HomeMy WebLinkAboutSEP2008-00052 - SEP Determinations - 5/1/2008 Pr,ON-STA MASON COUNTY
C DEPARTMENT OF COMMUNITY DEVELOPMENT
4 N1 v
o ^ u =_ Planning Division
o T = P O Box 279, Shelton,WA 98584
1 �,o~ (360)427-9670
1864
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2008-00052
Description of Proposal: Alderbrook Resort & Spa Stormwater Outfall Improvements.
Project has three construction elements: 1) extension of two
stormwater outfalls from existing shoreline near MHHW to
intertidal depths below -3 ft MLLW, 2) repair and modification of
an existing marine float to provide an outfall extension corridor
and improve aquatic habitat, 3) beach restoration and intertidal
habitat improvements.
Proponent: NORTH FORTY L�0060N(4
Site Address (If Assigned): 7101 E STATE ROUTE 106 UNION
Directions to Site: 7107 S.R. 106, Union
Parcel Number: 322335000014
Legal Description: SUNNY BEACH PCL 1 OF BLA #04-58
Lead Agency: Mason County
The Lead Agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An Environmental Impact Statement (EIS) is not required
under RCW 43.21 C.030(2)(c). This decision was made after review of a completed
Environmental Checklist and other information on file with the Lead Agency. This information is
available to the public upon request. MITIGATED MEASURES ARE ATTACHED.
Please contact Grace Miller at ext. 360 with any questions. This DNS is issued under WAC
197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown
below, when the determination is final. Comments must he submitted to Dept. of Community
Development, P.O. Box 279, Shelton WA 98584 by 5/,�/2008. Appeal of this determination
must be filed within a 14-day period following this final determination date, per Mason County
Code Chapter 15.11 Appeals.
10
� IDat
thorized Local Government Official Date
`kokoAALSq-PZ 13f—:::
.rraA ItMcoc- A PR to,4nr►- Lv�Dµ
MITIGATED
DETERMINATION OF NONSIGNIFICANCE
(WAC 197-11-350)
SEP2008-00052
CONDITIONS OF THIS DETERMINATION
1) Water quality is not to be degraded to the detriment of the aquatic environment as a result
of this project.
2) Residential developers and individuals shall be required to control erosion during
construction. Removal of vegetation should be minimized and any areas disturbed should
be restored to prevent erosion and other environmental
impacts.
3) All Conservation Measures listed within Section 8 of the Biological Assess ment/EvaIuation
must be implemented during project.
MASON COUNTY ENVIRONMENTAL CHECKLIST
BACKGROUND
1. Name of proposed project, if applicable:
Alderbrook Resort & Spa Stormwater Outfalls Improvements
2. Name of applicant:
North Forty Lodging, LLC
3. Address and phone number of applicant and contact person:
Applicant
North Forty Lodging, LLC
c/o Brian McGinnis
22526 SE 64th Place
Suite 210
Issaquah, WA 98027
(424) 369-9290
Contact Person
(1) Brian McGinnis
22526 SE 64th Place
Suite 210
Issaquah, WA 98027
(424) 369-9290
(2)Allison Reak
Sea-Run Consulting
6531 1Oth Ave NW
Seattle, WA 98117
(206) 718-3285
(3)Jason Van Gilder
Cosmopolitan Engineer 'qQ-m-P
ree Two nar t(j75
(206) 920-8781
4. Date checklist prepared:
April 10, 2008
5. Agency requesting checklist:
Mason County
TO BE COMPLETED BY APPLICANT I
6. Proposed timing or schedule (including phasing, if applicable):
Approximately three weeks of onsite construction activity during the approved in-water
work period(July 15, 2008 to Feb 15, 2009).
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain.
No.
8. List any environmental information you know about that has been prepared, or
will be prepared, directly related to this proposal.
JARPA Application(includes 2007 Alderbrook Resort and Spa Stormwater Outfalls
Repair BABE) submitted to the U.S. Army Corps of Engineers in December 2007 and
April 2008 Addendum.
9. Do you know whether applications are pending for governmental approvals of
other proposals directly affecting the property covered by your proposal? If yes,
explain.
No.
10. List any government approvals or permits that will be needed for your
proposal, if known.
Mason County--Substantial Development and Conditional Use permits, Shoreline
Management Program Environmental Checklist, ESA-Salmonids Checklist
Washington Department of Fish and Wildlife (WDFW)—Hydraulic Project Approval
Washington Department of Ecology (WDOE)--Section 401 Water Quality Certification
Washington Department of Ecology (WDOE) --Coastal Zone Management Consistency
approval
National Marine Fisheries Service (NMFS aka NOAA Fisheries)—Section 7 Endangered
Species Act concurrence
U.S. Fish& Wildlife Service (USFWS)—Section 7 Endangered Species Act concurrence
U.S. Army Corps of Engineers (USACE)—Section 404 Individual Permit
11. Give brief, complete description of your proposal, including the proposed
uses and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to repeat those answers on this page. (Lead agencies may modify this form
to include additional specific information on project description.)
This project proposes to restore a large area of eroded intertidal beach by re-routing and
extending two stormwater outfalls from upper intertidal to low intertidal/subtidal
elevations. Habitat restoration will include replacing eroded beach sediment with similar
material to its original contours and elevations and removing old construction debris from
intertidal habitat. Stormwater outfall improvements will include repairing and improving
Alderbrook Resort Stormwater Outfalls Repair -2- April 2008
Environmental Checklist
y
TO BE COMPLETED BY APPLICANT P �//
an existing floating dock and replacing part of a collapsed stone wall on adjacent property
that was damaged by stormwater discharges.
