HomeMy WebLinkAboutBLD2011-00272 LPG Unit Final - BLD Permit / Conditions - 4/28/2011 mspecuon Line taou,-+u-izoz
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton,WA 98584
RESIDENTIAL BUILDING PERMIT BLD2011-00272
OWNER: LINDA GASKINS RECEIVED: 4/12/2011
CONTRACTOR: LICENSE: EXP: ISSUED: 4/12/2011
SITE ADDRESS: 3500 E STATE ROUTE 302 BELFAIR EXPIRES: 10/12/2011
PARCEL NUMBER:
LEGAL DESCRIPTION: T 1 &T/L
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
ADDING NEW LPG FIREPLACE ST RT 3, R ON NORTH BAY RD, R ON ST RT 302 TO SITE ADDRESS ON
THE RIGHT SIDE
General Information Construction&Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.:
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: Lot Size: Deck:
Type of Work: MEC Fire Dist.: 5 No.of Stories: Occ. Load: Building:
Valuation: I Building Height: Occ. Status: Basement:
Manufactured Home Information Setback Information Shoreline&Planning Information
:
y
Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body:
Model: Width: Ft. Rear: Ft. Slope: Ft. Shoreline Desi
Side 1: Ft. g..
Year: Serial No.: Side 2: Ft. Comp. Plan Desig.:
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Gas Outlets 1 Mechanical Permit Fee GMM 4/12/2011 $79.20 S12011000
Propane Stove 1 Mechanical Base Fee GMM 4/12/2011 $28.50 S12011000
Total $107.70
BLD2011-00272 Please referto the following pages for conditions of this permit. 1 of 2
CASE NOTES FOR
BLD2011-00272
CONDITIONS FOR
BLD2011-00272
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-8W,--647-0 ,82. ThL,per n signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X 41.1`1 c.:
2) ALL FURNACE INSTALLATIONS SHALL MEET THE MINIMUM EFFICIENCIES SET FORTH IN THE CURENT EDITION OF THE WASHINGTON
STATE ENERGY CODE (WSEC). ANY PORTION OF THE MECHANICAL SYSTEM THAT IS ALTERED OR REPLACED SHALL MEET THE MINIMUM
S
X �,T D DS SET FORTH IN THE WSEC AND INTERNATIONAL MECHANICAL CODE.
3) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
pe t-t
ocation.
X
4) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
s}n §unty ordinances and building regulations.
MX.
5) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action ,or a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
hold �haat prevented action from being taken. No more than one extension may be granted.
X �',�
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended fora period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of
work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to
the above described propert and structure for reyi anripection.
OWN ER OR AGENT: -L n'7 DATE: s
BLD2011-00272 Please referto the following pages for conditions of this permit. 2 of 2
o CONCRETE MECHANICAL MANUFACTURED HOME D
o Date By cn
Footings/Setbacks Gas Piping Ribbons X
o Interior Date By interior-Date y�Z�-/ By ��. Date By z
0
Exterior Date By Exterior-Date By
r
INSULATION s.t-up
Point Load/isolated Footings Date By Z
BG 1 SLAB INSULATION ----------------
Date By Data By FIRE DEPARTMENT—
Date
Foundation Waits Floors Date By
Date By Data By DECKS
F RAM I NG Walls Date By
Date By Data By PROPANE TANKS
PLUMBING Vault Date ------ -
Date By OTHER
Groundwork Attic
Date By Type_
Date By Date By
D.W.v DRYWALL Type.
IntBraceWall Date By a)
Date BY Date By FINAL INSPECTION 0
m Water Line Fire Separation N
Date By Date By Date .L By
(D j
Pass or Request Inspect. c
7 Type of Insp. Fail Date Date Done By Comments VQ
N
0
N
r
O
8
CD
0
N
O
V1
CD
(D