HomeMy WebLinkAboutCOM2003-00089 Final Renovation and Additon to Roadway/Parkway Access - COM Permit / Conditions - 12/7/2004 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Inspection Line(360)427-7262
Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Phone: (360)427-9670,ext. 352
` Shelton, WA 98584
i�
COMMERCIAL BUILDING PERMIT COM2003-00089
OWNER: DAVID HOLMES RECEIVED: 5/1/2003
CONTRACTOR: WALSH CONSTRUCTION 206-547-3804 LICENSE: WALSHC99001 EXP.- 3/19/2005 ISSUED:
SITE ADDRESS: 7101 E STATE ROUTE 106 UNION EXPIRES:
PARCEL NUMBER: 322335000014
LEGAL DESCRIPTION: SUNNY BEACH LOTS 10-11 & 8-9 N OF HWY
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
RENOVATION AND ADDITION TO EXISTING RESORT UNION WA EAST ALONG SR 106 AT BEACH DRIVE INTERSECTION
INCLUDE PARKING/ROADWAY ACCESS IMPROVEMENT
General Information Construction&Occupancy Information
Type of Use: Insp.Area: No. of Units: Type of Constr.:
Type of Work: ADD Fire Dist.: 6 No. of Bathrooms: Occ. Group:
No. of Stories: Occ. Load:
Valuation: $ 89,532.00 Building Height:
Pre-Manufactured Unit Information Square Footage Information
Make: Length: Lot Size:
Model: Width: Building:
Year: Serial No.: Basement: Parking Spaces:
Setback Information
Shoreline&Planning Information
Front: Ft. Shoreline: Ft.
Rear: Ft. Slope: Ft. Water Body:HOOD CANAL Shoreline Desig.: Unknown
Side 1: Ft. SEPA?:Yes Comp. Plan Desig.: Mineral
Side 2: Ft.
Fire Protection System Information
Auto Fire Alarm System?: Emergency Key Box?: Standpipe?:
Auto Fire Sprinkler System?: Access Road?: Fire Extinguishers?:
Fixed Fire Suppression System?: Fire Hydrants?: Fire Lanes?:
COM2003-00089 Please refer to the following pages for conditions of this permit. 1 of 4
Plumbing Fixtures Mechanical Fixtures FEES
` Type Qty. Type Qty. Type By Date Amount Receipt
Plan Check Fee
Planning Review Fee
Total $15,505.01
CASE NOTES FOR
COM2003-00089
CONDITIONS FOR
COM2003-00089
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance
Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be
obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to
WA state law. X
2) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A
POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY
BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION
FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF
OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS.
X
3) The use, handling and storage of hazardous materials or flammable and combustible liquids in excess of 10 gallons is not allowed without the
approval of the Mason County Fire Marshal. X
4) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely
impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements
of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose.
For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a
driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450.
For any construction which is proposed to be located within 25' of a Mason County road right of way, it is suggested to contact that office to review
future planned work which may affect your project.
X
COM2003-00089 2 of 4
5). The lighting budget submitted by L&L Electric 6/24/2003 and attached to the approved building plans is approved as submitted.
Daylight zones, as defined in WSEC Chapter 2, both under and adjacent to glazing shall be provided with individual control or daylight-or
occupant-sensing automatic controls, which control the lightd independent of the general area lighting (WSEC 1513.3).
COMMISSIONING REQUIREMENTS: Lighting controls shall be tested to ensure that control devices, components, equipment and systems are
calibrated, adjusted and operate in accordance with approved plans and specifications.Sequences of operation shall be functionally tested to
ensure they operate in accordance with approved plans and specifications. A complete report of test procedures and results shall be prepared and
filed with the owner. (WSEC 1513.7)
X
6) The stormwater and erosion control plan, as referenced in the SEPA checklist, shall be implemented and adhered to during all construction
activities. A copy of the stormwater and erosion control plan shall be kept onsite during construction and made available to building inspectors.
X
7) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project.
X
8) The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the
Mason County Shoreline Master Program.X
9) Approved per dimensions and setbacks on submitted site plan. X
10) All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and
construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X
11) The provisions of the restoration plan shall be implemented prior to final approval. X
12) The activities and recommendations of the Habitat Management Plan shall be implemented and a follow-up site inspection shall be conducted by
planning staff prior to final approval. Pleae contact Rick Mraz @360-427-9670 x577 to schedule the inspection.
X
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at any time after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
OWNER OR AGENT: DATE:
COM2003-00089 3 of 4
v
, n .
