Loading...
HomeMy WebLinkAboutCOM2000-00086,BLD2001-00100 and MIS96-00811 - BLD Letters / Memos - 1/23/2007 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Permit Processing/Inspections/Addressing Mason County Bldg.III 426 W.Cedar P.O.Box 186 Shelton,WA 98584 (360) 427-9670 Belfair (360) 275-4467 Elma (360) 482-5269 Seattle (206) 464-6968 May 3, 2002 Blue Heron Homeowners Association C/O Gerald Rude 718 12th Avenue N. Edmonds, WA 98020 And Robert J. Macht, Property Manager C/O Bradley Scott Commercial Real Estate 400 Warren Ave, Suite 450 Bremerton, WA 98337-1479 RE: The Blue Heron Resort Condominiums Mason County Enforcement No.: ENF2002-00091 Site Address: 6520 E State Route- 106, Union, WA 98592 Dear Mr. Rude and Mr. Macht, In response to a complaint filed with this office, a site investigation at the Blue Heron Resort Condominiums was done by the Mason County Enviromental Health and Mason County Building Departments on April 23, 2002. As a result of that inspection, I have enclosed copies of referenced permits and a copy of the site investigation report done by the Building Department. A number of issues need to be addressed at the site and are indicated below: ❑ A soils/geotechnical engineering report by a Washington State licensed engineer needs to be submitted to the building department that addresses the ground movement occuring on site in addition to the ground water. The majority of slab entries and walkways have experienced shifting, the carport buildings and basement parking areas are showing signs of failure and/or cracking, and there is some significant ground water accumulation in the crawl spaces of some of the residential buildings. The manager on site discussed some of the t ground water concerns with us and informed us of some attempts to remedy the problem that had not been successful. ❑ After the fact re-roof permits must be applied for and issued for the buildings that had roof work done in absence of the required permits within the last few years. A requirement of the permit will be to provide required venting in those areas. ❑ Renewal of expired permits and final inspections must be performed on MIS96-0081 1(dock), BLD2001-001 00(manufactu red home), COM2000-00086(spa). ❑ the floats proposed under MIS96-00613 were constructed without the required permits, they are in violation of the Mason County Code, Title 14, Building and Construction. The permit submittal has expired and C, will need to be reapplied for. If the floats were not constructed, please notify this office so that we may note the file accordingly. ❑ Use of the carport buildings 8: 3 through 8 and building 4: 1 and 2 is prohibited. These buildings are showing definate signs of failure. All of the carports and basement parking areas/deck support walls in general need to be evaluated by a structural engineer with structural plans and design specifications submitted for repair permits as they all appear to either be failing by movement, members possibly overspanned or not tied in appropriately, and experiencing some rot and/or overturning of wood members. ❑ The insulation in the crawl spaces of the units has been installed backwards and needs to be corrected. Any wet or damaged insulation needs to be replaced. The appearance of mold witnessed on the insulation is indicative of moisture problems possibly due in part to the drainage issues and inadequate venting in the crawl. Any structural changes to provide adequate venting to the crawl area need to be permitted. ❑ Maintenance items such as rotting trim boards at concrete patio entry doors and at base of first floor units and in area of chimney chases where the downspouts and gutters are discharging should be addressed. o In researching to file records, it does not appear that permits were submitted or issued for the office building. Please provide any records you may have for clarification. 2 At this time, we are requesting that you make the necessary arrangements to comply with the above issues within 30 days of the receipt date of this notice. In the event that you feel you have received this notice in error or that the contents are not accurate, please contact either Larry Waters at (360)427-9670 ext 285 or myself at (360)427-9670 Ext 356 to discuss your concerns immediately. Sinc I ami riff Building Insp or/Co e Enforcement Cc: Property File Blue Heron Resident Managers, 6520 E State Route 106, Union, WA 98592 Debbie Riley, Environmental Health Manager Steve Kutz, Mason County Health Services Director 3 . SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3.Also complete A. ignature item 4 if Restricted Delivery is desired. _T ❑Agent ■ Print your name and address on the reverse X ❑Addressee so that we can return the card to you. B. eiv ■ Attach this card to the back of the mailpiece, (Printed Name) C. D to o Delivery or on the front if space permits. : e D. Is delivery address different from item 1? ❑Ye 1. Article Addressed to: If YES,enter delivery address below: ❑ NoYNL ROBERT MACHT BRADLEY SCOTT REAL ESTATE 400 WARREN. AVE STE 450 BREMERTON 98337-1479 a2>p Type , ertified Mail ❑ Express Mail E N F 2 0 0 2-0 0 0 91 "LJ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑C.O.D. L4Re.tr,cted Delivery?