Loading...
HomeMy WebLinkAboutSHR2018-00014 Hearing - SHR Letters / Memos - 1/25/2019 poc'Ft. TILE copy � �2ZZg504Zoiq S N� zol8- 000l� Mason County Department of Planning Building VIll * 615 W. Alder Street Shelton, Washington 98584 * (360) 427-9670 NOTICE of DECISION with STAFF REPORT FINDINGS for ADMINISTRATIVE SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT Case Number: SHIZ2018-00014 DATE: January 25, 2019 STAFF PLANNER: Ron Buckholt CASE INDEX Morgan SHR2018-00014 Exhibit# Date Description 1 January 12,2019 Decision with Staff Report Findings 2 October 22,2018 Completed ADU-Shoreline Application 3 December 10,2018 Applicants Site Plan with supplemental information 4 2015 ESRI World Imagery ofparcel/surrounding area 5 December 12, 2018 Notice of Application and Decision 6 December 12, 2018 Affidavit of Posting 7 December 20, 2018 Notice in the Newspaper SHR2018-00014 4- I. Introduction: Proposed detached accessory dwelling unit(ADU)of approximately 669 square feet within the 200 foot shoreline jurisdiction involves the conversion and addition of a pre-existing garage. The conversion and addition will establish 258 square feet of habitable space on the ground floor and 411 square feet of habitable space on the newly created second floor. The height of the remodeled garage will not exceed the 35 foot height restriction. The property has a primary residential dwelling of approximately 1,250 square feet,which is located slightly waterward of the proposed ADU. The linear separation between the 2 residential structures is approximately 27 feet. The proponent has obtained an administrative variance in order for the side yard zoning building setback to be reduced to 5 feet from the edge of the south property line. The existing garage structure, which is intended to be converted to the proposed ADU, is currently located approximately 5 feet from the southern property line. The proposed ADU is located within 200 feet of a designated shoreline of the state and is required to obtain an administrative Shoreline Substantial Development Permit. II. Applicant: Paul and Marla Morgan, owners. 111. Authorized Representative: same as above. IV. Date of Complete Application: December 10, 2018. V. Site address and Project Location: 7710 E. Grapeview, Allyn, WA 98524 Parcel 12229-50-02019. VI. Evaluations. A. Characteristics of the area. This parcel is adjacent to other SFR developed shoreline lots to the north and south. In general, the properties within the vicinity from the subject site are also developed with single family residential dwellings. B. Characteristic of the site. The approximate 1/3 acre site is accessed off of Grapeview Loop Rd. The property currently consists of an existing single family residence(SFR) and a detached garage(proposed to be converted to an ADU). C. Comprehensive Plan Designation. The Mason County Comprehensive Plan designation for the site is Rural. D. Shoreline Master Program Designation.tion.The Shoreline Master Program environmental designation is Urban Residential. E. Zoning. Rural Residential 5 (RR5). Vll. SEPA Compliance and other public notice requirements. The proposal is SEPA exempt under WAC 197-11-800, as a single-family residential dwelling. SHR2018-00014 -2- Vlll. Other Permits. The proposal requires a Mason County Building Permit, Administrative Zoning Variance and Environmental Health approval. IX. Analysis. A. Comprehensive Plan Review Type Il Review for permit applications require administrative review in order to ensure that the proposal will be consistent with Mason County's Development Codes, adopted plans and regulations. The administrative staff shall review the proposal according to the following criteria: 1. The development does not conflict with the Comprehensive Plan and meets the requirements and the intent of the Mason County Code, especially Title 6, 8, and 17. 2. The development does not impact the public health, safety and welfare and is in the public interest. 