Loading...
HomeMy WebLinkAboutSEP98-0149 - SEP Determinations - 10/30/1998 SEP98.0149 AGE �99� MASON COUNTY �. N DEPARTMENT OF COMMUNITY DEVELOPMENT MPSON o0 Planning-Landfill-Utilities MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) Description of Proposal : To waiver a 1.34 acre tract for a forest practice moratorium, due to a forest practice violation. Proponent : ROBERT BIEHL Location of Proposal : . . . . . . . . . . . . . . . PARCEL#:1223075tfM �I DoZ La TR 26 OF SURVEY 2/108 The site is located in a portion of the NE 1/4 of Section 30, Township 22 N. , Range 1 W. W.M. , Mason County Lead Agency: MASON COUNTY The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment . An Environmental Impact Statement (EIS) is not required under RCW 43 .21C. 030 (2) (c) . This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request . MITIGATION MEASURES ARE ATTACHED. 7 1p '] O,v u N,-/ Please contact / � / at ext . K6 with any questions . This DNS is issued under 197-11-350 (2) , the Lead Agency will not act on this proposal for 14 days from the date below. Comments must be submitted by 11/13/98 . DATE: 10/30/98 Signature of e. onsible official Date Responsible Official : Gary Yando Director of Community Development 426 W. Cedar, PO BOX 578 Shelton, WA 98584 SQUAXIN TRIBE DNR (360) 427 -9670 DOE FPD #S�St�Gz��) MIT-DNS, rev: 08/23/96 W D W M C PW - APPLICANT Conditions of this Case are listed below: Case Nu.:SEP98-0149 1) MITIGATION #1 : The applicant is required to submit a Geo-tech report due to steep slopes within 100' of site. The geo-tech report must be done by a licensed engineer in the State of Washington. The geo-tech report must address timber harvesting and road access placement. The geo-tech report must be submitted to Mason County Department of Community Development(DCD) and Mason County Public Works. The waiver will not be approved until Mason County Public Works has reviewed and comments sent to DCD. 2) MITIGATED CONDITION #2: A Stormwater Site Plan (SSF) will be created and implemented prior to development, clearing, grading, or construction of any portion of the site. x----------------------- 3) MITIGATED CONDITION #3: Emergency vehicle apparatus access roads shall conform with the requirements of the Uniform Fire Code and Mason County Title 16. If the access road cannot conform, special conditions will be placed on any building pei mit issued on property that is served by a non-conforming access road. Contact the Mayon County Fire Marshal for details. 4) INFORMATIONAL ONLY: Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 5) INFORMATIONAL ONLY: Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. X 6) INFORMATIONAL ONLY: Storm drainage facilities are required by the County for residential development projects. Facilities shall include, but not be restricted to vegetated swales, retention ponds and use of artificial or natural wetlands PROVIDED no adverse impacts to the receiving wetlands would occur and are subject to Mason County approval. X 7) INFORMATIONAL ONLY: Storm drainage facilities shall be separate from sewage disposal transport facilities and include provisions to prevent uncontrolled and untreated direct entry of surface water runoff into receiving waters. Storm drainage facilities shall include, but not be restricted to vegetated swales, retention ponds and artificial and natural wetlands PROVIDED no adverse impacts to the receiving wetlands would occur and shall be subject to Mason County approval. X The Comp&ny has not su vey�the premises described in /� �e70dooThe sketch below is furnished without eharUe solely for the purpose of assisting In locating . �}said promises and the CompenY asGumm no liability as to the D •(J}��M�CJ�1 validity,location of Ownership of any easement or other MAI MUM EZ9 ter shown thereon nor for the Inaccuracies tlierein,Including SHELTON (206) 426-1626 the accurate location of boundaries,Including water bourn P.O.SW RAILROAD FAX 426 9493 �,ries. This sketch does not Purlrod to show all highways.reads SHELTON.WA 98594 and easements adjoining or affecting said premises,nor is it 6REMF.RTON I77-5017 a part or maf(,cation of the report commitment,policy or other Title evidence to which It may be attached. RILL 345 FR 833 SHORT PLAT OF A PORTION OF THE SOUTH HALF (S1 ) OF THE NORTHEAST S NO N 1 SECTION (30), TOWNSHIP (22) NORTH, RANGE (1) WEST, W.M. QUARTER, H, zirtort Plat ,�L �_ -1 r1.1 2'111 SEP — 5 1oacT� ►1/^Rlrtiii rK WARNING. Mason County has no responsibility to build, improve, maintain or otherwise service the private roads contained within or providing service to the prcpFrty described in the short plat. WW RE[ A!'