HomeMy WebLinkAboutSEP2019-00072 - SEP Determinations - 9/25/2019 srnre a�
o �
a
S `
�y�leas do
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 -Olympia, Washington 98504-7775 •(360)407-6300
711 for Washington Relay Service •Persons with a speech disability can can 877-833-6341
September 25, 2019
Ron Buckholt,Planner
Mason County
Department of Community Services
Planning Division
PO Box 279
Shelton,WA 98584
Dear Ron Buckholt:
Thank you for the opportunity to comment on the mitigated determination of nonsignificance for
the Kronquist Southerland Soft Shoreline Adaptive Management Project(SEP2019-00072)
located at 241 East Nelson Road as proposed by Michael A Southerland et ux represented by
Mason Conservation District. The Department of Ecology(Ecology)reviewed the
environmental checklist and has the following comment(s):
WATER QUALITY)WATERSHED RESOURCES UNIT:
Chris Montague-Breakwell(360)407-6364
Erosion control measures must be in place prior to any clearing, grading,or construction.
These control measures must be effective to prevent stormwater runoff from carrying soil
and other pollutants into surface water or stormdrains that lead to waters of the state. Sand,
silt,clay particles,and soil will damage aquatic habitat and are considered to be pollutants.
Any discharge of sediment-laden runoff or other pollutants to waters of the state is in
violation of Chapter 90.48 RCW,Water Pollution Control, and WAC 173-201A,Water
Quality Standards for Surface Waters of the State of Washington, and is subject to
enforcement action.
Ecology's comments are based upon information provided by the lead agency. As such,they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments,please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(MLD:201905193)
cc: Chris Montague-Breakwell,WQ
Mason Conservation District(Proponent)
_ MASON COUNTY
Planning Division of Community Development
MASON COUNTY 615 W.Alder St. Bldg.8,Shelton,WA 98584
COMMUNITY SERVICES 360-427-9670 ext 352
0,�tGng Plannuig,Fnvirmma W"Palth Community Hoahh
MITIGATED DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-34)
SEP2019-00072
Description of REPAIR AND MAINTENANCE OF A PREVIOUS SHORELINE ADAPTIVE MANAGEMENT
Proposal: PROJECT
Proponent: MICHAEL A SOUTHERLAND ET UX
Location of 241 E NELSON RD
Proposal:
Parcel Number: 122294400050
Legal Description:
Lead Agency: Mason County
Planner: Ron Buckholt
The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the
environment.An Environmental Impact Statement(EIS)is not required under RCW 43.21C.030(2)(c). This decision was
made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This
information is available to the public upon request.
Please contact the planner at 360-427-9670 x352 with any questions. This DNS is issued under WAC 197-11-340(2).
The Lead Agency will not act on this proposal for 14 days from the date shown below,when the determination is final.
Comments must be submitted to the Dept. of Community Development, 615 W Alder St, Shelton WA 98584 by:
09/25/2019 Appeal of this determination must be filed with a 14-day period following this final determination date,
per Mason County Code Chapter 15.11 Appeals.
Authorized Local Government Official Date
MITIGATING MEASURES:
1 Debris or deleterious material resulting from construction shall be removed from the beach area and
project site and shall not be allowed to enter waters of the State.
2 Residential developers and individuals shall be required to control erosion during construction.
Removal of vegetation should be minimized and any areas disturbed should be restored to prevent
erosion and other environmental impacts.
3 Proponent shall obtain all necessary state and federal permits prior to the commencement of any
work.
SEPA Environmental Checklist Mason County Permit Center Use:
`
❑ Single Family DNS: $600.00 SEP SFp�1- 0067ZG Sh
❑ Other DNS: 0 to 9.99 acres: $730 Parcel#: LZ Z /r yy_0Do0
10 to 20 acres: $880 Date Rcvd: IG
Over 20 acres: $1100
❑ DS/EIS: $5000 + $90 per hour
Purpose of checklist:
Governmental agencies use this checklist to help determine whether the environmental impacts of your
proposal are significant. This information is also helpful to determine if available avoidance, minimization
or compensatory mitigation measures will address the probable significant impacts or if an environmental
impact statement will be prepared to further analyze the proposal.
Instructions for applicants: fbfjp
This environmental checklist asks you to describe some basic information about your proposal. Please
answer each question accurately and carefully, to the best of your knowledge. You may need to consult
with an agency specialist or private consultant for some questions. You may use "not applicable"or
"does not apply" only when you can explain why it does not apply and not when the answer is unknown.
