Loading...
HomeMy WebLinkAboutSHR2008-00010 - SHR Permit / Conditions - 7/1/2008 MASON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT Planning Division P 0 Box 279 Shelton, WA 98584 11flo (360)427-9670 SHORELINE PERMIT Case No.: SHR2008-00010 STATUS: ISSUED Received: 4/17/2008 Issued: 7/1/2008 Expires: 7/1/2010 Tvge of Permit: Sub. Dev./Conditional Use Applicant: NORTH FORTY LODGING 22526 SE 64TH PLACE STE 210 ISSAQUAH, WA 98027 Location of Project: 7107 SR 106, Union WA Within Hood Canal and/or its associated wetlands. The projectwill be within shorelines of statewide significance. Shoreline Desiqnation: Urban Parcel Number: 322335000014 Address: 7101 E STATE ROUTE 106 UNION Leqal Description: SUNNY BEACH PCL 1 OF BLA #04-58 Project Description: Restore a large area of eroded intertidal beach by re-routing and extending two stormwater outfalls from upper intertidal to low intertidal/subtidal elevations. Proposed project has three construction elements: 1) extension of two stormwater outfalls from existing shoreline near mean higher high water to intertidal depths below -3 ft mean lower low water, 2) repair and modification of an existing marine float to provide an outfall extension corridor and improve aquatic habitat, and 3) beach restoration and intertidal habitat improvements. SHR2008-00010 1 of 2 STATE O R- C E I V E D I U L 2 1 10Q� STATE OF WASHINGTON MC _ PLANNING DEPARTMENT OF ECOLOGY _ — — -- PO Box 47775• Olympia, Washington 98504-7775 • (360) 407-6300 July 16, 2008 I certify that I mailed a copy of this document to the persons and addresses listed herein, postage prepaid, in a receptacle for United Brian McGinnis States mail in Lacey,Washington,on North Forty Lodging, LLC a4l 22526 SE 64th PL Ste 210 Signature ca'f"l ` Issaquah WA 98027 Subject: Mason County Permit#SHR2008-00010 NORTH FORTY LODGING LLC -Applicant Shoreline Substantial Development and Conditional Use Permits # 2008-SW-03356 - CONCURRENT FILING Dear Mr. McGinnis: Purpose: Notification of Receipt of Concurrent Permit Filings and Approval of Conditional Use Permit On 7/3/2008,the Department of Ecology received notice that Mason County approved your application for a Substantial Development.Permit and a Shoreline Conditional Use Permit. Your permit authorizes the extension of two stormwater outfalls from their existing location near MHHW to depths below-3 ft MLLW;the repair and modification of the existing floating dock including installation of grating and sealed floats, and replacement of treated wood components with composite wood and steel pilings; and restoration of beach areas eroded by stormwater discharge. Work will occur within shoreline jurisdiction of Hood Canal(Chapter 90.58, RCW). Shoreline Substantial Development Permit: Before you begin activities authorized by this permit,the law requires you to wait at least 21 days from the date we received the decision letter from Mason County (7/3/2008). This waiting period allows anyone who may disagree with any aspect of this permit, including you,to appeal the decision to the state Shorelines Hearings Board. You must wait for the conclusion of an appeal before you can begin the activities authorized by this permit. The appeal period for the Substantial Development Permit ends 7/24/2008. 00 Shoreline Conditional Use Permit: By law, Ecology must review all Conditional Use Permits for compliance with the following: • The Shoreline Management Act(Chapter 90.58 RCW) • Ecology's Conditional Use Permit approval criteria(Chapter 173-27-160 WAC) • The Mason County Shoreline Master Program After reviewing for compliance, Ecology must decide whether to approve, approve with conditions, or disapprove a Conditional Use Permit. Our Decision: Ecology approves your Conditional Use Permit provided your project complies with the conditions required by Mason County. Please note that other federal, state, and local permits may be required in addition to this shoreline permit. What Happens Next? Before you begin activities authorized by this permit, the law