Loading...
HomeMy WebLinkAboutBLD2011-00521 Storage Final - BLD Permit / Conditions - 11/2/2011 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, WA 98584 RESIDENTIAL BUILDING PERMIT BLD2011-00521 OWNER: DONALD LILLIE RECEIVED: 6/27/2011 CONTRACTOR: TOWN AND COUNTRY 800-824-9552 LICENSE: TOWNCPF099LT EXP: 6/30/2013 ISSUED: 7/28/2011 SITE ADDRESS: 650 E VICTOR RD BELFAIR EXPIRES: 1/28/2012 PARCEL NUMBER: 122214190030 LEGAL DESCRIPTION: TR 3 OF NE SE TR 3 OF SP#1212 PROJECT DESCRIPTION: DIRECTIONS TO SITE: STORAGE BUILDING SR 302 TURN ON VICTOR RD AT FIRE STATION AT EAST SIDE OF CASE INLET AFTER SECOND 90 DEGREE TURN ON ROAD#630 IS ON RIGHT HAND SIDE ADDRESS ON ROCK UNDER MAILBOX General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: VB Type of Use: SF Insp. Area: No. of Bathrooms: Occ. Group: U Lot Size: Deck: Type of Work: ACC Fire Dist.: 2 No. of Stories: 1 Occ. Load: Building: Garage-Detached 720 Valuation: $ 27,835.20 Building Height: 17 Occ. Status: Primary Basement: Manufactured Home Information Setback Information Shoreline & Planning Information Make: Length: Ft. Front: N 245.0 Ft. Shoreline: Ft. Water Body: Rear: S 364.0 Ft. Slope: Ft. SEPA?: No Model: Width: Ft. Side 1: W 110.0 Ft. Shoreline Desig.: Not Applicable Year: Serial No.: Side 2: E 33.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Planning Review Fee TW 6/27/2011 $205.00 S12011000t Plan Check Fee TW 6/27/2011 $84.31 S12011000t Building Permit Fee TW 6/27/2011 $421.55 S12011000i Building Permit Fee TW 6/27/2011 $421.55 S120110001 EH Plan Review KKK 7/6/2011 $103.00 S620110001 Building State Fee LDK 711 412 01 1 $4.50 S12011000i Total $1,239.91 BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 1 of 5 CASE NOTES FOR BLD2011-00521 CONDITIONS FOR BLD2011-00521 1) A Road Access Permit or Approval must be granted by the Mason County Department of Public Works. For more information contact Public Works, at (360)427-9670, ext. 450. The building permit will not be"finaled" until the permit holder can show proof that the access permit from Public Works has been"finaled"and approved. X 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. he person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) Owner/Agent im sible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28.x 4) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to anyfurther inspections being performed or approvals granted. 5) The plan review check list and corrections are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED",they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of plans on site for the duration of the project. Failure to comply and/or removal of aporrovedocuments will result in failure of required building inspections. X 6) This structure is approved as un-heated space. If at any time this building is to be used for anything other than what it is approved for, a change of use permit shall b� lied for, reviewed and approved prior to the change. X `S2 7) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X 8) The"approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved"site plan is not on site,then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department priorto any further inspections being performed or approvals granted. BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 2 of 5 9) REQUIREMENTS FOR ROOF COVERINGS. Roof coverings shall be applied in accordance with the applicable provisions of the current code and the manufacturer's installation instructions. x IT7_�Z� 10) A Mason County Stormwater Management Worksheet was completed and signed as part of this building permit application. Design, sizing, placement, inspection and maintenance of stormwater management systems shall be the responsibility of the ownerlagent of the developed parcel. It is the owner/agent/contractor's responsibility to ensure that Mason County Department of Public Works has approved the stormwater site plan for this parcel prior to the commencement of any development activities. "NOTE if Stormwater Management option"A"was selected on the Small Parcel Stormwater Management Application/Worksheet the document entitled"Managing Storm Drainage on Small Lots, The Small Parcel Stormwater Site Plan"constitutes an approved plan based on the criteria listed on the application/worksheet. If the development has, or will have, a septic/drainfield system you are responsible for contacting Mason County Division of Environmental Health to ensure that the stormwater system will