You may also attach or incorporate by reference additional studies reports. Complete and accurate
answers to these questions often avoid delays with the SEPA process as well as later in the decision-
making process.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact.
Instructions for Lead Agencies:
Please adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse
impacts. The checklist is considered the first but not necessarily the only source of information needed to
make an adequate threshold determination. Once a threshold determination is made, the lead agency is
responsible for the completeness and accuracy of the checklist and other supporting documents.
A. BACKGROUND LeM
1. Name of proposed project, if applicable: Leipi
Kronquist Southerland Soft Shoreline Adaptive Management Project
2. Name of applicant: nei
Mike Southerland and Eileen Kronquist, represented by Mason Conservation District
3. Address and phone number of applicant and contact person: Lpl
241 E Nelson Road, Allyn, WA 98524
Please contact Katrinka Hibler at MCD in regards to this application at 360-427-9436 x 117
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 1 of 11
4. Date checklist prepared: hI eM
8-19-19
5. Agency requesting checklist: 1heM
Mason County
6. Proposed timing or schedule (including phasing, if applicable): hei
This work is proposed to be completed before November 30th 2019.
7. Do you have any plans for future additions, expansion, or further activity related to or connected with
this proposal? If yes, explain. Lhelpl
No
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal. h( eM
A JARPA was prepared for the bulkhead removal that was completed in October of 2018.
A SEPA exemption was issued at that time due to the removal/restoration nature of the project.
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain. lei
An HPA modification in regards to this project.
10. List any government approvals or permits that will be needed for your proposal, if known. [ ell
An HPA modification. The original HPA was issued for the bulkhead removal.
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site. There are several questions later in this checklist that ask you to describe
certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead
agencies may modify this form to include additional specific information on project description.)Lheipj
The bulkhead removal that was completed in 2018 exposed freshwater seeps that have
led to bank erosion at a higher rate than anticipated. The current proposal is a repair of that project.
The proposed repair will use the 8 large (3-man) anchor rocks as toe protection in the area with
the highest bank. The remainder of the bank will be protected with geotextile bags filled with
k. The repair will include additional planting. An native soil excavated
planting soli or drain roc p p g Y
for the wall footings will be used on site as beach nourishment material (at the request of the
WDFW habitat biologist). Additional drainage will be installed behind the seat rocks on the slope
above the shoreline. The geotextile bags combined with slate pavers will be used to create
beach access stairs.
12. Location of the proposal. Give sufficient information for a person to understand the precise location
of your proposed project, including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the range or boundaries of the
site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not required to
duplicate maps or detailed plans submitted with any permit applications related to this checklist. Lelpj
Parcel#(s): 12229-44-00050
Address: 241 E Nelson Road, Allyn, WA 98524
Legal Description:
Twp/Range/Section and/or GPS location: S29 T22N R01 W 47.360638, -122.826084
SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 2 of 11
i
B. ENVIRONMENTAL ELEMENTS [help]
1. Earth
a. General description of the site Ih�l
(circle one): Flat, rolling, hilly, steep slopes, mountainous, other: low bank shoreline
b. What is the steepest slope on the site (approximate percent slope)? h� eM
Vertical bank 3 to 4 feet high.
c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)?
If you know the classification of agricultural soils, specify them and note any agricultural land of
long-term commercial significance and whether the proposal results in removing any of these
soils. (helpj
jWeb soil survey clasifies this area as Alderwood gravelly sandy loam.
Visual inspection: Consolidated till soils with perennial seeps.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe. hC elgl
Before the bulkhead was removed, a section of bulkhead had failed. Soils in that area had eroded
and formed a vertical bank.
e. Describe the purpose, type, total area, and approximate quantities and total affected area of any
filling, excavation, and grading proposed. Indicate source of fill. Lhelpl
Purpose: slow unexpectedly high erosion rate after bulkhead removal. Approximately 50 linear feet of bank
P P Y 9 PP Y
protection with lantable eotextile bags and about 20 feet of existing on site large rock. 13 CY of planting
P P 9 9 9 9 9
soil and gravel to fill the bags. Beach nourishment with native material excavated for preparation of site.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. hI M
No clearing will be done. Heavy equipment on the beach to place the rock may cause some disturbance
to consolidated beach soils.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)? [hej
None
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Lelp
Plywood sheets will be used under heavy equipment to distribute weight and reduce erosion.
