HomeMy WebLinkAboutBLD2012-00013 Cancelled Heat Pump and Furnance - BLD Permit / Conditions - 1/9/2012 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
Not
MECHANICAL PERMIT BLD2012-00013
OWNER: MICHA, BENNETT RECEIVED: 1/9/2012
CONTRACTOR: JIM'S HEATING &AIR 360.427.5332 LICENSE: JIMSHHA913NE EXP: 8/5/2013 ISSUED: 1/9/2012
SITE ADDRESS: 531 E SHERWOOD CREEK RD ALLYN EXPIRES: 7/9/2012
PARCEL NUMBER: 122292290350
LEGAL DESCRIPTION: S .64 AC OF TR 3 OF N1/2 NW LOT: A OF SP 1659
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
NEW HEATPUMP & FURNACE ST RT 3 TO ALLYN, L ON SHERWOOD CREEK RD TO VERY END
General Information Setback Information
Type of Use: F Insp.Area: Front: Ft. Shoreline: Ft.
Type of Work: MEC Fire Dist.: 5 ear: Ft. Slope: Ft.
Valuation Side 1: Ft.
Side 2: Ft.
Me anical Fixtur S JN
FEES
Type Qty. Type By Date Amount Receipt
Furnace<100K 1 Mechanical Permit Fee GMM 1/9/2012 $36.50 S120120000C
Heat Pump 1 Mechanical Base Fee GMM 1/9/2012 $28.50 S120120000(
Total $65.00
BLD2012-00013 Please refer to the following pages for conditions of this permit. Page 1 of 3
CASE NOTES FOR
BLD2012-00013
CONDITIONS FOR
BLD2012-00013
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-80 -0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON
STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE
MINIT STANDARDS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE.
X
3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit evocation.
X /
4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
may,
5) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time
for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the
permit er have prevented action from being taken. No more than one extension may be granted.
X
6) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan" to ensure
these structures meet the setback conditions listed.
XX
BLD2012-00013 Please refer to the following pages for conditions of this permit. Page 2 of 3
AW M.
This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate
and grants employees of Mason Co y access to the above described property and structure for review and inspection.
OWNER OR AGENT: DATE:
BLD2012-00013 Please refer to the following pages for conditions of this permit. Page 3 of 3
W
o CONCRETE Gas Piping MANUFACTURED HOME m
o Into.>ror -Date By Z
N Footings I Setbacks F lerow-Date By Ribbons Z
_____ ...._ _._..---- m
o Date By INSULATION pate gy
w Foundation Walls BG/SLAB INSULATION Set-up 3
Date By Date By Date By n
FRAMING Floors: FIRE DEPARTMENT y
Date By Date By
Date By Walls
PLUMBING Date By DECKS
.._ ._._. Date By
Groundwork Vault TANKS
Date ByDate By Date By
Attic
D.W.V Date By OTHER
Date By DRYWALL Type.
Date By
Water Line Date By Type:
-o Date By Int.Brace Wall Date By
v MECHANICAL Date By FINAL INSPECTION
y
m Fire Seperation O
m
Date By Date By Date By N
C
° Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments
0
co
w
cn
CD
Ch
0
0
0
a
o'
cn
o —
5
y
fD
3
(0
0
0
JAN-08-2012 13:55 From:Jim, s Heatine & Air 3604273120 To:4277798 Page: 1�1
PERMIT NO.� 2� -60013
MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar•P.O. Box 186, Shelton,WA 98584
Shelton (360)427-9670 •Belfair(360) 275-4467• Elma (360) 482-5269
On the web wWw.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner 1KrCj,%A Company Name—�J1�-+'s /11`4t" its t?
Mailing Address_ - / P427-14SOIJ R Mailing Address E 44 wee 4n!lA P
City �'n'A-) -_-,State Gih Zip Code 7 LS XV City •5'A r'LrrN State 4AZA Zip Code 9es-Xy
2'7-s 33 z
Phone'�� b -� `/��r Ph Phone Y Other Ph.
Lien/Title Holder Contractor Reg.#Jte6#11219�3A 6 Exp. fR-S"- 13
E mail address E Mail Address J rNY.-4 'Re
Drivers Lic.# DOB Drivers Lic.#14re4 j DOB
SEPTIC INFORMATION - Connect to New Septic Existing Septic Connect to Sewer System
Name of Sewer System
PARCEL INFORMATION- 12 Digit Parcel No. - - Fire District
Legal Description
Site Address (Please include street name, street number and city) At
Directions to site�✓_Y 3 i 2'`` �� A 11'e v, Z��9—��a rl,�,Qrr �c2�5r-R, 1nr, /s o, &c lifi—
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff—Stream—Slopes or Bluffs > 15%
TYPE OF JOB - New Add Alt Repair,,Other Use of Building
Location of Fixtures/Units - 1st Floor 2nd Floor Basement Garage.—Closet
PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS
Type of Fixture No. of Fixtures Fees Fuel Type:Electric_ LPG. Natural Gas_ Heat Pump_
Toilets Type of Unit No. of Units Fees 0
Bathroom Sink Furnace
Bath Tubs Heatpumps s
Showers Spot Vent Fan714
(�
Tank
n
Water Heater Propane � o
Clothes Washer Gas Outlets
Kithen Sinks WoodlGas/PelletStove
Dishwasher Kitchen Exhaust Hood
Hosebibs Dryer Vent
Other Other ;& r
Base Fee Base Fee �
TOTAL PLUMBING TOTAL MECHANICAL
C qER/BU[LDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of
such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that 1 am entitled to receive this
permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties_If permission is
required from any easement holder or any other party in interest regarding this application or the work proposed in the application,I have obtained fi
-permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf,represents that the information
provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection.
PROOF OF ONTINUATION WORK IS BY MEANS OF A PROGRESS INSPECTION. 0
X Date:_l—C —) Z �
CVfl or j Owners Representative/Contractor (indicate which one) A
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by: Planning Pd Ck# Date Bid Pd Receipt No.
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Occ Group—Type Constr.
Planning Department
Environmental Health Department
FEES
Plumbing & Base Fee Site inspection
Mechanical & Base fee UFC Plan Review Fee
Wood/Gas/Pellet Stove Fee Other
Violation Fee TOTAL FEES
Page 1 of 1
Kathy Soine - Extension
From: Wayne McKenna <macfac@hotmail.com>
To: <ks@co.mason.wa.us>
Date: 6/18/2012 11:51 AM
Subject: Extension
Request an Extension of permit BLDG 2012-0013 under name Micha Bennett. My name is Wayne McKenna, we
are requesting the extension because of a delay in other projects and we are going on holiday to Europe leaving
on the 6/18/2012 and coming back after the extension expires 7/23/2012. As per phone call a six month
extension will be granted.
Thank-you very much for your assistance in this matter
file://C:\Users\KS\AppData\Local\Temp\XPgrpwise\4FDF 1638Masonmai11001706B7011... 6/18/2012