Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD2008-01122 Final 2nd Story Addition and 1st FLoor Remodel - BLD Permit / Conditions - 2/18/2009
r Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2008-01122 OWNER: STUART STEADMAN RECEIVED: 9/4/2008 CONTRACTOR: JESFIELD CONSTRUCTION 275-6684 LICENSE: JESFII`228DO EXP: 11/24/2009 ISSUED: 10/2/2008 SITE ADDRESS: 7720 E GRAPEVIEW LOOP RD ALLYN EXPIRES: 4/2/2009 PARCEL NUMBER: 122295002018 LEGAL DESCRIPTION: ALLYN BEACH TRACTS BLK: 2 TR: 18 PROJECT DESCRIPTION: DIRECTIONS TO SITE: 2ND STORY ADDITION AND REMODEL OF PORTION OF 1ST FLOOR. ST RT 3 TO ALLYN, R ON GRAPEVIEW LOOP RD TO SITE ADDRESS ON THE LEFT SIDE. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: 5 Type of Constr.: VB Type of Use: SF Insp.Area: No. of Bathrooms: 3 Occ. Group: R3 Lot Size: Deck: Type of Work: ADD Fire Dist.: 5 No. of Stories: 2 Occ. Load: Building:1,624 Valuation: Building Height: Occ. Status: Seasonal Basement: cov deck 187 Manufactured Home Information Setback Information Shoreline & Planning Information Make: Length: Ft. Front: S 67.0 Ft. Shoreline: Ft. Water Body: CASE INLET g SEPA?: Yes Model: Width: Ft. Rear: N 24.0 Ft. Slope: Ft.Side 1: E 5.0 Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: W 0.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Lavatories 4 Furnace<100K 1 Plan Check Fee GMM 9/4/2008 $751.50 B12008000 Showers 2 Ventilation Fan 3 Planning Review Fee GMM 9/4/2008 $190.00 B12008000 Water Closets (Toilets) 3 Heat Pump 1 EH Plan Review GMM 9/4/2008 $40.00 b12008000 Water Heaters 1 Building State Fee MAL 9/12/2008 $4.50 B12008000 Bath Tubs 2 Building Permit Fee MAL 9/12/2008 $1,156.15 612008000 Mechanical Base Fee MAL 9/12/2008 $26.60 612008000 Plumbing Base Fee MAL 9/12/2008 $23.10 B12008000 Mechanical Fee MAL 9/12/2008 $59.30 612008000 Plumbing Fee MAL 9/12/2008 $97.20 812008000 Total $2,348.35 BLD2008-01122 Please referto the following pages for conditions of this permit. 1 of 4 I CASE NOTES FOR BLD2008-01122 a CONDITIONS FOR BLD2008-01122 1) Installation of heating equipment in single family residences shall meet the requirements of the current Washington State Energy Code. The furnace to be installed shall not exceed 150% of the heating and cooling design load. Heating and design load calculations for the purpose of sizing HVAC systems are required and shall be calculated in accordance with accepted engineering practice, including infiltration and ventilation. Design calculations shall be available for inspection during the framing inspection. Warm-air furnaces shall have a minimum efficiency of 78%AFUE or higher or 80% combustion efficiency. All ducts shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in accordance with manufacturers installation instructions Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall be insulated to R-8. X 47y^. 2) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the owner/agent of the developed parcel. It is the owner/age nt/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. "NOTE if Stormwater Management option "A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled "Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan" constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is a nowledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X 3) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the "approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and shall be collected by the Building De p ment prior to any further inspections being performed or approvals granted. X 4) Per 2003 IRC - SECTION 1609 -WIND LOADS - 1609.1 Applications. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads prescribed herein. Decreases in wind load shall not be made for the effect of shielding by other structures. Per FIGURE 1609 BASIC WIND,SPEED (3-SECOND GUST) the wind speed for Mason County is 85 MPH. X ((4 5) Per IRC - SECTION R905 - REQUIREMENTS FOR ROOF COVERINGS - R905.1 Roof covering application. Roof coverings shall be applied in accordance ith the applicable provisions of this section and the manufacturer's installation instructions. X BLD2008-01122 Please referto the following pages for conditions of this permit. 2 of 4 4 • 6) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-09a2-,The.person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 7) All property lines shall be clearly identified at the time of foundation inspection. X 8) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, anpl-flashing. Install metal connectors approved for contact with the new types of pressure treated material. X 9) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department prior tto any1further inspections being performed or approvals granted. X ! ,. 10) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of app�cuments will result in failure of required building inspections. X 11) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have pr ente action from being taken. No more than one extension may be granted. X 12) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Count r i ances and building regulations. X ` 13) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspector shall made prior to requesting additional inspections. X 14) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded, vegetated or given an equivalent type of erosion protection (silt fencing or straw matting). X C� BLD2008-01122 Please referto the following pages for conditions of this permit. 3 of 4 15) ,Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and collected by the Building Department prior to any further inspections being performed or approvals granted. X 16) All changes to "approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regul ion, must be reviewed and approved by Mason County prior to construction. X 17) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. `7'y X 18) Owner/Agent is espo sible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28. X 19) The Washint��n,Stt to Clean Air Act prohibits the burning of any construction or demolition debris in an outdoor fire. X 2 20) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Sim nn'to ensure these structures are shown and meet the setback conditions listed. X 21) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X 4/� " This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The o neror the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described prop an structure for r iew,and inspection. C,( OWN ER OR AGENT: DATE:_ ZZZ, U BLD2008-01122 Please refer to the following pages for conditions of this permit. 4 of 4 s W o CONCRETE MECHANICAL MANUFACTURED HOME C) Footings 1 Setbacks Date Footings /Z,0 B f�27 (� Ribbons v / / �w GasPiping Interior Date/©./d/. OY B,) Interior-Date By Date By NExterior Date By Exterior-Date By Set-upZ Point Load!Isolated Footings INSULATION Date By ' BG!SLAB INSULATION C/) Date By Data By FIRE DEPARTMENT C Foundation Walls Floors Date By > Date By Data By DECKS FRAMING Walls Date By Date By Data PROPANE TANKS PLUMBING vault Date By Date By OTHER Groundwork Attic Date By Date By Type:Date By O.w.v DRYWALL Type. Oate _ q.© W � B Int.Brace Wall Date By Date By FINAL INSPECTION p Water Line Fir•Separation N Date By Date By Date /� 6-1By CD co Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments N N o ` 0 8 c /20I7�i Q �✓ �1 0 CD 0 I��