2. Air
a. What types of emissions to the air would result from the proposal during construction, operation,
and maintenance when the project is completed? If any, generally describe and give
approximate quantities if known. LheU)
During construction, large equipment will emit exhaust. No emissions are expected after completion.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe. Lwjj
No
c. Proposed measures to reduce or control emissions or other impacts to air, if any: h( eM
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 3 of 11
3. Water
a. Surface Water: hei
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what stream or river it flows into. fhelpi
Case Inlet on Puget Sound
2) Will the project require any work over, in, or adjacent to (within 200 feet)the described
waters? If yes, please describe and attach available plans. he
Yes,work will occur on the beach above OHW and on the slope above the beach.
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material. h( em
No material will be placed in or removed from surface water or wetlands.
4) Will the proposal require surface water withdrawals or diversions? Give general description,
purpose, and approximate quantities if known. 1 ei)1
No
5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Leip]
Yes, the marine shoreline.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge. Lhel�
No
b. Ground Water:
1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a
general description of the well, proposed uses and approximate quantities withdrawn from
the well. Will water be discharged to groundwater? Give general description, purpose, and
approximate quantities if known. lbieM
No
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of animals or
humans the system(s)are expected to serve. hf eipl
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water)and method of collection and disposal,
if any(include quantities, if known). Where will this water flow? Will this water flow into other
waters? If so, describe. het
Stormwater and underground seeps will be collect in drain rock or pipe and daylighted to the beach.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 4 of 11
2) Could waste materials enter ground or surface waters? If so, generally describe. n[ elgl
WDFW has recommended the use of soil excavated for rock placement as beach nourishmet material
at the north end of the project site.Fines from this soil will enter marine waters as the material is sorted
by the tides.
3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so,
describe.
The groundwater seeps that currently outlet directly to the beach will drain through the geotextile gravel bags or be collected
behind the large rock and routed to the beach.
d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern
impacts, if any:
Drainage pipe and gravel geotextile bags are designed to reduce erosion caused by surface runoff.
4. Plants h( elp�
a. Check the types of vegetation found on the site: n[ eM
Vdeciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
V grass
pasture
crop or grain
orchards, vineyards or other permanent crops
V wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered? i)ei,)j
No vegetation will be removed or altered.
c. List threatened and endangered species known to be on or near the site. hel
None are known.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any: h( elpl
Soil geotextile bags will be hydroseeded with salt tolerant grasses and planted with Hookers Willow
and snowberry.
e. List all noxious weeds and invasive species known to be on or near the site.
Himalayan Blackberry
5. Animals
a. List any birds and other animals which have been observed on or near the site or are known to
be on or near the site. Examples include: h[ eM
birds( hawk, heron, eagle, songbirds)other:
mammals: deer, bear, elk beaver, other: marine mammals
fish: ss, salmon, rout, herring, shellfish, ther:
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 5 of 11
b. List any threatened and endangered species known to be on or near the site. Jkm
WDFW's Priority Habitats and Species interactive map idendified the site as a priority breeding area
for surf smelt and the shoreline as a Marine Wetland priority habitat.The bulkhead removal that was
completed has opened up the upper beach for surf smelt breeding.
c. Is the site part of a migration route? If so, explain. [bpjpj
The marine shoreline is an important habitat for salmonid species as they leave the estuaries and head out to the ocean.
d. Proposed measures to preserve or enhance wildlife, if any: hI elpl
This project is designed to stay above the OHW line thus preserving the gains in upper beach created
by the bulkhead removal.
e. List any invasive animal species known to be on or near the site.
None known.
6. Energy and natural resources
a. What kinds of energy(electric, natural gas, oil, wood stove, solar)will be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing,
etc. lbeM
Energy will not be required when the project is completed
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe. Lnei
No
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any: h[ eAl
7. Environmental health
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal?
If so, describe. h[ M
1) Describe any known or possible contamination at the site from present or past uses.
The septic drain field was in the front of the house.The drainfield was moved behind the house and further from the shoreline
in 2017.
2) Describe existing hazardous chemicals/conditions that might affect project development and
design. This includes underground hazardous liquid and gas transmission pipelines located
within the project area and in the vicinity.
None are known.
3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during
the project's development or construction, or at any time during the operating life of the
project.
The construction equipment used for project installatinwill operate on diesel fuel.The equipment will be required to
use biodegradable hydraulic fluid to reduce risks to the shoreline.
4) Describe special emergency services that might be required.
In the event of an oil or fuel spill, cleanup services may be required.
