Joint Aquatic Resources Permit
Application (JARPA) Form hel
t
Agency reference#:
USE BLACK OR BLUE INK TO ENTER ANSWERS IN WHITE SPACES BELOW. Tax Parcel#(s):
t '
Part 1—Project Identification
Unique project information that makes it easy to identify. nel '--------------------------------------'
la. Unique Project Identifier Number (UPI #) LqgM
• Don't have one yet?Get one at ittp://www.epermitting.wa.gov or call the Washington Governor's Office of Regulatory Assistance
at(800) 917-0043.
1 b. Project Name (Examples: Smith's Dock or Seabrook Lane Development)
Alderbrook Creek Hwy 106 Culvert Gravel Removal, Emergency Streambank Protection,
Footbridge, and Stream Restoration Projects.
Part 2—Applicant
The person or organization legally responsible for the project. [
2a. Name (Last, First, Middle) and Organization (if applicable)
Brian McGinnis, North Forty Lodging, LLC
2b. Mailing Address (Street or PO Box)
22526 SE 64th Place, Suite 210
2c. City, State, Zip
Issaquah, WA 98027
2d. Phone(1) 2e. Phone(2) 2f. Fax 2 . E-mail
Please contact ( ) ( )
agent
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b. of this
application.) hel
3a. Name (Last, First, Middle) and Organization (if applicable)
Kim Schaumburg
3b. Mailing Address (Street or PO Box)
10112 Bayview Rd KPN
3c. City, State, Zip
Vaughn, WA 98394
3d. Phone (1) 3e. Phone(2) 3f. Fax 3g. E-mail
JARPA 2009 Page 1 of 15
(253) 884-5776 (253) 225-2973 (253) 884-5776 TKimberly035@centurytel.net
Part 4—Property Owner(s) hel
Contact information for people or organizations owning the property(ies)where the project will occur. hei
X ❑ Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple property owners. Complete the section below and use JARPA Attachment A for each
additional property owner.
4a. Name (Last, First, Middle) and Organization (if applicable)
4b. Mailing Address (Street or PO Box)
4c. City, State, Zip
4d. Phone(1) 4e. Phone(2) 0. Fax 4 . E-mail
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. hel
❑ There are multiple properties or project locations (e.g., linear projects). Complete the section below and use
DARPA Attachment B for each additional property.
5a. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5n.) [hel
Alderbrook Resort& Spa 7101 East Hwy 106
5b. City, P State, Zip (If the project is not in a city or town, provide the name of the nearest city or town.) [hel
Union, WA 98592
I
5c. County hel
Mason
5d. Provide the section, township, and range for the project location.
Y4 Section Section Township Range
33 22N 03W
5e. Provide the latitude and longitude of the project location. Lhel
• Example:47.03922 N lat. /-122.89142 W long
47.20.53 N 123.04.01 W
5f. List the tax parcel number(s) for the project location. heI
• The local county assessor's office can provide this information.
322335000014
5g. Indicate the type of ownership of the property. (Check all that apply.) [
❑ State Owned Aquatic Land ❑ Tribal X❑ Private
JARPA 2009 Page 2 of 15
❑ Other publicly owned (federal,state,county, city,special districts like schools,ports, etc.)
5h. Contact information for all adjoining property owners, lessees, etc. (if you need more space, use JARPA Attachment
C.) hel
Name Mailing Address Tax Parcel #(if known)
Larry A. Power, Patrick Wheat, 3430 Pacific Ave SE, Olympia, WA 98501
& M. Wheat
Larry Power 8934 Buttonwood Lane NE, Olympia WA
98516
Jeffery & Patricia Raikes 3355 E. Laurelhurst Dr. NE, Seattle WA
98105
Brian McGinnis/North Forty 10 East Alderbrook Drive, Union WA 98592
Lodging
Alderbrook Country Club Inc. East 7090 Hwy 106, Union WA 98592
Allan &Janice Undem/Golf 10950 North La Canada, Gig Harbor WA
Villas 98335-5912
Allan &Janice Undem/Cottage 10 East Alderbrook Drive, Union WA 98592
#1
Barbra Bordeaux 2300 River Rd Unit 11, Yakima WA 98902-
1293
5i. Is any part of the project area within a 100-year flood plain? [bpipi
X❑ Yes ❑ No ❑ Don't know
5j. Briefly describe the vegetation and habitat conditions on the property. [Leipj
The property,which supports a large lodge and spa, is moderately vegetated with native vegetation. Numerous
large trees have been left and a buffer of native vegetation has been planted around Alderbrook Creek,which cuts
thru the site's parking area and driveway.
