Loading...
HomeMy WebLinkAboutCOM2024-00037 Tents - COM Application - 6/27/2024 MASON COUNTY COMMUNITY SERVICES Permit No: Q YY2 2D2'� -oty PERMIT ASSISTANCE CENTER: �� •BUILDING•PLANNING•PUBLIC HEALTH•FIRE MARSHALS �' � ) rI IM D 615 W.Alder Street,Shelton,WA 9858,4 Phone Shelton:(360)427-9670 ext 352•Far(360)427-7798 Phone ]— I Be jr(360)2754467•Phone Elma:(360)482-5269 J U Iv 2 2024 BUILDING PERMIT APPLICATION PROPERTYOWNERINFORM,/ATION: CONTRACTORINFOAlder Street r�I NAME: ( � zay t V MAII.ING SS: /5 i 0 MAII NG ADDRESS: 7' CITY: STATE: ZIP: CITY: STATE: ZIP: PHONE_#i: PHONE: CELL: �j PHONE#2: EMAIL: L• -� �7 EMAIL: cc L&I REG# Ems. J PRIMARY CONTACT' OWNER CONTRACTOR❑ OTHER❑ r i� NAMEl EMAIL MAILING ADDRESS CITY STATE ZIP r PHONE CELL' PARCEL INFORMATION: o PARCELNUMBER(12 Digit Number) r7f ZONING LEGAL DESCRIPTION(Abbreviated FIRE DISTRICT '+_ SITE ADDRESS t I I I tT, -J?n DIRECTIONS TO SITE ADDRESS IS THE PROJECT WITHIN 300 FT OF SLOPES)GREATER THAN 14%: YES[] NO❑ SNOW LOAD psf IS PROPERTY WTIIIIN200 FT OF THE FOLLOWING: (Chrckall thatapp7y): SALTWATER❑ LAKE❑ RIVER/CREEK❑ POND❑ WETLAND❑ SEASONAL RUNOFF❑ STREAM❑ TYPE OF WORK: NEW❑ ADDITION❑ ALTERATION❑ REPAIR❑ OTHER ❑ USE OF STRUCTURE(Aeridrsce.GaragS Comm..JB1dg.Etc) IS USE: PRIMARY❑ SEASONAL❑ NUMBER OF BEDROOMS NUMBER OF BATHROOMS HEATED STRUCTURE? YE (Whole Bldg)❑- YES(Part[r)of Bldg)❑ NO[] DESCRIBE WORK .iCJ�•� SOUARE FOOTAGE:(p.p.4 114 4-J6 U >E C j)Y!rcv ►�1`J `'d `-/1�` Z 5 p4��CJ• i e�Lp��.C.t� . 1 ST FLOOR sq.ft. 2ND FLOOR sq.$ 3 sq.9 BASEMENT sq.,RI�cR DECK sq.fL COVERED DECK sq.ft. STORAGE sq.ft. OTHER sq.1 GARAGE sq.fL Attached❑ Detached❑ CARPORT sq.&Attached❑ Detached❑ MANUFACTURED HOME INFORMATION: *4 COPIES OF THE %OP-PLAN REQUIRED* MAKE EL YEAR WIDTH BEDROOMS BATHS SERIALNUMBER ENVIRONMENTAL HEALTH: SEWAGFJSEWER SOURCE: SEPTIC❑ SEWER❑ / NEW❑ EXISTING❑ PLUMBING IN STRUCTURE? YES❑ NO❑ I,fyes,attach completed WalerAdequacy Farm PERIMETERNOUNDATION DRAINS PROPOSED? YES❑ NC)[] EXISTING SQ.FT. EXISTING BEDROOMS PROPOSED BEDROOMS TOTAL BEDROOMS OWNER acknowledges that submission of inaccurate information may result in a stop work order or permit revocation.Admowkedgement or such is by signature below.I declare that I am the owner and I further declare that I am entitled to receive this permit and to do the work as proposed.I have obtained permission from all the necessary parties,including any easement holder or parties of interest regarding this project.The owner or legal representative,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection.This pernitlapplication becomes null 8 void if work or authorized construction is not commenced within 180 days or if construction work Is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK ON THIS PERMIT IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS OF MORE WILL CAUSE THE APPLICATION TO BE EXPIRED.(MASON COUNTY CODE 14.08.42) Signature of OWNER(Must be signed by the OWNER) Date ?�EPARTMFIVT RENTER'15 APPROVED'= DATV"_`;'- DENIM r ::DATE TAGS/NOTES/CONDITIONS}, BUII DING DEPARTMENT T" PLANNING DEPARTMENT FIRE MAR CAA T PUBLIC HEALTH The tents we have are used during the Christmas season. One of the three we have is used to display and sell the wreaths. The other two are use to keep the finished products as they sell. k - r i 4 Sia�I � V Y Y a uQcuj)a� D . t rt (10 Ass�mbfY Manua! HHgw to build a Storao h It r? f` Specification Dimensions(WxLxH) 20ft x 30ft x 12ft Door Size(WxH) 14ftxl0.5ft Arch Interval Eft Arch m(mm) 70 x 42 x 1.50 Purlin m(mm) 40 x 1.20 Anchor Size 914x450mm Snow Rating 1.96 kpa/ 41 pounds per sq.foot Wind Load 50 miles per hour Material Galvanized Steel Tube&10.6oz High-Quality Fabric PE(Polyethylene)Material 300g(11 oz)PE (cover price:$860) 450g 0 6oz)PVC(cover price:$1,300) 650g(23oz)PVC(cover price:$1,700) Fabric 750g(26oz)PVC(cover price:$1,900) 900g(32oz)PVC(cover price:$2,200) Please contact us to order Snow Rate Test Result: Test Load Deflection 203012R Lb Kpa Point A(inch) Point B(inch) Point C(inch) Step 1 0 0 0 0 0 Step 2 1005 1.52 1.4 1.6 1.2 Step 3 1507 2.28 2.2 2.3 1.6 Step 4 Keep the test toad until 30 minutes Step 5 Remove the test load 0.6 1.1 1.2 Step 6 The test sample can withstand the applied test load without damage. Country of Origin China Features 12ft drive through the front door to end door An average of 7-10 years of cover lifespan,depending on the environmental and weather conditions. Style:Freestanding Commercial-grade galvanized steel tubes 100%waterproof,fire retardant,UV inhibitor Simple assembly,super easy to install CSA/TUV Snow Rating Test Report SGS fabric Certificate Type:Prefabricated Building Mason County WA GIS Web Map 2038 SUMMIT DR • 320295002016 320295002015 32029509201 `028 FERRY ST - • 320305021004 2030 PIONEER WAY 3 20 295 00 2017 32 0295002 901 320 9500 017 20300060010 320295002018 _-- — Ito IF 320305200009- 320301400020 f 1111 SE STATE ROUTE 3 ! 