Loading...
HomeMy WebLinkAbout24-87 - Res. County Road Project No. 1103 Spencer Lake Road MASON COUNTY C,l VISSIONER.S RESOLUTION NO, 2 4-8 7 COUNTY ROAD PR37ECT NO. 1103 WHEREAS, on Mason County Road No. 28240 known locally as the Spencer Lake Road, and more specifically located in , M.P. 2.1 to M.P. 2.4 , work defined as 'construction" in the BARS Manual, Page II-63, et seq, is determined to be neces- sary and proper, and WHEREAS, this project is identified as # 18 on the officially adopted County Annual Read Program. THEREFORE, BE IT RESOLVED BY THE BOARD OF COUNTY CO MIISSIONERS that it is their intention to Perform Preliminary Engineering & R/W Acquisition, Grade, Drain and Surface with BST. and that said work is to be performed by day labor in accordance with (day labor contract) the Washington State Standard Specifications for Road and Bridge Construction as adopted by Mason County. BE IT FURTHER RESOLVED that the above described County load Project is neces- sary and proper, and the estimated costs of said project are herewith set out as follows: Engineering $ 3,630.00 Right-of--Way $ 2,500.00 load Constructiori Co. forces)$ 37,870.00 TOTAL: $ 44,000.00 Engineer's Estimate in detail is on file in the office of the County Engineer. The County load Project herein described is HEREBY DECLARED to be a public neces- sity, and the County Road Engineer is HEREBY ORDER AND AUTHORIZED to report and pro- ceed thereon as by law, provided and in accordance with WAC 136-18. ADOPTED this 14th day of April 19 87 . BOARD OF COUNTY C a4vaSSIONERS MASON COUNTY, WASHIN r f ATTEST: ABSENT Clerk of the Board Member cc: Co. Commissioners Engineer JOURNAL: Publ. lt. , 4/23/87 (Bill Rd. Dept.) (CRP Form No. 1)