HomeMy WebLinkAboutFIR2011-00025 Final - FIR Permit / Conditions - 7/7/2011 y � MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262Phone: (360)427-9670, ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584
i
FIRE PROTECTION PERMIT FIR2011-00025
APPLICANT: NORTH FORTY LODGING LLC RECEIVED: 6/1/2011
CONTRACTOR: FOX FIRE PREVENTION (360) 871-1985 LICENSE: FOXFIP1127M8 EXP: ISSUED: 6/29/2011
SITE ADDRESS: 10 E ALDERBROOK DR UNION
EXPIRES: 12/29/2011
PARCEL NUMBER: -14
LEGAL DESCRIPTION: SUNNY BEACH PCL 1 OF BLA#04-58
PROJECT DESCRIPTION: ADDING 2 NEW SPRINKLER HEAD
GENERAL INFORMATION System Information
Type of Use:
Fire District: Sprinkler Heads: Audible Switches: Pull Stations:
Hood&Duct t: Flow Switches: Visual Devices: Door Releases:
Dry Chemical?: Pressure Switches:: Smoke Detectors: Duct Detectors:
Zones: Heat Detectors:
Wet Chemical?:
Sprinkler?: Y
Standpipe?: SQUARE FOOTAGE FEES
Monitoring Company: First Floor: Type Amount Due Amount Paid
Monitoring Phone No.:() - Second Floor: Sprinkler System Permit Fe $168.50 $168.50
Auto Fire Alarm?: Third Floor;:
Sprinkler System Plan Che $109.20 $109.20
Total: $277.70 $277.70
FIR2011-00025 Please refer to the following pages for conditions of this permit. Page 1 of 4
CASE NOTES
FI R2011-00025
4 CONDITIONS FOR
FIR2011-00025
1.) Per section 901.2.1 of the 2009 International Fire code, Statement of Compliance.
Before requesting final approval of the installation, the installing contractor shall furnish a written statement to the fire code official that the subject fire
protection system has been installed in accordance with the approved plans and has been tested in accordance with the manufactures specifications and
the appropriate installation standard. Any deviations from the design standards shall be noted and copies of the approvals for such deviations shall be
attached th written statement.
X
This permit bec mes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time
after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants
employees of Mason Count access to a above described property and structure for review and inspection.
OWNER OR AGENT: �j� DATE! 1 /�D 1Z
FIR2011-00025 Please refer to the following pages for conditions of this permit. Page 2 of 4
Z
CONCRETE MECHANICAL MANUFACTURED HOME O
c Date By — X
s Footings /Setbacks Ribbons
Gas Piping =
CInterior Date By Interior-Date By Date By TI
00 Exterior Date By Exterior-Date B et
0
TION
Point Load/Isolated Footings BGS/SLAB INSULATION Date By
Date By Data By FIRE DEPARTMENT r
Foundation Walls Floors Date By 0
Date By Data By DECKS )
FRAMING walls Date By Z
O
Date By Data By PROPANE TANKS r
PLUMBING vault pate By n
Date By OTHER
Groundwork Attic
Date By Date By Type:
Date By
o.w.v DRYWALL Type:
Int.Brace Wall Date B TI
Date By y
y Hate By FINAL INSPECTION N
m Water Line Firs Separation
mDate By Date By Date By
o Pass or Request Inspect. c
z Type of Insp. Fail Date Date Done By Comments
Un
o ^c. c,55 -6-l - -l G`J
d
N
O
1
0
O
7
a
o'
0
S
N
'O
O
N
(O
rD
W
0