320 9999 029006000 I 3 203 01490040 3202923 00020 I 1061 SE STATE ROUTE 3 • i 320292300040 5/21/2024, 6:08:22 PM 1:768 0 0.01 0.01 0.02 mi �-� County Boundary 1 0 01 'I 0 - TAT 0 I km No Filled ° Site Address (Zoom in to 1:3,000) Sources:Esri,HERE,Garmin,Intermap,increment P Corp.,GEBCO,USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey. Esri Tax Parcels (Zoom in to 1:30 000) Japan,METI,Esri China(Hong Kong),(c)OpenStreetMap contributors,and the GIS User Community Mason County WA GIS Web Map Application Mason County disclaims accuracy,reliability,or timeliness of website info,not liable for losses from reliance on it.https:Uwww.masoncountywa.gov/disclaimecphp a T 1 0 q � N V S AfJ� ti ICoD p —►"Cf m r N I\` in.AniM) Jo )J iU 92npaa off. 52vui4 JIb 4b 14a01'A 29 45Y7W sanoj!j uoilV 0juI f4a3BS Patmacl aoj aP!5uI aag i OgXdDXdOg 1 $31133 ONION I dozm MON lopes I SAFET . MMNTE16NOE Safety precautions MUST be followed at all times throughout the construction of your building! sharp edges always practice proper tool " I safety = ,beware of Care must be taken when handling Practice caution with the tools being Do NOT attempt to assemble your various pieces of your building since used in the assembly of this building. building on a windy day. The large many contain sharp edges. Please Be especially familiar with the panels can catch the wind like a "sail', wear work gloves,eye protection and operation of all power tools. causing them to be whipped around long sleeves when assembling or making construction difficult and performing any maintenance on your unsafe. building. Do NOT attempt to assemble your building before double checking that you have all the parts indicated on the don't focus weight parts list as well as all hardware. Any on roof no children or A building left partially assembled may be pets at Worksite� seriously damaged by even lightwinds. . I ANCHORING n [prevent wind damage. See anchoring the roof of the building. When using worksite during construction and until a step ladder make sure that it is the building is completely assembled. page for more info. fully open and on even ground before This will help avoid distractions and • You must also have a temporary climbing on it. any accidents which may occur. anchoring system in place in case you need to take a break from assembly. Exterior Care: For a long lasting finish,clean and wax the exterior surface.We recommend washing with a mild soap solution.DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in airtight containers designed for chemical and/or combustible storage. Corrosive chemicals such as fertilizers, pesticides and herbicides should be cleaned off the interior and exterior surfaces immediately. Rust caused by chemical damage is not covered by the warranty. Rust protection precautions may help to stop rust from developing, or stop it quickly as soon as it appears. •Avoid nicking or scraping the coating surface, inside and out. • Keep roof and base perimeter free of debris and leaves which may accumulate and retain moisture. These can do double damage since they give off acid as they decay. •Touch up scrapes or nicks and any area of visible rust as soon as possible.Make sure the surface is free of moisture,oils,dirt or grime and then apply an even film of high quality touch-up paint. •Various paint manufacturers provide products for rust treatment and coverage. If surface rust does appear on your shed we recommend treating those areas as soon as possible,following the paint supplier of your choice instructions. Our customer service department can provide the paint tinting formula for matching the color of your shed. • Roof: Keep the roof clear of leaves and snow. Heavy amounts of snow on the roof