September 6, 1994
Henry Nelson
16820-194th Ave. N.E.
Woodinville, Wa. 98072
Re: Grading permit GRD92-0025; Highway 101 across from Ayock Beach
access; road to subdivision.
Mr. Nelson:
Mason County Staff were contacted recently regarding the status of
the above referenced grading permit . It was discovered that the
road permit had never been finaled by us and that there are some
deficiencies in the work to date. Following are our concerns.
1. The recommendations in the geotechnical report were not
followed. The cut materials were graded over the edge of the
slope. The cut area was never protected with rock. The cross
culverts were eliminated, except for one.
2 . There is limited erosion control capability. The silt fencing
at the base has been nearly topped by sediment. There are no check
dams along the west drainage line. There is no vegetation growing
on the slopes. There has been no apparent effort to maintain the
limited erosion control measures which have been installed.
3 . The small road leading off your road to the Ayock water system
was to have been opened such that access to it would be achievable.
A culvert in this location would appear necessary.
4 . The secondary runoff collector at the base of the road needs
cleaning and new silt fencing or hay bales.
The following work, at a minimum, needs to be undertaken to bring
this road into compliance.
1. A licensed engineer shall be hired to evaluate the current
status of the road, including slope stability, and make
recommendations regarding erosion control methods to be employed.
2 . At a minimum, the following erosion control measures shall be
undertaken:
Recycled
** A retention pond shall be constructed at the base of the
culvert area, adjacent to Highway 101, which meets the
requirements of the Public Works Department. If there is
insufficient room within the easement right-of-way to build
such a facility, an alternative design must be implemented.
** The sediment built-up behind the silt fencing shall be
removed. New fencing shall be installed where necessary,
including at the secondary lower collector.
** All exposed sites shall be grass seeded.
** Check dams shall be installed every fifty feet along the
west drainage ditch.
3 . The access road to the Ayock water system shall be opened such
that it is possible to drive off your road and onto it. A culvert
shall be installed.
Please contact this office at your convenience so that we may
discuss these issues . The Fall rainy season is nearly upon us .
Thank you in advance for your cooperation.
Respectfully,
Don Brush, Planner
Department of Community Development
GARY YANDO,DIRECTOR
STgTFO
o A N DEPARTMENT OF COMMUNITY DEVELOPMENT
U
o T i PLANNING - SOLID WASTE-UTILITIES
� N Y 4) BLDG. III • 426 W. CEDAR • P.O. BOX 578
of o 1864 SHELTON, WA 98584 • (206) 427-9670
June 21, 1993
Bob Rux
P.O. Box 358
Woodinville, Wa. 98072
Re: Nelson grading permit: Status report
Dear Mr. Rux:
At your request, this is written notification of the status of this
permit request. The Department of Community Development, Planning
Division, has approved the permit subject to conditions to be
attached regarding the road approach. Final approval by this
department is contingent on receiving written notice from the
Washington State Department of Transportation regarding their
concerns .
At this time the permit is in the Mason County Building Department
for their review. Upon completion of that review and with the
possible inclusion of conditions as noted above, the permit will be
issued.
We apologize for the delay in processing but feel the site warrants
close scrutiny and precaution. Thank you for your patience.
Respectfully,
Don Brush, Planner
Department of Community Development
GARY YANDO,DIRECTOR
ON.STgTF
Q5 O,o
o A N DEPARTMENT OF COMMUNITY DEVELOPMENT
U
o T z PLANNING -SOLID WASTE -UTILITIES
z� N Y Y BLDG. III • 426 W. CEDAR • P.O. BOX 578
OJ o 1864 SHELTON, WA 98584 • (206)427-9670
June 23, 1993
Bob Rux
P.O. Box 358
Woodinville, Wa. 98072
Re: Nelson grading permit: Status
Dear Mr. Rux:
At your request, this is written notification of the status of this
permit request. The Department of Community Development, Planning
Division, has approved the permit subject to conditions which may
be attached regarding the road approach.
At this time the permit is in the Mason County Building Department
for their review. Upon completion of that review and with the
possible inclusion of conditions recommended by the State
Department of Transportation, the permit will be issued. We will
no longer hold the permit pending WDOT notification.
We apologize for the delay in processing but feel the site warrants
close scrutiny and precaution. Thank you for your patience.
Please disregard the correspondence sent June 21, 1993 regarding
the status of the permit.
Respectfully,
"Don Brush, Planner
Department of Community Development
Recycled
GARY YANDO,DIRECTOR
SON.STq FO
P
o A°u �N DEPARTMENT OF COMMUNITY DEVELOPMENT
'
s T. z PLANNING -SOLID WASTE - UTILITIES
z� Y BLDG. III • 426 W. CEDAR • P.O. BOX 578
rasa SHELTON,WA 98584 • (206) 427-9670
March 22, 1993
Jorstad Creek Development
Bob Rux
P.O. Box 358
Woodinville, Wa. 98072
Re: Nelson Grading Permit Application
Dear Mr. Rux:
Enclosed please find a copy of a letter received from the state
Department of Fisheries. This letter addresses stormwater concerns
relevant to development of your access road. Any information you
have assembled regarding your drainage plan should be forwarded to
WDF for their evaluation.
Mason County will evaluate the community drainfield system in
conjunction with the environmental review which will be undertaken
for the Jorstad Creek Mobile Home Park application. WDF concerns
regarding the septic system for the park will be considered at that
time.
We have responded to concerns raised by the Ayock Beach Homeowner' s
Association (copy of letters enclosed) . Please note issue number
two. .Mason County requests that you submit a letter to us stating
that construction of the access road will not eliminate access to
the existing Ayock Beach Water System reservoir. It would appear
that access could easily be maintained by tying in the water system
road with the new road. Any expense resulting from maintaining
this existing road connection to the new road will be borne by
yourself.
The state Department of Transportation has requested that we hold
issuance of our grading permit until they have reviewed - and
accepted all drainage plans and calculations. We understand that
you have been working cooperatively with them.
If you have any questions regarding this letter please call .
Respectfully,
C1,nlr'ush,
Planner
Department of Community Development
P�oN.srATFo
o A°u N DEPARTMENT OF COMMUNITY DEVELOPMENT
Z oT z
�OJ N Y aoY Planning - Landfill - Utilities
rasa
December 2, 1992
Bob Rux
Jorstad Creek Development
P.O. Box 358
Woodinville, Wa. 98072
Re: Grading permit application, Harry Nelson, across Highway 101
from Ayock Beach.
Dear Mr. Rux:
We would like to advise you of the status of this permit. We sent
copies of the submitted file information to the state Department of
Transportation for their review on November 4, 1992 . This is a
routine process for projects involving accesses to state highways.
They have indicated they will respond to us within the next two
weeks.
The Planning Department review has been completed and the file is
currently in the Building Department for their review. If you have
any questions feel free to call either myself or Rob Lum, Building
Inspector.
Thank you for your patience.
Respectfully,
/J
Don Brush, Planner
Department of Community Development
Gary Yando,Director of Community Development • Erik Fairchild,Planning Director
Mason County Bldg. 111 9426 W. Cedar • P. O. Box 578 • Shelton,WA 98584 • (206) 427-9670
ltnryc;le!i �g"�r