The project site is a commercial resort in operation since 1913 with a floating dock that
provides fuel and a sewage pump-out for south Hood Canal visitors and public access to
the resort and its facilities. Resort facilities and amenities include a restaurant, saltwater
swimming float, swimming pool, kayak rentals, beach combing, and shellfish digging
within the resort's Class 2 tidelands with oyster beds certified for harvest and
consumption. The total area of project site, within Alderbrook tidelands between mean
higher high water(MHHW)and extreme low water(ELW) is 21,700 ft2 (0.5 ac).
In 2004, the resort completed a major renovation and expansion, which included a new
stormwater collection and treatment system, restoration of a small creek (Alderbrook
Creek) for salmon habitat, and extensive landscaping improvements with native plants.
The new stormwater treatment system uses bioswales and filters that retain and treat
stormwater from all paved areas, including sidewalks, access drives, and parking areas, in
addition to small areas of lawn and large areas of native vegetation. The treated
stormwater is released via two stormwater outfalls located at mean higher high water on
the east and west sides of the resort.
This project would restore 0.14 ac/58 cy of eroded upper intertidal beach with native (or
matching) fill,remove more than 200 ft2 of debris from intertidal beach, extend two
existing stormwater outfalls from approximately MHHW to subtidal elevations(below
-3 ft MLLW), modify the existing marine float to eliminate its grounding footprint,
replace 21 creosote wood piles with 21 galvanized steel piles, replace 5,234 ft2 of marine
float solid decking with grated decking, and replace part of a collapsed stone wall on an
adjacent property. The project would result in a net increase of 3,322 ft2 of fine-grained
intertidal habitat.
The existing standpipe at the eastern outfall will be removed and replaced with a concrete
coupling that will allow the outfall extension pipe to drop below grade and run westward,
parallel to the bulkhead, turn northward, under the floating dock, before terminating at
-3 ft MLLW. Pipe material will consist of 395 ft of 18-in-dia corrugated polyethylene
storm sewer pipe (CPSSP) and 195 ft ofl 8-inch high-density polyethylene (HPDE). All
pipe laid parallel to the bulkhead will be buried three to six feet below grade. Under the
dock, the pipe section nearest the bulkhead will be buried for a distance of 90 ft, 50 ft of
pipe will be partially buried, and 190 ft of pipe will be elevated above the seafloor using
concrete anchors to allow littoral movement of fish, oyster spat, and beach sediment.
The floating dock and perpendicular moorage floats will be removed to accommodate
pipeline construction. After the pipeline is installed, all floats will be replaced(within the
same footprint)by sections that will use improved flotation, grated decking, and steel
piles. Forty-eight(48) 8-in-dia steel piles will be installed to support the bottom of the
floating dock a minimum of 12 inches above grade at low tides. Piles will be installed in
pairs across the width of the dock from the bulkhead to -4.5 ft MLLW. Each pair will be
connected by an 8-ft-long treated wood beam (12- by 12-in cross section)to support the
dock at low tides. Wood treatment will be ACZA (ammoniacal copper zinc arsenate).
Alderbrook Resort Stormwater Outfalls Repair -3- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT Y
Pairs of pile stops will be spaced between 14 and 18 ft apart. New flotation will consist
of high-density polyethylene(HDPE)tubs configured to allow fish passage between and
under the tubs. Fifty-two percent of existing solid wood decking will be replaced with
grated decking. The old dock will be donated to the Skokomish Tribe.
The existing western outfall will be extended from the bulkhead for a distance of 330 ft to
terminate at-3.5 ft MLLW. The section of pipe nearest the bulkhead will be buried for a
distance of 270 ft. The remaining 60 ft will be partially buried up to the outfall.
Following pipeline construction, approximately 58 cy of material similar to the existing
beach substrate will be salvaged from the site (from the pipeline trench sidecasting)
and/or imported to restore the natural beach profile. In addition, over 200 feet of
abandoned concrete,metal, and wood stave and plastic pipe will be removed and
disposed of in a landfill.
Construction equipment will consist of a small, rubber-tracked or similar type of
excavator to dig the pipeline trenches during low tides. Pile extraction and installation
will be done during high tides by a vibratory pile driver mounted on a barge. Equipment
access to the upper beach will be provided by a private drive on the adjacent east
property. Other material, including pipe, anchors, replacement float sections, and
imported fill, will be brought to the site by barge. Construction(in 2008) is estimated to
take 14 days over a period of 3 weeks to take advantage of the tides. The salmon and
trout combined allowable in-water work periods are July 15 —February 15. No forage
fish spawning areas or herring holding areas are recorded by WDFW at this location.
Additional details of the project construction and schedule information were provided in
JARPA Attachment A(December 2007). Engineering drawings and design details,
revised in April 2008, are provided in JARPA Attachment B (attached).
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a street
address, if any, and section, township, and range, if known. If a proposal would
occur over a range of area, provide the range or boundaries of the site(s).
Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans required by the agency,
you are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
East 7107 Highway 106,
East of Union, WA 98592
470 20' 53" N 1230 04' 01" W
Section 33 Township 22N Range 3 W
See attached Figures 1 and 2 from the April 2008 JARPA Attachment B Project Figures.