5k. Describe how the property is currently used. hel
There is a large lodge and spa on the property.
51. Describe how the adjacent properties are currently used. hel
JARPA 2009 Page 3 of 15
Adjacent properties support single-family residences.
JARPA 2009 Page 4 of 15
5m. Describe the structures (above and below ground) on the property, including their purpose(s). [
The Alderbrook Lodge and Spa has numerous buildings for lodging, plus the main lodge where there is
a restaurant, etc.
5n. Provide driving directions from the closest highway to the project location, and attach a map. nei
The site is located off Hwy 106, south of Union on the south shore of the Hood Canal.
Part 6—Project Description
J p
6a. Summarize the overall project. You can provide more detail in 6d. [
Approximately 50 cubic yards of gravel shall be removed from the Alderbrook Creek/Hwy 106
culvert to improve fish passage and to prevent flooding. Emergency streambank protection shall
be installed using woody debris, as per the HPA provisions, along approximately 60 feet of
eroding streambank. An engineered wood footbridge shall be installed over Alderbrook Creek.
Stream restoration shall occur along approx. 150 feet of the creek.
6b. Indicate the project category. (check all that apply.) hel
X❑ Commercial ❑ Residential ❑ Institutional ❑ Transportation ❑ Recreational
❑ Maintenance ❑ Environmental Enhancement
6c. Indicate the major elements of your project. (Check all that apply.) hel
❑ Aquaculture ❑ Culvert ❑ Float ❑ Road
❑ Bank Stabilization ❑ Dam /Weir ❑ Geotechnical Survey ❑ Scientific Measurement
❑ Boat House ❑ Dike / Levee /Jetty ❑ Land Clearing Device
❑ Boat Launch ❑ Ditch ❑ Marina / Moorage ❑ Stairs
❑ Boat Lift ❑ Dock / Pier ❑ Mining ❑ Stormwater facility
❑ Bridge X❑ Dredging ❑ Outfall Structure ❑ Swimming Pool
❑ Bulkhead ❑ Fence ❑ Piling ❑ Utility Line
❑ Buoy ❑ Ferry Terminal ❑ Retaining Wall (upland)
❑ Channel Modification ❑ Fishway
❑ Other:
JARPA 2009 Page 5 of 15
6d. Describe how you plan to construct each project element checked in 6c. Include specific construction
methods and equipment to be used. heI_]
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year flood plain.
As per the Mason County Shoreline Code, Alderbrook Creek shall be dredged of alluvial
sediments to alleviate flooding and facilitate channel clearance for fish passage. Approx. 50
cu/yds of alluvial sediments shall be removed and stored (off-site) for use in future stream or
beach restoration projects. Work shall be done during dry weather in August, before fall chum or
coho salmon return to spawn. Work shall be done from the road by a vacuum truck and with
hand tools. The stream shall be dewatered by diverting flow thru the existing SR Hwy 106
culvert, using a pump and portable culvert. The stream shall be screened above the pump inlet
to prevent the intake of fish.
Emergency streambank protection shall be installed using woody debris, as per the HPA
provisions, along approximately 60 feet of eroding streambank.
An engineered wood footbridge shall be installed over Alderbrook Creek. The bridge shall be
approx. 35 feet in length, and the footings shall be located outside of the floodplain. The bridge
shall be constructed of untreated cedar with concrete footings.
Stream restoration shall involve approximately 150-feet of Alderbrook Creek, upstream and
immediately south of the HWY 106 culvert. Where it is feasible, the streambank on both the east
and west sides shall be pulled back to a slope of between 2:1 or 3:1 and replanted with native
trees and shrubs. Large Woody debris shall be added to create habitat and to store sediments in
the incised upstream channel. Several natural sediment traps shall be made accessible by small
machinery for periodic cleaning (with hand tools) by creating paths off an existing trail.
All activities are within the 100- ear flood lain. The nearest waterbod is Alderbrook Creek.
