Loading...
HomeMy WebLinkAboutGeoTech Report Review for BLD2002-01644 - BLD Engineering / Geo-tech Reports - 1/14/2003 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: January 141h, 2003 INTER-DEPARTMENTAL COMMUNICATIONS TO: Scott Longanecker, DCD - Planner FROM: Alan A. Tahja, P/W - Co. Hydr. Engr. WO# PLG-03 SUBJ: Geo-Tech Report Review NAME: Amendala SFR g Hamma Ridge BLD2002-01644 Scott, The original geotechnical assessment, and the addendum prepared for the proposed Barry Tockar Single Family Residence (SFR) at Hamma Ridge, Mason County has been received and reviewed by Public Works, raising the following issues; The following case notes from Permit Plus indicate that a geotechnical report has been requested for this site; Due to slopes on site and adjacent to site a Geotechnical Report will be required to address slope stability, storm water and vegetation management, slope setbacks etc. Please see the enclosed Landslide Hazard Ordinance section E.S. with regards to requirements for Geotechnical Reporting. The landslide hazard covenant attached to the back of the ordinance will also need to be completed and recorded with the Mason County Auditor prior to permit issuance. Please provide a copy of the recorded document to the Planning Dept. Under this ordinance a minimum 50 foot vegetated buffer is required from landslide hazard areas. It appears that grading may have already occurred in this area. Grading is allowed in or within 300 feet of landslide hazard areas only under the conditions of an approved geotechnical report and Mason Environmental Permit, or Land Modification permit. Further grading is not permitted on site prior to the submittal and approval of a geotechnical report for the subject property and issuance of a building permit or other permit as mentioned above. Your geological engineer will need to address the grading,filling etc. that has already occurred on site, as well as any additional proposed land modification. 1) A licensed civil engineer should be required to complete portions of the report and stamp the report as required under Mason County's Resource Ordinance (17.01.100 e.3). The report contains elements and recommendations which should be required to be certified by an engineer. Stormwater runoff quantities and retention/detention/treatment facilities need File:H.IWPIGEOIReportsL4mendala-Tockandoc LNG, AuOdned br. oat W _ U of Wocic ��� ajR.GE TO.- NAME (� AGENCW/COMPANY („LJ _ 0 13 WNG ADDRESS (� z PHONE P& Works Person in Cha e: u •�:- :. -.;.: ..,:.<r•r..>,�:m.r.Ma-v:�:eiie:r:-rr<woeeewr<>Tvc:e):<:..,....:. (c) Project 77me Use: (from -to dates) Project Start date: _ C�.A�il//—__ .,-T� S�2Lc, 0.3 EsMWn ddF1 s b4kc �e txs: ESTIMATEO TOTAL.SS: COST ESTIMATE (D) Elk EmpIoy-4 IR:Iif Hours swt fit Toni.s sue¢ BAIL TOTAL M EQUIPMENT USED: MATERIAL USED: (F) ActuW cost BARS: PROD P DATE E7rtoyee kS £531� Flours f TOTAL s EQUIPMENT USED: a e � at DOTAL t'S MATERIAL US ED: TOTAL ALL (G) SILLEO DATE L*rV( PAIO DATE RECJ C 4 to be calculated and designed by a licensed civil engineer. 2) No slope analysis has been provided as required by the County's geotechnical reporting requirements. 3) The site plan is lacking details needed for a comprehensive review. With these and other issues in mind,the geotechnical report should not be considered complete. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Sin a ely, lan A. Tahja File.H:IWPIGEOIReportsL4mendala-Tockar.doc Bradley-Noble Geotechnical Services A Division of The Bradley Group, Inc. PO Box 12267, Olympia WA 98508-2267 Phone 360-357-7883 9 FAX 360-867-9307 10 February 2003 Mr. Greg Amendala Amendala Brothers construction 8047 Ellison Loop NW Olympia, Washington 98502 Subject: Addendum to our report of 14 January for the proposed residential construction for Mr. Barry Tockar in the Hamma Ridge development, Mason County Tax Parcel Number 323047590053, Lot 15. Dear Mr. Amendala: In this addendum to our previous report we are addressing additional site development issues and presenting additional comments on slope stability in the project area. You have indicated that you are considering use of on-site soils to construct structural fill sections for the support of footings and slabs on-grade. The native soils at this site are suitable for construction