HomeMy WebLinkAboutBLD2011-00521 Storage Final - BLD Permit / Conditions - 11/2/2011 Inspection Line (360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352
Mason County Bldg. III 426 W. Cedar P.O. Box 186
Shelton, WA 98584
RESIDENTIAL BUILDING PERMIT BLD2011-00521
OWNER: DONALD LILLIE RECEIVED: 6/27/2011
CONTRACTOR: TOWN AND COUNTRY 800-824-9552 LICENSE: TOWNCPF099LT EXP: 6/30/2013 ISSUED: 7/28/2011
SITE ADDRESS: 650 E VICTOR RD BELFAIR EXPIRES: 1/28/2012
PARCEL NUMBER: 122214190030
LEGAL DESCRIPTION: TR 3 OF NE SE TR 3 OF SP#1212
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
STORAGE BUILDING SR 302 TURN ON VICTOR RD AT FIRE STATION AT EAST SIDE OF CASE
INLET AFTER SECOND 90 DEGREE TURN ON ROAD#630 IS ON RIGHT
HAND SIDE ADDRESS ON ROCK UNDER MAILBOX
General Information Construction &Occupancy Information Square Footage Information
No. of Bedrooms: Type of Constr.: VB
Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: U Lot Size: Deck:
Type of Work: ACC Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building: Garage-Detached 720
Valuation: $ 27,835.20 Building Height: 17 Occ. Status: Primary Basement:
Manufactured Home Information Setback Information Shoreline & Planning Information
Make: Length: Ft. Front: N 245.0 Ft. Shoreline: Ft. Water Body:
Rear: S 364.0 Ft. Slope: Ft. SEPA?: No
Model: Width: Ft. Side 1: W 110.0 Ft. Shoreline Desig.: Not Applicable
Year: Serial No.: Side 2: E 33.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Planning Review Fee TW 6/27/2011 $205.00 S12011000t
Plan Check Fee TW 6/27/2011 $84.31 S12011000t
Building Permit Fee TW 6/27/2011 $421.55 S12011000i
Building Permit Fee TW 6/27/2011 $421.55 S120110001
EH Plan Review KKK 7/6/2011 $103.00 S620110001
Building State Fee LDK 711 412 01 1 $4.50 S12011000i
Total $1,239.91
BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 1 of 5
CASE NOTES FOR
BLD2011-00521
CONDITIONS FOR
BLD2011-00521
1) A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at
(360)427-9670, ext. 450. The building permit will not be"finaled" until the permit holder can show proof that the access permit from Public Works has
been"finaled"and approved.
X
2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-0982. he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
3) Owner/Agent im
sible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.x
4) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to anyfurther inspections being performed or approvals granted.
5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the
corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building
Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or
removal of aporrovedocuments will result in failure of required building inspections.
X
6) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use
permit shall b� lied for, reviewed and approved prior to the change.
X `S2
7) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X
8) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved"site plan is not on site,then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building Department priorto any further inspections being performed or approvals granted.
BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 2 of 5
9) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the
manufacturer's installation instructions.
x IT7_�Z�
10) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement,
inspection and maintenance of stormwater management systems shall be the responsibility of the ownerlagent of the developed parcel. It is the
owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel
prior to the commencement of any development activities. "NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater
Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan"constitutes
an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are
responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic
system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final
inspection of the building permit the owner/agent/contractor is aclwledging that all components of the stormwater management system have been
installed as approved on the stormwater site plan. X � �
11) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered.
A. Drainfield/Reserve requires a 10ft setback from all footing/foundations.
B. Septic tank(s) requires 5ft setback from all footing/foundations.
C. No found 'on ins within 30ft, down gradient of drainfield/reserve area.
X r`�
12) Stock Plan Identification number: 2009-0001
This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department,
original building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building
Inspector at eachhrreeg iced inspection.
13) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the
international cod.e s nd Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved.
X -�
14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be
X charged and shall be_Zc'olleted by the Building Department prior to any further inspections being performed or approvals granted.
15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the
State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in
permit revocation.