can damage the building making it unsafe to enter. Fasteners: Regularly check fasteners and retighten as necessary. General:Wash off inked part numbers on coated panels with soap and water. Please note,Manufacturer cannot be held responsible for any consequences due to buildings that are not installed per these instructions,or for damage due to weather conditions or acts of God. Keep these assembly instructions and owner's manual for future reference. A&DEMILa a TOOLa Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer. Tools and Materials: Here is a list of some basic tools and materials you will need to assemble your building. Decide which method of anchoring and the type of base you will use to make a complete list of the materials you will need. WHAT YOU NEED • Work Gloves • Safety Glasses • Nut Driver or Wrench • Step Ladder 8' Power Drill (Cordless, Variable Speed) TOM 7 Pliers T_ Utility Knife or Scissors Carpenter's Level Tape Measure Clamp • Grout (Asphalt Base) • 7/8" x 13" Masonry Bit (Asphalt Base) • 1/2" x 8" Masonry Bit (Concrete Base) RECOMMENDED TIME SAVERS • Square _ String (for squaring the frame) Awl (to align Holes) How to Select and Prepare YourBuilding Site: Before you start to assemble your building, you will want to decide on a good location. The best location is a level area with good drainage. •Allow enough working space so it is not difficult to move parts into position for assembly.Also,there needs to be enough space outside the building to be able to fasten the panel screws from the outside. • Before assembling any parts, your base should be constructed and an anchoring system should be ready to use. PLEASE READ AND UNDERSTAND INSTRUCTIONS COMPLETELY BEFORE ASSEMBLY. LAY OUT FRAME PARTS AS BELOW: W20'H12'ROUND Series—1.83 Arch spacing 203012R 204212R 200012R Part Code Description OTY OTY OTY I Roof Bent Tube (D42mm x 70mm x 2.16m 6 8 11 2 Middle Bent Tube (D42mm x 70mm x 2.16m 12 16 22 3 lower Bent Tube 0 42mm x 70mm x 2.I6m 12 16 22 4 Purlin (D40mm x 1.87m 25 35 50 4A Purlin-a tion 0 25mm x 1.57m NO\12 NO\16 NO\22 48 Purlin-o tion 0 25mm x 0.57m NO\6 NO\8 NOV 5 lower Tension Tube (D25mm x 1.54m 10\2 l6\2 22\2 (D25mm x 1.66m \I.7m\1.77 x 2 pcs 6 Diagonal Brace (D32mm x 2.15m 4 4 4 6A Top Brace NO NO 7 Base Plate for corners 4 4 4 8 Base Plate for middle arch 8 12 18 BA Ratchet tie down 1.5inch 12 16 22 9 Clip for No.6 (D60mm 8 8 8 10 Stake Peg (Dl4x450mm 36 48 66 II Roof Cover I 1 1 12 front 6 Back Cover I 1 1 13 Carriage Bolts M8*50mm 76 105 145 14 Carriage Bolts MI0*90mm 34 45 70 14A Bolts M10*30mm El El El 15 Bolts MIO*20mm NO NO NO 16 Knitting Roe for Cover 70m\90m I 1 1 17 Nylon Band for No.8A ratchet tie down 12 16 22 I8 Plastic Plug y25mm 4 4 4 19 Tension Hall for end cover 4 4 4 20 PVC Tube (P 19mm*2.2m NO NO NO 4 SPECIFICATION Width:6.Im Length: 9.15m\I2.81\18.3 Height:3.66m Door dimension:W4.5mxH3.2m NOTE:FRME EXTENSION KIT This is the base frame dimension.Your model may have more or less middle ribs than shown in the illustration.You will receive more extra ribs for every extra arch spacing of building length that you purchase.The basic frame assembly will remain the same. The cover will be the correct size for the length of the building. 1. PLOTTING THE FRAME: Before building your shelter,you should choose a flat area on your property and plot your shelter. A. Stake out the area for the shelter in the desired spot.The width of the area should be at least equal to the width of the shelter and the length should be equal to the length of the shelter. B. Measure diagonally from centre to centre of the tubes.These measurements should be the same.If they are not equal the stakes need to be adjusted until the width,length and inside measurements are correct. 9.15m � 10 1.83m 1.83m 1.83m 1.83m 1.83m Figure 1.1 12810"204212R) 7 I&W I= Faso ieao 7 1 m f+ 7 � 8 Figure 1.2 5 18.3m 7 10 ca r: 7 1.83m 1.83m 1.83m 1.83m Figure 2 2JOUNDATION PLACEMENT As Figure I show each Base Plate is equipped with three pieces of Stake Peg(No.ID). Note:The Stake Pegs apply for normal conditions,not suitable to the rock ground,frozen soil and concrete ground. 3. ASSEMBLE END AND MIDDLE RIBS Assemble end and middle ribs as shown.Securely fasten a►I of the joints with the hardware indicated. 