3. The development does not lower the level of service of transportation and/or neighborhood park facilities below the minimum standards established within the Comprehensive Plan. The development meets the applicable criteria; does not conflict with the Comprehensive Plan; and meets the requirements and intent of the Mason County Codes. The proposed ADU does not impact the public health, safety or welfare and is in the public interest. B. Mason CogpU Development Regulations 17.03.029 Accessory Dwelling Unit Requirement A. The ADU shall be subject to an administrative Shoreline Substantial Development Permit, when such an ADU is located within the 200 foot jurisdiction of the regulated shoreline. The proposed ADU is within 200 ' of the regulated shoreline and therefore shall be reviewed per the Shoreline Master Program policies and use regulations. The structures themselves will be in conformance with shoreline buffer and building setbacks. C. Mason CoupU Comprehensive Plan Chapter IX: Accessory Living uarters Policy Accessory living quarters for the use of guests, employees or immediate family members should be allowed as a Substantial Development,when minimal impact would occur to the surrounding area. The cumulative impact of like structures on neighboring properties must be considered. The proposal is on a relatively large lot(nearly 1/3 of an acre of property). Typical lots in this area are of similar size which are typical RR-5 zoned residential lots, with medium and larger homes dominating the lots.The proposed ADU conversion and existing single family residence will take up less than half of the lot. SHR2018-00014 -3- D. Mason County Code, Title 17.50 Zoning—Shoreline Master Program Use Regulations -Accessory Dwelling Units Accessory dwelling units are defined in this chapter as "Separate living quarters", attached or detached from the primary residence which contain less habitable area than the primary residence." They are subject to the following criteria: 1) Only one accessory dwelling unit allowed per legal lot. The subject parcel is only proposed to have one accessory dwelling unit. 2) Strict compliance with current sewage setback and design standards as per County health regulations. The subject parcel is on a sanitary sewer system and has an approved two party well. Typically,during building permit review, the Mason County Environmental Health Department will review for consistency with WAC 248-76-090 and set requirements accordingly. In this case, the Health Department conducted their health review and approved the subject ADU on November 19,2018. 3) Minimal impact on surrounding properties from view blockage, traffic, parking and drainage. The proposal will have minimal to no impact on views, traffic,parking and drainage. 4) Compliance with setback criteria. The proposal currently does not meet the setback criteria as set forth in the. RESIDENTIAL DEVELOPMENT table of Mason County Code 17.50.060 for the side yard building setback for the pre-existing garage structure conversion. However, the proponent has obtained an approved administrative variance to have the side yard zoning building setback reduced to no less than 5 ft. 5) Accessory dwelling units shall require a Substantial Development Permit and shall not exceed the size thresholds of 1,000 square feet or 80%of the primary residence, whichever is the most restrictive. The total square footage of the existing primary home is approximately 1,250 square feet and the proposed ADU is 669 square feet,thus satisfying the size threshold. 6) Furthermore, compliance with the requirements of MCC 17.03.029 - Accessory dwelling unit requirements: (a) The ADU shall be subject to a special use permit, unless in the shoreline jurisdiction, it is subject to an administrative shoreline substantial development permit; (b) The owner of the ADU must reside on the lot in either the principal residence or ADU; SHR2018-00014 4- (c)The ADU shall be located within one hundred fifty feet of the principal residence or shall be a conversion of an existing detached structure (i.e. garage); (d)The ADU shall not exceed eighty percent of the square footage of the habitable area of the primary residence or one thousand feet, whichever is smaller; (e)All setback requirements must be met by the ADU; (f) All applicable health district standards for water and sewer must be met by the