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 6 of 11
5) Proposed measures to reduce or control environmental health hazards, if any:
Biodegradable hydraulic oil will be used in construction equipment. Spill kit will be onsite during construction
b. Noise
1) What types of noise exist in the area which may affect your project (for example:
traffic, equipment, operation, other)? hel
The project will not be affected by noise.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)? Indi-
cate what hours noise would come from the site. 1hgM
During construction materials will be delivered to the project site and an excavator used for construction.
This equipment will generate standard levels of construction noise during working hours.
3) Proposed measures to reduce or control noise impacts, if any: jheip]
Limit construction activities to daytime working hours.
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?Will the proposal affect current land
uses on nearby or adjacent properties? If so, describe. hf etp
The current and proposed use is residential. The project will not change that designation.
b. Has the project site been used as working farmlands or working forest lands? If so, describe.
No
How much agricultural or forest land of long-term commercial significance will be converted to
other uses as a result of the proposal, if any?
None
If resource lands have not been designated, how many acres in farmland or forest land tax
status will be converted to nonfarm or nonforest use? hel
None
1) Will the proposal affect or be affected by surrounding working farm or forest land normal
business operations, such as oversize equipment access, the application of pesticides,
tilling, and harvesting? If so, how:
No
c. Describe any structures on the site. )he�)j
A single story single family residence is located on the site.
d. Will any structures be demolished? If so, what? hel
Some remanents of the bulkhead and boat launch footing have become exposed and will be removed as part of the project.
e. What is the current zoning classification of the site? h� M
Residential
f. What is the current comprehensive plan designation of the site? [help]
Shoreline environmental desigantion is residential
SEPA Environmental checklist(WAC 197-11.960)(MC version-non project portion omitted): 2016 Page 7 of 11
g. If applicable, what is the current shoreline master program designation of the site? Lnel
Residential
h. Has any part of the site been classified as a critical area by the city or county? If so, specify.
h[!�M Marine shoreline
i. Approximately how many people would reside or work in the completed project? Lflelpl
2
j. Approximately how many people would the completed project displace? ti el
0
k. Proposed measures to avoid or reduce displacement impacts, if any: L[ elpj
None
L. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any: hel 1
This proposal ensures that the residential land use will be maintained.
m. Proposed measures to ensure the proposal is compatible with nearby agricultural and forest
lands of long-term commercial significance, if any:
N/A
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-
income housing. help]
0
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing. h[ elpl
0
c. Proposed measures to reduce or control housing impacts, if any: Ll,�j
None
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed?Ll em
The proposed structure will not exceed the height of the adjacent bank.
b. What views in the immediate vicinity would be altered or obstructed? hf m
None
c. Proposed measures to reduce or control aesthetic impacts, if any: Lelp]
The goal is to create as natural a shoreline as possible.Vegetation will be planted in the face of the geotextile bags and
to overhange the proposed rock.
11. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?Lhe_lp,
None
b. Could light or glare from the finished project be a safety hazard or interfere with views? of elpl
No
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 8 of 11
c. What existing off-site sources of light or glare may affect your proposal? h[ elpl
None
d. Proposed measures to reduce or control light and glare impacts, if any: [help]
None
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity? [helpl
Shellfish harvesting, boating, beach walking
b. Would the proposed project displace any existing recreational uses? If so, describe. n( eU
No
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any: jheip.]
Rock stairs integrated into the geotextile bank protextion will improve beach access.
13. Historic and cultural preservation
a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old
listed in or eligible for listing in national, state, or local preservation registers located on or near
the site? If so, specifically describe. hI gM
No
features or other evidence of Indian or historic use or occupation?
b. Are there any landmarks, p
This may include human burials or old cemeteries. Are there any material evidence, artifacts, or
areas of cultural importance on or near the site? Please list any professional studies conducted
at the site to identify such resources. Eielp]
A cultural resources survey was completed by Margaret Berger of Cultural REsource Consultants
on September 15th 2016.
c. Describe the methods used to assess the potential impacts to cultural and historic resources on
or near the project site. Examples include consultation with tribes and the department of
archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. 1heU
DAHP and the tribes were consulted. Pedestrian surface survey and subsurface testing via hand excavated
shovel test probes were completed. A determination of"No historic properties affected"was recommended by
the consultant.
d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to
resources. Please include plans for the above and any permits that may be required.
Excavation will be limited to the amount necessary to create a shallow footing trench for the rock and
geotextile bag bank protection. No material will be removed from the site.