(Extra Fee) ❑Yes 2. (Transfer nsferle urom 7001 1940 0007 4247 4521 (transfer from PS Form 3811,August 2001 Domestic Return Receipt 102595-01-M-2509 UNITED STATES POSTAL SERVIC , -E First-E18SS-Majl- v Postage&-FeQs Pal IV! LISPS Permit No.G-10 • Sender: Please print your name, address, and ZIP+4 in this box • TAMI GRIFFEY111 MASON COUNTY PERMIT CE R� a P 0 BOX 186 SHELTON WA 9$58$ My 1�{IlIIlI�!llf�flttlll�il111111111111111If11111111111111Iffill MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Permit ProcessingAnspections/Addressing Mason County Bldg.III 426 W.Cedar P.O.Box 186 Shelton,WA 98584 (360) 427-9670 Belfair(360) 275-4467 Elma (360) 482-5269 Seattle (206) 464-6968 May 17, 2002 Robert J. Macht, Property Manager C/O Bradley Scott Commercial Real Estate 400 Warren Ave, Suite 450 Bremerton, WA 98337-1479 RE: Blue Heron Condominiums Dear Mr. Macht, In follow up to our telephone conversation yesterday, I am reiterating the highlights of our discussion in writing. The non-structural work of adding the exterior trim boards in the patio locations is exempt from the permit process however, this office is now aware that there is a possible rot problem with the floor joists in some locations. In reply to that, you stated that the Washington State licensed structural engineer that you have retained to address other issues on site will also be inspecting and providing possible corrections for that if deemed necessary. As indicated, I am leaving your file for my supervisor, Larry Waters, to review on May 22, 2002 and determine if further action is necessary based upon the new information provided. We also discussed that you were in the process of responding to our notice of May 3, 2002. 1 would suggest that you address that reply to Larry Waters, Lead Building Inspector as I will be out of the office until June 4, 2002. Please contact Mr. Waters with any concerns or questions you may have regarding this enforcement case. Please reference your case of ENF2002-00091 in all correspondence. SinJce ai Building Inspector/Code Enforcement Cc: Property File Larry Waters;,Lead Building Inspector May 23,2003 Dear Mason County Code Enforcement Tami Griffey, Regards to : Blue Heron Resort Condominiums "Time-Share Units" Site Address: East 6520 Highway 106 Union,WA 98592 RCl Exchanges Blue Heron Homeowners Association C/O Gerald Rude(president) Robert J. Macht(Property Manager)C/O Bradley Scott Commercial Real Estate 1. Mason County Enforcement No. ENF2002-00091 A number of issues- Please see attatched. *Check for A Follow up inspection report from Mason County. 2.EHS International, Inc.(Engineering, Health & Safety Consultants) (Industrial Hygienists,Engineers,Scientists,Environmental Education) Report done April 25.2002 Project #8607-01 & #8607-02 * Check for a Follow up inspection under buildings and units , now 1 year later. ITHERMATECH NORTHWEST INC Re: Mold Remidation Proposal 5/13/02 $137,308.78 (REMOVAL ONLY No REPLACEMENT) Please see attached 2 page copy. *one year later now(May 2003) has any mold remidition been done . 4.Department of Labor & Industries WISHA SERVICES DIVISSION Blue Heron Resort Condo. was Cited for Many Serious Violations note: page 17 "Informational Message"& the Dept. recomendation. Inspection # 305321812 Inspection Dates 05/02/02 - 06/05/02 Issuance Date08/29/02 Total mold survey report available 18 pgs. *No follow up inspections as of May 2003. On 5/16/03 We contacted Bruce Christian the Industrial Hygienist at (360)902-5477. This is the State of Washington Dept. of Labor & Industries. We ask if there has been any follow up inspection regards to opporations and procedures, since the many serious violations one year ago. There has been no furture inspections since 06/05/03. No complaints, no inspection needed. 5.Northwest Water Systems Re: Exisiting Drilled Well Recomendations of Important Improvments Needed in order to comply with Washington State Regulations. 6. H2O MANAGEMENT SERVICES Inspection Check List & Proposal. Job Description: Required for Compliance with State and Federal regulations.NOTE: 2 water management co. request compliance. r 1 i The Blue Heron Resort Condominium is a "Time-Share" facility, where there are 22 units, each unit has 6 owners. The owners use their unit, rent their unit, some belong to an exchange company called" RCI", where people from all around the world trade their timeshare for a stay at the Blue Heron Resort Condominiums, at Hood Canal in Mason County. These 22 units are housed in 3 buildings. there is a recreational building, office and resident managers quarters, on ten acres, 3 lawn terraces. There is a swimming pool, spa, 2 saunas, pool table, fooseball, ping pong table, 2 tennis courts, 2 volleyball courts, teatherball, basketball, horseshoes and a 400' beachfornt on Hood Canal, with a dock, float, picnic tables, small boats &tie up not to mention the oyster beds and great fishing and crabing. Needless to say this is a beautiful piece of property, that lots of people want to go see and enjoy. Possibly, it has not been properly maintained by the "Property Management Company", there has been a lot of known cover ups in the construction projects requested to be done(either by the insurance company for Blue Heron or request by the County. Please see pictures of rotten boards under floor of units, being covered up with brand new boards, just to please the outside look. The area mentioned unfortunatly are in the entrys that have tile, and there is Not much good wood left under the tiles. Look at building 4 unit 6 & 7. These units and buildings are so rotted in so many areas, water still sits under the units, mold, ect. The