ADU; (g)No recreational vehicles shall be allowed as ADU; (h)Only one ADU is allowed on any property; (i)An additional off-street parking space must be provided for the ADU. The proposal, as designed, appears to meet or will be conditioned to conform with all of the above criteria. X. Conclusions. The project is consistent with the Comprehensive Plan, Development . Regulations, Shoreline Master Program Policies and the Resource Ordinance. As proposed, staff approves the subject Shoreline Substantial Development Permit application #SHR2018-00014 to allow a 669 detached square foot ADU conversion/remodel from a pre-existing garage,pursuant to the following condition(s): 1.) The proponent shall adhere to all of the ADU criteria stipulated in MCC 17.03 and 17.50, as well as the Environmental Health requirements related to the two party water well. XI Choices of Action. 1. Approve. 2. Approve with conditions. 61 3. Deny XII. Appeal There is a 14-day appeal period associated with the subject Decision. The appeal deadline is February 8, 2019 @ 4:30 p.m. All timely appeals shall be filed in accordance with MCC 15.09 and 15.11. Ex Z For Mason CountvPermit Center use: CA ON COUNTY SHR ab 1 -0 C�� COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health Recv'd by. Planner: 615 W AlderSt.,Bldg 8,Shelton, WA 98584 Date Stamp Recv'd: Phone: (360)427-9670 ext 352 :• Fax(360)427-7798 ACCESSORY DWELLING UNIT PERMIT RECEIVED (Shoreline Substantial Development Permit with ADU criteria) OCT 2 2 20% 615 K Alder Street Per t and Fee: Shoreline Substantial Development (SHR) - application fee: $880.00 •IfADU is within 200'of a shoreline: a Shoreline Substantial Development Permit is required with signed publication notice,AND a list of property owners'names and addresses within 300'of property lines. - Environmental Health fee: $ The Washington State Shoreline Management Act (RCW 90.58) requires that substantial developments within designated shorelines of the state comply with its administrative procedures (WAC 173-14) and the provisions of the Mason County Shoreline Management Master Program. The purpose of this Act and local program is to protect the state's shoreline resources. The program requires that substantial development (any development of which the total cost or fair market value exceeds $7,047.00 or materially interferes with the normal public use of the water or shorelines of the State be reviewed with the goals, polices, and performance standards established in the Master Program. Answer all questions completely. Attach any additional information that may further describe the proposed development. Incomplete applications will be returned. Applicant(s) Name: ?Au I AL4J (AArl A 4-4a law- Mailing Address: j' o Sox 13oQ Phone: Z 53. - 1 32 ,-12'LZ_ E-mail: ?>nvr,vn 1`t6Z 2002 CJ H a heo. c�r�nr�. Property Owners Name: (ddifferent than applicant) Site Address: --1 I 1 o e. ��r�c. icw �op Qoaj } AI_T, wA, e 8 Brief Legal Description: ALL g FLLAU-k -1-ELLIG -F -K: Tax Parcel #: 12'LZ,9 - 50 - co-2-o► Zoning: 1Ajr; 1 Rev.January 2018 AD Permit-Shoreline Page I of 6 Project Description: Two P i}(LT GvN2 �,2o�b S ES T L TD /dCLtJDEFE Au IJPPEr— SToa:r— L✓NIci-4 G-1/LL PUS/GT/ bA.J As, AAJ a L.-i N E7Z Dflt T i o w ArL_I f!120 poS e*9 To I s-r )0 E{ L iG V�L Mason County Code Title 17.03.029 requires the following criteria to be met for consideration of an Accessory Dwelling Unit (ADU) Permit: ACCESSORY DWELLING UNIT(ADU) REQUIREMENTS YES NO INFORMATION 1. Is the ADU in a shoreline jurisdiction? ® ❑ Please inquire with Mason County 1 a Are you in the Flood Plain? ❑ Community Services staff, if unsure. 2. Will the owner of the lot reside in either the principal ❑ . residence or the ADU? 3. Will the ADU be located within 150 feet of the principal ❑ residence or will the ADU be a conversion of an existing structure i.e. garage)? 4. The ADU cannot exceed 80 percent of the habitable area ❑ of the primary residence, or 1000 sq. ft., whichever is smaller. Will your proposed ADU meet this criteria? Please inquire with Mason County 5. Will the ADU meet all setback requirements? ❑ Community Services staff, if unsure. Please see last page of this packet 6. Will all applicable health district standards for water and ❑ titled "ADU Environmental Health sewer be met by the ADU? Requirements" 7. Recreational vehicles are not allowed as ADUs. Please rsfi confirm (with YES)that you are not submitting a Recreational vehicle for review. 