Y p Y
n /6e. What are the start and end dates for project construction?. (month year) [ ]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or
stage.
Start date: As soon as all required permits have been obtained, and as per the time provisions of
the HPA. End date: ❑ See JARPA Attachment D
6f. Describe the purpose of the work and why you want or need to perform it. heI
To improve fish passage and habitat, prevent flooding, and allow a trail to cross the stream.
6g. Fair market value of the project, including materials, labor, machine rentals, etc. heI
Unknown.
6h. Will any portion of the project receive federal funding? hel
• If yes, list each agency providing funds.
❑ Yes X❑ No ❑ Don't know
JARPA 2009 Page 6 of 15
Part 7—Wetlands: Impacts and Mitigation
❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.)
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. nei
X❑ Not applicable
JARPA 2009 Page 7 of 15
7b. Will the project impact wetlands? hel
❑ Yes ❑ No ❑ Don't know
7c. Will the project impact wetland buffers? hel
❑ Yes ❑ No ❑ Don't know
7d. Has a wetland delineation report been prepared? hel
• If yes, submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? I
• If yes, submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands?
• If yes, submit the plan with the JARPA package.
❑ Yes ❑ No ❑ Not applicable
7g. Use the table below to list the type and rating of each wetland that will be impacted; the extent and duration
of the impact; and the type and amount of compensatory mitigation proposed. If you are submitting a
compensatory mitigation plan with a similar table, you may simply state (below) where we can find this
information in the mitigation plan. hel
Activity causing Wetland type Impact area Duration Proposed Wetland
impact(fill, and rating (sq. ft. or acres) of impact' mitigation mitigation area
drain, excavate, category type (sq. ft. or acres)
flood, etc.)
Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland
rating forms with the JARPA package.
2 Indicate the time(in months or years, as appropriate)the wetland will be measurably impacted by the activity. Enter"permanent" if
applicable.
3 Creation (C), Re-establishment/Rehabilitation (R), Enhancement(E), Preservation (P), Mitigation Bank/In-lieu fee(B)
Page number(s) for similar information in the mitigation plan, if available:
7h. For all filling activities identified in 7g., describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. hel
7i. For all excavating activities identified in 7g., describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. LbeAi
JARPA 2009 Page 8 of 15
l
7j. Summarize what the compensatory mitigation plan is meant to accomplish, and describe how a watershed
approach was used to design the plan. [netj
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) L e p]
❑ Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
hel
❑ Not applicable
BMP's shall be followed during construction to protect water quality at the site. The WDFW's HPA
provisions and construction rules shall also be strictly adhered to.
8b. Will your project impact a waterbody or the area around a waterbody? Lqeid
X❑ Yes ❑ No
8c. Summarize impact(s) to each waterbody in the table below.
Y [ ]
Activity Waterbody Impact Duration of impaCt2 Amount of Area (sq. ft. or
causing name location' material to be linear ft.) of
impact (clear, placed in or waterbody
dredge, fill, removed from directly
pile drive, waterbody affected
etc.)
The removal of Alderbrook Stream Approx. 1 day Approx. 50 1320 sf
alluvial Creek channel cu/yds of
sediments. alluvial
sediments to be
removed.
Addition of Alderbrook Stream Approx. 1 day for Approx. 1 dozen 240 sf for
LWD Creek banks emergency woody Pieces of LWD emergency LWD
and debris placement, placement and
channel and 1 week of 600 sf for stream
stream restoration restoration.
proect.
Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent, provide the distance between the impact and the
waterbody and indicate whether the impact will occur within the 100-year flood plain.
z Indicate the time(in months or years, as appropriate)the waterbody will be measurably impacted by the work. Enter"permanent"if
applicable.
8d. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? hel
• If yes, submit the plan with the JARPA package.
JARPA 2009 Page 9 of 15
❑ Yes X❑ No ❑ Not applicable
8e. Summarize what the compensatory mitigation plan is meant to accomplish. Describe how a watershed
approach was used to design the plan.
• If you already completed 7j., you do not need to restate your answer here. [
8f. For all activities identified in 8c., describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. hel
No fill shall be placed in the waterbody.
8g. For all excavating or dredging activities identified in 8c., describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hel
Gravel removal will be done by a vacuum truck from the road and with hand tools by hand. Approx. 50
cu/yds of alluvial sediments shall be removed and stored off-site for use in future restoration projects.