3.1 As Figure 3 shown to find one Roof Bent Tube (No.1),two Middle Bent Tubes (No.2), lower Bent Tube (No. 3)and assemble every group arch with BaltMBx6D (No.13).DO NOT install the screw on the top of the truss where the fabric will rest. 3.2 As Figure 4 shown to fix Roof Support Tube(No.GA)by using Bolt MIDx20mm (No.15)if your products is the PLUS model. 3.3 lift an assembled arch onto one base plate and force the other end of the arch onto the opposite base plate. —1 13 J►' `� 2 3 Figure 3 6 14 14 2 4B 4 4A 3 •i � 14A Figure 4 b 1 b b d 3 r Figure 5 3.4. Assemble middle ribs as shown,Securely fasten all of the joints with the hardware indicated. When finish installing the first two arches into the base plates, Install top and side rail using Roof 8 Sidewall Purlin(No.4)to connect them by Screw MIOxIOO(No.14).After that install the third arch, insert the third arch into the base plate,Connect all remain ribs and connect them by the top and side rails. Attation: Install top rail and side rail Place assembled first end rib in the staked area.Place the on the uprights.From the outside of the rib insert the bolt through the upright and then through another rail tubes NOTE:Sliding Cover Rails should be attached to frame,once cover is placed over the frame. Attach Wind Brace between the end rib and the first middle rib as shown Bolts attached at the cross rails should be inserted facing inside the shelter. 7 d t 1 2 3 l 1 Figure 6 b 14 4 Figure 7 14 �a 13 Figure 8 s 4. SQUARING UP THE FRAME A. Be sure the frame is in its final location,which needs to be as flat and level as possible. B. Measure across opposite corners. these distances must be equal to within I inch, A. Check that the front and rear of the frame measures is right in width. WARNING:Serious injury to persons or property could result if cover is installed and shelter is not completed and is left unattended.Shelter must be securely anchored until completed. 5. END AND DOOR PANEL INSTALLATION Use the supplied Nylon Band (Part No. 10)to tighten the roof cover to the end arches.The Nylon should be cut as your requirements when using.Fasten the Nylon Band at the bottom edge.then roof cover is tightened. hb 16 1212 i O Figure 9 2.Insert the Lower Tension Tube (No.5) into the bottom of Front and Back cover (No.17). 3.Put the Nylon Rope to fix it onto the Base Plate for Corners (No.7). 4.Tidy the Back Cover and Front Cover. Fasten the band inside the end of the roof cover,make the cover well fold to the frame and tie the end of the band to the Clips on Base Plate for four corners. 9 11 5 18 Figure 10 6. INSTALLIN6 THE COVER ON THE FRAME NOTE:00 NOT install the cover onto the frame of your building in high wind conditions.A slight breeze is the most advantageous for cover installation.To take advantage of the breeze,pull the cover up over the arches with breeze blowing in the cover like a sail filled with air. Figure 11 I. Assemble Tension Tube for Roof Cover(No.11) before installing the cover. Y. Roll out the roof cover on a ground sheet.Align the cover evenly to each end of the frame. 10 Note:Be sure doing not pull over the end of the roof cover. 3. Pull the cover over the frame EVENLY,CAREFULLY AND SLOWLY.DO NOT TIGHTEN.Adjust the cover so that it is square and evenly centered on the frame.Put the lower tension tube and insert them into the bottom pocket of roof cover, Note:The end flaps must overhang evenly at both ends. 4. With the end flaps flipped back and out of the way,use the supplied Nylon Band(Part No.17)to tighten the roof cover to the end arches.The Nylon should be cut as your requirements when using.Fasten the Nylon Band at the bottom edge.Drive the Ratchet Tie Down forth and back and then roof cover is tightened.NOW THE INSTALLATION IS FINISHED. 11 11 16 12 17 8A Figure 12 ALWAYS THINK SAFTY ! 11 NOTE: 1. Cloth tape for wrapping the gaps on the frame after frame installation. 