HomeMy WebLinkAboutBLD2004-00054 Road Access - RAP Letters / Memos - 2/23/2007 t
2200 d05
Mail Request
Debbera Coker
Mason County Building Department
P.O.Box 186,Shelton,WA 98584 Date a? a 3 7
(360)427-9670 ext.510/Fax(1360)427-7798
Mail to:
p a k5rre e eo-
o r t D�-chard �
Please mail the following items: Application
Building Permit
pApp '
Permit package checklist C��e n L°///Y! f Olt/
�7 ov �Oe
Plumbin ec form
Project Site Plan
Septic application info ❑existing knew
WSEC application
Water adequacy application
Address request form
Pre-Inspection application
Land modification form
�1 l /o r' CLC� Gsor� �ovr�
v �oG<d 11 Cce ss
Comments: ,5O ALSo Oeed a ro YPd Eq�sem P�'lf
er ys �'7 ice
967 o x 73
(3�
Ue� fi'�r1s ,
4
111 1\ c.V LUVJ 1 Ul.. U 1 'VL III I111V1jAOVl1 LUM10 IIVO 1111 A 1-1-111 111J. LJJ `t 1 U CJJU 1 . UC
R R.
Anderson, Burns & Hostnik
Attorneys at Law
E3915 Lakewood Dr. W, Suite A-1 Tacoma, WA 9B467-3299 (25a) 475-42C)Q
FAX (25Z3) 475-259e
J. Arvid Andereon
Charles R Host-nik Mark A. Triplett
Karol A. Wheeldon't Associate Attorney
•Alpo AdmiC.T.nra in Cali('cirnio Gary A. Burns
iLLM.In Tixec;c.n Refired
April 20, 2005
Bradley Keough
4441 S. Meridian PMB 389
Puyallup,WA 98323
Re: Lakeland Village/Channel Drive
Dear Mr. Keough:
Our firm represents Mr. Phil Graber, Mr. Graber owns two adjoining lots to the north of,.
and adjacent to, the lot you are currently developing (#104).
We are advised that you have encroached onto his property by constructing an access
road across his two lots. In doing so, you have cut valuable timber, significantly re-
graded portions of Mr. Graber's property, and completely blocked the right of way access
to his two lots. We have advised Mr. Graber that your actions constitute a significant and
willful trespass and he is entitled to damages pursuant to RCW 4.24,630 and/or RCW
64,12.030. These statutes provide a remedy of treble damages plus attorney's fees in
trespass actions.
This letter serves as your written notice to immediately cease and desist from any further
trespass on, through, or across Mr. Graber's property, including use of the access road
you have improperly and illegally out through his property. Should you continue to use
the goad to access your property, you do so at your own risk and your liability will
increase accordingly.
If you have legal counsel, please forward this letter to your attorney.
Sincerely,
Mark Triplett
File no. 5051
111 I1 t-v LUV..J 1- v1 vc.. 111 lll1l/LI1/.JW11 LJU111W 1IV"111111 1IIII 11V1 LJJ `tIJ LJVU 1 ! V1
! M
Anderson, Burns & Host:nik
Attorneys at, Law
SS 15 Lakewood Dr, W, Suit-a A-1 Tacoma, WA OS467-3299 (253) 475-4200
FAX (253) 475-259S
J. Arvid Anderson
Charles R. Hostnik Mark A. r-T:or ACC
Karol A. Whealdon't AsSeciaCo Attorney
•Alma Adrnirsrd in Crytdorni7 Gary A. Fiurns
1i_Lm.in Tnx�ition Retired
TELEF'AX COVER SHEET
TO: /4 cC.V SPg-(.)c t FAX4: `fZ`7
FROM: J. ARVID ,ANDERSON TRANSMITTED BY:
DATE: 12-(o f 0 s RE: 1vT /ov
VIGLa67
ENCLOSED: �e- c(�
The following, consisting of 7--pages including this cover sheet, is being sent to you. If you did not
receive all of the pages, or if the transmission is not clear, please call (253) 475-4200 immediately, For
a return message, our fax number is listed above.