Alderbrook Resort Stormwater Outfalls Repair -4- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT oc l
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site(circle one): Flat, rolling,hilly,steep slopes,
mountainous, other.
The shoreline adjacent to the project construction area is flat.
b. What is the steepest slope on the site (approximate percent slope)?
3- 5 percent
c. What general types of soils are found on the site (for example, clay, sand, gravel,peat,
muck)? If you know the classification of agricultural soils,specify them and note any
prime farmland.
Marine sediment is sandy gravel,with a fraction of surficial fines (i.e.,this is a low-
energy marine beach between mean higher high water and extreme low water). No
construction will occur waterward of MHHW. Upland soils are a mix of native and
imported material.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If
so, describe.
No.
e. Describe the purpose, type,and approximate quantities of any filling or grading
proposed. Indicate source of fill.
Not applicable.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
No upland clearing or construction will occur from this project. Shoreline access is
almost entirely on existing paved drives, so erosion is not anticipated. A short distance of
grass between a private drive and the upper shoreline(on an adjacent property)will be
covered with plywood to prevent vehicle ruts through the property. Any disturbed areas
will be immediately restored following construction.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
Alderbrook Resort Stormwater Outfalls Repair -S- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT le3c Y
No upland areas will receive new impervious surfaces. The total area of new impervious
surface in the intertidal would be about 247 ft2, consisting of the 19 concrete anchors that
will elevate part of the eastern outfall extension,the pipe sections that transition from
buried to exposed(each about 50 ft long), 48 pile stops, and the bulkhead connections
between the existing stormwater outfalls and the new pipe extensions. This total area is
about one percent of the Alderbrook intertidal property (21,700 ft2). The increase in new
impervious surface will be offset by the removal of about 200 ft2 of old pipe and debris
and the elimination of 3,072 ft2 of dock flotation that currently rests on the beach
substrate at low tides. The project would result in a net increase in fine-grained
intertidal substrate of 3,322 ft2.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
A Temporary Erosion Sedimentation Control plan will be fully implemented.
Construction techniques will utilize Best Management Practices (BMPs) such as those
described in the Stormwater Management Manual for Western Washington (2004). Silt
fences,plywood sheets, or other appropriate erosion control measures will be erected at
appropriate locations.
To reduce or control erosion in the intertidal,the construction area will be limited to a 25-
ft-wide corridor along the alignment. The allowable outfall construction area will be
semi-permanently flagged before construction vehicles begin working below MHHW.
Flagging, especially rebar stakes, will be removed after construction has been completed.
Excavation and fill within the upper to mid-intertidal zone will occur only during periods
of low tide. Trenches will be backfilled within a day of excavation.
Float-and-sink pipe installation, dock replacement,and pile extraction/driving will occur
only during high tides. Barges and boats will not be allowed to ground during low tides.
A Spill Prevention Control and Countermeasure(SPCC)Plan will be prepared and
implemented by the contractor. The plan will be site-specific, cover the project scope of
work, and include the following elements:
• Site- and project-specific information.
• Spill prevention, control and containment methods.
• Response protocols and reporting procedures for construction-related leaks or
spills.
• Contingency plan and provisions.
• Waste disposal methods and locations.
• Proper management of oil, gasoline and solvents used in the operation and
maintenance of construction equipment.
The SPCC will ensure that equipment will be free of external petroleum-based products
prior to entering the work area and during the work, and for making any necessary repairs
prior to returning the equipment to operation in the work area. This SPCC will be
consistent with requirements of W SDOT 2006 Standard Specifications section 1-07.15(1)
and the State of Washington Oil Spill Contingency Plan. No vehicles or equipment will
be serviced with oil-based products or refueled within the Alderbrook intertidal property.
Alderbrook Resort Stormwater Outfalls Repair -6- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT L-Y 7
Equipment staging and/or materials storage will not be allowed on the beach. Equipment
and materials will be delivered as-needed on a daily basis by rubber-tracked vehicle or
barge.
All unplaced construction materials and debris will be removed from the shoreline on a
daily basis prior to leaving the site for the work day.
2. Air
a. What types of emissions to the air would result from the proposal (i.e., dust,
automobile, odors, industrial wood smoke) during construction and when the project is
completed? If any, generally describe and give approximate quantities if known.
Construction equipment exhaust will occur during the expected two-three weeks of
construction. No emissions will occur from the project after construction is completed.
b. Are there any off-site sources of emissions or odor that may affect your proposal? If so,
generally describe.
None.
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
None.
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the site (including
year-round and seasonal streams, saltwater,lakes,ponds,wetlands)? If yes, describe type
and provide names. If appropriate, state what stream or river it flows into.
The proposed work will be in Hood Canal (WRIA#14). A nearby stream is Alderbrook
Creek, which was reconstructed in 2002 from a narrow drainage channel into a
meandering creek with a riffles/pool habitat complex and native riparian vegetation. The
mouth of Alderbrook Creek is within the project area, between the marine float and the
western outfall.
2) Will the project require any work over,in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
Yes,the entire project will occur within intertidal elevations of marine waters (see
JARPA for details and construction drawings). No construction will occur above
MHHW.
