Loading...
HomeMy WebLinkAboutSEP2019-00072 - SEP Determinations - 9/25/2019 srnre a� o � a S ` �y�leas do STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 -Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can can 877-833-6341 September 25, 2019 Ron Buckholt,Planner Mason County Department of Community Services Planning Division PO Box 279 Shelton,WA 98584 Dear Ron Buckholt: Thank you for the opportunity to comment on the mitigated determination of nonsignificance for the Kronquist Southerland Soft Shoreline Adaptive Management Project(SEP2019-00072) located at 241 East Nelson Road as proposed by Michael A Southerland et ux represented by Mason Conservation District. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WATER QUALITY)WATERSHED RESOURCES UNIT: Chris Montague-Breakwell(360)407-6364 Erosion control measures must be in place prior to any clearing, grading,or construction. These control measures must be effective to prevent stormwater runoff from carrying soil and other pollutants into surface water or stormdrains that lead to waters of the state. Sand, silt,clay particles,and soil will damage aquatic habitat and are considered to be pollutants. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48 RCW,Water Pollution Control, and WAC 173-201A,Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (MLD:201905193) cc: Chris Montague-Breakwell,WQ Mason Conservation District(Proponent) _ MASON COUNTY Planning Division of Community Development MASON COUNTY 615 W.Alder St. Bldg.8,Shelton,WA 98584 COMMUNITY SERVICES 360-427-9670 ext 352 0,�tGng Plannuig,Fnvirmma W"Palth Community Hoahh MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-34) SEP2019-00072 Description of REPAIR AND MAINTENANCE OF A PREVIOUS SHORELINE ADAPTIVE MANAGEMENT Proposal: PROJECT Proponent: MICHAEL A SOUTHERLAND ET UX Location of 241 E NELSON RD Proposal: Parcel Number: 122294400050 Legal Description: Lead Agency: Mason County Planner: Ron Buckholt The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment.An Environmental Impact Statement(EIS)is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact the planner at 360-427-9670 x352 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below,when the determination is final. Comments must be submitted to the Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by: 09/25/2019 Appeal of this determination must be filed with a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date MITIGATING MEASURES: 1 Debris or deleterious material resulting from construction shall be removed from the beach area and project site and shall not be allowed to enter waters of the State. 2 Residential developers and individuals shall be required to control erosion during construction. Removal of vegetation should be minimized and any areas disturbed should be restored to prevent erosion and other environmental impacts. 3 Proponent shall obtain all necessary state and federal permits prior to the commencement of any work. SEPA Environmental Checklist Mason County Permit Center Use: ` ❑ Single Family DNS: $600.00 SEP SFp�1- 0067ZG Sh ❑ Other DNS: 0 to 9.99 acres: $730 Parcel#: LZ Z /r yy_0Do0 10 to 20 acres: $880 Date Rcvd: IG Over 20 acres: $1100 ❑ DS/EIS: $5000 + $90 per hour Purpose of checklist: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. Instructions for applicants: fbfjp This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use "not applicable"or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision- making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Instructions for Lead Agencies: Please adjust the format of this template as needed. Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. A. BACKGROUND LeM 1. Name of proposed project, if applicable: Leipi Kronquist Southerland Soft Shoreline Adaptive Management Project 2. Name of applicant: nei Mike Southerland and Eileen Kronquist, represented by Mason Conservation District 3. Address and phone number of applicant and contact person: Lpl 241 E Nelson Road, Allyn, WA 98524 Please contact Katrinka Hibler at MCD in regards to this application at 360-427-9436 x 117 SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11 4. Date checklist prepared: hI eM 8-19-19 5. Agency requesting checklist: 1heM Mason County 6. Proposed timing or schedule (including phasing, if applicable): hei This work is proposed to be completed before November 30th 2019. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. Lhelpl No 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. h( eM A JARPA was prepared for the bulkhead removal that was completed in October of 2018. A SEPA exemption was issued at that time due to the removal/restoration nature of the project. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. lei An HPA modification in regards to this project. 10. List any government approvals or permits that will be needed for your proposal, if known. [ ell An HPA modification. The original HPA was issued for the bulkhead removal. