April 22, 2002
Richard Funk
9015 172°d Avenue NE
Redmond, WA 98052
RE: Shoreline permit application no. SHR2001-00016 51 foot
stairway from bulkhead to top of bank — additional information per our site meeting, and
conversation with Ms. Funk on 4/22/02.
Dear Mr. & Ms. Funk:
Thank you for the opportunity to meet recently with you and your contractor at your
Stretch Island site. We hope that meeting with both Mason County and Department of
Ecology staff at the same time, was of assistance to you in your work to develop and
revise your project and application materials. From staff s point of view we now have a
clearer understanding of your proposal, and changes you wish to make to it. As a follow-
Ltp to both that discussion, and a recent phone conversation with Ms. Funk, we provide
the information below.
Geotech Report: Your geotech report will need to be revised to address changes to your
proposal, and other items we discussed (listed below). Working closely with your
geotechnical engineer as you redesign your location, stair configuration and site
configuration, will be key as the report is updated. Observed changes to the slope since
the original report also need to be addressed.
Cut, fill, regrading and recontouring, relocation and modification to stairs: From the
on-site discussions it is now clear that you wish to cut back a substantial amount of
material back from your shoreline bank, and place it in a low area, while allowing natural
drainage to continue flowing to the north corner of your property and onto the beach. We
understand the filled area will be recontoured to ensure that the natural drainage of the
site is not impeded, simply moved to an area slightly inland of its existing location.
Please clearly show how this is to be accomplished in your plans, including:
• Cross-sections of bank area and upland site (in several places) showing "before"
and "after" grading. Show depth of cut and fill.
• Profile views of bank showing before and after grading (include stairs in after).
• Contoured plan views of the site showing drainage both before and after, with
contours at close enough intervals to show the changes in the site configuration.
9 Show locations of"cut" and "fill" in detail.
• Quantity of material to be moved (cu yd). We understand from you that the
quantities will change per your decision to relocate the stairs to near the joint
property line.
• NOTE: Also provide a clear site plan which shows the project in relation to the
entire two parcels.
As discussed on site, once we have this information including revised quantities of fill,
we will be able to determine the level of shoreline review process necessary for the
project.
Planting plan: per our on-site discussion with Kim Van Zwalenburg, the Department of
Ecology website provides some guidance material.
Revisions to stairway plans and location (provide also to the building department):
MR?rcks
In your shoreline permit revision materials show plan and profile views of the
revised stairs in relation to the site.
• lans examiner of the Mason County Building
Department to discuss engineering requirements for stairs, stairway code
including setbacks from property line, and engineering requirements related
issues. She can be reached at (360) 427-9670 ext 510.
Joint Use Stairway questions
We understand this is to be a joint use stair,vay and you had questions about vrhether it
would be possible to execute a joint use agreement if you owned both properties at the
time. We suggest that you discuss this question with your legal advisor, who could
discuss the various issues involved in crafting a document addressing the use of a
structure by the current and future owners of the parcels in question.
As you put together the additional information for submittal, please bear in mind that the
application materials need to make your project completely understandable to shoreline
permit reviewers who have never seen your site or your project before. We look forward
to receiving your revisions and additional information, so we may continue review of
your shoreline permit. If you have any questions whatsoever, please feel free to contact
me at (360) 427-9670 extension 295.
Sincerely,
Pamela D Bennett-Cumming, Senior Planner
MASON COUNTY PLANNING DEPARTMENT
Cc: ,
Kim Van Zwalenburg, Department of Ecology Shorelines Section
WtSON COUNTY DEVELOPMENT REGULATIONS May S, 2002
LIST OF ADJACENT PROPERTY OWNERS
WITHIN 300 FEET OF YOUR PROPERTY BOUNDARIES
Addresses are to be obtained from the Mason County Assessor's Office, Bldg. 1 Second Floor.