Construction for the eastern outfall extension will occur from an elevation of
approximately 9.2 ft MLLW to -3.0 ft MLLW. Construction for the western outfall will
Alderbrook Resort Stormwater Outfalls Repair - 7- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
occur from approximately 9.2 ft MLLW to-3.5 ft MLLW. Repair/replacement of the
floating dock, including piles,will occur between mean higher high water(about
13.5 ft MLLW) and about-16.5 ft MLLW.
3) Estimate the amount of fill and dredge material that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
The purpose of the project is to restore intertidal habitat that has been severely eroded by
stormwater discharges in the upper intertidal; therefore,the project will result in a net
increase of fill material to restore native grades and fill eroded areas. Any removal of
material is either temporary (to lay pipe)or restorative (debris removal).
Roughly 45 cy of material will be temporarily removed (sidecast) along the pipeline
construction alignments to install the outfall extensions. The total intertidal area that may
be disturbed during construction is about 0.53 ac. This area is within a 25-ft-wide swath
that extends along the pipeline alignment and is referred to as the allowable construction
limit.
Imported fill includes the following: small gravel and sand"habitat mix" sized similarly
to the site's natural substrate, rock and large gravel that will be added under and around
the buried sections of pipe to create a stable foundation, about 3 cy of concrete to build
connections between the bulkhead and both proposed pipeline extensions, about 0.25 cy
concrete to separate the eastern outfall extension from the sewer pipeline near the
bulkhead, 920 ft of 18-in-dia pipe to extend the outfalls, 17 ft 2 of stop piles, and about
22 cy of concrete anchor/supports.
Approximately 58 cy will be used to restore the natural surface grade over 0.14 acres of
eroded beach. Part of the fill material will be salvaged from native material excavated
from the pipeline trenches and the remainder will be imported; grain size will be similar
to the native beach material.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No.
5) Does the proposal lie within a 100-year floodplain? If so,note location on the site plan.
Yes; the entire intertidal area is considered floodplain.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No. The removal of 19 creosote-treated wood piles may be considered waste removal
from surface waters.
Alderbrook Resort Stormwater Outfalls Repair -8- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
b. Ground:
1) Will groundwater be withdrawn, or will water be discharged to groundwater? Give
general description, purpose,and approximate quantities if known.
No.
2) Describe waste material that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals. . . ; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of animals
or humans the system(s) are expected to serve.
None.
c. Water runoff(including stormwater):
1) Describe the source of runoff(including storm water) and method of collection and
disposal,if any (include quantities, if known). Where will this water flow? Will this water
flow into other waters? If so, describe.
The project will not change the source of stormwater runoff or method of collection
and disposal. Site stormwater will continue to discharge into Hood Canal, but at
deeper intertidal elevations, where the new outfalls will be submerged almost all the
time.
2) Could waste materials enter ground or surface waters? If so, generally describe.
The proposed project will not generate or disturb waste materials. A sewage pump-
out station for visiting boats will be temporarily removed during dock replacement.
The pump-out station does not store waste, so disconnecting the pump will not result
in the release of waste.
The removal of 21 creosote-treated wood piles may be considered waste removal
from surface waters. The piles will be transported from the site by barge, cut into 4-
ft-long pieces, and transferred to an upland disposal facility.
d. Proposed measures to reduce or control surface, ground, and runoff water impacts,
if any:
(Repeated from B.l.h.) A Temporary Erosion Sedimentation Control plan will be fully
implemented. Construction techniques will utilize Best Management Practices(BMPs)
such as those described in the Stormwater Management Manual for Western Washington
(2004). Silt fences,plywood sheets, or other appropriate erosion control measures will be
erected at appropriate locations.
To reduce or control erosion in the intertidal,the construction area will be limited to a
25-ft-wide corridor along the alignment. The allowable outfall construction area will be
semi-permanently flagged before construction vehicles begin working below MHHW.
Flagging, especially rebar stakes,will be removed after construction has been completed.
Alderbrook Resort Stormwater Outfalls Repair -9- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
Excavation and fill within the upper to mid-intertidal zone will occur only during periods
of low tide. Trenches will be backfilled within a day of excavation.
Float-and-sink pipe installation, dock replacement, and pile extraction/driving will occur
only during high tides. Barges and boats will not be allowed to ground during low tides.
A Spill Prevention Control and Countermeasure(SPCC)Plan will be prepared and
implemented by the contractor. The plan will be site-specific, cover the project scope of
work, and include the following elements:
• Site- and project-specific information.
• Spill prevention, control and containment methods.
• Response protocols and reporting procedures for construction-related
leaks or spills.
• Contingency plan and provisions.
• Waste disposal methods and locations.
• Proper management of oil, gasoline and solvents used in the operation and
maintenance of construction equipment.
The SPCC will ensure that equipment will be free of external petroleum-based products
prior to entering the work area and during the work, and for making any necessary repairs
prior to returning the equipment to operation in the work area. This SPCC will be
consistent with requirements of WSDOT 2006 Standard Specifications section 1-07.15(1)
and the State of Washington Oil Spill Contingency Plan. No vehicles or equipment will
be serviced with oil-based products or refueled within the Alderbrook intertidal property.
Equipment staging and/or materials storage will not be allowed on the beach. Equipment
and materials will be delivered as-needed on a daily basis by rubber-tracked vehicle or
barge.
All unplaced construction materials and debris will be removed from the shoreline on a
daily basis prior to leaving the site for the work day.