8. Your property will onlyhave one 1 ADU? � El 9. You have provided an additional off-street parking space N ❑ for the ADU? (Ord. 108-05 Attach B. (part),2005) Rev.January 2018 ADU Permit-Shoreline Page 2 of 6 0 SITE PLAN CHECK-LIST Please provide/attach a site plan that includes the following: indicate Scale and North Arrow. ful Property line dimensions, easements, and right-of-ways. The location of all existing and proposed structures. Include square footage of existing and proposed structures. ASetback distance, in feet from all property lines and structures. Existing and proposed road access to and from the site. Parking spaces. La Location of Onsite Sewage System (OSS) components (including tanks, drainfields, reserve areas, etc.) (Location of existing and proposed wells, within 100ft. of property, shown with 100ft. radius. Location of existing and proposed waterlines. Steep bluffs,wetlands, streams, and bodies of water. Surface and storm water run-off routes. On a separate piece of paper(#of pages: ), state your reasons for requesting an Accessory Dwelling Permit and be sure to address the following six criteria. Your request will be evaluated based on these criteria and the Accessory Dwelling Unit Requirements from the previous section. 1. Will the proposed use be detrimental to public health, safety, and welfare? �40 2. Will the proposed use be consistent and compatible with the intent of the Comprehensive Plan? N�(es , 1+1s A" AIttWtd (Ace -41- - kis F,'0Ver y 3. Will the proposed use introduce hazardous conditions, at the site,that cannot be mitigated through appropriate measures to protect adjacent properties and the community at large? Ko 4. Is the proposed use served by adequate public facilities,which are in place, planned as a condition of approval or as an identified item in the County's Capital Facilities Plan? %(aS 5. Will the proposed use have a significant impact upon existing uses on adjacent 4( lands?/ �'' No , All Acen+ l omds 0.*,e 51,hilt 7"dy 3 no .�A�A� ,b�rex,-- W. 6. If located outside of an Urban Growth Area,will the proposal result in the need to extend urban services? No add� vyx-A urbAv% servi cc s W-fe64-ed Applicant's Signature Date L0 1 o ( 7 Rev.January 2018 AD Permit-Shoreline Page 3 of6 MASON COUNTY COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health ADU ENVIRONMENTAL HEALTH REQUIREMENTS YES NO INFORMATION 1.Will the ADU be served by an EXISTING Onsite Sewage System(OSS)? X OSS's are sized off bedrooms. Refer to the onsite sewage records 1(a). Total bedroom count from existing and proposed connected structures on file with Mason County to find match the approved OSS records on file? your OSS approved size. Ifbedroom count exceeds system size, contact a licensed septic designer for upgrade options. X OSS application and design permit 2. Will the ADU be served by a NEW Onsite Sewage System(OSS)? must be submitted and approved prior to EH approval of ADU Permits -Foundation to Drainfield(s):10ft -Foundation to Reserve Area(s): loft 3. Will the ADU meet all setbacks to new or existing OSS components? /[ -Foundation to Septic Tank(s): 5ft J� Down gradient / Foundation/perimeter drains must maintain 30ft to Drainfields. Attach a signed Sewer Adequacy 4. Will the ADU be served by a NEW or EXISTING sewer connection? Form from Sewer System Manager`< I to this application. 