Y
U 2 00031
TaAmes d-
0. Idy Ka c-; re �tYlaK�sK�
�CA-)I lO l
�� -emm , a-m�q - St-2�e
Ll2, Ob LUz
rv-edcl' c, C TauSev�o(
C.LvZ3 Dr n lJ �-1 l ct ooao
UM gy33r Iz:);S -N"ills
3q 3
UZ 001to -
lam-,
1.U1A
�( 2 000a0 `� 3
��� La �eshmre l7�
cs-Cc�ssQ 1�d,��e � r'Ylr L4 723Cp- 135�
Tu'-m' '\6 l7 Cockrav)
�d S
L-1 I
6�2
l
. 21 1
I /4 81 G.L.* 5 816
SCALE I " = 200 '
S THE TCH l SL A ND
�Z/��vU� 4290010
41 90021 4190023
SP 318
3P 2845
4290180 41 90022 4190024
---- S 11114 1 I-U
SOMERS FISHER RD.
4200032
———— — BLA 96
4200033
---—' 4100100
S 9116,
6 4200031
L. 6 41
T R 4 I
3'
4200160
yU
�S S S S 23/126 4190063
42001 70 3 1�
41
Sp 2088
I I
,41 90062 190060 41 gQ
S 22/19 BLA 00-01 SP 1497
393 Stye+cA j Ts (. 4 1 c
4200140 /��(� S 26/229
v BLA 01-36
SP 1756
4200090 ppJ s 22/245 4190112
S k iq or 6.[, pQO BLA 00-01 4190113
S 24/244
BLA 97-63 4190111
�5
4300020 fr✓� 44 00130
5 41 90114
4300120 G . L . 5 S 27/1
4300190
S 6146
4 00do0
4300180
P�
4300030
S 250 4390210 0P� �P
1
4390240 SAND R �►�G��$
4390170
�Jp�
4300140
CASE INLET
J / 4300230
MASON COUNTY ,r
DEPARTMENT OF COMMUNITY DEVELOPMENT
Planning
Mason County Bldg.1 411 N.5th
P.O.Box 279 Shelton,WA 98584
r+
(360) 427-9670 Belfair(360) 275-4467 Elma (360) 482-5269 Seattle ( ) -6968
October 17, 2001
Richard Funk
9015 172"d Avenue NE
Redmond, WA 98052
RE: Shoreline permit application no. SHR2001-00016, 51 foot stairway from bulkhead to
top of bank.
Dear Mr. Funk:
Mason County Planning Department is contacting you regarding your proposal to install
stairs to access the shoreline from your property located on Stretch Island, following field
review of your recently submitted additional narrative information. Please take the time
to review the information provided to you in this letter. Following your review, please
feel free to contact staff at the number provided below.
Washington State Department of Ecology (DOE) provided a comment letter on your
proposal (letter dated September 12, 2001). In that letter they raised several questions
about the project, relating to: review of the stairway under the Residential Development
and Piers and Docks chapter of Mason County's Shoreline Master Program (SMP),joint
use of the stairs, the substantial size of the structure relative to Residential Development
chapter policies, the site plan relative to adjacent residences and topography, and
lowering of the bluff by 6 to 8 feet. Erosion control provisions for water quality were
also discussed.
You have responded with a narrative dated October 4, 2001, which planning staff has
now reviewed. Following receipt of the narrative, planning staff scheduled a site re-visit
to re-review the project location in light of both the DOE letter and your recently
received additional narrative. We had originally understood from you that the beach was
inaccessible from your upland property. However during this recent site visit we found a
way to literally scramble down the cliff to verify the estimated location of the stair/deck
complex with the benefit of your additional narrative, rather than simply viewing from
above. To date there are the following unresolved issues:
1. Joint use: to date we have no documentation addressing joint use. Please provide a
copy of the recorded joint use agreement for the two parcels.