4. Plants
a. Check or circle types of vegetation found on the site:
_X_ deciduous tree: alder, maple, aspen,other:
_X_ evergreen tree: Douglas fir, western red cedar, pine, other
_X_ shrubs: snowberry, rhododendron, salal
grass
pasture
crop or grain
wet soil plants: cattail, bullrush, skunk cabbage, other: Salicornia sp. (pickleweed)
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
The shoreline adjacent to the intertidal area is vegetated with some native and non-native
shrubs and grass. Near the mouth of Alderbrook Creek are several patches of pickleweed
(Salicornia sp.). Eelgrass is not present within the intertidal elevations of the project.
Alderbrook Resort Stormwater Outfalls Repair -10- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
Macroalgae,possibly a Fucus sp., has been reported as attached to the waterward side of
some moorage floats.
b. What kind and amount of vegetation will be removed or altered?
Any attached algae on the old floats will be removed when the floats are removed.
Replacement floats will provide attachment area for new algae.
C. List threatened or endangered species known to be on or near the site.
No threatened or endangered plants are known to be on site.
d. Proposed landscaping,use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
No shoreline vegetation will be disturbed, so no replacement is proposed.
i. Animals
a. List any birds and animals which have been observed on or near the site or are
known to be on or near the site:
birds: hawk, heron, bald eagle, songbirds, other: marbled murrelet
mammals: deer, bear, elk,beaver,other: river otter
fish: salmon,trout, herring, sandlance, shellfish,other:
b. List any threatened or endangered species known to be on or near the site.
From Alderbrook Resort and Spa Stormwater Outfalls Repair 2007 BABE
Common Name Listing Status Designated Critical Habitat
Chinook salmon(Puget Sound) Threatened Marine Nearshore
Chum salmon(Hood Canal Summer Run) Threatened Marine Nearshore
Critical Habitat for Chinook and Chum Salmon Designated Yes
Bull Trout(Puget Sound-Coastal) Threatened Marine Nearshore
Critical Habitat for Bull Trout Designated Yes
Puget Sound Steelhead and Critical Habitat Threatened Marine Phases
Bald Eagle Threatened No
Marbled Murrelet and Critical Habitat Threatened Yes
C. Is the site part of a migration route? If so, explain.
Yes,the site is part of a migration route for both juvenile and adult salmon, steelhead,
and bull-trout.
d. Proposed measures to preserve or enhance wildlife, if any:
The project was designed to eliminate beach erosion from two stormwater outfalls,
restore the beach to its native grade, and recover oyster beds. To achieve its restoration
Alderbrook Resort Stormwater Outfalls Repair -11- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANTG(
goal, the two outfalls were designed to be extended to near-subtidal elevations,routed
around existing oyster beds, and buried along most of the new alignments. Along the
deepest section of the extended eastern outfall, where the pipe emerges from below
grade, about 190 ft of pipe will be elevated about four inches off the bottom to allow
water and sediment circulation and fish passage.
To avoid digging through existing oyster beds, the eastern outfall alignment was routed
along the bulkhead and under the existing floating dock. This route will require the
floating dock to be replaced with a modified floatation system that will accommodate the
pipe. The dock will be replaced within the same location and footprint. Dock
components will be assembled in sections off site and floated into place above the
pipeline alignment during high tide. The replacement dock will be constructed from a
recycled wood-composite material (e.g., Trex®). Replacement details are shown in the
April 2008 JARPA Attachment B, Figures 21-23. About 52 percent of the decking will
consist of expanded steel grating to allow greater transmission of light through the dock.
The old friable Styrofoam slab flotation will be replaced with small polyethylene tubs
configured to fit around the new pipeline. Pile stops will be used to eliminate all dock
area that currently grounds on the beach at low tide, recovering about 3,025 ft2 of
substrate. Dock modification and debris removal will result in a net increase of 3,322 ft'
of fine-grained intertidal habitat.
All 21 creosote piles will be removed and replaced in approximately the same locations
by steel piles. All piling removal and installation will be completed using vibratory
hammers to minimize the noise impacts on wildlife, especially marbled murrelet. Any
piles that cannot be removed will be cut off at or below the seafloor level. All creosote
piles will be disposed of at a suitable upland disposal facility. All removal and
replacement of piles will be conducted by barge at high tide. No pile driving equipment
will be allowed to anchor in oyster beds or ground on the beach.
The western outfall will be extended from the existing bulkhead approximately 330 ft to
an outlet elevation of-3.5 ft MLLW. About 270 ft of pipe will be buried and 60 ft will be
exposed. During discussions in the fall of 2007 with Dan Guy (NMFS), this alignment
was determined provide the maximum benefits for federally listed threatened and
endangered species and critical habitat,while causing only temporary harm (i.e., digging)
to the oyster beds.
All in-water activities will take place during the WDFW and USACE (combined) in-
water work window of July 16 to February 15 for the protection of salmonids.
The restoration of the existing eroded channels will include the removal of the abandoned
pipes (over 100 ft of wood stave pipe and 100 ft of concrete pipe), concrete and rock
debris, and plastic conduit, and the demolition of an existing cantilevered concrete block
at the end of the outfall standpipe. The collapsed section of the adjacent property's rock
wall will be replaced in-kind. The eroded channel near the existing bulkhead will be
filled with native or similar material. Native beach material and/or habitat mix
(approximately 35 cy)that matches the existing surface grain size will be used for final
backfill and grading east of the floating dock to natural beach grades.