not adversely affect the septic system of this, or any other, parcel. You may also wish to consult with the septic design professional involved with the project. By calling for a final inspection of the building permit the owner/agent/contractor is aclwledging that all components of the stormwater management system have been installed as approved on the stormwater site plan. X � � 11) Owner/builder assumes all responsibility if drainfield/reserve area is encumbered. A. Drainfield/Reserve requires a 10ft setback from all footing/foundations. B. Septic tank(s) requires 5ft setback from all footing/foundations. C. No found 'on ins within 30ft, down gradient of drainfield/reserve area. X r`� 12) Stock Plan Identification number: 2009-0001 This project is approved subject to the provisions identified the Mason County Stock Plan Policy. The site plan approved by the Planning Department, original building plans, and all attachments approved by the Mason County Building Department shall be available for the Mason County Building Inspector at eachhrreeg iced inspection. 13) This structure is limited to U-occupancy use only(private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the international cod.e s nd Mason County Regulations unless a"Change of Use" permit is applied for, reviewed and approved. X -� 14) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee(refer to current fee schedule, minimum 1 hour)will be X charged and shall be_Zc'olleted by the Building Department prior to any further inspections being performed or approvals granted. 15) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 3 of 5 16) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X `� 17) Placement of str cture must comply with standards set forth per the international codes regarding descending and/or ascending slopes. X > 18) All changes to"approved"building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. X 19) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building X spector shall b ewe prior to requesting additional inspections. 20) All property lines shall be clearly identified at the time of foundation inspection. X 21) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordina�_nnces and building regulations. 11��� 22) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevenntaction from being taken. No more than one extension may be granted. X :R2 23) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material.hi X yV 24) Retaining walls needed to support a surcharge such as structures, roads, or to support slopes, shall require a separate building permit and approval prior to construction of the retaining wall.X IF:F_�, BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 4 of 5 25) By definition, propane tanks and heatpumps are structures, which must meet setback conditions. Please check your"Approved Site Plan"to ensure these structures meet the setback conditions listed. X fj 26) Landings and stairs must meet the same setback conditions as any permitted structure; and, must be shown on your site plan. Please check your "Approved Site Plan"to ensure these structures are shown and meet the setback conditions listed. X 27) Approved per dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X 28) All construction and demolition debris must be removed from the site after project completion. Proper disposal oLronstruction debris must be on land in such a manner that debris cannot enter or cause water quality degradation of State waters. X 29) Prior to final approval, all upland areas disturbed or newly created by construction activities shall be seeded,vegetated or given an equivalent type of erosion protection (silt fencing, straw, or jute matting). X �LS This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf,represents that the information provided is accurate and grants employees of Mason County access to the ab described property and structure for review and inspection. OWNER OR AGENT: DATE: Z S (1 BLD2011-00521 Please refer to the following pages for conditions of this permit. Page 5 of 5 co o CONCRETE MECHANICAL MANUFACTURED HOME o Date t Footings t Setbacks Gas Piping By Ribbons m o interior Date By interior-Date By bate By ch Exterior Date g'i`f By Exterior-Rate B Set-up Z Point Load!Isolated Footings INSULATION Data By D BG J SLAB INSULATION, r' Date By Data By FIRE DEPARTMENT Foundation Walls Floors Date By Date By Data By DECKS FRAMING walls Date By Date -6— By Dato By PROPANE TANKS PLUMBING vault Data By Date "y _ OTHER Groundwork Attic Type: Date By Bata ByDate By b.W.V DRYWALL Type- Int Brace Wall Date By W v Date By Data By CD FINAL INSPECTION � v (n Water Line Fire Seperation N m Data By Data By Date lf— L—1 By o s Pass or Request Inspect. c Type of Insp. Fail Date Date Done By Comments N CD If 0 Q o' Cn 0 Err m 3 v co m 0 M .