X
BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 3 of 5
16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X `�
17) Placement of str cture must comply with standards set forth per the international codes regarding descending and/or ascending slopes.
X >
18) All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or any other Mason County
ordinance or regulation, must be reviewed and approved by Mason County prior to construction.
X
19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED
BUILDING CODE.
The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
X spector shall b ewe prior to requesting additional inspections.
20) All property lines shall be clearly identified at the time of foundation inspection. X
21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordina�_nnces and building regulations.
11���
22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevenntaction from being taken. No more than one extension may be granted.
X :R2
23) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners,
connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.hi
X yV
24) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior
to construction of the retaining wall.X IF:F_�,
BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 4 of 5
25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure
these structures meet the setback conditions listed.
X fj
26) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your
"Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed.
X
27) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure.
X
28) All construction and demolition debris must be removed from the site after project completion. Proper disposal oLronstruction debris must be on land in
such a manner that debris cannot enter or cause water quality degradation of State waters. X
29) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given an equivalent type of
erosion protection (silt fencing, straw, or jute matting). X �LS
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any
time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be
occupied.Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate
and grants employees of Mason County access to the ab described property and structure for review and inspection.
OWNER OR AGENT: DATE: Z S (1
BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 5 of 5
co
o CONCRETE MECHANICAL MANUFACTURED HOME
o Date
t
Footings t Setbacks Gas Piping By Ribbons m
o interior Date By interior-Date By bate By
ch Exterior Date g'i`f By Exterior-Rate B Set-up Z
Point Load!Isolated Footings INSULATION Data By D
BG J SLAB INSULATION, r'
Date By Data By FIRE DEPARTMENT
Foundation Walls Floors Date By
Date By Data By DECKS
FRAMING walls Date By
Date -6— By Dato By PROPANE TANKS
PLUMBING vault Data By
Date "y _ OTHER
Groundwork Attic
Type:
Date By Bata ByDate By
b.W.V DRYWALL Type-
Int Brace Wall Date By W
v Date By Data By
CD FINAL INSPECTION �
v
(n Water Line Fire Seperation N
m
Data By Data By Date lf— L—1 By o
s Pass or Request Inspect. c
Type of Insp. Fail Date Date Done By Comments N
CD
If
0
Q
o'
Cn
0
Err
m
3
v
co
m
0
M
.� ' site clan
'A" ITOWn&Country- Suite C•16521 Highway 99•Lynnwood,WA 98037-3161 PI ase Check After Doing Site Plan: Septic and drainfield ❑`Lot size Draw North Arrow in Circl
POST FRAME BUILDINGS Everett:(425)258-4171 Puyallup:(253)840-9552 Li roperty dimensions ❑Sewer lines Edlevation of property
Divisrou OF Administrative Headquarters: (425)743-1555 Lid
buildings 1�t g g ffSetbacks of proposed&existing buildings El Bodies of water
FAX: 425 742-4378 Toll Free: 1-800-824-9552 Pro osed building ain road with name ❑Floor Ian
PERMABILT Contractors Llc.W TOWNCPF099LT p g p
Quality:Our Future Depen4 On It.- ❑Easements Access tp proposed building QAlopes&Contours(5'increments)
Job Name:J�n�;Rr-c- r!.I L t t E Job Site Address: (0S Cl E- y i cI'l l t^D
Tax Account#:
Legal Description: 2,-'»t<L PA i S, V A
�2-s i2� �(I' '� (7 p.�f;)
_........�..
r--w' 1
j'R1VI+TR �
W1Gtt- d
1�
7
f„
.q
STbRACY_ '�
Pa v I t.Ta I tt t: �a
.,+•-1:�.c1 �-_.""'~ ^--•-•• is
1,
'PApKINf0
INfoVA
A
4
..•y,it U:.id: G
4'1
L.
v r
'aC RV oSiLD
10 i W AM t,rot. o AB
'tl r
6'
3 1
I c
r
J '\-'U N T Y DG,�� 1�1�11 G Sv ►
SI� P Iv y REZ)uIREa Tyr'} W A AAA.