ground movement occuring on site in addition to the ground water, this is why the majority of the slab entries and walkways have experienced shifting. Who watches out for the health and safte y concerns in a public facility, where there are so many issues of possible liability? We would like to request an inside investigation as to the progress with the toxic mold abatement project, if there is abatement. We also would like to request an investigation on the property management company as they have been the party that was paid to over see the Blue Heron property and liability issues for the Homeowners association for 20+years. What happened?We are concerned with liability and who is to be held accountable for the violations, and for not addre ssing the problem prior to it getting to this point of an unhealthy environment for those who become VICTIMS(employees, the owners, and unknowledgable innocent renters & exchanges. RCI had stopped the inbound exchanges for a few months, due to the previous Resident Manager giving the RCI Co knowledge of the environmental issues and the mold report. After the previous resident managers were fired due to their knowledge and health concerns of others, the RC I Exchange started sending inbounds. There is a great demand for Timeshare Units in Washington State, since there are only 3 on the Western side, and aprox 1/3 - 1/2 of the owners of the Blue Heron belong to R C I a timeshare world wide exchange company. We believe the facility should be Temporarily Closed. It should be considered an unhealthy environment until all the required mold& abatement as well as any other liability, water run off problems addressed at all 4 buildings and strucural rot removed and replaced to code as requested by authorities. Prior to re-opening the facility the units should be retested by an environment specialist and a final inspection should be in order, by the County (Health Dept., Environmental Dept., Building& Code Enforcement, and the State Washington Drinking Water Opporations inspection for code compliances. Please help save innocent victims from exposure. Please keep in mind that we are just a few of many concemed citizens. We do not wish to get into trouble for informing you of the serious situation at the Blue Heron Resort Just hope you will consider looking into it for best intrest to others. Thank you for your time and we will be in touch with you. We are sending copies of some major problems, from water under units to new boards being placed over rotted wood and moldy insulation, and moisture areas above units. More pictures and more info available the health risk of innocent victims in the future at the Blue Heron- Debra&Brian Barrett PO BOX 164 Rockport, Wa 98283 PS We want to keep our name free from harms way,just concerned citizens Department of Labor & Industries Inspection Number: 305321812 tea, WISHA SERVICES DIVISION Ins pection Dates:05/02/2002-06/0612002 PO Box 44604 Issuance Date: 08/29/2002 a Olympia, WA 98504-4604 CSHO ID: C2000 �» Optional Inspection Nbr: h20231942 Citation and Notification of Penalty Company Name: Blue Heron-Resort Condominium Homeowners Assoc Inspection Site: 6520 E State Route 106, Union, WA 98592 Citation 2 Item 3 Type of Violation: General 800-13005 The employer did not hold safety committee meetings. You must make sure that safety meetings: Are held at least once a month; or weekly (or bi-weekly) if conditions arise that require discussions of safety problems. Be composed of at least one management representative, in addition to the crew/staff. Safety meetings were not being regularly held. **** INFORN ATIONAL MESSAGE **** Based on visual examination and the reports from EHS International, the presence of mold in several areas of the complex has been well documented. It is the recommendation of the Department that remediation take place to remove mold-contaminated materials and that corrective action is taken to control water intrusion into the remediated structures to prevent a recurrence. UBI Number: 601991019 Mgmt. Official Contacted: BRIAN BARRETT, RESIDENT MANAGER Employer Walkaround Rep.: DEBBY BARRETT, RESIDENT MANAGER Closing Conf. Employer Rep.: BOB MACHT, PROPERTY MANAGER ATTENTION EMPLOYER, IF YOU HAVE ANY QUESTIONS OR ARE IN NEED OF CLARIFICATION IN REFERENCE TO THIS CITATION, PLEASE CALL THE HYGIENE COMPLIANCE SUPERVISOR AT (360) 896-2378 - VANCOUVER. Pa a 17 of 18 WISHA-2 (Rev.01-99) Citation S Notice of Asseoement 4 employer Copy - White Region Copy - Pink CSHO Copy - Green Imis copy - Yellow Appeals Copy - Grey --- a EHS-International, Inc- ENG1rJEERtNd, HF:,^LTH 8a SAFETY CONSULTANTS Industrial Hygienists • Engineers • Scientists ♦ Environmental Educators Bf:ADLEY SCOTT.INC. BLUE HERON RESORT CONDON-11NIUM E!IuI PROiECT/1 9607-02 Synopsis of Sampling Activities, Laboratory Results and Recommendations Prepared for Owner's Meeting on Saturday, April 27, 2002 Sampling Activities: 1. EHSI performed a Mold Survey on April 12,2002. 2. Visual Assessment 3. Moisture Meter assessments 4. Non-viable sampling techniques- a. Biaaerosol Sampling—Collecting known volume of air to be analyzed for types and amounts of`ungi present. b. Tape Lift Sampling—Collecting samples to identify fungi types or determine types and amounts of fungi present. s. Four Resort Units, Clubhouse, Resident Manager's Home,Annex a. Generaily,2 bioaerosol and 2 tape lift samples collected from each assessed unit. C bservations: 1. Spotty mold growth on underside of reef decking in Buildings 4, 8 and Clubhouse. 