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.)Lheipj The bulkhead removal that was completed in 2018 exposed freshwater seeps that have led to bank erosion at a higher rate than anticipated. The current proposal is a repair of that project. The proposed repair will use the 8 large (3-man) anchor rocks as toe protection in the area with the highest bank. The remainder of the bank will be protected with geotextile bags filled with k. The repair will include additional planting. An native soil excavated planting soli or drain roc p p g Y for the wall footings will be used on site as beach nourishment material (at the request of the WDFW habitat biologist). Additional drainage will be installed behind the seat rocks on the slope above the shoreline. The geotextile bags combined with slate pavers will be used to create beach access stairs. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Lelpj Parcel#(s): 12229-44-00050 Address: 241 E Nelson Road, Allyn, WA 98524 Legal Description: Twp/Range/Section and/or GPS location: S29 T22N R01 W 47.360638, -122.826084 SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 2 of 11 i B. ENVIRONMENTAL ELEMENTS [help] 1. Earth a. General description of the site Ih�l (circle one): Flat, rolling, hilly, steep slopes, mountainous, other: low bank shoreline b. What is the steepest slope on the site (approximate percent slope)? h� eM Vertical bank 3 to 4 feet high. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. (helpj jWeb soil survey clasifies this area as Alderwood gravelly sandy loam. Visual inspection: Consolidated till soils with perennial seeps. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. hC elgl Before the bulkhead was removed, a section of bulkhead had failed. Soils in that area had eroded and formed a vertical bank. e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Lhelpl Purpose: slow unexpectedly high erosion rate after bulkhead removal. Approximately 50 linear feet of bank P P Y 9 PP Y protection with lantable eotextile bags and about 20 feet of existing on site large rock. 13 CY of planting P P 9 9 9 9 9 soil and gravel to fill the bags. Beach nourishment with native material excavated for preparation of site. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hI M No clearing will be done. Heavy equipment on the beach to place the rock may cause some disturbance to consolidated beach soils. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? [hej None h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Lelp Plywood sheets will be used under heavy equipment to distribute weight and reduce erosion. 2. Air a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. LheU) During construction, large equipment will emit exhaust. No emissions are expected after completion. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. Lwjj No c. Proposed measures to reduce or control emissions or other impacts to air, if any: h( eM SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11 3. Water a. Surface Water: hei 1) Is there any surface water body on or in the immediate vicinity of the site (including year- round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. fhelpi Case Inlet on Puget Sound 2) Will the project require any work over, in, or adjacent to (within 200 feet)the described waters? If yes, please describe and attach available plans. he Yes,work will occur on the beach above OHW and on the slope above the beach. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. h( em No material will be placed in or removed from surface water or wetlands. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. 1 ei)1 No 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Leip] Yes, the marine shoreline. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. Lhel� No b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. lbieM No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s)are expected to serve. hf eipl c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water)and method of collection and disposal, if any(include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. het Stormwater and underground seeps will be collect in drain rock or pipe and daylighted to the beach. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 11 2) Could waste materials enter ground or surface waters? If so, generally describe. n[ elgl WDFW has recommended the use of soil excavated for rock placement as beach nourishmet material at the north end of the project site.Fines from this soil will enter marine waters as the material is sorted by the tides. 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. The groundwater seeps that currently outlet directly to the beach will drain through the geotextile gravel bags or be collected behind the large rock and routed to the beach. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: Drainage pipe and gravel geotextile bags are designed to reduce erosion caused by surface runoff. 4. Plants h( elp� a. Check the types of vegetation found on the site: n[ eM Vdeciduous tree: alder, maple, aspen, other evergreen tree: fir, cedar, pine, other shrubs V grass pasture crop or grain orchards, vineyards or other permanent crops V wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? i)ei,)j No vegetation will be removed or altered. c. List threatened and endangered species known to be on or near the site. hel None are known. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: h( elpl Soil geotextile bags will be hydroseeded with salt tolerant grasses and planted with Hookers Willow and snowberry. e. List all noxious weeds and invasive species known to be on or near the site. Himalayan Blackberry 5. Animals a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: h[ eM birds( hawk, heron, eagle, songbirds)other: mammals: deer, bear, elk beaver, other: marine mammals fish: ss, salmon, rout, herring, shellfish, ther: SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11 b. List any threatened and endangered species known to be on or near the site. Jkm WDFW's Priority Habitats and Species interactive map idendified the site as a priority breeding area for surf smelt and the shoreline as a Marine Wetland priority habitat.The bulkhead removal that was completed has opened up the upper beach for surf smelt breeding. c. Is the site part of a migration route? If so, explain. [bpjpj The marine shoreline is an important habitat for salmonid species as they leave the estuaries and head out to the ocean. d. Proposed measures to preserve or enhance wildlife, if any: hI elpl This project is designed to stay above the OHW line thus preserving the gains in upper beach created by the bulkhead removal. e. List any invasive animal species known to be on or near the site. None known. 6. Energy and natural resources a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. lbeM Energy will not be required when the project is completed b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. Lnei No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: h[ eAl 7. Environmental health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. h[ M 1) Describe any known or possible contamination at the site from present or past uses. The septic drain field was in the front of the house.The drainfield was moved behind the house and further from the shoreline in 2017. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. None are known. 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. The construction equipment used for project installatinwill operate on diesel fuel.The equipment will be required to use biodegradable hydraulic fluid to reduce risks to the shoreline. 4) Describe special emergency services that might be required. In the event of an oil or fuel spill, cleanup services may be required. SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11 5) Proposed measures to reduce or control environmental health hazards, if any: Biodegradable hydraulic oil will be used in construction equipment. Spill kit will be onsite during construction b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? hel The project will not be affected by noise. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi- cate what hours noise would come from the site. 1hgM During construction materials will be delivered to the project site and an excavator used for construction. This equipment will generate standard levels of construction noise during working hours. 3) Proposed measures to reduce or control noise impacts, if any: jheip] Limit construction activities to daytime working hours. 8. Land and shoreline use a. What is the current use of the site and adjacent properties?Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. hf etp The current and proposed use is residential. The project will not change that designation. b. Has the project site been used as working farmlands or working forest lands? If so, describe. No How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? None If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or nonforest use? hel None 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: No c. Describe any structures on the site. )he�)j A single story single family residence is located on the site. d. Will any structures be demolished? If so, what? hel Some remanents of the bulkhead and boat launch footing have become exposed and will be removed as part of the project. e. What is the current zoning classification of the site? h� M Residential f. What is the current comprehensive plan designation of the site? [help] Shoreline environmental desigantion is residential SEPA Environmental checklist(WAC 197-11.960)(MC version-non project portion omitted): 2016 Page 7 of 11 g. If applicable, what is the current shoreline master program designation of the site? Lnel Residential h. Has any part of the site been classified as a critical area by the city or county? If so, specify. h[!