Loading...
HomeMy WebLinkAboutHPA Bulkhead - BLD Permit / Conditions - 7/22/2009 TWashington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal Pursuant to Chapter 34.05 RCW Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: July 22, 2009 Control Number: 117936-1 Project Expiration Date: September 30, 2010 FPA/Public Notice#: N/A PERMITTEE AUTHORIZED AGENT OR CONTRACTOR [Therese DeLeo 1 N Gull Place Hoodsport,WA 98548 Project Name: DeLeo Bulkhead Project Description: Construct a bulkhead approximately 20 feet tall by 180 feet long with ACZA treated wood and steel "I" beams set in concrete. PROVISIONS 1. TIMING LIMITATIONS: The project may begin July 23, 2009 and shall be completed by September 30, 2010, provided: a. The work area is dry. 2. NOTIFICATION REQUIREMENT: The Area Habitat Biologist (AHB) listed below shall receive written notification (FAX, email or mail) from the person to whom this Hydraulic Project Approval (HPA) is issued (permittee) or the agent/contractor no less than three working days prior to the start of construction activities. The notification shall include the permittee's name, project location, starting date for work, and the control number for this HPA. 3. Work shall be accomplished per plans and specifications, as described in the "Smith-DeLeo Plan" revised July 1, 2009, submitted to the Washington Department of Fish and Wildlife, except as modified by this Hydraulic Project Approval. A copy of these plans shall be available on site during construction. BULKHEAD 4. Excess material excavated from the lakebed for the footings shall be placed waterward at the face and along the toe of the bulkhead. 5. Material that is waterward of the ordinary high water line shall not be utilized for backfill. 6. Dumping onto the bank face shall not be permitted. 7. Removal of existing trees, stumps and/or rootwads along the bank or waterward of the bulkhead shall be minimized to those features necessary for bulkhead construction. Page 1 of 5 HYDRAULIC PROJECT APPROVAL Coastal Washington 48 Devonshire Road Department of FISH and RCW 77.55,021-Appeal Pursuant to Chapter 34.05 RCW Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: July 22, 2009 Control Number: 117936-1 Project Expiration Date: September 30, 2010 FPA/Public Notice#: N/A 8. All trenches, depressions, or holes created within the ordinary high water line shall be backfilled prior to inundation by high water or wave action. EQUIPMENT 9. The use of equipment below the ordinary high water line shall be limited to hand held tools only. 10. Equipment used for this project shall be free of external petroleum-based products while working around the lake. WATER QUALITY 11. If at any time, as a result of project activities, fish are observed in distress, a fish kill occurs, or water quality problems develop (including equipment leaks or spills), immediately stop work except for efforts to control leaks or spills or prevent toxic substances from entering the water and notify the Washington Military Department's Emergency Management Division at 1-800-258-5990, and to the Area Habitat Biologist listed below. Work shall not restart on the project until approved by the Area Habitat Biologist. 12. All lumber to be used for the project shall meet or exceed the standards established in 'Best Management Practices For the Use of Treated Wood in Aquatic and Other Sensitive Environments' developed by the Western Wood Preservers Institute, Wood Preservation Canada, Southern Pressure Treaters' Association, and Timber Piling Council, dated August 1, 2006, and any current amendments or addenda to it. Current amendments and addenda include but may not be limited to 'Amendment#1: CCA- Chromated Copper Arsenate', dated October 25, 2006; and 'Addendum #1: ACC -Acid Chromated Copper', dated February 28, 2007. 13. All ACZA wood treatment methods shall be verified by providing a signed and dated certification from a third party. 