2. Significant water and moisture below Buildings 4 and 8. 3. Water on concrete s!ab at carport level of Building 1. 4. Limited areas of water and/or mold staining in some bathrooms. Laboratory Results: 1. When compared to outdoor air most indoor sampling locations had elevated levels of Aspergillus/PenictUiuin,CWosporium sp.and UlocWiurn sp. fungi. 2. Levels highest in the one attic space sampled. S. Levels also high in the two crawlspaces sacipled-no visible fungi observed. 4, Levels in units generally exceeded outdoor levels. Recommendations i. Locate and alleviate the source of water to the goof decking,crawlspaces and Building I concrete slab_ In some castor it may necessitate changes to drainage and groundwater drainage pattems. 2. Remove and replace all non-structural mold contaminated building materials. Clean and encapsulate mold affected structurai building materials. 3. Perform mold abatement activities in accordance with industry protocols to protect occupants, and unaffected areas from exposure to elevated levels of mold spores. 4. Perform a clean-up,using appropriate techniques,of all units and contents. 7. Perform clearance inspections and air sampling to monitor abatement work. Website References 1. http://aerotech labs.coin 2. http://www.eDa..ov;ebtt)ages/,iirindoorairpoIlution.himI 4. i P t J• :j '� 14cy ti STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES PO Box 44611, Olympia, WA 98504-4611 leg Debra & Brian Barrett PO Box 482 Union, WA 98592 Dear Mr. & Mrs. Barrett: In response to your complaint against Blue Heron Resort Condominiums, an inspection was conducted on 2 May 2002 . Regarding the allegations in your complaint, the employer was cited for the following: • Not providing an emergency eyewash despite the use of corrosive chemicals. • Not requiring the use of eye protection during the mixing and use of corrosive chemicals. • Lack of a Chemical Hazard Communication Program and a list of chemicals. • Lack of an Accident Prevention Program. • Not maintaining a Material Safety Data Sheet (MSDS) for each hazardous chemical present. • Not providing training regarding the hazards of the chemicals used by employees. • Improper labeling of hazardous chemicals. • Lack of information regarding asbestos containing materials at the facility. • Not providing training to housekeeping and maintenance staff in regards to asbestos at the facility. • Improper wiring and ventilation in the boat motor storage room. • Not providing required information to voluntary respirator users. • Not documenting a personal protective equipment hazard assessment. • Not conducting health and safety meetings. In addition, an informational message was sent regarding the presence of mold contamination in parts of the facility. If you have any questions concerning this inspection, please contact me immediately. You have the right for further review by submitting a written statement of position to me at the regional office noted above. In addition, Washington State law (RCW 49.17.160) provides protection against discrimination for employees who are involved in protected safety and health related activity. If you are an employee of the employer and you believe that you are being treated differently or action is being taken against you because of your safety or health activity, you may file a complaint with the Department of Labor and Industries. You should file this type of complaint as soon as possible, since RCW 49.17.160 (2) requires alleged discrimination complaints to be filed within 30 days of the alleged discriminatory action. For more information, or assistance in filing a discrimination complaint, please feel free to contact me. Your actions and interest in safety and health are sincerely appreciated. If you have any questions regarding this matter, please contact me at (360) 902-5477. Sincerely, R. Bruce Christian Industrial Hygienist Enc: CC: Compliance Region Files Central Files Notice of Alleged Safety & Health Hazards Department of Labor& Industries ��,BTATg 0 Division of Industrial Safety and Health 4 .Q 40D Date , 1. Complaint Number ��� 18F'9 goy 202319422 .. Employer name Blue Heron Condominiums 1. Site Location (Street, City, State, ZIP) E 6520 Highway 106, Union, WA 98592 1. Mailing Address(If different)(Street, City, State,ZIP) i. Management Official 6. Telephone Number Bob Macht/Gerald Rude 479-6900 Type of Business Time Share Resort Condominiums Hazard Description. Describe briefly the hazard(s)which you believe exist. Include the approximate number of employees exposed to or threatened by each hazard: 1. Managers quarters and other buildings where employees work potentially contaminated with mold. Standing water and inadequate ventilation have led to discoloration of building materials with mold. 2. Improper storage and handling of oil, gas, chemicals and fertilizers. 3. Waste oil drum is full and no plan in place to remove it. 4. No battery storage area. 5. Boat motors and gas stored near laundry area. 6. Water from drinking well does not meet state regulations. 7. Water system routed through road runoff storm drain on beach. 