�M Marine shoreline i. Approximately how many people would reside or work in the completed project? Lflelpl 2 j. Approximately how many people would the completed project displace? ti el 0 k. Proposed measures to avoid or reduce displacement impacts, if any: L[ elpj None L. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: hel 1 This proposal ensures that the residential land use will be maintained. m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest lands of long-term commercial significance, if any: N/A 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing. help] 0 b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. h[ elpl 0 c. Proposed measures to reduce or control housing impacts, if any: Ll,�j None 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed?Ll em The proposed structure will not exceed the height of the adjacent bank. b. What views in the immediate vicinity would be altered or obstructed? hf m None c. Proposed measures to reduce or control aesthetic impacts, if any: Lelp] The goal is to create as natural a shoreline as possible.Vegetation will be planted in the face of the geotextile bags and to overhange the proposed rock. 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur?Lhe_lp, None b. Could light or glare from the finished project be a safety hazard or interfere with views? of elpl No SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11 c. What existing off-site sources of light or glare may affect your proposal? h[ elpl None d. Proposed measures to reduce or control light and glare impacts, if any: [help] None 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? [helpl Shellfish harvesting, boating, beach walking b. Would the proposed project displace any existing recreational uses? If so, describe. n( eU No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: jheip.] Rock stairs integrated into the geotextile bank protextion will improve beach access. 13. Historic and cultural preservation a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers located on or near the site? If so, specifically describe. hI gM No features or other evidence of Indian or historic use or occupation? b. Are there any landmarks, p This may include human burials or old cemeteries. Are there any material evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. Eielp] A cultural resources survey was completed by Margaret Berger of Cultural REsource Consultants on September 15th 2016. c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. 1heU DAHP and the tribes were consulted. Pedestrian surface survey and subsurface testing via hand excavated shovel test probes were completed. A determination of"No historic properties affected"was recommended by the consultant. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. Excavation will be limited to the amount necessary to create a shallow footing trench for the rock and geotextile bag bank protection. No material will be removed from the site. 14. Transportation a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. hf eM The site is accessed via State Hwy 3, Grapeview loop road, E Nelson Road, private driveways and the yard adjacent to the house. SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 9 of 11 b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? n[ eM Mason transit authority operates scheduled routes on Hwy 3 with a stop in Allyn (approximately 2 miles from the site). Dial a ride services are available to the site. c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? nC M N/A d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). helms] No e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air transportation? If so, generally describe. >hejp] Boats are moored off the shore. f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and nonpassenger vehicles).What data or transportation models were used to make these estimates?Lelp� No additional trips. g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: [t1op] N/A 15. Public services a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. nel No b. Proposed measures to reduce or control direct impacts on public services, if any. RjeM N/A 16. Utilities a. Circle utilities currently available at the site: Lhep] electricity,Jnatural gas, water, refuse servicel telephone, sanitary sewer, septic systeml other SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11 b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. of eM None C. SIGNATURE hey The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Signed: 9-9-19 Print Name of Signee: Katrinka Hibler If applicable, Position and Agency/Organization: District Engineer, Mason Conservation District Date Submitted: 9-9-19 SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11 MASON COUNTY DCD SEPA Contact List Sent SEPA�;';";- '; 