction documents "shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of this code." Please identify the proposed gas piping locations, penetration protections, piping materials (in accordance with IFGC 403), pipe sizes (in accordance with IFGC 402), piping support (in accordance with IFGC 407), etc. as well as the Btu ratings of all proposed gas-fired equipment and appliances. 18. Multiple Sheets. Duct sizes for the induction primary air supply are not provided on the mechanical plans. In accordance with the International Mechanical Code (IMC) Section 106.3.1, "Construction documents shall be drawn to scale and shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of this code." While duct materials are described in the specifications, the mechanical plans do not describe the duct sizes, locations, support, etc. Please provide all information to indicate satisfaction of IMC Chapter 6 requirements. 19. Sheet M3.01. Where do the duct coil condensation drains discharge? Please clarify. 20. Sheet M3.01. The exhaust duct up (at the NW corner) is depicted as a supply. Please clarify the discrepancy. 21. Sheets M2.02 & M3.02. The Life-Skills Room, 100 includes a proposed laundry washer and dryer. No dryer exhaust is shown on the reflected ceiling plan, nor is one shown on Sheet M3.02. Each dryer installation shall be provided with an exhaust system in accordance with IMC Section 504. Please provide complete details and descriptions of the dryer exhaust system indicating satisfaction of IMC requirements. 22. Sheet M3.02. Is there a relief air anywhere to equalize pressure at the Plan Area 1? Sheet M3.02 indicates each classroom will be supplied with air from the induction supply system. Approximately 8400 cfm is supplied to this area. Transfer ducts and grills move excess air to the hallways, however, the only exhausts are at the restrooms drawing only 700 cfm of air from the hall. - - This portion of the-building is not shown to-be served•by a-HRU, nor is a relief air shown. V'fthefe--is---- the excess air proposed to go? How will the system be balanced? Please clarify and/or correct. In addition, how is IMC 601.2 satisfied? Please describe. (A similar situation, but not nearly as pronounced, could also occur at Hall H10 at Sheet M3.04... Please clarify.) 23. Sheet M3.03. No dimension is provided in Detail 2 to indicate the distance between RH2 and RH1. Is sufficient distance provided between exhaust air and intake air to satisfy the requirements of IMC 501.3? Please clarify. 24. Sheet FS-4. In the Kitchen Room 301, Sheet FS-4 requires for the refrigeration equipment, that a total heat load of 14.8 BTUs per hour needs to be exhausted (in addition to the Type I cooking hood). The HVAC sheets include exhaust for the Scullery, but (other than the cooking hood) none for the Kitchen area. Please clarify and/or correct. 25. Sheet M7.05. Hydronic boilers B-1 and B-2 are not identified in the mechanical schedules. Please provide all necessary unit descriptions, sizes, BTU ratings, efficiencies, etc., as well as all combustion air and exhaust requirements. 26. Sheet M7.05. The hydronic boiler pressure relief piping is identified as gas pipe. Please clarify and/or correct. 27. Sheets M2.03, M2.04, M3.03 (& others). No information is provided describing the proposed use and installation of the (assumedly) domestic cooking ranges at the Commons (near Grid J-7) and at the Science Room 205. It appears that the range at the Commons Room will be secured behind an overhead door when not in use, but such is not fully described. The mechanical reflected ceiling plans do not indicate any form of range exhaust systems for the cooking range proposed at the commons near Grid J-7, or for the range proposed at the Science Room, 205. While M3.04 does include an exhaust at Room 205, no exhaust is shown at Sheet M3.03 for the cooking range at the Ca1BPm LLC Page 4 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com commons. Please clarify the proposed use of both ranges and describe the exhaust systems, clearances, and any other protective items proposed associated with the use and installation of cooking ranges. 28. Multiple Sheets. It is assumed that the range installation proposal intends to utilize one of the Washington State Code Amendment provisions applicable to IMC 507.2.2 to use a domestic range hood in lieu of a Type I hood and suppression system over the domestic ranges, though this is not described. There is an inherent hazard however, with any cooking equipment in a public setting, especially when accessible to unsupervised students. Typically, commercial cooking equipment is provided with interlock systems that shut down fuel supply and/or disconnect power upon activation of a fire suppression or fire alarm system (See IBC 904.3.3 and 904.11.2.). While without the Type I hood, shut-down equipment is not necessarily specified by the code, the hazard of items left unattended upon activation of a fire alarm remains unabated. Is it the architect's intent to provide some additional form of protection and/or automatic shut-off devices for the ranges? Please fully describe the intended installations, clearly identifying compliance with IMC 507, IFC 609 and IBC/IFC 904 requirements. 