PRIVILEGED AND CONFIDENTIAL COMMUNICATION
ATTORNEY WORK PRODUCT/ATTORNEY-CLIENT COMMUNICATIONS
This facsimile message is a privileged and confidential communication and is intended solely for
the use of the individual Darned above. If you are not the named individual, of the person responsible to
deliver this communication to that named individual, then you are hereby advised that any
dissemination, distribution, or copying of this communication is prohibited,
If you have received this communication in error, please immediately notify the sender by
telephone, and return the original transmission to the sender by first class mail. We will reimburse you
for postage costs,
MESSAGE,: P F( i [, C� "�ems'- ASK- `02 i k-4
�� i� yv
P�cA s L. FC-.�t_• F 2-C—� -ram u.S � (�v
ITI
�SS 1 STi�.vG�
lam, c3nttey- rce rceougn Page 1
From: Michael Sprouffske
To: Tami Griffey
Date: 5/17/2005 4:26:27 PM
Subject: Re: Keough
have not heard anything from Brad Keough since April 28. He returned my call. At that point he had not
recieved your letter. I informed him of the intent of your letter and the intent of my letter. he basically
denied any wrong doing and said that he would be getting an attorney. That was the end of the
conversation.
I stopped by there yesterday everything was as before. I will let you know more as I hear anything.
Case Activity Listing 2/23/2007
11:38:53AM
Case #: BLD2004-00054
i�
Assigned Done
Activity Description Date I Date 2 Date 3 Hold Disp To BY Updated Updated By
BLDA201 STOP WORK ISSUED 7/18/2005 Hold DONE LDK 7/20/2005 TLG
Posted site. Continuing complaints regarding ongoing construction activities. Since lst notice to stop was by letter,this was a formal posting of stop work on site.
BLDA010 Application Received 1/20/2004 1/20/2004 None DONE TW 1/20/2004 NJP
BLDB 110 Building Plan Review 1/20/2004 1/23/2004 None DONE JRN 1/23/2004 JRN
review complete,sent to case manager,JRN 01-23-04
BLDB120 WSEC Compliance Review 1/23/2004 None DONE JRN 1/23/2004 JRN
review complete,LPG furnace,2001 WSEC path option IV,JRN 01-23-04
BLDB155 Letter of Incompleteness 1/26/2004 None DONE RAM RAM 1/26/2004 RAM
A field inspection of the subject property was conducted on 1/22/04 to assess critical areas issues relevant to proposed construction of a single-family residence.
The parcel contains a steep slope. A steep slope trends downward toward the building site at an apparent angle between 8.5 and 21.8 degrees. This area may meet the criteria for a Landslide Hazard Area per
the provisions of the Mason County Resource Ordinance No.77-93. Applications for development within 300 feet of a potential Landslide Hazard Area require a geological assessment to evaluate slope
stability and address specific efforts to remediate the hazard. Based upon the results of the assessment,a more detailed geotechnical report may be required.
Enclosed is a copy of the Landslide Hazard Areas chapter of the Resource Ordinance. Please note the distinction between a geologic assessment and a geotechnical report. This project will require a
geological assessment.
The assessment must note if hazards are present and that the hazards of the landslide area can be overcome in such a manner as to prevent harm to property and public health and safety,and must also assure
the project will cause no significant environmental impact. If you have questions or require clarification,please contact me.
BLDB200 Environmental Health Review 1/20/2004 1/28/2004 None DONE CEW 1/28/2004 CEW
North Bay Sewer
BLDB210 Water Adequacy 1/20/2004 1/28/2004 None DONE CEW 1/28/2004 CEW
rec wa from doh
BLDB130 Planning Review 1/20/2004 4/13/2004 None DONE RAM RAM 4/13/2004 RAM
Site inspection conducted on 1/23/04. Steep slopes along west edge of lot. Hold for geological assessment. Geological assessment received in planning on 4/8/04. Forwarded to P/W 4/12/04. Review
complete 4/13/04. See conditions.