't, i ._ to (check all that apply) on__ '_!1 <' Skokomish Tribal Nation, Nat. Res.Dept. WA Department of Commerce ATTN:Julian Sammons reviewteam@commerce.wa.gov N 541 Tribal Center Rd., Skokomish Nation,98584 jsammons@skokomish.org U.S.Army Corps of Engineers dsarff@skokomiosh.org SEPA Reviewer-Jason Sweeney Skokomish Tribal Historic Preservation Officer PO Box C-3755,Seattle,98124 ATTN: Kris Miller Jason.t.sweeney@usace.army.mil 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay1@skokomish.org WA Dept. of Fish and Wildlife Quinault Indian Nation SEPAdesk@dfw.wa.gov ATTN: Mark Mobbs PO Box 189,Tahola, 98587 WA Dept.of Fish and Wildlife mmobbs@quinault.org ATTN: Chris Waldbillig Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290 2952 SE Old Olympic HWY,Shelton 98584 Port Orchard,WA 98366 jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov emarbet@squaxin.us szaniewski@squaxin.us WA Dept. of Fish and Wildlife rfoster@squaxin.us ATTN: Darrin Masters The Confederated Tribe of the Chehalis 450 Port Orchard Blvd, Suite 290 ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366 420 Howanut Rd., Oakville, 98568 Darrin.Masters@dfw.wa.gov gconnelly@chehalistribe.org WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife 950 Farman Avenue N, Enumclaw,98022-9282 ATTN: Allison Cook southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed) WA DNR,Aquatic Resources 1111 Washington St SE,Olympia WA,98501 PO BOX 47027, Olympia,98504-7027 allison.cook@dfw.wa.gov and@dnr.wa gov WA DNR,SEPA Center WA Dept.of Transportation ATTN: External Coordinator ATTN: Dale Severson PO BOX 47015,Olympia,98504-7015 P.O. Box 47440, Olympia 98504-7440 sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov Olympic Region Clean Air Agency ATTN: Lauren Whybrew City of Shelton 2940-B Limited Ln. NW,Olympia.98502 ATTN:Jason Dose lauren.whybrew@orcaa.org 525 West Cota St.,Shelton 98584 Mason County Transit jasond@ci.shelton.wa.us ATTN: Danette Brannin 790 E Johns Prairie Rd,Shelton,98584 0 Port of Shelton dbrannin@masontransit.org ATTN: Brandon Palmer Mason County PUD#1 21 West Sanderson Way,Shelton 98584 ATTN: Darrin Hall BrandonP@portofshelton.com N 21971 Hwy 101, Shelton,98584 darrinh@mason-pud1.org E3 Dep't of Archaeology&Historic Preservation Mason County PUD#3 P.O.Box 48343,Olympia,98504-8343 ATTN: Kristin French SEPA@dahp.wa.gov kristin.french@masonpud3.org WA Department of Ecology a Tacoma Public Utilities-Real Property Services Environmental Review Section ATTN: Dave Letterman PO BOX 47703, Olympia, 98504-7703 3628 S 35th St,Tacoma, 98409-3192 separegister@ecy.wa.gov dletterm@cityoftacoma.org ID WA Department of Health Mason Cty P.W.ATTN:. ATTN:Joe Laxson joe.laxson@doh.wa.gov Mason Cty E.H.ATTN: Other: f�a,� ✓�YIL.Cj �fn'j(f.X�n Mason Cty Bldg ATTN: Agent: K Applicant: School District: MC DCD last updated on 2/28/19 9/12/2019 Mail-RBuckholt@co.mason.wa.us RE: SEP2019-00072 Shaun Dinubilo <sdinubilo@squaxin.us> Thu 9/12/2019 8:48 AM To:Ronald Buckholt <RBuckholt@co.mason.wa.us>; Hi Ron, Thank you for contacting the Squaxin Island Tribe Cultural Resources Department regarding the above listed project for our review and comment. We have no specific cultural resource concerns for this project. However, if DAHP recommends a survey, or any other additional recommendations, we concur with DAHP's recommendations. We would prefer to receive an electronic copy by email once completed. If any archaeological or cultural resources are uncovered during implementation, please halt work in the area of discovery and contact DAHP and the Squaxin Island Tribe's Archaeologist, Shaun Dinubilo via email at sdinubilo@squaxin.us. Shaun Dinubilo Archaeologist CR Department Squaxin Island Tribe 200 S.E. Billy Frank Jr. Way Shelton, WA 98584 Office Phone: 360-432-3998 Cell Phone: 360-870-6324 Email: sdinubilo@squaxin.us From: Mariah Frazier [mailto:MFrazier@co.mason.wa.us] Sent:Wednesday, September 11, 2019 10:57 AM To:SEPA Center<sepacenter@dnr.wa.gov>; Ecology SEPA Register<separegister@ecy.wa.gov>;Jason Sweeney <Jason.t.sweeney@usace.army.mil>; Chris Waldibillig<Chris.waidbillig@dfw.wa.gov>;Jeff Dickison<jdickison@squaxin.us>; Erica Marbet<emarbet@squaxin.us>; Sarah Zaniewski <szaniewski@squaxin.us>; Shaun Dinubilo<sdinubilo@squaxin.us> Cc: Ronald Buckholt<RBuckholt@co.mason.wa.us>; katrinka@masoncd.org Subject:SEP2019-00072 Good Morning, Please see attached documents regarding SEP2019-00072. Proponent: Michael A Southerland et ux Parcel: 12229-44-00050 If you have any questions, please direct them to Planner Ron Buckholt at rbuckholt@co.mason.wa.us . https://owa.co.mason.wa.us/owa/?ver=15.2.397.3&cver=15.2.330.5&vC=O&forceBo=false#path=/mai I 9/12/2019 Mail-RBuckholt@co.mason.wa.us Thank you, Mcw aY>,Fralier Mason County Community Services Planning Clerical/Addressing (360)427-9670 ext 365 112 2/2 .,.Cason.wa.us/owa/?ver=15.2.397.3&cver=15.2.330.5&vC=O&forceBO=false#path=/mail