29. Kitchens and Kitchenettes, even if only for teaching purposes, must also satisfy the accessibility requirements of ICC/ANSI A117.1 Section 804. ICC/ANSI A117.1 804.3 requires that a (Section 902 compliant, forward approach) Work Surface shall be provided. Typically (and required with a bottom-hinged oven) the work surface shall be immediately adjacent to the range. Please clarify and correct and show how both rooms with domestic ranges (300 & 205) will satisfy all ICC/ANSI A117.1 requirements. 30. Specification 11 3100, in Section 1.01 identifies that the specification section includes range hoods twice (#1 & #7) but does not include ranges. It is assumed to be a typo, and that domestic ranges should also be included (as they are described in 2.01 C). The specification also does not describe if the unit(s) will satisfy the accessibility requirements of ICC/ANSI A117.1 Section 804.5, including the specific cooktop requirements of 804.5.4 and 804.5.5. (Similarly, refrigerators/freezers shall satisfy 804.5.6.) Please clarify satisfaction of all appliance accessibility requirements. 31. Hydronic system pipe details are not included on the mechanical plans. Please clarify all pipe materials, pipe sizes, connections, installation methods, system drainage provisions, pipe insulation, testing procedures, etc. indicating compliance with IMC Chapter 12 requirements. Plumbing: 32. Sheet P2.03. The kitchen waste is depicted as being separate from the remainder of the sanitary drainage, and is assumed to be directed to a grease interceptor. The plan sheet also includes a #3 Construction Note for"4-inch Grease Laden Waste"to see septic plans for continuation. a. There is no callout to reference Note #3. (It is assumed however to be applicable to the kitchen waste.) b. Copies of septic plans are not provided, and the civil design sheets do not include an extension of (or connection to) a grease laden waste disposal system. Is a grease interceptor provided in accordance with UPC 1014 requirements? Please describe. c. The dishwasher in the Scullery Room 301A is shown discharging to a floor sink connected to the drainage system (assumed to flow to a grease interceptor). UPC 1014.1.3 generally prohibits food waste disposal units and dishwashers from discharging to a grease interceptor. Please clarify and/or correct. 33. Sheet C4.1. Sheet C4.1 does not include a new sanitary sewer drain or any information in regard to a grease interceptor as required by UPC 1014. Please clarify. 34. Sheet C4.1. Sheet C4.1 does not include the sanitary sewer discharging from Area 1 of the building. It is assumed that this is existing, and should be included on the plan. Please clarify. CgIp: m LU Page 5 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com 35. Sheet P2.01. The 4-inch floor clean-out between toilets at 402 and 400 is depicted in the space between the walls which will not be accessible. It is assumed that this is intended to be at the opposite side of the adjacent wall, or into the wall as a wall clean-out. Please clarify and/or correct. 36. Plumbing system pipe details and sizes are not fully indicated on the plumbing plans. Please clarify all pipe materials, pipe sizes, connections, installation methods, pipe insulation, testing procedures, etc. indicating compliance with UPC requirements. Drafting / Reference Issues: There are numerous drafting and/or erroneous references, incomplete references, and erroneous or incomplete details throughout the plan sheets. While the following items are not necessarily code related issues, the final approved plan set needs to be accurate so that all persons involved with the construction, including building inspectors with limited time on-site, can easily find necessary information. In accordance with IBC 107.2.1, "Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official." 37. Sheet L2.03. Point of Connection note references POC detail Sheet L2.06. POC details appear to be at C/1-2.08. Please clarify. 38. Sheets A2.00 & A2.03. The elevator detail callout is shown as 3/A2.26. I would assume that this should reference either detail 1 or 4 of Sheet A2.26. Similarly, Sheet A2.01 references 3/A4.10 at the same location. 3/A4.10 does not exist. Please clarify the elevator area references. 39. Sheet A2.01. At Mechanical/Electrical room 406, Section 9/A4.00 is called out, but Section 9/A4.00 does not exist. Please clarify. 40. Sheet A2.03. Interior elevation notations for Office 019A, Health 019, and Electrical Room 009 do not appear to be consistent with the plan. Please clarify and/or correct. 41. Sheet A2.04. Interior elevation callouts appear to be inconsistent at many of the rooms, including, but not limited to, 202, 204, 204D, 204E, and 207. Please clarify and/or correct. 42. Sheet A2.05 & A7.12. Elevation D at 2/A7.12 includes the door at the SW corner of the gym, which, according to the plans, is proposed to be removed. Please clarify the discrepancy. 43. Sheet A3.00 & A3.03. Elevation 2/A3.00 appears to include the exterior stairway that the demolition plans propose to remove. (related to the comment immediately above) Please clarify and/or correct. 