^I f 0 !?r SON GCUHIY ALLn!t 1.dROTCHE SELLER: Richard Merrill 28.35 Marie Place v Pou 85 $EP 5 Plsbo, Washington 98370 1 REQUEST OF 1 PUNNING DIRECTOR C1 1 • L� PMae (3 E sq, EASEMENT-SdeUE}/ x 100 VOL,2r GAGE legs ROD IroR S N0.3216 7- 0 N C/ �- � � 165• � w, %` p �_ 5 Ad, 1rRtunr'10 w v 3 �. cL / 7 5f141, �I+ 5 C, v 60, } . �tll' o Z `o V � IN' 1.3 Palo IEL 1JQPIU(rf1D, \ - � SCALE: 1" 100' __---- R �LIIARD A&022/S J , Basis of perimeter bear in s and distances of total tract: Survey recorded n Vo ume 2 of �J Surveys, page 108, under Auditor's File No. ` 321604. No. 47432 . GARY YANDO,DIRECTOR P5U.STglFO o A N DEPARTMENT OF COMMUNITY DEVELOPMENT U z o T z PLANNING - SOLID WASTE - UTILITIES N Y Y BLDG. I • 411 N. 5Tf' ST. • P.O. BOX 578 1864 SHELTON, WA 98584 - (360) 427-9670 December 3, 1998 Mr. & Mrs. Thomas E. Marsh, Jr. P.O. Box 478 Allyn, WA 98524 Dear Mr. & Mrs. Marsh: The Mason County Department of Community Development would like to thank you for responding to the SEPA notice that was posted on the Biehl property. This department relies on neighboring property owners to identify problems and possible solutions in areas of our County that need to be addressed. As to your comments in your letter of November 10, 1998 . First of all I would like to say that I am sorry for not getting a response to you immediately, I have been on vacation for two weeks. We understand the problems that you are having in your neighborhood with run-off, slides and the harvesting of timber on neighboring properties. In Mr. Biehl' s case, he didn' t get a permit to harvest the timber on his site, but Mr. Biehl has indicated that he was given mis-information as to the requirements for the harvesting of timber and requirements that were in place prior to his harvesting of timber. Mr. Biehl is going through the moratorium waiver process which is allowed through County Ordinance #108-98 . The moratorium has been placed on parcel "D" of Short Plat 1545. This moratorium does not allow any development permits to be issued for 6 years. Development permits are identified as building permits, sewage permits, well permits, permanent access permits and any permits that are not required for the harvesting of timber. As to problems roblems with run-off, slides and excess Y building, Mr. Biehl has been required to develop a geo-tech report that addresses the hazardous slopes that exist within 600' of his property, per Mason County Ordinance #77 -93 . The geo-tech report must be done by a licensed engineer in the State of Washington and must meet the standards of this Ordinance. At this time the County is waiting for a geo-tech that will meet these standards. In conjunction with the geo-tech report Mr. Biehl is required to submit a Stormwater Plan for his site that will mitigate any activities on his property. This plan must meet the Department of Ecology's Technical Stormwater Manual, that has been adopted by Mason County as a guideline for developing stormwater plans. Recycled U;;v We can not address your concern with the amount of building that is going on in your neighborhood since a property owner is, allowed to construct a residence on their property as long as its permitted and meets Mason County Building Standards, per the adopted Uniform Building Code (UBC) and other regulations. Having read other letters submitted to this department pertaining to the Biehl project, we understand the problem that you are having with the community access road and limited funds collected for your road maintenance fees. This problem is outside of the Counties jurisdiction, as it is a private road. We hope that as more property owners build, they will also contribute to your road maintenance fund. We have attached to this letter the SEPA checklist that you have requested and as soon as we receive the mitigation information, we will be sending this to you and the others that have submitted letters to this department. If you should have any further questions pertaining to this waiver, please contact Randy Neff, (360) 427-9670, ext. 363 . Tandy rely,ff H: \WP\Biehlcom