Loading...
HomeMy WebLinkAboutStormwater SIte Plan - BLD Engineering / Geo-tech Reports - 3/15/1999 76 - 66U,6 Stormwater Site Plan Ed Busch Property - DCD WO#9905 P � Union, Washington Prepared for: South Shore Construction 230 East Hillside Drive Belfair, WA 99528 Prepared by: Morta Engineering and Testing P.O. Box 250 Ocean Shores, WA 98569-0250 (800) 590-0958 March 15, 1999 March 15, 1999 Report No. 001 Page 1 of 5 Morta Engineering and Testing South Shore Construction 230 East Hillside Drive Belfair, WA 98528 (360)275-0818, (360)405-8194 pager, (360)426-9673 fax Attn: Richard Moore, Owner Subject: Stormwater Site Plan for the Ed Busch Property- DCD WO#9905 Mason County,Washington Introduction On March 3, 1999, Steven P. Morta P.E. of Morta Engineering and Testing investigated the above site to prepare a Stormwater Site Plan (SSP) to protect the neighboring properties and the waters of Washington State, i.e., Hood Canal. Mr. Steve Morta met with Mr. Rich Moore onsite to walk the property and in particular investigate the two installed culverts; the north and the south culverts as well as the junction of the two streams. This hydraulic engineering report will determine if the two installed culverts are adequately sized to accommodate the 100 year 24 hour rainfall and to provide mitigation measures for reducing, if not eliminating, subsequent soil erosion and sedimentation as a result of planned development of the area. Hydraulic Analysis for North and South Culverts To determine the adequacy of the 18" diameter north corrugated culvert an hydraulic analysis was performed as shown on Sheet 1 of the appendix. Figure 2 was used as a guideline for this analysis and shows the isopluvials, i.e., contour lines of constant rainfall intensities. For the Hood Canal area this was shown to be about 7.0 inches per 24 hour period. However, rain intensities on the order of 2.0 inches per hour have been recorded in the area. This was used in the hydraulic analysis called the Rational Method (Ref. 1). A runoff coefficient of 0.20 takes into account the combination of forest land and single family residences. And, finally, the area of contribution was estimated at 4 acres. With this information the peak flow, Qp, can now be computed as 1.60 cubic feet per second. The existing flow passing through the culvert was somewhat lower than this value even though heavy rains had fallen a few days before this site investigation was undertaken. If the north culvert were flowing full at a grade of 20%its flow rate would be 34.59 cfs which is over 20 times greater than the maximum anticipated. Therefore, this 18" diameter corrugated culvert is more than adequate to handle the 100 year 24 hour rain intensity. A similar hydraulic analysis was performed for the 18" dia. south corrugated culvert with a maximum peak flow rate computed to be 2.5 cfs which is over 10 times less than it maximum capacity of 34.59 cfs. P.O. Box 250,Ocean Shores,WA 98569 (360)289-0958 Office,(800) 590-0958 Bus,(360)289-9682 Fax (360)580-1379 Mobile,(360) 538-1736 Aberdeen Laboratory March 15, 1999 Report No. 001 Page 2 of 5 Morta Engineering and Testing Nearly 100 year 24 hour rainfall has recently occurred in the area and large landslides north of Hoodsport have covered Highway 101 making it impassable. These two streams were flowing at their near maximum capacities and still the water was no more than a couple of inches deep in the 18"diameter culverts as shown in Photo No. 4 for the north culvert and Photo No. 9 for the south culvert. Mitigation Measures at the North and South Culverts Debris traps are recommended at the inlet of both culverts to help stop any loose debris from flowing into the culverts and possibly clogging them up which in turn would cause the water to flow over the roadway and potentially causing failure. Photos No. 1 and 2 show that a pile of limbs and branches have been placed on the inlet side of the culvert to help catch organic debris that may come flowing down the stream. These traps will require as a minimum weekly monitoring during the heavy rainfall periods from mid to late November until the end of March. Recompaction of the culvert embankment especially on the downslope side is required preferably with a vibratory hoepack to prevent loose