of structural fill sections . The soils do contain plastic fine6 in varying concentrations . The upper recessional outwash soils are relatively free of these fines, and we expect that they can be placed and compacted in all but the most inclement weather. The underlying till contains higher percentages of fines and is moisture sensitive. Compaction can be obtained in these soils if moisture contents are controlled. Enclosed with this report is a copy of our Recommended Grading Specification for your use. Construction of structural fill sections in conformance with these specifications will ensure that the structural fill sections are suitable for support of footings and slabs on grade. Conformance with these requirements will also ensure that the work conforms to the standards of the industry and the minimum requirements of the Uniform Building Code. 03010402 Page 1 of 3 03010402 Page 2 of 3 The area of recent instability and earth movement referred to in our report is in excess of 1000 horizontal feet from this property. Based on field observations, our opinion of the risk to access road use is considered to be valid as this road crosses the area of active periodic soil movement. Review of the geologic information and our field observations did not indicate active earth movements in the area of: proposed construction. This is consistent with the mapped geology of the area. We find a thin layer of recessional outwash soils over highly overconsolidated soils . Failure of highly overconsolidated material at slope angles present in the general area is considered unlikely. Slope angles are less than the angle of internal friction of the highly overconsolidated soils . When slope angles are less than the angle of internal friction, slope stability is inferred. There is no active erosion in the toe area to oversteepen the slope. Topography of the area was presented on the topographic and geologic maps . At the scale and contour of these maps, determining actual slope angles in the project area are not reliable. You have provided us a survey that you conducted between the road and top of slope to the northeast of the proposed building area. This map indicates a fall of 60 feet in 510 feet, or about 7 degrees or 12 percent slope. You also provided a contour map that was indicated as being prepared as part of the subdivision. The scale of this map appears to be 1 inch representing 200 feet with a contour interval of five feet. Measuring from center of northeast property line to center of south property line, we have a horizontal distance of about 660 feet and a vertical relief of 140 feet or about 11 degrees or 21 percent slope. Based on our field observations, research, and evaluation of topographic information recently provided to us, it is our opinion that a residence may be constructed at the location indicated on this lot with no risk of slope failure or erosion of the slope face affecting the foundation support. We do not consider the preparation of a geotechnical report appropriate for this site. The recommendations presented in this report and previous report must be 03010402 Page 3 of 3 incorporated in the site development work. As discussed, the slope must be protected from concentrated flows of storm water as these uncontrolled flows can cause localized destabilization and accelerated erosion. If you have any additional questions, or if we may be of additional service to you or your client on this project, please contact us at our Olympia office. C� Wash . Cordially, e ��9 \ f BRADLEY-NOBLE GEO`PECHNICAL SERVICES Sed Ge o David C. Stro g, L.E.G DAVID C. STRONG Enclosure: Recommended Grading Specification Bradley-Noble Geotechnical Services A Division of The Bradley Group, Inc. PO Box 12267, Olympia WA 98508-2267 Phone 360-357-7883 • FAX 360-867-9307 RECOMMENDED GRADING SPECIFICATIONS In areas under structures, paving sections, and sidewalks, strip all topsoil and organic material . For structural fill in areas under footings and slabs on grade, we recommend that all soils be compacted to a minimum density of 95% of ASTM D-1557 . This includes proof-rolling native soils exposed in the bottom of the excavation prior to placement of fill . Materials under the paving section should also be compacted to the minimum density by