44. Sheets A2.06 & A7.14. Laundry Room elevations at 3/A7.14 appear inconsistent with the floor plan. Please clarify. 45. Sheets A2.06 & A7.14. Custodial Room 403 elevations at 2/A7.14 appear inconsistent with the floor plan. Please clarify. 46. Sheet A2.06. Multi-purpose Room 407, elevations do not appear to be at 3/A7.13. 47. Sheet A4.11. The callout for the ship's ladder details on wall section 4/A4.11 is imcomplete. Please clarify and/or correct. 48. Sheet A7.02. At the reception 101 workstation interior elevation callouts, it appears E, F, G, and H may not be labeled correctly. (In addition, detail 2, part D location is unknown.) Please clarify and/or correct. 49. Sheet A7.02. Detail 1, Part D appears to be inconsistent with the floor plan. Please clarify. 50. Sheet A7.03. Detail 4 appears to be inconsistent with Room 011 where it is referenced. Please clarify. COd&M lu Page 6 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com 51. Sheet A7.03. Detail 5 appears to be inconsistent with Room 009 where it is referenced. Please clarify. 52. Sheet A7.04. Detail 2 appears inconsistent with Room 019-Health. Please clarify. 53. Sheet A7.04. Detail 3 appears inconsistent with Room 019A-Health Office. Please clarify. 54. Sheet A7.04. Detail 4 appears inconsistent with Room 021-Hall. Please clarify. 55. Sheet A7.07. The first Detail 4 (should this be #3?) appears inconsistent with Room 205A- Storage. Please clarify. (In addition, the different plan arrangement may affect elevation 4-Part C as the door placement to Room 205A appears different. Please clarify.) 56. Sheet A7.08. Detail 1 appears to have Parts A and C switched, and B appears to have a "cabinet wall' on the opposite side. Please clarify. 57. Sheet A7.08. Detail 2 appears to have Parts A and C switched, and B & D appear to have a "cabinet wall" on the opposite side. Please clarify. (Perhaps 115 and 113 are supposed to be "OH" instead of 106 & 108?) Regardless, please correct the discrepancies. 58. Sheet A7.09. Detail A, Parts A and B appear to be inconsistent with the plans. Please clarify. 59. Sheet A7.09. Detail 2, Expanded Plan and Parts A & B appear inconsistent with floor plans. Please clarify. 60. Sheet A7.10. Detail 1. 1 assume all 4 panels are not Part A. Detail 1/A7.10 is not referenced on Sheet A2.04. Please clarify. 61. Sheet A7.10. Detail 2, Workroom 200B is incomplete, as is Detail 3 for Conference Room 200C/200D-SIM. Please clarify. 62. Sheet A7.11. Detail 4 appears inconsistent with Room 204E-Uniform Room. Please clarify. 63. Sheet A7.12. Detail 2, Part D contains the exit door that the plan sheets indicate as being removed. Please clarify. 64. Sheet A7.13. Detail 6 appears to be inconsistent with the floor plan for Hall 402C. Please clarify. 65. Sheet A7.13. Details 3, 4 & 5 for Hall 400B, 400C, and 402B are incomplete and/or are not used. Please clarify. 66. Sheet A7.14. Detail 2 appears inconsistent with floor plan for Room 403-Custodian. Please Clarify. 67. Sheet A7.14. Detail 3 appears inconsistent with floor plan for Laundry Room 404. Please Clarify. 68. Sheet A7.14. Detail 4, Part B appears to be labeled as Part C. Please clarify. 69. Sheet A7.14. Details 5 and 5. Both details are numbered 5, one for Room 401A, and the other for Hall H 14. Please Clarify. Unfortunately, the construction plans cannot be recommended for approval for a building permit until all outstanding issues are resolved. To re-submit plans: Please make the required corrections and/or clarifications and submit a revised electronic copy of the plans (.PDF or .DWF); or, if on paper, two complete sets of the plans clearly identifying all revisions. If the plan sets are re-submitted electronically, then once approved, the electronic set will contain the approval indications and will be returned to the County on two CDs, one copy for the County record, COMM MC Page 7 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com and one copy to be returned to the applicant/architect in order to print off an official "Approved Site Copy" of the plans to be maintained on-site during construction. Electronic plans may be e-mailed to mbarth(a)-codeproswa.com or instructions and passwords may be provided for me to download the revised plans from a FTP site or similar arrangement, or they can simply be mailed on a CD to the address below. To aid in the timely review of the revised plans, please detail all corrections and/or revisions in a cover letter, numbered the same as the comments above. Revisions should be marked on the sheets and noted with a cloud surrounding them or some other method to distinguish the changes. Please also be sure to identify if any other changes are made that are not associated with the plan review comments. If you have questions or concerns about the review comments, please contact me directly at mbarth a�codeproswa.com or call me at 360-801-0543. Sincerely, r.. Digitally signed by Michael J.Barth,M.C.P. Date:2015.07.02 16:42:40-07'00' Michael J. Barth, M.C.P. Building Code Consultant WePw LI.0 cc:Mason County DCD Erickson McGovern Hainline&Associates PCs Structural Solutions coddorm UC Page 8 of 8 P.O.Box 185 Allyn,WA 98524 CodeProsWA.com