material from sloughing into the stream. This is required at both the north and south culverts. Rock armoring will be required at the inlet and especially at the outfall of both culvert to minimize soil erosion and potential embankment failure. Photo No. 4 shows little to no rock armoring on the north culvert. This is also required for the south culvert. As a backup another 12" diameter black corrugated culvert can be placed above the existing 18"diameter culverts to allow water to pass through the upper 12" culvert just in case the lower 18" culvert gets plugged up with debris. This can be done at both the north and south sites since there will be some additional fill placed in these areas to help level out the grade of the access road. Structural fill shall be placed on both embankments with a loose lift thickness not to exceed 12" and then compacted to 95% of maximum dry density per ASTM D-1557 which is the modified proctor at both culvert sites. Hydraulic Analysis at the Confluence of both North and South Streams As shown in Figure I both streams mentioned above converge together near the base of the hillside as shown in Photo No. 13. The combined stream then continues to flow into an existing channel on the northeast side of a residence down at the base of the hillside located next to SR 106 as shown in Photo No. 12. As shown in Sheet 3, the stream meets a man-made rock and concrete dam with only a 6" diameter opening for the stream to flow into. During the recent heavy rainfall this 6" plugged up with debris causing the stream to actually flow around this small dam as shown in the drawing on Sheet 3. There is evidence that the some water had actually flowed overland toward the house. P.O.Box 250,Ocean Shores,WA 98569 (360)289-0958 Office,(800)590-0958 Bus,(360)289-9682 Fax (360)580-1379 Mobile,(360)538-1736 Aberdeen Laboratory March 15, 1999 Report No. 001 Page 3 of 5 Morta Engineering and Testing This is why its very important to replace the 6" pipe with a 24" pipe as shown in Sheet 3 so that the entire stream will flow in the pre-existing channel and eventually into Hood Canal. At the time of the site visit the stream was flowing clear. Before constructing a 24" diameter hole in the existing rock and concrete dam it is important that it is on Ed Busch's property instead of the new owners of the home just downstream of the dam. If it does belong to the new home owners then permission will be required from them to actually perform this work which would prevent them from getting flooded. Most of the hydraulic analysis has already been completed on page 1 above. Essentially, the maximum flow rate passing through the dam will be the convergent flow of the two individual culverts resulting in 4.1 cubic feet per second. However, this combined flow will need to be increased due to the additional collection area from the culvert outlets to the dam itself which results in about a 50%increase in the flow or 6.2 cfs. A 24" diameter pipe with a 10% grade can accommodate a flow of 46.52 cfs or nearly 8 times the expected maximum flow. There's conservatism in the 24" diameter opening in the dam to ensure that it can accommodate flows that may originate from the construction of single family residences above the existing residence. Mitigation measures will now be addressed to prevent overflow of the concrete dam with its 24" diameter opening. Mitigation Measures for the area above the 24" diameter pipe A trash rack will need to be placed in front of the 24" diameter opening to prevent debris from clogging it up which will require periodic maintenance to remove and clean the trash rack especially during the winter months when the rainfall and the potential of excess organic debris is prevalent. To ensure that this pipe and the existing channel and 18" diameter culvert downstream of the dam does overflow is to ensure that no residences or appurtenances are constructed within 150 feet on either side of the stream valley edges all along the length of both streams. This also applies to any other streams within the proposed development. Each proposed residential owner is to develop their own Stormwater Site Plan for their own 5 plus acre site to ensure that no surface water runoff from impermeable surfaces such as roof down spouts, driveways, and