Loading...
HomeMy WebLinkAbout48-87 - Res. Assigning Mason County Road Projects Number RESOLUTION NO. " tZ-87 BEFORE THE BOARD OF COUNTY Cu'MMISSIONER.S of MASON County,Washington. In the matter of initiating county road projects and assigning CRP numbers. IT IS HEREBY RESOLVED THAT the roads listed below be improved as shown between the points indicated. These projects are hereby declared to be public necessity and the county road engineer is hereby ordered and authorized to report and proceed thereon as by law provided.(RCIV 36.7S.us0, 36.80.030. .+6.80.o7o)(optiiltla!Refcrctices). IT IS FURTHER RESOLVED that appropriations from the officially adopted road fund budget and based on the county engineer's estimates are hereby made in the amounts and for the purposes shown: f1) (2) (3) 101 (5) (6) (7) (e) 191 O r) Annual ROAD ROAD NAME AND/OR TYPE OF T COST ESTIMATE (THOUSANDS) Const. BRIDGE NUMBER LOG WORK R EyC.I N, Pfn9• CRP NO. (See Code) CONSTROCT1ON Item No M,P. TO M.P. R.O.W. FEDERAL LOCAL 1. Shelton-Matlock-Brady 90100 9.61 10.78 E X --- --- 92 1 11 7 2. Shelton-Matlock-Brady 90100 15.54 16.94 E X --- --- 71 1 11 8 3. Johns Prairie 51720 1.04 1 .58 E X --- --- 28 1 11 9 4. Batstone Cut-Off 51300 0.00 0.44 E X --- --- 23 1 11 0 5. Grapeview Loop 96140 0.00 1 .72 E X --- --- 88 1 11 1 6. North Shore 70390 2.60 4,60 E X --- --- 92 1 11 2 TYPE OF WORK CODE (5) The construction is to be accomplished by contract A. PRELIMINARY ENGINEERING F. CURBS d GUTTERS in accordance with RCW 36.77.020 et, seq. S. RIGHT-OF-WAY G SIDEWALKS C. GRADING,DRAINING,SURFACING H. TRAFFIC FACILITIES D. LIGHT BIT.SURF.TREATMENT 1. BRIDGECONSTRUC'TION (6) The construction is to be accomplished by county E A.C,ORP.C.C.PAVEMENT J. PATHS &TRAILSFiCW forces in accordance wi th RCW 36.77,060 and WAC 47,301 136-18. ADOPTED this_7th day of BOARD OF COUNTY COMMISSIONERS OF ATTEST _ MASON� COUNTY,WASH. 7 --- > f f, mangy cc : Cmmrs. Engineer eer Journal: Publ . It: July 9, 1987 (Bill Road Dept. )