Alderbrook Resort Stormwater Outfalls Repair - 12- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT 7
Beach restoration will include the removal of abandoned pipes(over 100 ft of wood stave
pipe and 100 ft of concrete pipe), concrete and rock debris,plastic conduit, and the
demolition of an existing cantilevered concrete block at the end of the outfall standpipe.
About 35 cy of native or similar-sized imported habitat mix will be used to fill eroded
channels and return beach near the eastern outfall to native grades. Nineteen creosote
piles(about 10-in-dia)will be replaced with equivalent diameter steel piles.
Approximately 23 cy of native material and/or habitat mix will be used to re-grade the
erosion that has occurred on the beach in the vicinity of the western outfall. A total of
approximately 58 cy of fill material will restore about 0.14 ac of intertidal habitat and
allow oysters and other shellfish to recolonize the currently impacted beach.
6. Energy and natural resources
a. What kinds of energy (electric, natural gas, oil,wood stove, solar)will be used to
meet the completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
None. Both outfall systems work via gravity.
b. Would your project affect the potential use of solar energy by adjacent properties?
If so, generally describe.
No.
C. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts,if any:
None (no energy will be used).
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste that could occur as a
result of this proposal? If so, describe.
No. The existing stormwater treatment system will not be affected by this project. The
stormwater outfalls will be extended to discharge into near-subtidal waters,to achieve
maximum dilution. The resort stormwater is not known to be toxic or hazardous. Most
of the stormwater runoff is composed of natural drainage from seeps and runoff from
"clean"areas (e.g., landscaped areas, roof drains, sidewalks). Runoff from the parking
areas is wither infiltrated or treated before release. Runoff from SR-106 is either
infiltrated or treated before release. Alderbrook is located in a rural, remote location that
does not have heavy traffic or industrial activity nearby.
1) Describe special emergency services that might be required.
Not applicable
Alderbrook Resort Stormwater Outfalls Repair -13- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
2) Proposed measures to reduce or control environmental health hazards,if any:
Stormwater from both parking lots are collected and directed into bioswales,
infiltration trenches and sand filters per the Washington State Department of Ecology
Stormwater Design Manual (2000).
b. Noise
1) What types of noise exist in the area which may affect your project(for example:
traffic, equipment, operation, other)?
None. Existing noise onsite would come from recreational boats, but no boats will
have access to the resort during construction because the dock will be temporarily
removed.
2) What types and levels of noise would be created by or associated with the project on
a short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
During construction there will be short-term noise from the equipment used, which
may include rubber-tracked excavators, light-weight dump trucks, a pneumatic
powered jack hammer(for concrete removal), a tug-assisted barge and a vibratory
pile driver. No pile proofing is required. Construction will occur during daylight
hours.
3) Proposed measures to reduce or control noise impacts, if any:
Air compressors for the pneumatic powered jack hammer will be placed away from
beach and guests. Land-based construction vehicles will be equipped with mufflers.
8. Land and shoreline use
a. What is the current use of the site and adjacent properties?
The current use of the site is hotel/resort that has been in existence since 1913. The resort
dock is used by the public for access to recreational moorage, fuel, a sewage pump-out
station,the resort shoreline and waters,and the resort restaurant.
Adjacent properties to the west and east are residential.
b. Has the site been used for agriculture? If so, describe.
No. The site includes Class 2 tidelands and is currently certified for shellfish harvest.
C. Describe any structures on the site.
Structures existing on the property consist of the resort hotel complex and spa; an
enclosed swimming pool; 21 resort cottages; a concrete bulkhead along the shoreline; a
Alderbrook Resort Stormwater Outfalls Repair -14- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT /
floating dock with a sewage pump-out station, fuel, and associated office; a kayak rental
float and swimming float;paved parking areas; a sewage treatment system; and a
stormwater collection and treatment system with two outfalls that are the subject of this
application. Details and photos of the structures affected by this proposal are provided in
JARPA Attachment A(December 2007) and the latest engineering details are in JARPA
Attachment B of April 2008 (attached).
d. Will any structures be demolished? If so,what?
The existing eastern outfall standpipe and concrete slab will be removed.
e. What is the current zoning classification of the site?
Rural tourist
f. What is the current comprehensive plan designation of the site?
Rural
g. if applicable, what is the current shoreline master program designation of the site?
Urban Commercial
h. Has any part of the site been classified as an "environmentally sensitive" area? If
so, specify.
The site is a privately owned Class 2 Tideland certified for shellfish harvest. The site
has extensive oyster beds. The site is also habitat for federally listed threatened and
endangered species of salmonids (i.e., Hood Canal summer chum salmon, Chinook
salmon, Puget Sound steelhead, and bull trout).
i. Approximately how many people would reside or work in the completed project?
None.
j. Approximately how many people would the completed project displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if and:
Not applicable.
1. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any:
The project purpose is to restore and enhance 0.14 ac of intertidal beach habitat and
oyster beds. The outfall extensions were designed to eliminate intertidal erosion, prevent
future erosion from stormwater discharges by submerging the outfalls, achieve maximum
Alderbrook Resort Stormwater Outfalls Repair -1 S- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
stormwater mixing in Hood Canal outside the elevations of critical habitat use by juvenile
salmonids,and allow shellfish beds to recover. The outfall extensions were designed to
minimize impacts to existing oyster beds and minimize the footprint of pipe resting on
the beach. The dock replacement was designed to eliminate the area of dock that
currently grounds on the beach, maximize the amount of light penetration through the
dock(by using grated decking over 52 percent of the surface) and remove creosote from
the marine environment(by using steel piles). The dock will retain its fuel and sewage
pump-out services and public access to the shoreline.