sidewalks is directed into a stream channel whether it is flowing or not since some of these streams only appear during the rainy season. This is to prevent increased flows down below where a residence has already been established along State Route 106. To prevent additional streams from being created on the hillside due to new construction which could jeopardize existing residences down below it is important that each new homeowner contain their surface water runoff in the form of French drains flowing into drywells or equivalent. By preserving the trees and vegetation on their land this will help to absorb most of the water that falls on their property. P.O.Box 250,Ocean Shores,WA 98569 (360)289-0958 Office,(800) 590-0958 Bus,(360)289-9682 Fax (360)580-1379 Mobile,(360) 538-1736 Aberdeen Laboratory March 15, 1999 Report No. 001 Page 4 of 5 Morta Engineering and Testing Existing constructed roads in the proposed develop need to be fully utilized so as not to create additional impermeable roadway surfaces if it is not required. This geotechnical engineer will need to be contacted prior to the construction of any new roads to ensure that it will be stable and that it will not create additional surface water runoff into the existing streams. Preserve the existing trees and ground cover since they help to reduce soil erosion and sedimentation of the streams by absorbing most of the rainfall that falls on them. Trees have the capability of"pumping" water up out of the ground through the process of evapotranspiration whereby their root systems pull in water and through the process of capillary action draw this water out through their leaves and needles. This is why it is important to leave as many trees and vegetation in their natural state. The reason people live on hill sides is to take advantage of the panoramic views they get of Hood Canal below and also of the Olympics to the north. The first tendency is cut down trees in front of their homes to get this view which leaves vulnerable the homesites below it due to erosion and potential slides. However, rather than cutting down these trees and vegetation which help to prevent soil erosion and stream sedimentation it is better to trim back the branches to more than 25 to 35 feet up from the base of the tree. This provides more of a natural view and at the same time it also preserves the trees and keeps them alive to help hold the soils inplace. Best Management Practices (BMPs) shall be implemented as specified in the Storm Water Management Manual for the Puget Sound Basin - The Technical Manual, (Ref. 2). This manual provides the guidelines and the analysis for proposed site development. A proposed homeowner can contact this geotechnical engineer prior to the construction of their home to ensure that the BMP's in the Manual are properly implemented for their specific applications. This will depend upon the location of their residence, the amount of impermeable surface that will be created, and other key factors that are called out in the Manual. It is important that the proposed general locations of the homes be specified in advance to ensure that the proposed 5+acre homesites are distributed far enough apart to minimize the effects of additional impermeable surfaces and the potential for increased soil erosion and the resultant sedimentation and potential overflow of the existing streams down below. Conclusions and Recommendations 1. The 18" diameter culverts located on the north and south streams as shown in Figure 1 are sized adequately for the anticipated 100 year 24 hour rainfall. However, in case of blockage by debris that may plug up these culverts it is recommended that a 12" diameter culvert be place above the existing 18"culverts to act as backups. This is feasible since the road at these stream crossings will be raised for a smoother grade. 2. Both the inlet and outlet ends of the culverts shall be sufficiently rock armored to protect the culverts from potential washout due to soil erosion around and under the culverts. P.O.Box 250,Ocean Shores,WA 98569 (360)289-0958 Office,(800)590-0958 Bus,(360)289-9682 Fax (360)580-1379 Mobile,(360)538-1736 Aberdeen Laboratory March 15, 1999 Report No. 001 Page 5 of 5 Morta Engineering and Testing 3. The embankments and the additional fill shall be compacted to 95% of maximum dry density as determined by the modified proctor method per ASTM D-1557. 