Pagel of 4 CaseActivity-rpt
Case Activity Listing 2/23/2007
11:38:53AM
Case #: BLD2004-00054
i�
Assigned Done
Activitv Description Date 1 Date 2 Date 3 Hold Disp To By Updated Llpdated By
BLDB225 Public Works Review 4/12/2004 4/13/2004 None DONE AAT AAT 4/13/2004 AT
Geotechnical assessment reviewed,and acceptance recommended.Main concern will be controlling silt and erosion during construction.See attached IDC to DCD.
BLDA100 Approved for Issuance 4/20/2004 None DONE TW 4/20/2004
sewer paid
BLDA500 Issue Building Permit 4/23/2004 None DONE KS 4/23/2004 K)
BLDA540 Print Inspection Card 4/23/2004 None DONE KS 4/23/2004 KS
BLDA510 Reprint Building Permit 8/19/2004 None DONE PIB 8/19/2004 PIB
BLDC110 Footing Inspection 8/18/2004 8/19/2004 None FAIL LDK 8/20/2004 KLW
FOOTING AND SETBACKS FAILED,NO GEOTEC OR ASSESSMENT TO VERIFY.SETBACKS AND FOOTINGS OK PER PLAN, 1.NO APPROVED GEOTEC REPORT FOUND ON SITE,2.
POST ADDRESS AT HEAD OF DRIVEWAY,3.ACCESS ROAD INTO LOT AT TOP APPEARS TO HAVE CUT IN BANK PROVIDE PUBLIC WORK OK AND OR ANY REQUIREMENT
NEEDED.IF ANY APPEARS TO BE WITHIN ROAD SETBACKS,GEOTEC MAY HAVE TO ADDRESS THIS ISSUE.IFHASN'T ALREADY,NOT OK TO POUR.
BLDC110 Footing Inspection 8/24/2004 8/26/2004 None COND RLS 8/27/2004 KLW
(NOTE ON BACK OF PERMIT TO INSTALL SILT FENCE PER GEOTEC REPORT.
BLDC115 Foundation Wall Inspection 9/7/2004 9/7/2004 None PASS TFR 9/8/2004 KLW
BLDC140 Framing/Plumbing/Mechanical 2/23/2005 2/25/2005 None FAIL RLS 3/4/2005 KLW
FRAME/WATERLINE FAILED,MECH/DWV/GAS PIPING PASSED. 1.IMPROPER TEST ON PLUMBING SUPPLY EITHER A.WORKING H2O PRESSURE OR 50#AIR TEST WITH GUAGE,2.
NO DRIP LEG ON LP GAS PIPING,3.TOP PLATES LESS THAN 4'REQUIRE 12"STRAP AT ALL BREAKS,4.FIRE BLOCKING A.VAULT LINE IN LIVING ROOM AGAINST GABLE END
TRUSS,B.TUB/SHOWER DRIANS 1/2"PLYWOOD OR 7/16 OSB TIGHT TO PIPE FOAM 1/4"GAP MAX,5.FIRE PLACE NOT INSTALLED,6.INTERIOR BRACEWALL PANELS NOT
NAILED OFF WIH 3 16DS AT 16'O.C.,7.AT FRONT DOOR APPROVED PLANS CALLED FOR LESS THAN 4'RECESSED FROTN DOOR OR INSTALL 2'8"ALTERNATIVE BRACEWALL
PANEL NONE OF ABOVE DONE GET ENGINEER TO APPROVE ASBUILT,8.SOLID BLOCKING MISSING BETWEEN BEARING POINT OF TRUSSES AT FRONT DOOR,9.SEE TRUSS
ENGINEERING GABLE END BRACING MISSING,OK TO INSULATE DO NOT COVER CORRECTIONS.