CONCRETE MECHANICAL MANUFACTURED HOME
N
o Footings / Setbacks Date B v Ribbons
D B '
o ate Y Gas Piping�inQ b Date B y
w Foundation Walls Date B v Set-up
Date By INSULATION Date By
B G / Slab Insulation Floors Final
Date By Date B y Date B v
FRAMING Walls FIRE DEPT
Date By Date By Date By
PLUMBING Attic OTHER
Groundwork Date B y
Date By WALLBOARD NAILING
D.W.V. Date By
Date By FINAL N PECTION
Water Line Date Z 6 a By
Date By Date By �
ICIAO i w L4 LE
O Z - 0 v 1,UVA r 2 G a c r� 4s ���
Vy — 3 0e; i81KP% �, P 4z� mu� zS
P Al
9 — ..? — l/ davOAA ti art
/O 03 3�W f,G
T.4�i� I'lo, -1. S
F L/%, f i h`fU p
S��4
11 3-I/l/y/co - rj&e'e/ ' vcAk 1�SLt �! t"v� c�,r�� i� -+U (A3� 4 1-0014-tc) o
�o d
0
Case Activity Listing 8/19/2003
8:08:26AM
Case #: COM2003-00089
Assigned Done
Activitv Description Date 1 Date 2 Date 3 Hold Disp To By 1"pdated l`pdated B�
COMB009 Fire Marshal Review None 5/l/2003 NJP
COMB110 Building Plan Review 5/1/2003 None 5/l/2003 NJP
COMB120 WSEC Compliance Review None 5/l/2003 NJP
COMB 135 Addressing None 5/1/2003 NJP
COMA010 Application Received 5/l/2003 5/1/2003 None DONE TW 5/l/2003 NJP
COMB200 Environmental Health Review 5/l/2003 5/5/2003 None DONE CEW 5/5/2003 CEW
on sewer
COMB210 Water Adequacy 5/l/2003 5/5/2003 None DONE CEW 5/5/2003 CEW
remodel
COMB 130 Planning Review 5/l/2003 7/11/2003 None DONE RAM RAM 7/11/2003 RAM
Hold pending approval of Special Use Permit,Shoreline Permit Mason Environmental Permit. Hearings set for May 27,2003. Special Use Permit SDP,and MEP approved on 6/23/03. Shoreline
CUP/VAR approved by DOE on 7/8/03. Copy received from North 40 of 7/11/03. See conditions.
COMA510 Reprint Commerical Permit 8/19/2003 None DONE PIB 8/19/2003 PIB
Page 1 of 1 CaseActivity..rpt
Michael Grohs- FW: Master List Leases Permits-Agreements.xls Page 1
From: "Brian McGinnis" <bmcginnis@northfortylodging.com>
To: "Michael Grohs" <michaeg@co.mason.wa.us>
Date: 2/7/2005 3:50:17 PM
Subject: FW: Master List Leases-Permits-Agreements.xls
Michael:
Here is the list of final items before Rick was to sign off the
COM2003-00089 permit (see his email message below).
These have all been completed. See my comments in Red.
Call me with any questions. n
.Brian ''// (�
/�
c�Nnis p�uwC d. U
Brian McGinnis
President
North Forty Lodging LLC
SE 64th Place
Suite 210 sa cry s�$
Suite
Issaquah, WA 98027
Tel: (425)369-9290
-----Original Message-----
From: Richard Mraz [ <mailto:Mrazr@co.mason.wa.us>
mailto:Mrazr@co.mason.wa.us]
Sent: Monday, October 18, 2004 11:37 AM
To: bmcginnis@northfortylodging.com
Subject: RE: Master List Leases-Perm its-Agreements.As
Looks good and looks pretty much complete. Thanks, Brian. Any idea about
the salmon carcass tossing?
Rick
p.s. Let me know what you decide to do about the algae growth in the
off-channel rearing pool. a.l/?�0��►,,a����-
>>>"Brian McGinnis"<bmcginnis@northfortylodging.com> 10/15/2004
5:06:36 PM >>>
Rick:
Thank you for coming out to meet with me this week. Walsh has permit
#COM2003-00089, which they are mailing to me.
On the basis of our discussion,we will be doing the following:
1. Covering the area surrounding our new maintenance building. Around the
maintenance building, we will complete the final grading and cover with
Michael Grohs FW: Master List Leases-Permits-Agreements.xls Page 2
t
gravel. On the open site area, we will be using erosion control practices
on that parcel. We will either spray it with erosion control hydroseed or
cover it with plastic within the next two weeks. (#12 on the permit
map)The area surrounding our maintenance building has been graded and
covered with fresh gravel. The open site area is now covered with growing
grass from erosion control hydroseed.
2. Cover or hydroseed the open area above our storm water outfall (#4 on the
permit map).
This area is now covered with filter fabric, held down by stakes and larger
rocks. We will add grass to this area when the weather gets warmer.
In addition, we will get you copies of our storm water drainage drawings
that reflect what was actually constructed. We have drawings that are
almost"as-built'drawings and will send you a copy. The drawings of all
storm drainage will need to be recorded with Mason County for easements.
Rick was sent a copy of these drawings. Let me know if you need to see our
cover letter.
We will also armor the beach with washed rock or gabion where the outfall
from the sand filter resides off of the cottage courtyard.
The outfall has been armored with gabion rock.
Thanks, Brian
Brian McGinnis
President
North Forty Lodging LLC
22526 SE 64th Place
Suite 210
Issaquah, WA 98027
Tel: (425)369-9290
-----Original Message-----
From: Richard Mraz [<mailto:Mrazr@co.mason.wa.us>
mailto:Mrazr@co.mason.wa.us]
Sent: Friday, October 15, 2004 9:05 AM
To: bmcginnis@northfortylodging.com
Subject: Re: Master List Leases-Permits-Agreements.xls
Brian:
I only need to sign off COM2003-00089.
Rick
>>>'Brian McGinnis" <bmcginnis@northfortylodging.com> 10/14/2004
4:04:12 PM >>>
Rick:
Attached is a list of Mason County permits. Can you please give me the ones
that you need to sign off for C of O?
Michael Grohs- FW: Master List Leases-Permits-Agreements.xls _ Page 3
Mike/Les/Greg:
Which of the orange Mason County permit cards in your files?
Thanks, Brian