14. Fresh concrete or concrete by-products shall not be allowed to enter the lake at any time during this project. All forms used for concrete shall be completely sealed to prevent the possibility of fresh concrete from getting into the lake. 15. Extreme care shall be taken to ensure that no petroleum products, hydraulic fluid, fresh cement, sediments, sediment-laden water, chemicals, or any other toxic or deleterious materials are allowed to enter or leach into the lake. 16. Erosion control methods shall be used to prevent silt-laden water from entering the lake. These may include, but are not limited to, straw bales, filter fabric, temporary sediment ponds, check dams of pea gravel-filled burlap bags or other material, and/or immediate mulching of exposed areas. Page 2 of 5 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal Pursuant to Chapter 34.05 RCW Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: July 22, 2009 Control Number: 117936-1 Project Expiration Date: September 30, 2010 FPA/Public Notice#: N/A 17. All waste material such as construction debris, silt, excess dirt or overburden resulting from this project shall be deposited above the limits of flood water in an upland disposal site. 18. Alteration or disturbance of the bank and bank vegetation shall be limited to that necessary to construct the project. Within seven calender days of project completion, all disturbed areas shall be protected from erosion using vegetation or other means. Within one year of project completion, the top of the bank shall be revegetated with native or other approved woody species. Vegetative cuttings shall be planted at a maximum interval of three feet (on center) and maintained as necessary for three years to ensure 80 percent survival. 19. If high flow conditions that may cause siltation are encountered during this project, work shall stop until the flow subsides. PROJECT LOCATIONS Location #1 WORK START: July 23, 2009 WORK END: September 30, 2010 WRIA Waterbody Tributary to: 16.6002 Lake Cushman Skokomish River NF 1/4 SEC. Section: Township: Range: Latitude: Longitude: County: Center 05 22 N 04 W N 47.42468 W 123.22092 Mason Location#1 Driving Directions From Shelton, north on Hwy 101, at Hoodsport go left on Hwy 119, go right on Standstill Dr and then curveright onto Gull Place to 61 N Gull Place. APPLY TO ALL HYDRAULIC PROJECT APPROVALS This Hydraulic Project Approval pertains only to those requirements of the Washington State Hydraulic Code, specifically Chapter 77.55 RCW(formerly RCW 77.20). Additional authorization from other public agencies may be necessary for this project. The person(s)to whom this Hydraulic Project Approval is issued is responsible for applying for and obtaining any additional authorization from other public agencies (local, state and/or federal)that may be necessary for this project. This Hydraulic Project Approval shall be available on the job site at all times and all its provisions followed by the person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work. This Hydraulic Project Approval does not authorize trespass. The person(s)to whom this Hydraulic Project Approval is issued and operator(s) performing the work may be held liable for any loss or damage to fish life or fish habitat that results from failure to comply with the provisions of this Hydraulic Project Approval. Page 3 of 5 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal Pursuant to Chapter 34.05 RCW Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date:July 22, 2009 Control Number: 117936-1 Project Expiration Date: September 30,2010 FPA/Public Notice#: N/A Failure to comply with the provisions of this Hydraulic Project Approval could result in a civil penalty of up to one hundred dollars per day and/or a gross misdemeanor charge, possibly punishable by fine and/or imprisonment. All Hydraulic Project Approvals issued pursuant to RCW 77.55.021 (EXCEPT agricultural irrigation, stock watering or bank stabilization projects) or 77.55.141 are subject to additional restrictions, conditions or revocation if the Department of Fish and Wildlife determines that new biological or physical information indicates the need for such action. The person(s)to whom this Hydraulic Project Approval is issued has the right pursuant to Chapter 34.04 RCW to appeal such decisions. All agricultural irrigation, stock watering or bank stabilization Hydraulic Project Approvals issued pursuant to RCW 77.55.021 may be modified by the Department of Fish and Wildlife due to changed conditions after consultation with the person(s)to whom this Hydraulic Project Approval is issued: PROVIDED HOWEVER,that such modifications shall be subject to appeal to the Hydraulic Appeals Board established in RCW 77.55.301. APPEALS INFORMATION If you wish to appeal the issuance or denial of, or conditions provided in