5. Will the ADU be served by a NEW or MSTTNG public water system �/� Attach a signed Water Adequacy (over 3 connections)? Form from Water System Manager to this application 6. Will the ADU be served by an EXISTING private well? Well must be permitted and 7. Will the ADU be served by a NEW well that is not constructed yet? X constructed prior to EH approval of ADU permits. Mason County Code Title 17.03.029 requires EH approval prior to approval of ADU permit. Environmental Health Review Pre-approval: Comments: I? Q 41,1 wR_ ` ' P P R O V E f—e ,-e A , l 1- 19 - l8 W� Lza18 -6cy3 NOV 19 2018 MASON COUNTY ENVIRONMENTAL HEALTH wLJ (EH approval stamp with Initials of EHS) ADU Permit—Shoreline Page 6 of6 Paul and Marla Morgan Request for an Accessory Dwelling Permit: 7710 E. Grapeview Loop Road, Allyn, WA 98524 We are requesting a permit to build an ADU over our existing garage(adjacent to our full time residence)to accommodate family and friends. There is currently a small living space at the back of the garage that will be remodeled as a living/kitchen space, and we intend to build a 2' story addition above with two bedrooms and a bath. A small balcony is proposed over the existing driveway. No new impervious surface proposed. The ADU will be a private residence and will not pose any detriment to public health, safety or welfare, nor will it introduce hazardous conditions at the site harmful to adjacent properties. The design and use will be compatible with the intent of the Comprehensive Plan. Our lot is serviced by a county sewer system. The proposed use for the ADU is to accommodate our children/future grandchildren and friends and will not significantly impact existing uses on adjacent lands and we foresee no need to extend urban services in any way. No new parking is planned; existing site can accommodate a minimum of three spaces. .�. (� PAUL&MARLA MORGANJ SITE PLAN a v N LL, k ,� SIDE sETEACK 7710 E.GRAPI=VIEW LOOP ROAD = o - �] _ # ALLYN,WA 98524 PARCEL#12229-50-02019 a i S SEWAC."E FENCE ND ROCK WALL PUMP HOUSE PUMP I GRINDER P.L.14S' IXISTNG CM G NIN SEWER UNE - - b .3.,.�.. O.H. / I uj Z PROPOSED h I i UNDER EXIST.ROOF I l' 70 SHORE NE BUFFER Z Q \\ li EXISTING HOU E /� U O 3 eo a J EW WNS 1vo DR/V SEWER 0J / 2 �I � �Z 10 p UI / n / REARS K 1>1 C Q Q W/WCWAY Q � � NT SETBACK I �' fi 4.8�1� , II7 N Q A � \ •3t .ttt�C."! IXISTIt{IG no I ,I ` I I I , F. PARKIIIII�Ir�!llkllllllllG . ��: DKS LA S.— A F- u�neu�u NaW ADDITION P�A���...IIID P.L-14s' i I / 5TAlE OF wAeH NY OVER GARAGE / I wrvAlm irtn.ess sl FENCE AND ROCK WALL / OF SGALE 1'-10-CY � SIDE SETBACK r - - ------ --- -------- ------------ I �Y ,,� r- I �ISTNG GAoa�E�L ileac FOOTA3E: �W I yZ] Z I I. : t ; ; I Q d O I I EX8`GA2�.GE: 405 SF O t n ------ h I' TOTAL EQSTNG. 6639F J U BDRn1 F I' PROPOSED NEW: Q � NEW 9EGOND FLOOR 411 9F NEW DECK 133 9F x z m h dECK � i Rom I i TOTAL ADU c1 -n V6• i eE�ow ;i (EXLSTNG NEW 25 k B a411=669 9F h I' -PROPOSED ADU MEETS ALLOWED ADU REQUIREMENT OF 1000 SF OR 80%OF RESIDENCE(5EE SHEET 2) IA z > I19n ro I 'I l9 I I U -_a:v4' I r h ___________ L O C' __�-r O ----e'aa/::---- - ;N a-� Q 3 co a, a a GARAGE ADU UPPER FLOOR PLANe 3 �.4• as v�. --------------------------- — ------- - w a --- - -------- LE § 4 ^ Ivim' I I 1 li 1GKUP - - II EXISTING 1 L*41R ST R I I 1 S I oRH: UKs o'a I '4�•L.�_ _ ' ___ _________ ' _ I 1 II _, A4 J IL_________ I I L ....:.. 1 ...:., ARCHRECT 1155 _E%I TNG___ __ __ _ _ _ __ _ _ TNG WI pO�v s ISOT G OO�V EW p(TERICR DOOR I I ROCK AF W RET V NING SS Ve' L'-79/6' 1S-2 v7 9'-103/ TI NDTVAIm OF GARAGE ADU GROUND FLOOR PLAN 3 3 me xc �8z z' NO N p P 00 3!a bZ N Iq 3� m m 7 m Z � � m w I I Q6 n ¶¶ �Pn I yuy L I I � a-o vd• im-n vs _ v'-o vB• � J} 0 L, --- 1 P u y�m a IE C o ul � N m g n A® o o a 8� DZ in --J 6 I inn b Z y sa vs p S 3'-O W I v - I A P w•-�tee• m rn d z to m < E 4 n CD Ea n al 41 O T m io-to trs I I I � g i f ' I II II N II rII II z _ ______________ -- __- FD II � II b ' " I x � I I I N �97-T �r PAUL & MARLA MORGAN ,,,,, DILL SOU SA 7710 E. Grapeview Loop Rd ARCHITECT Allyn, WA 98524 r � Mason County WA GIS Web Map �r• � 7740 E GFRy.APEVIEVV LOOP RD a 122204380110 7730 E GRAPEVIEW LOOP RD o - + ' 122291180311 �,720,E�iRAPEoIEWLO,)P,RD — 771t? E1,61RAPEVIEW LOOP RD o �f. 77i)0 E.GRAPEVIEW L(>C>P RD 122 291180311 { �?; E,fiRAPEVIEVIJ LOOP RD �7 >7 0 E <;RAPEVIE:'d:' LOOP RD III 12229tcP Y tti �I } II E t+:AF'LVIE4�' LtsOF'.RD 10/22/2018 9:54:52 AM 1:766 0 0.01 0.01 0.02 mi County Boundary 0 0.01 0.02 0.04 km ° Site Address (Zoom in to 1:5,000) Tax Parcels (Zoom in to 1:30,000) Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS,USDA,USGS,AeroGRID,IGN,and the GIS User Community Mason County WA GIS Web Map Application