2. Please adjust the roof cover every month. It's necessary to make the cover flat and well tensioned. Confirm that all the hardware and parts are present WON attempdng to assemble your storage Unit. For missing or damaged parts contact customer service. Do not returen to store Customer Service admin@suiheshelter.com 12 RETURN AND WARRANTY INFORMATION WARRANTY INFORMATION WHAT IS NOT COVERED UNDER WARRANTY: Manufacturers/distributors/retailers of these products are not responsible for the following: (1) Used products; (2) Any product that that been used,altered,or modified in any way; (3) Depreciation: (4) Damage caused by lack of reasonable and proper maintenance; (5) Failure to follow instructions, directions, drawings (G) Improper installation,misuse or lack of proper protection during installation,use or storage; (7) Damage resulting from accident or falling objects; (S) Damage due to normal maintenance or lack thereof; (2) Exposure to harmful chemicals,fumes,or other substances,foreign or natural in the atmosphere; (ID) Acts of God,which includes but is not limited to,wind damage,excessive snow load,flood,hail,tornado,sleet,ice, fire; (11) Unforeseen causes or circumstances,such as but not limited to: added load to the structure,or any other external forces (12) Product which is not in the possession of the original purchaser; (13) Structure is not properly anchored or installed; (14) Third party installation fees are not covered under warranty 13 (15) Loss of income,wages,travel expenses,personal property,equipment rental,fuel,and/or property value are not recoverable (10)Any condensation damage to the product and its contents. End panels are excluded from any warranty regardless of the product series or classification. FAILURE DUE TO IMPROPER INSTALLATION OF THE PRODUCT IS NOT COVERED UNDER WARRANTY If a product/part is deemed to be defective 6 not caused by the purchaser and within the warranty term limits, Our company will provide replacement parts at no charge to the purchaser. Examples of defective parts are (but not limited to): torn covers,holes in cover,bent bolts,broken ratchets. RETURN INFORMATION Suihe Limited does offer product return with a I % restocking fee. It is also the customer responsibility to pay for returned product shipment to and from the final destination. It is also customer responsibility to arrange delivery of the returned product to the manufacturer in the original condition (which includes packaging). Upon suitable assessment of the returned package,the refund will be provided. Suihe Limited reserves the right to decline product returns under certain conditions. Product ordering and payment constitutes acceptance of the terms and conditions stated above. TERMS AND CONDITIONS We strive to provide the best products and services at a reasonable price for potential and ordering customers.This informational instruction is targeted to provide as much informational material as possible in order for potential customers to make an educational decision. Our products are designed to provide an optimal shelter solution at a reasonable cost. The terms and conditions below apply to the products described on this website. Suihe Limited also assumes no responsibility for any"human caused" or"animal"related incidents.This list includes (but is not limited to)to the following: fire,vandalism,chemical interaction,falling objects,damage caused by animals or insects, misassembly, improper anchoring,lack of proper maintenance/care,and additional weight added to the inside or outside of the structure. Suihe Limited is not responsible for any of the following as a result of usage of these fabric structures. This list includes (but is not limited to)the following: loss of wages, loss of income,depreciation, property damage, litigation costs,equipment or vehicle rental, equipment damage,construction costs,fuel costs,appraisals, livestock or animal loss,and bodily injury or death. Suihe limited strongly recommends purchasing insurance for all structures in the rare event of damage due any of the above stated items. Although our shelter products are considered"temporary/portable structures"and typically do not require building permits,Suihe Limited recommends all prospective purchasers consult local authorities on building permits prior to purchase. Although our fabric structures perform well under a variety of weather conditions, no snow or wind load ratings are provided due to the"portable structure" nature.As a result,Suihe Limited assumes no responsibility for damage or destruction caused by any Act of God.This includes (but is not limited to):wind,snow,hail,lightning,hurricanes,tornadoes,volcanoes,rain,avalanches, fire,or flooding. Product purchase constitutes acceptance of the above terms and conditions.