14. Transportation
a. Identify public streets and highways serving the site or affected geographic area and describe
proposed access to the existing street system. Show on site plans, if any. hf eM
The site is accessed via State Hwy 3, Grapeview loop road, E Nelson Road, private driveways
and the yard adjacent to the house.
SEPA Environmental checklist(WAC 197.11-960)(MC version-non project portion omitted): 2016 Page 9 of 11
b. Is the site or affected geographic area currently served by public transit? If so, generally
describe. If not, what is the approximate distance to the nearest transit stop? n[ eM
Mason transit authority operates scheduled routes on Hwy 3 with a stop in Allyn (approximately
2 miles from the site). Dial a ride services are available to the site.
c. How many additional parking spaces would the completed project or non-project proposal have?
How many would the project or proposal eliminate? nC M
N/A
d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle
or state transportation facilities, not including driveways? If so, generally describe (indicate
whether public or private). helms]
No
e. Will the project or proposal use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe. >hejp]
Boats are moored off the shore.
f. How many vehicular trips per day would be generated by the completed project or proposal? If
known, indicate when peak volumes would occur and what percentage of the volume would be
trucks (such as commercial and nonpassenger vehicles).What data or transportation models
were used to make these estimates?Lelp�
No additional trips.
g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest
products on roads or streets in the area? If so, generally describe.
No
h. Proposed measures to reduce or control transportation impacts, if any: [t1op]
N/A
15. Public services
a. Would the project result in an increased need for public services (for example: fire protection,
police protection, public transit, health care, schools, other)? If so, generally describe. nel
No
b. Proposed measures to reduce or control direct impacts on public services, if any. RjeM
N/A
16. Utilities
a. Circle utilities currently available at the site: Lhep]
electricity,Jnatural gas, water, refuse servicel telephone,
sanitary sewer, septic systeml other
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 10 of 11
b. Describe the utilities that are proposed for the project, the utility providing the service, and the
general construction activities on the site or in the immediate vicinity which might
be needed. of eM
None
C. SIGNATURE hey
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relying on them to make its decision.
Signature:
Date Signed: 9-9-19
Print Name of Signee: Katrinka Hibler
If applicable, Position and Agency/Organization: District Engineer, Mason Conservation District
Date Submitted: 9-9-19
SEPA Environmental checklist(WAC 197-11-960)(MC version-non project portion omitted): 2016 Page 11 of 11
MASON COUNTY DCD SEPA Contact List
Sent SEPA�;';";- '; 't, i ._ to (check all that apply) on__ '_!1 <'
Skokomish Tribal Nation, Nat. Res.Dept. WA Department of Commerce
ATTN:Julian Sammons reviewteam@commerce.wa.gov
N 541 Tribal Center Rd., Skokomish Nation,98584
jsammons@skokomish.org U.S.Army Corps of Engineers
dsarff@skokomiosh.org SEPA Reviewer-Jason Sweeney
Skokomish Tribal Historic Preservation Officer PO Box C-3755,Seattle,98124
ATTN: Kris Miller Jason.t.sweeney@usace.army.mil
80 N Tribal Center Rd,Skokomish Nation,98584
shlanay1@skokomish.org WA Dept. of Fish and Wildlife
Quinault Indian Nation SEPAdesk@dfw.wa.gov
ATTN: Mark Mobbs
PO Box 189,Tahola, 98587 WA Dept.of Fish and Wildlife
mmobbs@quinault.org ATTN: Chris Waldbillig
Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290
2952 SE Old Olympic HWY,Shelton 98584 Port Orchard,WA 98366
jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov
emarbet@squaxin.us
szaniewski@squaxin.us WA Dept. of Fish and Wildlife
rfoster@squaxin.us ATTN: Darrin Masters