Earthstar Geographics I L EX S NOTICE OF APPLICATION AND NOTICE OF DECISION FOR Administrative Shoreline Substantial Development Permit Notice is hereby given that Mr.And Mrs.Morgan has filed an application for an Administrative Shoreline Substantial Development Permit(SHR2018-00014)to construct an approximate 669 square foot detached accessory dwelling unit(ADU)within the shoreline jurisdiction. The subject ADU will consist of converting a portion of an existing 405 square foot detached garage structure(while adding a 411 square foot second floor above the garage structure). The ground floor of the garage structure will consist of 258 square feet of habitable floor area combined with 411 square feet of new second floor habitable floor area.The total square footage of the ADU will be approximately 669 square feet. The ADU is subject to Mason County Development Regulations Section 8.52; 17.03 and 17.50-Shoreline Master Program. Site Address and Project Location:7710 E.Grapeview,Allyn,WA 98524 Parcel Number: 12229-50-02019 Zoning:RR-5(Residential) Date of Received Submittal: October 22,2018 Date of Complete Application: December 10,2018 Notice of Application: December 12,2018 Public comment deadline:January 11,2019 @ 4:30 PM Notice of Pending Decision will be issued:on or after January 11,2019 The subject file application and decision can be viewed by all interested parties at the Permit Assistance Center, located at 615 W.Alder Street,Shelton,WA 98548 during normal business hours. A public hearing will not be held regarding the proposed project,however written comments may be submitted to the Planning Department during this 30-day shoreline public comment period to:Mason County,Planning Department,Attn:Ron Buckholt, 615 W.Alder Street,Shelton,WA 98584,by January 11,2019(a,4:30 PM. Following the 30-day public comment period(January 11,2019),a copy of the decision will be forwarded to all parties of record(only those whom provided comment(s)during the 30-day public comment period). The referenced decision may also be viewed at the Permit Assistance Center during normal business hours by any party of record or interested parties. Please be aware that the decision will only be forwarded to the applicant,Dept.of Ecology,Attorney General and parties of record generated during the subject 30-day public comment period. Please note that there is a 14-day appeal period following the issuance date of said decision. The decision will be issued on or after January 11,2019. Timely appeals shall be filed with the Mason County Planning Department in accordance with the requirements stipulated in MCC 15.09 and 15.11 The proposal is exempt from SEPA review. Please contact Ron Buckholt of the Mason County Department of Community Development at(360)427-9670 ext. 287,or at the address listed above,with questions regarding this permit application. AFFIDAVIT OF POSTING NOTICE STATE OF.WASHINGTON ) ss. COUNTY OF MASON ) &C-{OL do hereby certify that I posted 3 copies of the attached on L day of 20_LL in Z public places as follows: one at �kx\0yvv * �- one at RQ-WSp� _�ollrna� Z CO�SQt t1yC' W 25� �5 one at _l �l E _ GP-A Pr-v e ,r./ a111K wd�l� Sooft rodj�s of t►� P"DJecf srFe In witness whereof, the party has signed this Affidavit of posting Notice this 1ZTMday of 20 I . By. Address: STATE OF WASHINGTON ) ss COUNTY OF MASON ) ' I2 � Y , Subscribed and sworn to me this day of 20 Notary Publi r t e State'^o ashington ,V �O\ ,pTAq'p 9*- % Residing at s Commission Expires ;cn�•. AVe��G�.'O? or Z .a `¢.4 ♦•. M « .,� e t i x t x , Jry �, /.• , 7 ��r,q� ar . "ll i ��, y-• �Y.�` � '� F)�,' X =r�': 7.�'�X1 f t'!YR' r �1 �� Y; '� tip• 'C��`rE 'ey '.a��� ' � I �t y � �� � ,11''�r �1�,,tr �. rcfW tk �- -�VI�'i �fzll C o M �1, y # # j44l911 r S% r 1 r h fy Er.l LIST OF ADJACENT PROPERTY OWNERS' MAILING ADDRESSES WITHIN 300 FEET OF YOUR PROPERTY BOUNDARIES FOR PUBLIC HEARING NOTIFICATION M. K. Notf�,txeF, PD at x 555 `7G50 r--. (;;TF-aeevlr-W Loop Tz� fktrl.-YrJ, U'� G 852.