a Hydraulic Project Approval,there are informal and formal appeal processes available. A. INFORMAL APPEALS(WAC 220-110-340) OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021, 77.55.141, 77.55.181, and 77.55.291: A person who is aggrieved or adversely affected by the following Department actions may request an informal review of: (A)The denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic Project Approval; or (B)An order imposing civil penalties. A request for an INFORMAL REVIEW shall be in WRITING to the Department of Fish and Wildlife HPA Appeals Coordinator,600 Capitol Way North, Olympia,Washington 98501-1091 and shall be RECEIVED by the Department within 30 days of the denial or issuance of a Hydraulic Project Approval or receipt of an order imposing civil penalties. If agreed to by the aggrieved party, and the aggrieved party is the Hydraulic Project Approval applicant, resolution of the concerns will be facilitated through discussions with the Area Habitat Biologist and his/her supervisor. If resolution is not reached, or the aggrieved party is not the Hydraulic Project Approval applicant, the Habitat Technical Services Division Manager or his/her designee shall conduct a review and recommend a decision to the Director or his/her designee. If you are not satisfied with the results of this informal appeal, a formal appeal may be filed. B. FORMAL APPEALS (WAC 220-110-350) OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (EXCEPT agricultural irrigation, stock watering or bank stabilization projects) or 77.55.291: A person who is aggrieved or adversely affected by the following Department actions may request a formal review of: (A)The denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic Project Approval; (B)An order imposing civil penalties; or (C)Any other'agency action'for which an adjudicative proceeding is required under the Administrative Procedure Act, Chapter 34.05 RCW. A request for a FORMAL APPEAL shall be in WRITING to the Department of Fish and Wildlife HPA Appeals Coordinator, shall be plainly labeled as'REQUEST FOR FORMAL APPEAL' and shall be RECEIVED DURING OFFICE HOURS by the Department at 600 Capitol Way North, Olympia,Washington 98501-1091,within 30-days of the Department action that is being challenged. The time period for requesting a formal appeal is suspended during consideration of a timely informal appeal. If there has been an informal appeal,the deadline for requesting a formal appeal shall be within 30-days of the date of the Department's written decision in response to the informal appeal. C. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO RCW 77.55.021 (agricultural irrigation, stock watering or bank stabilization only),77.55.141, 77.55.181,or 77.55.241: A person who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic Project Approval may request a formal appeal. The request for FORMAL APPEAL shall be in WRITING to the Hydraulic Appeals Board per WAC 259-04 at Environmental Hearings Office,4224 Sixth Avenue SE, Building Two- Rowe Six, Lacey,Washington 98504;telephone 360/459-6327. Page 4 of 5 Washington HYDRAULIC PROJECT APPROVAL Coastal Department of 48 Devonshire Road FISH and RCW 77.55.021-Appeal Pursuant to Chapter 34.05 RCW Montesano,WA 98563 WILDLIFE (360)249-4628 Issue Date: July 22, 2009 Control Number: 117936-1 Project Expiration Date: September 30,2010 FPA/Public Notice#: N/A D. FORMAL APPEALS OF DEPARTMENT ACTIONS TAKEN PURSUANT TO CHAPTER 43.21 L RCW: A person who is aggrieved or adversely affected by the denial or issuance of a Hydraulic Project Approval, or the conditions or provisions made part of a Hydraulic Project Approval may request a formal appeal. The FORMAL APPEAL shall be in accordance with the provisions of Chapter 43.21 L RCW and Chapter 199-08 WAC. The request for FORMAL APPEAL shall be in WRITING to the Environmental and Land Use Hearings Board at Environmental Hearings Office, Environmental and Land Use Hearings Board,4224 Sixth Avenue SE, Building Two- Rowe Six, P.O. Box 40903, Lacey,Washington 98504;telephone 360/459-6327. E. FAILURE TO APPEAL WITHIN THE REQUIRED TIME PERIODS results in forfeiture of all appeal rights. If there is no timely request for an appeal,the department action shall be final and unappealable. ENFORCEMENT: Sergeant Makoviney (31) P3 Habitat Biologist for Director Gloria Rogers 360-249-4628 WDFW CC: Page 5 of 5