proof-rolling prior to placement of the paving section. This includes proof-rolling in-place soils , soils that have been disturbed during construction, and all structural fill materials . For imported structural fill we recommend that a clean, six-inch minus, well graded gravel or gravelly sand (classifying as GW or SW as determined by ANSI/ASTM test method D-2487 ) be used. On site material proposed for use to construct structural fill sections will require the approval by the soils engineer or engineering geologist prior to placement. We also recommend that no more than 7% by weight pass the #200 screen as tested by ANSI/ASTM D-1140 test procedure. Other material may be substituted with prior written approval for use by the soils engineer or engineering geologist. Backfill for walls restraining earth should conform to WSDOT 9-03 . 12 (2 ) gravel backfill for wall to ensure drainage. All fill should be placed in uniform horizontal lifts of six to eight inches loose thickness, conditioned to the optimum moisture content, and compacted to the specified minimum density before placing the next lift . It is the contractor's responsibility to ensure that sufficient density tests or field verification of the fill has been performed to ensure that the required minimum density has been uniformly achieved prior to placement of additional structural fill material . We further recommend that all utility trench backfill be compacted as specified above. Earthwork should be performed by an approved testing laboratory under the supervision of Bradley-Noble to ensure compliance with the compaction requirements . Recommended Grading Specifications Page 1 of 2 Recommended Grading Specifications Page 2 of 2 Placement of fill sections on slopes greater than 4 : 1 (horizontal to vertical) will be benched as directed into native soils . Height and width of the bench will be determined in the field by the soils engineer or engineering geologist. Unrestricted slopes shall not exceed 2 : 1 (horizontal to vertical) for fill embankments and cuts that expose native soils without written approval by Bradley-Noble Geotechnical Services . All fill slopes will be rolled. The project's civil engineer is responsible for the protection of the constructed fill slopes from uncollected runoff . All fill slopes will be compacted by track rolling or other approved methods to densify the surface of the fill slope. We recommend that all cut-and-fill slopes be seeded as soon as possible after construction to allow the establishment of vegetation to protect the slope from sheet washing. Placement of fill will be suspended during periods of unfavorable weather. No fill is to be placed while the fill is :frozen or thawing. When work is stopped by rain, the placement of fill will not resume until the soils engineer or engineering geologist determines that the moisture content is suitable for compactive effort and that the previously placed fill has not been loosened. The contractor will take appropriate measures during unfavorable weather to protect the fill already :in place. Measures that may be required include the limiting of wheeled traffic and grading to provide temporary drainage of the fill . At the direction of the soils engineer or engineering geologist, the contractor will be responsible for the removal or reworking of fill that has softened to less than the required compaction. I 04/21/2003 09:01 3608660475 HORIZON AMENDALA WAGE el 30 04/17/03 09:o9 FAX 1 360 867 931D7 Bradie7 Group 1A01 Bradley-Noble Geotechnical Services A Qivlsian of The Brodicy Group, Inc- PO Box 12267, Olympia WA 98508-2267 Phone 350-357-7BB3 • FAX 360-867-9307 17 April 2003 Mr. Crag Amendala Awndala Bmthere ConStruction 6047 Blli.aon Loop RW Olympia, Washington 98502 subjects Relocation of the drain field at the Bar Toakar pro jQct in tbg Hammy. Ridge Devel.op>Qent, mason County, xau3ningtozx. Dear Mr. Amandala! From our talephoTLe di.scuanion, Wo underetaad that thQ drain field for this residence is now proponed to bw construG#�od about 50 fAQt to the nQrtheast of tha residence. This ins still in an areas of modarat8 slope and upelope from the break in elope whQ" the slave angle increases darn to the nortberaat On this property. On Our orIg"al Visit to this site, thia area had outwassh