� ' site clan 'A" ITOWn&Country- Suite C•16521 Highway 99•Lynnwood,WA 98037-3161 PI ase Check After Doing Site Plan: Septic and drainfield ❑`Lot size Draw North Arrow in Circl POST FRAME BUILDINGS Everett:(425)258-4171 Puyallup:(253)840-9552 Li roperty dimensions ❑Sewer lines Edlevation of property Divisrou OF Administrative Headquarters: (425)743-1555 Lid buildings 1�t g g ffSetbacks of proposed&existing buildings El Bodies of water FAX: 425 742-4378 Toll Free: 1-800-824-9552 Pro osed building ain road with name ❑Floor Ian PERMABILT Contractors Llc.W TOWNCPF099LT p g p Quality:Our Future Depen4 On It.- ❑Easements Access tp proposed building QAlopes&Contours(5'increments) Job Name:J�n�;Rr-c- r!.I L t t E Job Site Address: (0S Cl E- y i cI'l l t^D Tax Account#: Legal Description: 2,-'»t<L PA i S, V A �2-s i2� �(I' '� (7 p.�f;) _........�.. r--w' 1 j'R1VI+TR � W1Gtt- d 1� 7 f„ .q STbRACY_ '� Pa v I t.Ta I tt t: �a .,+•-1:�.c1 �-_.""'~ ^--•-•• is 1, 'PApKINf0 INfoVA A 4 ..•y,it U:.id: G 4'1 L. v r 'aC RV oSiLD 10 i W AM t,rot. o AB 'tl r 6' 3 1 I c r J '\-'U N T Y DG,�� 1�1�11 G Sv ► SI� P Iv y REZ)uIREa Tyr'} W A AAA. C DES SLjBJEC i 10 ,P B Qy Da[e 52� J,-r-Tr t4. ,1' _ � 'L U lit♦s. P1- ALL SETB AC THE FURKS AREASUR E MHEFROMFRO ECTION pF THE BUILDING PROD A t PLANNING - RECEIVED JUN 2 7 2011 426 W. CEDAR ST. C>:n o 0 DO NOT SIGN INCOMPLETE SITE PLANI Customer has verified and approved the location of the building,orientation of the building to the North,and verifies that all White-Customer Copy White-Office Copy utilities are shown on this drawl In the corrqct/Ocation. CUSTOMER SIGNATURE- -� ' -�- LEAD# � { ( 01995 Perma-Bilt Industries FR-34 6/07 I II�III IIIII III II' 1 'o FORM MUST BE COMPLETED IN INK MASON COUNTY PERMIT NO. �1 1✓ � l ' PLEASE PRESS HARD BUILDING PERMIT APPLICATION C�J� 426 W. Cedar - P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 - Belfair (360) 275-4467 - Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner 1A ;LUe- Company Name Town t Cni vit •, Posh Frll"e sul Mailing A dress (650 E. kl:e�tolr Roa Mailing Address ( Z wy `1`1 SuAc C City_�3CA�a:r State V(A Zip Code 985ZB City Wyinwc State WA Zip Code ga03"1 Phone_ 3(00-Z"15 yZZ'1 Other Ph. Phone `1ZS_1y3- 1556- Other Ph. Lien/Title Holder Contractor Reg. 4SLT Exp. E mail address E Mail Address Per-►na�i IA. corn Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic Existing Septic )< Connect to Water System Name of Water System Well__Water System Name of Water System PARCEL INFORMATION - 12 Digit Parcel No._1ZZZ1410=30 Fire District Legal Description 1Z 3 of tJE SE 3 a 5Q * it Z Site Address (Please include street name, street number nd city) (.SO f- icru(Z a a: Directions to site 5R 3c)-L. Nur or tc-Tort (ZA- S� ' 1c ° #kGSo is -.. Rt1S. A $ av\ Will timber be cut and sold in parcel preparation?Yes/ Is property within 200'of Saltwater Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes4R TYPE OF JOB - New X Add Alt Repair Other PRIMARY RESIDENC ❑ SEASONAL ❑ Use of Building 5Voc"e. Describe Work _12-0 sF d��,sl�.�l Posh Er.,►,.� 5��.+� F,1 , No. of Bedrooms O No. of Bathrooms 0 Square Footage- 1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage -1Z�Sf Attached ache Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No.of Bedrooms No.of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation. Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permis- sion from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this applica- tion or the work proposed in the app ion, I have obtained permission from them to apply f r this permit and conduct the work proposed. X Date: ry Own r/ wners Re resentativ 'Contractor (indicate which one) ' FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Planning Pd Ck# Date Bid Pd Receipt No. DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department Planning Department Environmental Health Department Public Works Department Fire Marshal FEES 4. Buildinq Permit Fee Site Inspection Plan Review Fee EH Review Fee ry Plumbing & Base Fee Planning Review Fee Mechanical & Base fee Other - Wood /Gas/Pellet Stove Fee State Fee Violation Fee Pre-Paid at Submittal Valuation$ TOTAL FEES