9. Housing
:1. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
Not applicable.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle,or low-income housing.
Not applicable.
C. Proposed measures to reduce or control housing impacts, if any:y:
Not applicable.
Ill. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what
is the principal exterior building material(s) proposed?
The outfall extensions will be 18-in-dia black plastic pipes. About 50 ft of the western
outfall will be visible at extreme low tides. The eastern outfall will be buried and hidden
by the floating dock. At low tides,the replacement dock will project about one foot
higher than the existing dock because of the pile stops. The pile stops will be installed
under the dock, so no additional piles will be visible.
b. What views in the immediate vicinity would be altered or obstructed?
No views will be altered by the eastern outfall extension. About 50 ft of the western
outfall will be visible at extreme low tides for about an hour during daylight, a few days
each year. At low tides,the replacement dock will project about one foot higher than the
existing dock because of the pile stops. The pile stops will be installed under the dock, so
no additional piles will be visible.
C. Proposed measures to reduce or control aesthetic impacts, if any:
The eastern outfall alignment was designed to be buried along the bulkhead and hidden
under the existing dock for the remainder of the extension. The alignment was chosen to
avoid oyster beds and reduce aesthetic impacts for the resort. The western outfall
Alderbrook Resort Stormwater Outfalls Repair -16- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT Wf'
alignment was designed to move the outlet to the deepest elevation possible, while
remaining on resort property and to minimize the length of pipe visible during low tides.
About 50 ft of the western outfall will be visible at extreme low tides for about an hour
during daylight, a few days each year.
The pile stops were designed to support the dock from below so that the 48 additional
piles would not affect aesthetics.
Removal of old debris, replacement of the damaged rock wall, removal of the stormwater
outfalls from the bulkhead to near-subtidal elevations, and restoration of the eroded beach
are aesthetic improvements.
1 1. Light and glare
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
The proposed project would not alter existing lighting. If construction occurs at night,
temporary lighting would be required.
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
If construction is scheduled at night, temporary lighting would be necessary for safety.
Construction lighting would temporarily interfere with views, but the interference would
be of short duration, at night, during winter low tides, when fewer people use the resort or
adjacent summer homes.
c. What existing off-site sources of light or glare may affect your proposal?
None.
d. Proposed measures to reduce or control light and glare impacts, if any:
Due to the higher cost of night construction, the project would try to minimize night
construction, and consequently, night construction lighting.
12. Recreation
a. What designated and informal recreational opportunities are in the immediate vicinity?
Swimming, boating, clamming,kayaking,oyster collection, and dining occurs within or
adjacent to the project area. The dock provides public access to the shoreline and to the
resort restaurant.
b. Would the proposed project displace any existing recreational uses? If so, describe.
The proposed project would temporarily displace some recreational uses during dock
replacement.
Alderbrook Resort Stormwater Outfalls Repair - 17- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Because the project site is a resort, the proposed project has been designed to minimize,
reduce, and control impacts on recreational opportunities. The extension and burial of
stormwater outfalls was designed to eliminate beach erosion and recover shellfish beds
for recreational users. The replacement dock will enhance public access between the
shoreline,water, and resort. The removal of abandoned pipes and creosote piles will
enhance recreational use. The restoration of the beach and tidelands will provide
enhanced recreational opportunities.
13. Historic and cultural preservation
a. Are there any places or objects listed on, or proposed for, national, state, or local
preservation registers known to be on or next to the site? If so, generally describe.
No.
b. Generally describe any landmarks or evidence of historic, archaeological,scientific, or
cultural importance known to be on or next to the site.
There are no known historic landmarks located on or near the site(per Washington
Department of Historic Preservation WISAARD online search).
c. Proposed measures to reduce or control impacts, if any:
If any evidence of historic, archaeological or cultural importance is discovered during
construction,the State Historic Preservation Office will be notified immediately and
appropriate measures taken.
14. Transportation
a. Identify public streets and highways serving the site, and describe proposed access to
the existing street system. Show on site plans, if any.
The major road in the project vicinity is State Route (SR) 106. Access will be via
existing connections
b. Is site currently served by public transit? If not, what is the approximate distance to
the nearest transit stop?
The Alderbrook Inn is currently serviced by public bus, which travels between Belfair
and Shelton. It passes the resort twice a day, and stops when requested.
c. How man parking spaces would the completed project have? How man would the
YP g P P P J Y
project eliminate?
Not applicable.
Alderbrook Resort Stormwater Outfalls Repair - 18- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT
d. Will the proposal require any new roads or streets, or improvements to existing roads
or streets, not including driveways? If so, generally describe(indicate whether public or
private).
No.
e. Will the project use (or occur in the immediate vicinity of)water, rail, or air
transportation? If so, generally describe.
No.
f. How many vehicular trips per day would be generated by the completed project? If
known, indicate when peak volumes would occur.
Not applicable.
g. Proposed measures to reduce or control transportation impacts, if any:
Not applicable.
15. Public Services
2.
a. Would the project result in an increased need for public services (for example: fire
protection, police protection,health care, schools, other)? If so, generally describe.