s;anda and gravels exposed ;Ln the zest pits that wore open at this time. ThPas soils are r_mmable and po:rOUB. We did observe till. in a nym, of the restrictive` la r• the test pits at 4i?pth which is a reetrict� y$ Ixrat%l.lati0n of a gravity Ayet®m is in our opinion a better solution than relying o>1 a F-OW mystmn' with pumps you need power, and they are prow to failure and require mii.ntonarwo. From discussion vi-Lh septic e s we undarctand that much of the effluent design ors,� irad water i,r� thought to be ei.tbar evaporated or transp by planta . The actual volumes of water bai g introduced into the drain field when d1stributed by the lateral systez is not expected to be high on a per square LOOM DQSI.D. we der xx,ot a ez �1as� �k,is wntcar when distributed over the area of the drainfi®ld would have any adverse effect on the aoile of the slope or elope stability. If you have any qu�eozl.o ia, or if •ro may be of turthe£ assistance to YOU, please Contact us at our Olympia office. dk W ashl Cordially, BRADLEY-NORT.R [ 9MIEMMICAL SERVICES 1129 David C. trong�_ E.G. ensued a O v MASON COUNTY PUBLIC WORKS DIRECTORICOUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: January 24t', 2003 INTER-DEPARTMENTAL COMMUNICATIONS TO: Scott Longanecker, DCD -Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. Work Order# PLG-03 SUBJ: Geo-Tech Assessment Review NAME: Tockar SFR g Hamma Ridge BLD2002-01644 Scott, The geotechnical assessment prepared for the proposed Barry Tockar SFR in the Hamma Ridge Development area,has been received and reviewed by Public Works. Case notes appear to indicate that a geotechnical report was required to be prepared for the proposed residential development. The assessment submitted lacks many of the details required in a geotechnical report conforming to County critical resource ordinance requirements. Though the report preparer indicates he has no objections to the proposed development,he has not provided the required information needed for Public Works to be able to express an opinion that geological concerns have been adequately and conclusively addressed. The applicant should be contacted and directed to have his agent/geologist provide the required information. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Sin ely, I h � Alan A. Tahja File.H.I WPI GEOUSESMNTSI Tockar.doc MUM A .. *Wtwd tor. Date: r Tie Of Wodc - /�Go _ �vr��r�o�.r df✓� p U o cv CII1RGE TO .-, a NAME W cs AGENCY/COMP U ANY W Z o BMUNG ADDRESS -�� Z PHONE Pfl. Works Person in Charge x.:�� • +�c� ,yen .M ^'.MeDairr ♦>M"^a.+eR.cuc.e s.[ (C) Project Time Une. (from-to dates TO Pno}od Stag date: � EOme6d Rish 0gto: ham: 2 ESTIMATED TOTAL ss: COST ESTIMATE (D) P314 _ Y« £IAii ffwrs Sat Frill i YOTAL= f3AIE TOTAL n EQUIPMENT USED: MATERIAL USED: (F) Ac(xW Cost x BARS: PROJ M. DATE EmPiayee Y` Narm f � TOTAL$ EQUIPMENT USED: Qa� � at TOTAL I'S MATERIAL US ED: TOTAL ALL (G) SUED DATE !M/1 PAID DATE RECf CWI �Y1 en A Bradley-Noble Geotechnical Services A Division of The Bradley Group, Inc. PO Box 12267, Olympia WA 98508-2267 Phone 360-357-7883 • FAX 360-867-9307 14 January 2002 Mr. Greg Amendala Amendala Brothers Construction 8047 Ellison Loop NW Olympia, Washington 98502 Subject: Evaluation of soil bearing capacity and other geotechnical considerations for your proposed residential construction project for Mr. Barry Tockar in the F[amma Ridge development, Mason County Tax Parcel Number 323047590053 . Dear Mr. Amendala: As requested, we have visited the above site in order to develop an opinion on the suitability of the site soils to safely support the proposed single-family residence. At the time of our site visit, the access road had been rough cleared, the building and drainfield areas had also been stripped of vegetation and native soils exposed. Excavation had exposed soil profiles in the building site. This letter will present our opinion and observations of site soil conditions . The project site is located in an upland area to the south of Jurst:ed Creek and to the west of Highway 101 . The area of proposed construction is on a nearly level area with a northeast-facing slope. The slope is gentle in the area of proposed construction and steepens to the northeast. The area of proposed construction is above and west of the toe of