8. Tripping hazards on sidewalks and patio. :2000(30) Hazard Location. Specify the particular building or worksite and the workshifts where the alleged violation exists: BRADLEY SCOTTI-1�o COMMERCIAL REAL ESTATE May 20, 2002 Larry Waters Mason County Department of Community Development PO Box 186 Shelton, WA 98584 Dear Larry, Following is our proposed course of action, in response to a site visit by Tami Griffey on 4/23 and her related correspondence of 5/3 and 5/17 regarding the Blue Heron Condominiums, E. 6520 Hwy 106 in Union, #ENF2002-00091. I met last week with a geotechnical engineer on the site to review the issues of ground water/ground movement. I expect him to complete his report by the end of this week and we will forward a copy to you. We will address issues of moisture/water in the crawl spaces based on his findings. Within the next few weeks we will apply for after the fact permits for the office building and for the recent roofing work and we will address the requirements for additional venting at that time. We will also request final inspection on the dock, spa and manufactured home projects. The proposed floats were not constructed and there is no plan to do so at this point. As you are aware, we are in the process of performing maintenance of trim boards and chimney chases and we acknowledge that the replacement of structural elements such as rotten floor joists requires a permit. We will be using the services of a structural engineer to assist us in these repairs. We will also have a structural engineer examine the condition of the carports for building 4 and 8 as well as the decks over the parking area for building 1. We understand that these repairs are to be permitted also. _ L +�0IV 400 WARREN AVENIJE • SUITE 450 • BREMERTON,WASHINGTON 98337-1479 • (360 479-6900 • FAX 6 7MY9 • (999�479-6903 Established 1979 '�'VO-M MUNOY Because of the scope of the work involved, we respectfully request an extension of time to complete these repairs. I will keep you posted as to our progress and we look forward to completing this work in as timely a fashion as possible. Please let me know if there is any thing else that you need at this time. Thank you very much. Sincerely, Robert J. Macht, CMCA, AMS Director, Property Management Division I Case Activity Listing 1/ ��� 10:26:53AM53AM T I D E M A R K Case#: ENF2002-00091 COMPUTER SYSTEMS, INC. Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By ENFA911 Miscellaneous Action 5/16/2002 None DONE TLG 5/17/2002 TLG Photos of rot in flooring system provided at counter ENFBO15 Cert.Notification Status 6/12/2002 None 6/12/2002 TLG ENFA010 Complaint Received 4/23/2002 None DONE TLG 5/3/2002 TLG ENFB002 Site Invest 4/23/2002 4/23/2002 4/23/2002 None DONE LAW 5/3/2002 TLG The major problem on the site appears to be ground movement and a lot of ground water. All of the residential buildings inspected appear to be in need of maintenance in regard to providing adequate venting in the crawl spaces,removal of wet insulation and insulation that was installed backwards in the crawl and blocked venting in the attic spaces where the vaulted ceilings are. There is some major cracking on the concrete slab entries and walkways as well as rotting of the trim board at the base of the structures. The gutters on some of the buildings upperfloors discharge or divert roof runoffadjacent to the chimney chase where rot is also evident.There is also some downspouts that don't be into drains and instead discharge at the base of the structure. The crawl space venting that is provided is deficient and at that partially blocked. There is significant problems with the carport structures and they should not be used until permits for the repairs are issued.,111Q,jpist beams are oywurninu;n C ate+Bldi! 4-1&2 and the side wall appears to be leaning. The carport bldg 8:3-8 is taped off and is not in use presently. The concrete wall is leaning,slab has signicant cracks,beams are bowed and some of the posts have failed and temp.support posts have been placed. At the present time,the building department w0 r e the following: 1. A complete soils/geotechnical engineering report that addresses the soil and ground movement in relation to that which is occurring on the site both as it effects the carports as well as the entry slabs, walkways and parking basements. Of concern is also the ground water that appears to be present on the site.2. After the fact re-roof permits for the buildings that had new roofing within the past 2 years 3. Use of carport buildings has been revoked until structuraf plans accompanied by full structural engineering for repair has been submitted.4.Renewal of permits;MIS96-008 I l(dock),BLD2001-00100 (Manufactured Home),COM2000-00086(Spa)and final inspection of all. A permit for floats(MIS96-00613)was applied for in 1996 but never issued. There is also no record of permits for the office building itself. All of these issues need to be addressed. ENFB006 Notification of Owner 5/3/2002 None DONE TLG 5/17/2002 TLG Letter sent to property manager,Robert Macht, and Blue Heron Homeowners Association. Need geotech report regarding water problems and ground movement,ATF re-roof permits,renewal&inspection of dock,spa,MH permits,prohibit use of carports and submit engineering for walls showing failure,remove and correct insulation in crawl areas,maintenance of rotted non-structural memebers,permits for the office building. Comply within 30 days. ENFA900 Telephone Call 5/16/2002 None DONE TLG 5/17/2002 TLG Upon being provided with photos of rotten floor joists and given information that it was being covered up,I called Robert Macht. He acknowledged that the trim