+ �/tLrltAµ % A.96TA 4^T>?eLLFTTj ,?0 8oX 12gS A-L U'64, O A 9 S524-- S ERtiEST P ;SSNtV-LEY A. MCGtBaoN p r> box 4l02 A Lux -1, l-3A 1:16524- O9o2. .l E p R-,r AT5 o1,1 .po gox 2�04- STuAR�- � KA�Z'N�Yr� STE,ar�Ma,N Po Box 2q$ LAW(Z�Nc E E• ��(21�5 J R. eT U x 3 S�S LAK-�woc� P•vE, s . wa g43�44��235 V14N P-OSSUM TES-ME5 Zte,55 Ova a-ill, �EDMorli�� 1NA. 9 5�5 P o Pox �3a�o Art�Y►—� W�. q e,52+-13 e 4 Rev.January 2018 AD Permit-Shoreline Page 5 of 6 MASON COUNTY COMMUNITY SERVICES Building,Planning,Environmental Health,Community Health 615 W.Alder St.—Bldg.8,Shelton,Wa 98584 Phone:(360)427-9670 ext.352 ♦ Fax:(360)427-7798 ADDITIONAL INFORMATION FOR SHORELINE SUBSTANTIAL DEVELOPMENT PUBLICATION COST AGREEMENT (/orpublic hearings or commercial SEPA's) Publication cost is the responsibility of the applicant. Final permit processing will not occur until advertising fees have been paid to the newspaper by the applicant. The Shelton-Mason County Journal will bill the applicant directly. I/WE understand that I/WE must sign and date the attached acknowledgment indicating and that I/WE understand that is MY/OUR responsibility. I/ WE must submit the signed page as part of application in order for it to be considered as complete. Signature of Property qrwner Date Print Name OR Signature of Applicant Date Print Name Rev.January 2018 AD Permit-Shoreline Page 4 of 6 12 1�O l x Page 13-16-Shelton-Mason County Joui PUBLIC NOTICES PUBLIC NOTICE NOTICE OF APPLICATION AND NOTICE OF DECISION FOR Administrative Shoreline Substantial Development Permit Notice is hereby given that Mr.And Mrs.Mor- gan has filed an application for an Administra- tive Shoreline Substantial Development Permit (SHR2018-00014)to construct an approximate 669 square foot detached accessory dwelling unit (ADU) within the shoreline jurisdiction. The subject ADU will consist of converting a portion of an existing 405 square foot detached garage structure (while adding a 411 square foot second floor above the garage structure). The ground floor of the garage structure will consist of 258 square feet of habitable floor area combined with 411 square feet of new sec- ond floor habitable floor area.The total square footage of the ADU will be approximately 669 square feet. The ADU is subject to Mason County Development Regulations Section 8.52; 17.03 and 17.50 - Shoreline Master Program. Site Address and Project Location: 7710 E. Grapeview, Allyn, WA 98524 Parcel Number: 12229-50-02019 Zoning: RR-5 (Residential) Date of Received Submittal: October 22,2018 Date of Complete Application: December 10, 2018 Notice of Application: December 12,2018 Public comment deadline:January 11,2019 @ 4:30 PM Notice of Pending Decision will be is- sued:on or after January 11,2019 The subject file application and decision can be viewed by all interested parties at the Permit Assistance Center,located at 615 W.Alder Street,Shelton, WA 98548 during normal business hours. A public hearing will not be held regarding the proposed project, however written comments may be submitted to the Planning Department during this 30-day shoreline public comment period to:Mason County,Planning Department, Attn: Ron Buckholt, 615 W.Alder Street, Shel- ton, WA 98584, by January 11, 2019 @ 4:30 PM. Following the 30-day public comment period (January 11, 2019), a copy of the deci- sion will be forwarded to all parties of record (only those whom provided comment(s)during the 30-day public comment period). The refer- enced decision may also be viewed at the Per-- mit Assistance Center during normal business hours by any party of record or interested par- ties. Please be aware that the decision will only be forwarded to the applicant,Dept.of Ecology, Attorney General and parties of record gener- ated during the subject 30-day public comment period. Please note that there is a 14-day ap- peal period following the issuance date of said decision. The decision will be issued on or after, January 11,2019. Timely appeals shall be filed with the Mason County Planning Department in accordance with the requirements stipulated in MCC 15.09 and 15.11 The proposal is exempt from SEPA review.Please contact Ron Buckholt of the Mason County Department of Commu- nity Development at (360) 427-9670 ext.287, or at the address listed above, with questions regarding this permit application. 1679 December 20,27 2t