Page 2 of 4 CaseActivity..rpt
2/23/2007
Case Activity Listing 11:38:53AM
Case #: BLD2004-00054
i�
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDC125 Framing Inspection 3/21/2005 3/23/2005 None PASS LDK 3/24/2005 KLW
BLDC100 Inspection 3/21/2005 3/23/2005 None FAIL LDK 3/24/2005 KLW
SEE ITEMS# 1 AND 5 FROM PREVIOUS CORRECTION NOTICE
BLDC130 Plumbing Inspection 4/18/2005 4/19/2005 None PASS RLS 4/20/2005 KLW
BLDC145 Insulation Inspection 4/18/2005 4/19/2005 None PASS RLS 4/20/2005 KLW
WALL VAULTED INSULATION PASS.
BLDA540 Print Inspection Card 4/20/2005 None DONE KKK 4/20/2005 KKK
BLDA200 HOLD 4/21/2005 4/21/2005 Hold DONE TLG 4/21/2005 TLG
Hold final. Access has 2 problems. PW ROW has been compromised by cut and access itself is not in dedicated access easement. Property owner where it is located has not granted permission.
BLDA920 Miscellaneous Action 7/18/2005 None DONE TLG 4/18/2006 GMM
Mick Sprouffske informed me that RAP is still suspended and that work is continuing. LDK to do site investigation and post if work is ongoing.
4/18/06 received a call from public works stating that rap has been approved. gram
BLDA900 Telephone Call 8/8/2005 None DONE TLG 8/8/2005 TLG
Received call from Rob Drexler of Windemere regarding adjacent parcel and access issues. Forwarded him to talk with Mick S.
BLDA910 Meeting 4/27/2006 None DONE BJR 5/5/2006 BJR
Meeting on site with Craig Haugen,TJ Martin,Barb Robinson and John Herman to discuss issues with driveway grade and access and requirement for residential fire sprinklers prior to final occupancy
approval. PW has not approved driveway as of this date. Location of dw has changed since original permit approval. Geotech report does not address location of new dw and excavation/fill that has
occurred with placement of dw.
BLDA800 Documents Received 7/21/2006 None DONE BJR 7/21/2006 BJR
Amendment to geotech report received on 6-20-06 by E3RA. Forwarded to Public Works and Fire Marshall for review.New RAP needed to serve this lot and 61 Channel Drive.Easement required to serve
this lot.
Page 3 of 4 CaseActivity..rpt
Case Activity Listing 2/23/2007
11:38:53AM
Case #: BLD2004-00054
i�
Assigned Done
Activity Description Date 1 Date 2 Date 3 Hold Disp To By Updated Updated By
BLDA900 Telephone Call 9/18/2006 None DONE TLG 9/18/2006 TLG
Mr.Graber called regarding status of RAP. Tried to refer him to PW but he said he was referred to me. I sent email to MCPW-Dave Clevenger and Fire Marshal requesting that if they have updated
information,they contact Mr.Graber. Also provided BR's contact info to him.
BLDA900 Telephone Call 2/22/2007 None DONE DLC 2/23/2007 DLC
William Brasch,a licensed contractor will take over the project for new owner. Advised contractor to complete a new permit application form so that we can update our records and reprint conditions. The
contractor stated that they have the approved plans. The cost is$64(min. 1-hr fee).
The information will not be mailed until discussion with with Fire Marshal and community development deputy direcotr.-do 2/23/2007
2/23/2007:Information will be mailed with note,"Road access is not approved.Contact Mason County Public Works at(360)427-9670 ext.450.Also require approved easement and sprinkler system.
Contact the Mason County Fire Marshal at(360)427-9670 ext.273 or Barb Robinson,Deputy Director Mason County Community Development at(360)4279670 ext.603 for further questions."d coker
Page 4 Of 4 CascActivity..ipt