the slope where sliding and slumping has been active along Highway 101, especially during winters of heavy rains . Work by the Department of Transportation has stabilized much of the toe area along Highway 101 at the access to this development. We also noted that in driving up to the site, the first 400 to 600 feet of the access road from Highway 101 in the Mile 322 area was showing distress from soil movement associated 03010401 Page 1 of 3 03010401 Page 2 of 3 with previous mass wasting events . Access to the building site may be temporally lost until the road can be reconstructed. We found slopes moderate in the general area and less than 2 : 1 horizontal to vertical) in the building area. From our discussion, we understand that the clearing was conducted to allow construction of the residence, decks, garage, and drainfield. From the stakes indicating building corners, we do not consider the clearing to have been excessive. Site geology in this area consists of glacial deposition associated with the Vashon lobe of the Frazier continental glaciation. Cropping out are fluvially deposited sands and gravels associated with Vashon recessional outwash. Below the outwash deposits, we found in some of the open test pits, the very dense and highly overconsolidated subglacial till . Clasts contained in the soils are associated with continental glaciation rather than alpine glaciation from the Olympic mountains . To verify our interpretation of the site geology, we have referred to the Geologic Map of the Brothers Quadrangle, Jefferson, Mason, and Kitsap Counties, Washington by W. M. Cady, M. L. Sorensen, and N. S . Macleod, 1972 , GQ 969 , published by the Department of the Interior, U.S . Geological Survey. The general area of this site is mapped as Qc, continental glacial deposits . The project site is outside of mapped areas of geologic hazards from erosion or landslide hazard. The site soils offer good support for standard spread footings . All footings must be founded on the dense native soils . We also recommend that the footings be founded a minimum of 1 . 5 feet below adjacent finish grade for frost protection and confinement. Safe bearing capacity of these soils exceeds 3000 pounds per square foot. For footings founded on the dense native soils, we do not expect that significant long-term total or differential settlement is likely. Attention to collection and disposal of storm water from impervious surfaces will be required. We recommend that a continuous perimeter footing drain system be installed around the structure to protect 03010401 Page 3 of 3 the crawl space or daylight basements from surface flow of water. The subglacial till is for all practical purposes impermeable and flows of water will develop on its surface during periods of heavy or prolonged rainfall. The water from roof rain leaders should be collected into a separate tightline system isolated from the footing drains . The roof rain leader system and footing drains may be connected into a common discharge line at an elevation such that backup into the footing zone cannot occur. Collected water should be carried below the drainfield area for disposal . Point discharge is to be avoided. Point discharge can create areas of localized saturation and induce slope instability or accelerated erosion. We recommend that the water be infiltrated using either swales or perforated pipes following the contour. This will allow the water to be infiltrated over a wide area and avoid concentrated flow. After completion of the construction, we recommend that all areas of exposed mineral soil be reseeded to control surface erosional processes by sheet flow of water. The Mason county agricultural agent can provide you with recommend species. We also recommend that the property owner review the DNR recommendations for creating a defensible area around the residence in event of fire. Based on our site inspection and review of available geologic information we have no objections based on geotechnical considerations to the proposed development if the general recommendations of this report are included in the site work. Cordially, BRADLEY-NOBLE GEOTECHNICAL SERVICES O Washi r t¢ �`9f v � David C. Strong, L.E.G. 'R` • Enaneerr.�GxJ-•3ia `� �cP 1129 p�`h 0 �Sed GeO D,AVID C. S-i RflNG