No.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Not applicable.
16. Utilities
a. Circle utilities currently available at the site: electricity, natural gas,water, refuse
service, telephone, sanitary sewer, septic system, other.
The existing dock has electricity,water, telephone and sanitary sewer utilities.
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which might
be needed.
The dock will be repaired utilizing the existing utilities. Electricity and water is provided
by Mason County PUD No. 1. Sewage treatment is provided by a WDOE-approved
collection and treatment system that is owned and operated by North Forth Lodging,
LLC. Telephone service is provided by Qwest. No change in service is expected.
Alderbrook Resort Stormwater Outfalls Repair -19- April 2008
Environmental Checklist
TO BE COMPLETED BY APPLICANT �X 7
B. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is relying on them to make its decision.
Signature:
Brian McGinnis, applicant
Date Submitted: �77 710?
Prepared by:
Allison Reak
Alderbrook Resort Stormwater Outfalls Repair -20- April 2008
Environmental Checklist
�xy
ESA LISTED SALMONIDS CHECKLIST
Applicant Information Project Information
Name &min. e Name
Phone Locationa-
Description L
Z
This worksheet was designed t g o help
e p project proponents, and government agencies, identify when a project
needs further analysis regarding adverse effects on ESA(Endangered Species Act) listed salmonids. Salmonids
are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species
listed as endangered, threatened or being considered for listing.
If ESA listed species are present or ever were present in the water shed where your project will be located, your
project has the potential for affecting them, and you need to comply with the ESA. The questions in this section
will help determine if the ESA listings will impact your project.
The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can proNide information for the
following two questions.
1. Are ESA listed salmonids currently present in the vhaersh6d in which your project will be located?
YES �_ NO Please describe. ,& �Gvue� a' ��Z� —
2. Has there ever been an ESA listed salmonid stock present in this waterstfd?
YES NO Uncertain Please describe. #M-Ve &rit2Q.Q'
, 4te
�irn
If you answere "yes" to either of the above questions, you shouldcomplet remainder of hi
checklist.
April 2003
Mason County Environmental Checklist Page 15
PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity.
1. Name of watershed: /Vi9'fr'
2. Name of nearest waterbody: 4�_
3. What is t e distance from this project to the nearest body of water:
—LS AfL--Rj Often a buffer between the project and a stream can reduce
the chance of a negative impact to fish.
4. What is the current land use betw
eenoject and the potentially affected water body arking lots,
farmland,etc.)? ��yy�lYC.Q�t C,(.tCiL / Z ttt,
l Id
5. Is the project above a:
* natural permanent barrier(waterfall) YES NO ?°
* natural temporary barrier(beaver pond) YES NO >o
* man-made barrier(culvert,dam) YES NO
* other(explain):
6. If yes, are there any resident salmonid populations above the blockage?
YES NO Don't know
rJ114p
7. What percent of the project will be impervious surface (including pavement&roof area)?
Mason County Environmental Checklist Page 16
1--?(y
FISH MIGRATION: The following questions will help determine if this project could interfere with
migration of adult and juvenile fish.
Both increases and decreases in water flows can affect fish migration.
1. Does the project require the withdrawal of:
a. Surface water? YES NO )_
Amount
Name of surface water body
b. Ground water? YES NO -710_
Amount
From where
Depth of well
2. Will any water be rerouted: YES NO d
If yes, will this require a channel change?
3. Will there be retention or detention ponds? YES NO 0
If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or
a surface water body?
If to a surface water discharge, please give the name of the waterbody.
4. Will this project require the building of new roads? YES NO
Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat.
5. Are culverts proposed as part of this project? YES NO >0
6. Will topography changes affect the duration/direction of runoff flows?
YES NO _ °X If yes, describe the changes.
7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage
of flows? YES NO -- Q If yes, how will the loss of flood storage be mitigated by your
project?
Mason County Environmental Checklist Page 17
WATER QUALITY: The following questions will help determine if this project could
Adversely impact water quality. Such impacts can cause problems for listed species.
Water quality can be made worse by runoff from impervious surfaces,altering water temperature,discharging
contaminants,etc.
1. Do you know of any problems with water quality, in any of the streams, within this watershed? YES
X NO If yes, describe.
b-4�� rxyr— 4Z'Z4
2. Will your project either reduce or increase shade alQng or.over a waterbody?
YES NO
23
Removal of shadirg eget on or the building of structures such as docks or floats often results in a change in shade.
3. Will the project increase nutrient loading or have the potential to increase nutrient loading or
contaminants (fertilizers, other waste discharges, or runoff) to the waterbody? YES NO _,,�O
4. Will turbidity be increased because of construction of the project or during operation of the project?
YES
��NO
In-w ter or near water ork will often inct t bidity. r 3
5. Will your project require long term intenance, i.e. bn�ge cleaning, highway salting, and chemical
sprays for vegetation management, clearing of parking lots?
YES NO If yes, please describe.
Mason County Environmental Checklist Page 18
VEGETATION: The following questions are designed to determine if the project will affect riparian
vegetation, thereby, adversely impacting salmon.
1. Will the project involve the removal of any vegetation from the stye anks:
YES NO
If yes, please describe the existing conditions, and the amount and type of vegetation to be removed.
2. If any vegetation is removed, do you plan to re-plant?
YES NO If yes, what types of plants will you use?
NAP
Mason County Environmental Checklist Page 19