C DES SLjBJEC i 10 ,P
B Qy Da[e 52� J,-r-Tr t4.
,1' _ � 'L U lit♦s.
P1-
ALL SETB AC THE FURKS AREASUR
E MHEFROMFRO
ECTION pF THE BUILDING
PROD
A
t
PLANNING -
RECEIVED
JUN 2 7 2011
426 W. CEDAR ST.
C>:n o 0
DO NOT SIGN INCOMPLETE SITE PLANI
Customer has verified and approved the location of the building,orientation of the building to the North,and verifies that all White-Customer Copy White-Office Copy
utilities are shown on this drawl In the corrqct/Ocation.
CUSTOMER SIGNATURE- -� ' -�- LEAD# � {
( 01995 Perma-Bilt Industries FR-34 6/07 I II�III IIIII III II'
1 'o
FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT NO. �1 1✓ � l '
PLEASE PRESS HARD BUILDING PERMIT APPLICATION C�J�
426 W. Cedar - P.O. Box 186, Shelton, WA 98584
Shelton (360) 427-9670 - Belfair (360) 275-4467 - Elma (360) 482-5269
On the web www.co.mason.wa.us
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner 1A ;LUe- Company Name Town t Cni vit •, Posh Frll"e sul
Mailing A dress (650 E. kl:e�tolr Roa Mailing Address ( Z wy `1`1 SuAc C
City_�3CA�a:r State V(A Zip Code 985ZB City Wyinwc State WA Zip Code ga03"1
Phone_ 3(00-Z"15 yZZ'1 Other Ph. Phone `1ZS_1y3- 1556- Other Ph.
Lien/Title Holder Contractor Reg. 4SLT Exp.
E mail address E Mail Address Per-►na�i IA. corn
Drivers Lic.# DOB Drivers Lic.# DOB
SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic )<
Connect to Water System Name of Water System
Well__Water System Name of Water System
PARCEL INFORMATION - 12 Digit Parcel No._1ZZZ1410=30 Fire District
Legal Description 1Z 3 of tJE SE 3 a 5Q * it Z
Site Address (Please include street name, street number nd city) (.SO f- icru(Z a a:
Directions to site 5R 3c)-L. Nur or tc-Tort (ZA- S� '
1c ° #kGSo is -.. Rt1S. A $ av\
Will timber be cut and sold in parcel preparation?Yes/
Is property within 200'of Saltwater Lake River/Creek Pond
Wetland Seasonal Runoff Stream Slopes or Bluffs > 15%
Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes4R
TYPE OF JOB - New X Add Alt Repair Other PRIMARY RESIDENC ❑ SEASONAL ❑
Use of Building 5Voc"e. Describe Work _12-0 sF d��,sl�.�l Posh Er.,►,.� 5��.+� F,1 ,
No. of Bedrooms O No. of Bathrooms 0 Square Footage- 1 st Floor 2nd Floor
3rd Floor Basement Deck Covered Deck Other Sq.ft.
Garage -1Z�Sf Attached ache Carport Attached Detached
MANUFACTURED HOME INFORMATION - Make Model Year
Length Width Serial No. No.of Bedrooms No.of Bathrooms
Type of Heat Purchase Price $ Replacement Unit? Yes/ No
Installer Name Certification No.
OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.
Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further
declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permis-
sion from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this applica-
tion or the work proposed in the app ion, I have obtained permission from them to apply f r this permit and conduct the work proposed.
X Date: ry
Own r/ wners Re resentativ 'Contractor (indicate which one) '
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by: Planning Pd Ck# Date Bid Pd Receipt No.
DEPARTMENTAL REVIEW APPROVED DENIED NOTES
Building Department
Planning Department
Environmental Health Department
Public Works Department
Fire Marshal
FEES
4.
Buildinq Permit Fee Site Inspection
Plan Review Fee EH Review Fee ry
Plumbing & Base Fee Planning Review Fee
Mechanical & Base fee Other -
Wood /Gas/Pellet Stove Fee State Fee
Violation Fee Pre-Paid at Submittal
Valuation$ TOTAL FEES