The Confederated Tribe of the Chehalis 450 Port Orchard Blvd, Suite 290
ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366
420 Howanut Rd., Oakville, 98568 Darrin.Masters@dfw.wa.gov
gconnelly@chehalistribe.org
WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife
950 Farman Avenue N, Enumclaw,98022-9282 ATTN: Allison Cook
southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed)
WA DNR,Aquatic Resources 1111 Washington St SE,Olympia WA,98501
PO BOX 47027, Olympia,98504-7027 allison.cook@dfw.wa.gov
and@dnr.wa gov
WA DNR,SEPA Center WA Dept.of Transportation
ATTN: External Coordinator ATTN: Dale Severson
PO BOX 47015,Olympia,98504-7015 P.O. Box 47440, Olympia 98504-7440
sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov
Olympic Region Clean Air Agency
ATTN: Lauren Whybrew City of Shelton
2940-B Limited Ln. NW,Olympia.98502 ATTN:Jason Dose
lauren.whybrew@orcaa.org 525 West Cota St.,Shelton 98584
Mason County Transit jasond@ci.shelton.wa.us
ATTN: Danette Brannin
790 E Johns Prairie Rd,Shelton,98584 0 Port of Shelton
dbrannin@masontransit.org ATTN: Brandon Palmer
Mason County PUD#1 21 West Sanderson Way,Shelton 98584
ATTN: Darrin Hall BrandonP@portofshelton.com
N 21971 Hwy 101, Shelton,98584
darrinh@mason-pud1.org E3 Dep't of Archaeology&Historic Preservation
Mason County PUD#3 P.O.Box 48343,Olympia,98504-8343
ATTN: Kristin French SEPA@dahp.wa.gov
kristin.french@masonpud3.org
WA Department of Ecology a Tacoma Public Utilities-Real Property Services
Environmental Review Section ATTN: Dave Letterman
PO BOX 47703, Olympia, 98504-7703 3628 S 35th St,Tacoma, 98409-3192
separegister@ecy.wa.gov dletterm@cityoftacoma.org
ID WA Department of Health
Mason Cty P.W.ATTN:. ATTN:Joe Laxson
joe.laxson@doh.wa.gov
Mason Cty E.H.ATTN:
Other: f�a,� ✓�YIL.Cj �fn'j(f.X�n
Mason Cty Bldg ATTN: Agent: K
Applicant:
School District:
MC DCD last updated on 2/28/19
9/12/2019 Mail-RBuckholt@co.mason.wa.us
RE: SEP2019-00072
Shaun Dinubilo <sdinubilo@squaxin.us>
Thu 9/12/2019 8:48 AM
To:Ronald Buckholt <RBuckholt@co.mason.wa.us>;
Hi Ron,
Thank you for contacting the Squaxin Island Tribe Cultural Resources Department regarding the above listed
project for our review and comment. We have no specific cultural resource concerns for this project. However, if
DAHP recommends a survey, or any other additional recommendations, we concur with DAHP's
recommendations. We would prefer to receive an electronic copy by email once completed. If any archaeological
or cultural resources are uncovered during implementation, please halt work in the area of discovery and contact
DAHP and the Squaxin Island Tribe's Archaeologist, Shaun Dinubilo via email at sdinubilo@squaxin.us.
Shaun Dinubilo
Archaeologist
CR Department
Squaxin Island Tribe
200 S.E. Billy Frank Jr. Way
Shelton, WA 98584
Office Phone: 360-432-3998
Cell Phone: 360-870-6324
Email: sdinubilo@squaxin.us
From: Mariah Frazier [mailto:MFrazier@co.mason.wa.us]
Sent:Wednesday, September 11, 2019 10:57 AM
To:SEPA Center<sepacenter@dnr.wa.gov>; Ecology SEPA Register<separegister@ecy.wa.gov>;Jason Sweeney
<Jason.t.sweeney@usace.army.mil>; Chris Waldibillig<Chris.waidbillig@dfw.wa.gov>;Jeff Dickison<jdickison@squaxin.us>;
Erica Marbet<emarbet@squaxin.us>; Sarah Zaniewski <szaniewski@squaxin.us>; Shaun Dinubilo<sdinubilo@squaxin.us>
Cc: Ronald Buckholt<RBuckholt@co.mason.wa.us>; katrinka@masoncd.org
Subject:SEP2019-00072
Good Morning,
Please see attached documents regarding SEP2019-00072.
Proponent: Michael A Southerland et ux
Parcel: 12229-44-00050
If you have any questions, please direct them to Planner Ron Buckholt at rbuckholt@co.mason.wa.us .
https://owa.co.mason.wa.us/owa/?ver=15.2.397.3&cver=15.2.330.5&vC=O&forceBo=false#path=/mai I
9/12/2019 Mail-RBuckholt@co.mason.wa.us
Thank you,
Mcw aY>,Fralier
Mason County Community Services
Planning Clerical/Addressing
(360)427-9670 ext 365
112 2/2
.,.Cason.wa.us/owa/?ver=15.2.397.3&cver=15.2.330.5&vC=O&forceBO=false#path=/mail