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project.
9a. If you have already worked with any government agencies on this project, list them below. [
Agency Name Contact Name Phone Most Recent
Date of Contact
Mason County Kell McAboy ( 360) 427-9670 ex:295 9-10-09
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 on the Washington Department of
Ecology's 303(d) List? heI
• If yes, list the parameter(s) below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at:
http://www.ecy.wa.gov/programs/wq/303d/.
❑ Yes X❑ No
Alderbrook Creek is not listed.
9c. What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hel
• Go to hftp://cfpub.epa.gov/surf/locate/index.cfm to help identify the HUC.
JARPA 2009 Page 10 of 15
17110018.
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? heI
• Go to http://www.ecy.wa.gov/services/gis/maps/wria/wria.htm to find the WRIA#.
WRIA 14.
I
I
I
i,
JARPA 2009 Page 11 of 15
9e. Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hel
• Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.htmi for the standards.
X❑ Yes ❑ No ❑ Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? [help]
• If you don't know, contact the local planning department.
• For more information, go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
❑ Rural ❑ Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other Urban Commercial
9g. What is the Washington Department of Natural Resources Water Type? [hel
• Go to http://w_, wa.gov/BusinessPermits/Topics/ForestPracticesApplicationsiPages/fp watertypiing.as x for the Forest
Practices Water Typing System.
❑ S X❑ F ❑ Np ❑ Ns
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? hel
• If no, provide the name of the manual your project is designed to meet.
X❑ Yes ❑ No
Name of manual: Stormwater Management Manual for Western Washington.
9i. If you know what the property was used for in the past, describe below. [help]
It has been used as a lodge for some time.
9j. Has a cultural resource (archaeological) survey been performed on the project area? [
• If yes, attach it to your JARPA package.
❑ Yes ❑ No Unknown.
9k. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project
area or might be affected by the proposed work. hel
The Chinook salmon, the Hood Canal summer-run chum, the bull trout, the Puget Sound
steelhead, the killer whale, the leatherback turtle, the humpback whale, the marbled
murrelet, and the Steller sea lion are the ESA listed threatened or endangered species in
the area.
91. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. [
Stream and marine/esturaine shoreline. See above, plus fall-run chum, coho, cutthroat trout, bald eagle,
osprey, etc.
JARPA 2009 Page 12 of 15
Part 10—Identify the Permits You Are Applying For
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.ecy.wa.gov/opas/.
• Governor's Office of Regulatory Assistance at (800) 917-0043 or helpA-ora.wa.gov.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) el
• For more information about SEPA,go to www.ecy.wa.gov/programs/sea/sepa/e-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
X❑ A SEPA determination is pending with _Mason County (lead agency). The expected
decision date is
❑ I am applying for a Fish Habitat Enhancement Exemption. (Check the box below in 10b.)
• Submit the Fish Habitat Enhancement Project form with this application. The form can be found at
http://www.epermifting.wa.gov/Portals/ JarpaResourceCenter/images/default/fishenhancement.doc
❑ This project is exempt (choose type of exemption below).
❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt?
❑ Other:
❑ SEPA is pre-empted by federal law. hel
10b. Indicate the permits you are applying for. (Check all that apply.) hel
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
X❑ Shoreline Exemption Type (explain): Project is exempt under Mason County Code._
Other city/county permits:
❑ Floodplain Development Permit X❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
X❑ Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
Washington Department of Natural Resources:
❑ Aquatic Resources Use Authorization
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ General Bridge Act Permit ❑ Private Aids to Navigation (for non-bridge projects)
JARPA 2009 Page 13 of 15
ilk
Part 11—Authorizing Signatures
Signatures required before submitting the JARPA package.
11a. Applicant Signature (required) [
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the
permitting agencies entering the property where the project is located to inspect the project site or any work
related to the project. (initial)
Applicant Date
11 b. Authorized Agent Signature [help]
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
Authorized Agent Date
11c. Property Owner Signature (if not applicant) [
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Date
18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact The Governor's Office of Regulatory Assistance (ORA). People with hearing loss
can call 711 for Washington Relay Service. People with a speech disability can call(877)833-6341.
