Loading...
HomeMy WebLinkAboutBLD2019-00584 Final Propane - BLD Permit / Conditions - 9/5/2019 Mason County Mason County - Division of Community Development 615 W. Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us B DD2019-00584 MECH/PLUMB - RESIDENTIAL PROJECT DESCRIPTION: 2 NEW 120 GAL PROPANE TANKS AND ISSUED: 06/03/2019 OUTLETS SITE ADDRESS: 789 E CHESAPEAKE DR SHELTON MASON EXPIRES: 11/30/2019 COUNTY PARCEL: 121195700030 1 APPLICANT: ADAMS, MORRIS OWNER: MORRIS ADAMS 789 E CHESAPEAK DR 789 E CHESAPEAK DR SHELTON,WA 98584 SHELTON,WA 98584 206-348-7632 FEES: Paid Due Mechanical Base Fee $30.00 $0.00 Mechanical Fees $162.00 $0.00 Final Inspection $80.00 $0.00 State Fee-Residential $6.50 $0.00 Totals : $278.50 $0.00 FIXTURES QW Mechanical Fixtures 2.0000 Gas Outlet(s)(1-5) 2.0000 Propane Tank(s) REQUIRED INSPECTIONS BLD-Final Inspection CONDITIONS Printed by:Nicole Norris on:06/03/2019 12:29 PM Page 1 of 3 cc, rr�Y�n Mason County i Mason County - Division of Community Development 615 W.lt lder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us MECH/PLUMB - RESIDENTIAL BLD2O19-00584 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982.The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. * The demolition and disposal of debris must meet the regulations of Mason County and Olympic Region Clean Air Agency (ORCAA). It is unlawful for any person to cause or allow the demolition (or major renovation)of any structure unless all asbestos containing materials have been identified and removed from the area to be demolished. Work shall not commence on an asbestos project or demolition project unless the owner or operator has obtained written approval from ORCCA.2490 B Limited Lane NW, Olympia WA 98502, 360.586.1044/800.422.5623 www.orcaa.org * By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your "Approved Site Plan"to ensure these structures meet the setback conditions listed. * All furnace installations shall meet the minimum efficiencies set forth in the current edition of the Washington state energy ' code (WSEC). any portion of the mechanical system that is altered or replaced shall meet the minimum standards set forth in the WSEC and international mechanical code. * All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall be made prior to requesting additional inspections. * All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. * All propane tanks must be installed in accordance with the International Fire Code and all applicable Mason County ordinances. All propane tanks filled on site must be located a minimum of 10'from any possible source of ignition (electrical outlets, electrical fixtures, compressors, etc), mechanical system air intake (direct vent appliance, ventilation air intake, etc), and/or any weeds, grass, brush,trash or any other similar combustible materials. Propane tanks less than 125 gallons must also be located a minimum of 5'from any building opening (foundation vents,windows, doors etc). Setback to the public way, or access easements shall be the greater of 25-ft or as specified in the Mason County Development Regulations. Setback to property lines shall be the greater of 5-ft or as specified in the Mason County Development Regulations. If a propane tank is exposed to probable vehicular damage, protective bollards must be installed. Printed by:Nicole Norris on:06/03/2019 12:29 PM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Bldg. 8 Shelton, WA 98584 360-427-9670 ext 352 www.co.masonma.us MECH/PLUMB - RESIDENTIAL BLD2019-00584 1 hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions f any. other state/local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed by:Nicole Norris on:06/03/2019 12:29 PM Page 3 of 3 INSPECTION CARD Mason County 615 W. Alder St. Bldg. 8, Shelton, WA 98584 360-427-9670 ext 352 www.co.mason.wa.us PERMIT# BLD2019-00584 PROJECT ADDRESS 789 E CHESAPEAKE DR SHELTON MASON COUNTY, WA 00000 PARCEL# 121195700030 PROJECT DESCRIPTION 2 NEW 120 GAL PROPANE TANKS AND OUTLETS OWNER MORRIS ADAMS ADDRESS 789 E CHESAPEAK DR PHONE 206-348-7632 CONTRACTOR ADDRESS PHONE CONTRACTOR LICENSE LENDER INSPECTION INSP DATE Comments INSPECTION INSP I DATE Comments BLD-Final Inspection &L •