boards they are putting up now will need to be removed to correct other items after the structural engineer has done a site visit which will be in about 2 weeks.He is in the process of responding to our last letter with their intent. I told him I would follow up this conversation with a faxed letter to him. ENFA911 Miscellaneous Action 6/12/2002 5/23/2002 None DONE TLG 6/12/2002 TLG Letter sent to LW and referred tome. Geo report should have been done by 5/24 and mailed to us but no copy received. ATF permits and finals on expired permits to be arranged and submitted within next few weeks and extension requested for all compliance. Structural inspector to look at floor joists and carpot/deck parking areas but no dates given. Letter sent in response,refer to notification of owner Page 1 of 2 CaseActivity..ipt Case Activity Listing 9/26/2002 T I D E M A R K Case#: ENF2002-00091 2:56:49PM COMPUTER SYSTEMS. INC. .assigned Done Activity Description Date 1 Date Date llold Disp To By Irp a� � ' TpBaed ENFA010 Complaint Received 4,23/2002 None DONE TLG 5/3/2002 TLG ENFB002 Site Invest 4/23/2002 4/23/2002 4/23/2002 None DONE LAW 5/3/2002 TLG The major problem on the site appears to be ground movement and a lot of ground water. All of the residential buildings inspected appear to be in need of maintenance in regard to providing adequate venting in the crawl spaces,removal of wet insulation and insulation that was installed backwards in the crawl and blocked venting in the attic spaces where the vaulted ceilings are. There is some major cracking on the concrete slab entries and walkways as well as rotting of the trim board at the base of the structures. The gutters on some of the buildings upperfloors discharge or divert roof runoff adj scent to the chimney chase where rot is also evident.There is also some downspouts that don't tie into drains and instead discharge at the base of the structure. The crawl space venting that is provided is deficient and at that partially blocked. There is significant problems with the carport structures and they should not be used until permits for the repairs are issued. The joist beams are overturning in Carport Bldg 4-1&2 and the side wall appears to be leaning. The carport bldg 8:3-8 is taped off and is not in use presently. The concrete wall is leaning,slab has signicant cracks,beams are bowed and some of the posts have failed and temp.support posts have been placed. At the present time,the building department will require the following: 1. A complete soils/geotechnical engineering report that addresses the soil and ground movement in relation to that which is occurring on the site both as it effects the carports as well as the entry slabs, walkways and parking basements. Of concern is also the ground water that appears to be present on the site.2. After the fact re-roof permits for the buildings that had new roofing within the past 2 years 3. Use of carport buildings has been revoked until structural plans accompanied by full structural engineering for repair has been submitted.4.Renewal of permits MIS96-00811(dock),BLD2001-00100 (Manufactured Home),COM2000-00086(Spa)and final inspection of all. A permit for floats(MS96-00613)was applied for in 1996 but never issued. There is also no record of permits for the office building itself. All of these issues need to be addressed. ENFB006 Notification of Owner 5/3/2002 None DONE TLG 5/17/2002 TLG Letter sent to property manager,Robert Macht, and Blue Heron Homeowners Association. Need geotech report regarding water problems and ground movement,ATF re-roof permits,renewal&inspection of dock,spa,MH permits,prohibit use of carports and submit engineering for walls showing failure,remove and correct insulation in crawl areas,maintenance of rotted non-structural memebers,permits for the office building. Comply within 30 days. ENFA900 Telephone Call 5/16/2002 None DONE TLG 5/17/2002 TLG Upon being provided with photos of rotten floor joists and given information that it was being covered up,I called Robert Macht. He acknowledged that the trim boards they are putting up now will need to be removed to correct other items after the structural engineer has done a site visit which will be in about 2 weeks He is in the process of responding to our last letter with their intent. I told him I would follow up this conversation with a faxed letter to him. ENFA911 Miscellaneous Action 6/12/2002 5/23/2002 None DONE TLG 6/12/2002 TLG Letter sent to LW and referred to me. Geo report should have been done by 5/24 and mailed to us but no copy received. ATF permits and finals on expired permits to be arranged and submitted within next few weeks and extension requested for all compliance. Structural inspector to look at floor joists and carpot/deck parking areas but no dates given. Letter sent in response,refer to notification of owner ENFB006 Notification of Owner 6/12/2002 None DONE TLG 6/12/2002 TLG Notice to owner: Please resubmit geo report by 6-21,apply for ATFs and get finals by 6-30 and get structural engineer out there by 6-30 and submit report to us within 2 weeks of the date of report. ENFA910 Meeting 8/27/2002 8/27/2002 None DONE LAW 9/17/2002 LW I MET WITH THE ENGINEER FOR BLUE HERRON, FRED KAGEL TO GO OVER SITE CONDITONS FOR THE NEW GEO-TEC REPORT AS WELL AS STORM WATER ISSUES EFFECTING THE STRUCTURES. Page 1 of 2 CaseActivity..rpt Case ActivityListing9/26/2 2:56:49PMPM T I D E M A R K Case#: ENF2002-00091 