2. It does not appear that the proposed stair/deck complex's horizontal size will fit
within the space available for it, according to the plans submitted. The site plan
completed by "Decks by JRW" shows the project extending outward from the top of
the bank a total of 34 feet 10 inches. This would put the lower terminus of the stairs
substantially waterward of the bulkhead, given the planned layout in relation to the
actual cliff, which is almost vertical. While there is some space at the base of the cliff
and landward of the bulkhead, it does not appear to allow for the horizontal distance
of the project as proposed. Using deck-size areas between stair lengths, rather than
landing-size areas appears to significantly increase the horizontal scale of the project,
as well as the visual impact.
3. Your own site plan also shows the cliff as having a greater horizontal distance
between its top and the base, than appears to occur on site (see also 1 above).
4. Now that the on-site survey stakes have been placed, staff was able to get a better
idea of where the boundary line between your northerly (to be sold?) parcel, and your
southerly (proposed stairs location) parcel will be. Using that information, the
narrative response, and approximated information from the submitted site plans, staff
attempted to estimate where the stairway would locate relative to the top of the bluff,
where the bluff would be pulled back, and how topography may alter as a result. (At
present this information is not well represented on any site plan, however the�,we�eeh
r6rt re&tences removing 4to 6 vertical feat4soil, on page'A). It appears based on
field observations of site topography that there would be a steep face at the northerly
end of the southerly parcel (between there and the parcel to the north. This is not
shown on the plans or addressed in the application. 21 accurate site plansf
hich,show:"be€vre" and "after" configuration ofttt-- .
,�z viers.-.Please also provide information on the amount of fill to be graded.
Your narrative indicates "significant amounts of soil", but we do not have a cubic
yard estimate from you. Please provide this so we can make a determination as to
whether a grading permit is necessary, and whether the project requires review under
the Landfill chapter of the SMP.
5. Your narrative states that the bulding code requires there to be a maximum of 12
stairs between landings. You use this is part of the argument for the large number of
decks in your project. This information is in error. Planning staff has verified from
Mason County Building Inspector Tami Griffey that code actually states that there
may be a maximum of a 12 FOOT vertical height between landings. Maximum
individual stair rise (height) is 8 inches. It yo"'ffa_ve questions relating to this or other
code issues, please feel free to call her-- she can be reached at (360)427-9670
extension 356. We appreciate your interest in working with the natural topography,
however even with this in mind, applying the actual code could result in a structure
which had significantly less visual impact.
6. Based on the above review, which included our field re-visit with the additional
information from you, we concur with DOE's concern regarding the excessive scale
of the project relative to Residential Development chapter Policy #6 and #12 which
address the visual and other impacts of shoreline structures. Following additional site
review we also concur with their concern about t eat RI f the gazebo forward of,
any possible house location on this or adjacent sites, and therefore forward of the
proposed shoreline setback common line. It appears that as many of the issues above
are addressed, the result will be a revised project which more closely meets the
policies and use regulations of the Shoreline Master Program.
Our role in providing you with this information is to assist you in understanding the
problematic issues relating to your project at this time. Our role in the public hearing
process will be to represent your project in relation to the applicable policies and use
regulations of the Shoreline Master Program, and to make recommendations accordingly.
At present, even with the additional narrative information provided, and our ongoing
office and field review, the project in its present form does not appear to be consistent
with shoreline regulations.
We also suggest that a scheduled site visit with yourself, planning staff, and the DOE
shorelines representative may be possible to arrange. This may assist you as you work to
resolve the issues. In the meantime, no further case action will occur until we receive the
necessary revisions. We look forward to receiving them so we can move forward with
your case. If you have any questions whatsoever, please feel free to contact me at(360)
427-9670 extension 295.
Sincerely,
Pamela D Bennett-Cumming, Senior Planner
MASON COUNTY PLANNING DEPARTMENT
Cc: Grace Miller, Lead Senior Planner
Tami Griffey, Mason County Code Enforcement Officer/Building Inspector.
Kim Van Zwalenburg, Department of Ecology Shorelines Section
1