requires you to wait at least 21 days from the mailing date of this letter(see certification above). This waiting period allows anyone(including you) who disagrees with any aspect of this permit,to appeal the decision to the state Shorelines Hearings Board. You must wait for the conclusion of an appeal before you can begin the activities authorized by this permit. The Shorelines Hearings Board will notify you by letter if they receive an appeal. We recommend, however, you contact the Shorelines Hearings Board before you begin permit activities to ensure no appeal has been received. They can be reached at(360)459-6327 or http://www.eho.wa.gov/Boards/SHB.asp. If you want to appeal this decision, you can find appeal instructions (Chapter 461-08 WAC)at the Shorelines Hearings Board website above. They are also posted on the website of the Washington State Legislature at: http://apps.le .wa. ovg� /wac. If you have any questions,please contact Kim Van Zwalenburg at(360)407-6520. Sin y, Perry J nd, UEnvironmentalAssistance Manager Sh ands and Program PJL:KV:dn cc: Grace Miller, Mason County Allison Reak, Sea-Run Consulting THIS SECTION FOR DEPARTMENT OF ECOLOGY USE ONLY IN REGARD TO A CONDITIONAL USE OR VARIANCE PERMIT Date received by the Department 7614W Approved Denied This conditional use/variance permit is approved/denied by the Department pursuant to chapter 90.58 RCW. Development shall be undertaken pursuant to the following additional terms and conditions: (Date) (Signatu Authorize ent Official) SHORELINE PERMIT CHECKLIST Application received and logged: �y�2i�ex (A er you have determined it is complete) Legal Notice delivered to Journal: (Affidavit of publication to be picked iip by staff after paid by applicant) Legal Notice Mailed: — (Give mailing list within 300'to clerical staff to mail on s e day as fax notice to Journal OR by the 2nd publication date,fill in as deadline for mailing) Legal Notice Posted: ;V (Has to be done BY second publication date but can be done befo it Complete Affidavit of Posting and have notorized.Take photos of site and adjacent parcels when posting site) Photos Taken: (Prior to packets being sent to Hearings Examiner,can do while posting site) SEPA required? YES r NO . Circulated on: HEARING DATE AND TIME: CP/i v/Z) (Establish potential date when first begin permit.Hearing must be after 30 day public comment period and allow time for yourself to write staff report&make packets to mail to HEX at least two weeks prior to hrg) WRITE STAFF REPORT: 5 � (Begin and deadline date Pick up Affidavit of Posting from Journal (to put in HEX pckts) 3C MAIL PACKETS TO HEX: (Give 3 sets to Susie two weeks before hrg) D/ ELISION: V Notice of Final Decision sent: 52 (To applicant and all parties of record) NOTES: j . Shoreline Management Act Permit Data Sheet and Transmittal Letter .� From: mason. county To: wash- stai-n nAnt of E;rile; P.O. Box _-e)ti ATTN: Shoreline Permit Reviewer Shelton, VIA 98584 Southwest Regional Office Box , Olympia-,VIA 98'504 Date of Transmittal: Z/a/o S� Date of Receipt (Dept of Ecology) Type of Permit: (Indicate all that apply) Substantial Development vl Conditional Use ✓ Variance Revision Other Local Government Decision: Approval Conditional Approval ✓ Denial Applicant Information: Applicant's Representative: (if primary contact) Name: Name: Address:_��5,�r, ray PL .S aca Address: LQ5 3c io'" Ayg A)W y55c ,1, W,¢ 9floa3 5ea'Me' tyA g 017 Phones ( ): (Y�3&2-jt, Phone(s): 69oc;) Is the applicant the property owner: ✓ Yes No .Location of Property (Section,Township and Range to the nearest 1/4, 1/4 Section or latitude and longitude,and a street address where available �e C 3a 7zuN a3 /V d.a 5_3 N /a30 Dgf o 1 (�f Water Body Name: no,d-e"&/ Shoreline of Statewide Significance: Yes No Environment Designation: 66hc��, Description of Project: (Summary of the intended use or project purpose) . ,41de,16w)e 1&sal ad&g Sna -QD ww � I _ rho is F.l�ud" Notice of Application Date: Final Decision Date: G4aS g By: 6�a'qg ji'lle4 Phone #: 99&70 Q �1