COMPUTER SYSTEMS, INC. Assigned one - -;_ Activ ,escription AL Date i Date 2 ;. Date 3 Hold Disp To By Updated updated By': *7.ENFA910 Meeting 9/3/2002 9/3/2002 None DONE LAW 9/26/2002 TLG MET WITH MIKE DEACON THE GENERAL CONTRACTOR FOR THE SITE.HE WANTED TO SHOW ME THE WALKING BRIDGE OVER HWY 106.THE PORTION OF THE BRIDGE OVER THE WRIGHT-OF-WAY IS IN NEED OF REPAIR.THE STATE D.O.T NEEDS TO BE CONTACTED ABOUT THIS ISSUE,IT IS WITHIN THE WRIGHT-OF WAY AND IS EXEMPT FORM THE UBC REQUIREMENTS. ENFA911 Miscellaneous Action 5/16/2002 None DONE TLG 5/17/2002 TLG Photos of rot in flooring system provided at counter ENFBO15 Cert.Notification Status 6/12/2002 None 6/12/2002 TLG Page 2 of 2 -low Case ActivityListin 5/3/2002 g 7:55:06AM T I D E M A R K Case #::.COM2000-00086 COMPUTER SYSTEMS, INC Assigned one "Date-1 Date 2 Date 3 Mold Disp To By Updated Undated � COMA010 Application Received 8/2/2000 8/312000 None DUNE KLW 8,3r2000 KLW COMB110 Building Plan Review 8/3/2000 11/9/2000 None DONE SKM SKM 11/9/2000 NIP NOW UNDER REVIEW .LEFT MESSAGE WITH MR. GREENE PE,I NEED CLARIFACATION ON THE SUCTION RELIEF LINE.08/15/00 SKM PLACED IN HOLD FILE. revisions recived, still need new packet for change in fixtures.File placed in hold./released from hold,information recived.skm @ front counter. COMB130 Planning Review 8/8/2000 8/10/2000 None DONE SLO SLO 8/10/2000 SLID GMA approved 8/10/00 COMB 135 Addressing 8/3/2000 8/4/2000 None DONE GMM 8/4/2000 GMM COMB138 Planning Pre-Review 8/4/2000 8/8/2000 None DONE MMS 8/8/2000 MMS COMB200 Environmental Health Review 8/3/2000 8/29/2000 None HOLD CEW 9/6/2000 CEW need approval from Gary Frazer before I can sign off COMB201 EH More Info Letter 8/29/2000 None DONE CEW 8/29/2000 CEW We need a letter of approval from Gary Frazer at the State DOH. COMA920 Miscellaneous Action 9/11/2000 None DONE SKM 9/11/2000 SKM MR.DAVE GREEN CAME TO THE FRONT COUNTER TO PAY THE PERMIT FEES FOR THE PROJECT,WHEN THE STATE SIGNS OFF THE PERMIT WILL BE OK TO ISSUE.THE LETTER IS NOW WITH THE STATE AND CINDY W.IS WAITING FOR RESPONSE.09/11/00 SKM. COMB007 Plans Revision Submitted 10/20/2000 None RECV SKM SKM 10/20/2000 SKM recived revisions for the plumbing system and called Dave Greene eng.requesting updated component information for the revised system. He will fax a new collated packet to be attached to the plan. placed in hold bin until the information arrives. COMA600 File Possession 10/20/2000 10/20/2000 None DONE SKM 10/20/2000 SKM LEGAL FILE IS IN THE COMMERCIAL HOLD BIN. KELLY HAS IT WAITING FOR REVISIONS. 10/20/00 SKM recived requested updated info and sent file and plans back to case mgr.skm. Page l of 2 CaseActivity-Ipt Case Activity Listing 5/3/2002 7:55:06AM T I D E M A R K Case #: COM2000-00086 COMPUTER SYSTEMS. INC. ' Assigned Done Activity Descriptio'Y '° , Date 1 Date 2 Dated;. Hold Disp To By Updated Updated COMB200 Environmental Health Review 11/13/2000 11/13/2000 None IN)VIF CF« 11/13/2000 CEW see condition COMA200 HOLD 11/13/2000 11/13/2000 Hold DONE CEW 11/13/2000 CEW Please highlight condition for operating permit.This permit needs to be obtained before use of the spa X COMA100 Approved for Issuance 11/15/2000 None DONE KS 11/15/2000 KS COMA500 Issue Commercial Permit 1 1/17/2000 None DONE KS 11/17/2000 KS COMC100 Inspection 5/30/2001 5/30/2001 None PASS GDR 5/31/2001 KLW SLAB AREA ONLY,THIS INSPECTION WAS FOR NEW SLAB AROUND A NEWLY INSTALLED SPA PIPING ALREADY COVERED AND TESTED BY INSTALLERS. jQOMC157 Final Inspection-Failed 7/6/2001 7/6/2001 None FAIL LAW 7/10/2001 KLW I.INSTALL HANDRAILS ON STEPS PER REVISED PLANS,2.PROVIDE A COPY OF THE SPECIAL INSPECTION REPORT FOR THE DOUBI.E CHECK VALVE,NO INSPECTION OF ANY UNDERGROUN PIPING BY ME. Page 2 of 2 CaseActivity..rpt 5/3/2002 Case Activity Listing 7:53:53AM T I D E M A R K Case #r;:;BLD2001-00100 COMPUTER SYSTEMS. INC. Assigned Done Date l Date 2 Date 3 Hold Disp To By Updated Updated BLDA010 Application Received 2/1//2001 2,1;2001 None DO'."I. KLW 3- 19/2001 BLR BLDBI 10 Building Plan Review 2/1/2001 2/5/2001 None DONE MEC 2/5/2001 MEC ok for install of a 2000,Fleetwood,Brookshire 56'x28',2-05-01 MC BLDB130 Planning Review 2/14/2001 2/20/2001 None DONE SLO SLO 2/20/2001 SLO Replacement mobile BLDB 135 Addressing 2/1/2001 2/7/2001 None DONE GMM 2/7/2001 GMM BLDB138 Planning Pre-Review 2/7/2001 2/14/2001 None DONE KLF KLF 2/14/2001 KLF BLDB200 Environmental Health Review 2/1/2001 2/14/2001 None DONE NJP 3/2/2001 CEW this is a replacement mobile home.There are records. Need to have tank pumped.psd 2/14/01 I spoke to Richard Bensen,DOH,and there are complete records at their office. There are 5 septic systems-one was approved for 2667gpd-two was approved for 2100 gpd-one systemwas approved for 833 gpd and the last system was approved for 1400gpd.He didn't have a problem with the replacement of the mobile home as long as the manager approves the connection and the tanks are pumped and inspected and not failing.Pam Denton BLDB210 Water Adequacy 2/1/2001 2/13/2001 None DONE PSD 2/13/2001 PSD rep lac ern ent.psd BLDB201 EH More Info Letter 2/13/2001 None DONE PSD 2/13/2001 PSD Please havethe septic tank pumped and inspected in order to verify that the septic system is functioning properly. BLDA100 Approved for Issuance 3/5/2001 3/5/2001 None DONE TW 3/5/2001 TW BLDA500 Issue Building Permit 3/14/2001 None DONE NJP 3/14/2001 NJP Page I of 2 CaseActivity-rpt 'tea 5/3/2002 Case Activity Listing 7:53:53AM T I D E M A R K Case #: BLD2001-00100 COMPUTER SYSTEMS, INC. Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated BLDC199 Mobile Strip Footing 4/25/2001 4/25/2001 None COND GDR 4/26/2001 KLW FIX AND PROCEED,PROVIDE PICTURES OF STEEL SUPPORTED AND TIED. BLDC200 Mobile Home Set Up 5/14/2001 5/14/2001 None FAIL GDR 5/16/2001 KLW NO SET UP MANUAL ON SITE FOR INSPECTION BLDC200 Mobile Home Set Up 5/16/2001 5/16/2001 None FAIL GDR 5/18/2001 BLR I.Need TPR drain to outside of skirting.UTO.2.Need Dryer vent to outside of skirting. UTO.3.House bibs need vaccum breakers.4. Finish insultaing water lines and valve.5. Provide manufacturer specs for anchoring system used.6.Replace all cracked or broken blocks.7.Water in belly wrap.Replace all wet insulation.DO NOT REUSE.8.Possible plumbing leak.9.Remove all water under plastic vapor barrier and home. 10. Replace any missinf floor insulation to manufactures specs. 11.Tape or seal all belle wrap penetrations. 12.Loose blocks&Wedges,check all. BLDC200 Mobile Home Set Up 5/21/2001 5/21/2001 None PASS GDR 5/22/2001 KLW BLDC215 Mobile Home Final-Failed 8/20/2001 8/20/2001 None FAIL GDR 8/22/2001 KLW OK FOR 90 DAY TEMP OCCUPANCY, 1.NEED TO POST ADDRESS OR HOUSE NUMBER ON HOME UBC 502 OR EMS911.2.NEED PROTECTED COVER ON CRAWL SPACE ACCESS,3. FINISH BACK FILL OR COVER AT DECK BLOCKS. Page 2 of 2 CaseActivit ..rpt ` Case Activity Listing 5/3/2002 �f 7:58:19AM T L 0 E M A R K Case #: MIS96-00811 COMPUTER SYSTEMS. INC. -_z Assigned lion Date Hold Disp To B p' >3`ted``` Updafed MISA010 Application received 11/4/1996 None 11/4/1996 KW MISA015 Waiver in File 11/4/1996 None N/A 11/4/1996 KW MISB135 RLC Checklist Review 11/22/1996 None SHR HRF 11/22/1996 HRF No RLC required.Shoreline issue. MISBI 10 Structural Plan Review 11/22/1996 12/10/1996 None DONE WLC 12/10/1996 DLC Please review for structural and return to Hugo @ PLanning.Thank You. MISB128 Addressing 11/4/1996 11/6/1996 None DONE GMM 11/7/1996 GMM MISB127 Planning Pre-Review 11/6/1996 11/8/1996 None DONE AHB 11/8/1996 AHB MISB129 Sent to Planning 12/10/1996 12/10/1996 None 12/10/1996 DLC MISA050 Approved For Issuance 12/10/1996 None DONE CPH 12/16/1996 CPH MISA500 (F)Issue permit 12/19/1996 None DONE KS 12/19/1996 KS MISA950 List of Conditions 12/19/1996 None DONE KS 12/19/1996 KS MISCI ;E�nal:inspection; 4 1/23/1997 1/24/1997 1/24/1997 None FAIL LW 1/24/1997 LAW NO PLANS ON SITE,1 ALSO SPOKE WITH THE MANAGERS HWO DID NOT HAVE THE PLANS.THEY CALLED THE CONTRACTOR TO SEE IF HE COULD BRING OUT THE PLANS BUT ALL THEY GOT WAS A RECORDING. Page 1 of 2 CaseActivity..rpt _ 1 Case Activity Listing s/3/2o02 :SS:19AM T I- D 1 M A R K Case #: MIS96-00811 COMPUTER SYSTEMS. 'NC Assigned Done Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated tpdated MISA560 Permit cancelled 12/9/1998 None DONE 9 1995 Page 2 of 2 CaseActivity..rpt Case Activity Listing 5/3/2002 8:41:50AM T I D E M A R K Case MIS96-00613 COMPUTER SYSTEMS, INC. MISA560C, ''` 5/3/2002 None DONE TLG 5/3/2002 TLG MISA010 Application received 9/3/1996 None 9/3/1996 KW MISB 135 RLC Checklist Review None 9/3/1996 KW MISB 1 10 Structural Plan Review None 9/3/1996 KW MISB130 Planning Review 9/4/1996 None HRF 9/4/1996 MMS MISB128 Addressing 9/3/1996 9%4/1996 None DONE GMM 9/4/1996 GMM MISB131 Environmental Health Review None 9/3/1996 KW MISB127 Planning Pre-Review 9/4/1996 9/4/1996 None DONE MMS 9/4/1996 MMS I Page 1 of 1 CaseActivity.rpt MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Permit Processing/Inspections/Addressing Mason County Bldg. III 426 W.Cedar P.O.Box 186 Shelton,WA 98584 (360) 427-9670 Belfair (360) 275-4467 Elma (360) 482-5269 Seattle (206) 464-6968 June 12, 2002 Bradley Scott Commercial Real Estate Attn: Robert J. Macht 400 Warren Ave Suite 450 Bremerton, WA 98337-1479 RE: Blue Heron Condominiums ENF2002-00091 Dear Mr. Macht, Your letter of May 20, 2002 was referred to me today. At the time it was written, you indicated that you had met with the geotechnical engineer and expected a copy of the report by the end of the week or May 24, 2002, and stated that you would forward a copy immediately. As of today, I have not received a copy of the report or any mitigation measures. If you could make arrangements to submit another copy of that report by June 21, 2002, it would be appreciated. Also mentioned within the letter was your intent to have a structural engineer assess the floor rot damage in the units and the stability of the carports and parking areas with decking above however, you did not give a timeline as to when this inspection will occur. It is imperative that this situation be addressed immediately and I am requesting that the inspection occur no later than June 30, 2002 and that the structural assessment report be forwarded to this office within 2 weeks of the inspection date. The permits for the office building and roofing projects have not yet been received and the final inspections on the dock, spa and manufactured home have not yet been arranged. I will also ask that these items be completed prior to June 30, 2002. Since you stated that these issues would be taken care of in a few weeks, as of your May 20, 2002 letter, this should be consistent with the time schedule you had referred to. If you should have any questions, please feel free to contact me at (360)427-9670 ext 356. Sinc I , T iG e uilding Inspect r/Code Enforcement Cc: Property File Larry Waters, Lead Building Inspector