ORA publication number: ENV-019-09
JARPA 2009 Page 14 of 15
I'I�.Ii�I�I��iIPY.III• �' ! � II��� i4ll 1 I ''. I ! I � �
• •t • ..J ♦ a...v+....T•wr++.sw.y.a.M...rV.Tre-rM".r�..s«..svaw.w."r."..' �^1
F �3►:'. '� ��:i,F�ai11i��Y�r�tt'�!� :�t'�l+''•+41Y,t€$��3lt!
e .��:R�'.,�sas t':�gt:'!raa^;1'•:ttt•�►isl•,�sTnW �bay s�+itr"'.���ze ; �;pa.
1"Ii1; pWplltlitttll a;;,flwiuYM!'�k;��?�!} 1!: i
I wirtif+r that tv*0 Oftet t1 nj W*41 idt.."sna b011161, ;t At" 1wtlVtl�4;��ti ir;t'il�l1 n!{►Ytilir0i� '!1 �$a, lit a;iC�i�j111► k
.�.�,.t,iiri•ii eiili • .wri� :: io .... '� CIO lo'90�31-;:Po4t!d iN:i{.ttW4, YAr°tl i foul", to haft wok
..;vow normits
M!d.'•1�:,� 9t� �?Ft 3'Js'tli�;s 1--kc: '?15 : (fit On t"1y#.11"hil!f!A P9�iiUit�tM i�oA t�tlti�
flt i rN"' IPA
!".MI M-2
Ol 11 b, Aut WrIM4di,4404 eum MWJ
aeMy"I to thft�#s,Vof my knowlodQe arid Miele they inlo(!iWK)"v Wdud Ili OM i P044"gYl0i' ,08 bo", pc1rmp"G*,
art! i1;:CeJ em. i iitld ftltliy W i itit'ti th. A..1 hor►y to cN+4y 01A the�Yr>filC4il4�!UGtiVitil4 and 18tgr�t�SW work
only tiller 111JI
ttel4)tt4[� etllf�xH. iiAly,lsb!:11 I�Nu�d.
11C, Prq} t1�'aYryi�r �!`tNttliYf '1 flat mnVIcan;?
' t" ' �ii c xi H",-a�; t3r71.1svn "fia ol.0%H'ity 1,�h•af!1 the ;;f:j'�f! i_ i:)^li��! 't i"Ars04 t;:fit!ie", ..+:t %itio
01`f'►?iti�i`it ty:t :$ �'� litfif•lif Q t3
or any Wt�"K: �T�i�titt ir11��r"('llotl�tchil{I dC4tiC AC rti�H5ufk9 *`v linjet5 awl, if p ac..tiyati tiVl'i i}r�i -'1:;!l1i:Xi i:; iht
t..�• r RI ;14. "LYfpt"d is o,;O" .la -of his ?1,w 0j, (ck, .tiWy
Ni •,-M11100u't 7. •'t'1iyiYt•:tl��•` -J 4 ...1 .•.�»1�: A4 a.ira...,riii.�..;(.��d•t��.''.i1 v:.IwC�S+ i t�l'?r:t14YN�11,�. 7Y��wMtT a=' Y�lt�{P lit.: f
111�1�Z1+{Mlttt�(Nu4 tf tfN,111.aa f/(l CIA/A 11r}'1,00.0*rl4 ry C%.,,t".t ..'.'N SI fir.*yf 11,ot V#J71t
+�!+'/."y'fl!1 i+.flP!1 tN!'►"'!!!`�.,!h}f'1*1'}.i�M n'fI5111:`.!,r:}�t1•.+;t :�.•]`J.•f!1�')1�:., . . ':ita.�l• } ' i.'
i K Zvi,i f .11i�.t�rYKiitt :,a�,SvZ!'aif l,�,ii1(ii..utl,.iw�`'i 11N1':V�VUfik?t G t)t�Nwa J1 ,te}�k 81',rl:'�, t4.,ut9:�1F`+/�}•F�Y.t�tilb t 4� }111.. +. '.+;wt
� 1
't 11, say SO or 'fin
V Ct4l t�9
J�JvI•.4 a av5
MANl
tC I' 41�?In?II!! � ila � • 11R1•.IS.diY11i Mu, , 1'.�, 't°�I11. t: �.;. •Ih I
1 I'