Loading...
HomeMy WebLinkAboutCertification of Consistency NWS-2007-732-SO - OT General - 12/26/2007 CERTIFICATION OF CONSISTENCY WITH THE WASHINGTON STATE COASTAL ZONE MANAGEMENT PROGRAM FOR FEDERALLY LICENSED OR PERMITTED ACTIVITIES Federal Project Number: NWS-2007-732-SO Applicant: Brian McGinnis, Alderbrook Resort and Spa Project Description: Stormwater outfalls repair project on Hood Canal that will extend two outfall discharges at MHHW to-3 ft MLLW to reduce beach erosion. Eastern outfall will be routed between oyster beds under existing dock,which will be repaired(replaced)to accommodate pipe. Dock provides public access to shoreline,oyster beds, recreational opportunities(swimming, kayak rentals), the resort facilities,and the resort restaurant. Project will restore 0.14 ac of eroded intertidal habitat. Dock modifications will result in a net gain of 2,688 sq ft of intertidal habitat, reduce shading, and replace creosote pile with steel pile. Erosion and turbidity will be significantly reduced and stormwater will be fully mixed with marine water at new outlets. JARPA attached. This action under CZMA §307(c)(3)is for a project that will take place within Washington's coastal zone or which will affect a land use,water use,or natural resource of the coastal zone. The project complies with the following enforceable policies of the Coastal "Lone Management Program: 1. Shoreline Management Act(SMA): Is outside of SMA jurisdiction ( ) Applied for shoreline permit (x)# being reviewed by Mason Co. Has a valid shoreline permit ( )# issued by on __ Has received an SMA Exemption ( )# issued by on_ _ 2. State Water Quality Requirements: Does not require water quality permits ( ) Applied for water quality certification (X) Has received water quality certification ( )# issued on Applied for stormwater permit ()# issued on A __ Has received stormwater permit ( )# issued on _ 3. State Air Quality Requirements: Does not require air quality permits (X) Applied for Air Quality permit ( )# being reviewed by_ Has an Air Quality permit ( )# issued by on ___ 4. State Environmental Policy Act: SEPA Lead Agency is: Mason Co. Project is exempt from SEPA () SEPA checklist submitted (X)date Dec. 27,2007 SEPA decision issued/adopted ()DNS OMDNS O EIS O Other _date___ NEE A decision adopted by ( )SEPA# date lead agency to satisfy SEPA Public Notice for this.proposed project was provided through: (X) notices mailed to interested parties using_DARPA mailing list on (date). ( ) publication in (newspaper)on _(dates). Therefore, l certify that this project complies with the enforceable policies glWashington's approved Coastal Zone Management Program and will be conducted in a manner consistent with that program. tiignaturc:- _ ,.,�,2- Date: l�- a 6Lo-;r—