4. There shall be no construction activity within 150 feet of either side of the stream valley crests to ensure that there will be no additional surface runoff directed into existing streams. 5. Adequately sized trash racks shall be secured to the inlet side of the north and south culverts as well as the 24" diameter opening at the man-made dam. These racks will need to be cleaned out approximately once or every other week during the winter months to ensure that the streams continue to flow freely. During the rest of the year these racks need to be cleaned out on a monthly basis if there is still flowing water. 6. It will be the responsibility of each new homeowner to prepare a Stormwater Site Plan prior to P tY P eP construction to ensure that their additional surface water runoff does not adversely impact the with the use of Department of Ecology's natural dram age stems ahead in lace. Also, ep gy � systems Y P BMPs the amount of soil erosion and sedimentation will be minimal. 7. The natural state of the hillside is to be preserved as much as possible including trees and existing ground cover since they absorb large amounts of rainfall and help to keep the soils from over saturating by pumping out water through their root-trunk-leaves transpiration system. 8. No clear cutting will be allowed. To provide a view, branches will be trimmed 25 feet to 35 feet from the base of the tree rather than cutting down the trees themselves which will help to preserve the health of the trees. 9. Bare areas especially on the inlet side of the culverts within the stream valleys are to be replanted with indigenous plants such as ferns, salal, alder and fir saplings to reestablish the natural treed setting of these areas. This again will help to reduce soil erosion and stream sedimentation. 10. After the addition of the 12" diameter culverts and subsequent embankment compaction as well as the construction of the 24" diameter pipe in the manmade dam and the installation of the trash racks, this professional civil engineer is to be called at(800) 590-0958 to review the work performed and prepare a final report to be submitted to the Mason County Public Works Director and the County Road Engineer. P.O.Boa 250,Ocean Shores,WA 98569 (360)289-0958 Office,(800)590-0958 Bus,(360)289-9682 Fax (360)580-1379 Mobile,(360)538-1736 Aberdeen Laboratory March 15, 1999 Report No. 001 Page 6 of 5 Morta Engineering and Testing If you have any questions regarding this engineering report do not hesitate to call me at(800) 590-0958 or on my cellular phone at(360) 580-1379. P. 1t10 Sincerely �09 Morta Engineering and Testing, x SIDNAL ti-t1 Steven P. Morta, P.E. Professional Civil Engineer and Owner rEXPIRES:1/14/ p2 O 0 I� Technical references: 1. Civil Engineering Reference Manual by Michael R. Lindeburg,P.E., dated 1986. 2. Stormwater Management Manual for the Puget Sound Basin (The Technical Manual), prepared by the Washington State Department of Ecology, dated February 1992. 3. Soil and Rock (n - Volume 04.08, prepared by the American Society of Testing Materials, dated 1998. 4. SEPAXPA Site Visit by Alan A. Tahja, P/W - County Hydraulic Engineer dated February 8, 1999 5. Slope Stability Investigation for Pebble Beach Tracts and Vicinity Located near Union, Mason County,Washington,Report No.002,dated Sept. 16, 1997 P.O.Boa 250,Ocean Shores,WA 98569 (360)289-0958 Office,(800)590-0958 Bus,(360)289-9682 Fax (360)580-1379 Mobile,(360)538-1736 Aberdeen Laboratory sly,rs..«.ca+c _5" •/QO' .sos.a aAa.40 Ji�rc � wce fsi C04WAK -LO r �Y.. \ Ica No / l / /. O ••► >• r •�-y •r J r. ,�// �• f s �0 COACAAS a� '�4ts y� �,b'i fi tie f r:.gees } Ir •� �s' ItwCN ACC 03� •;.,�� F'd 1 ' "CAC 1 Cot � � ' • �� T?I jo AL ACROrs e e' wouw•srnnMarc'• I - P •- puce la WOOD llris ti of as Q:tstjer n71.a j \ 1 •; � fry.'A w w om 3— ors.s'yip�C t!�j yr. it ONE \ i VAMao • � , .��•ANOL# Ce4wKK �� �'.',� •Xa , 1p � '� COrrJ+•w'/G SfG BSI:,. ��. ') ,:J' .z e • ,�• .err `� rues aiAc.. (\\\tnofrfawa) ii-c.rw':JPr plGll� ` Ili.»� ..,`UhN ;.•• »�IS/TES lali+u►CpiuEC'LT H.M 1[bli+1 9fb(f wE in K IN NOgO N nMcila rJl io+r'00- 4 - :.Yii�..- --..: ;1`•r • ii7 st.+, !iJ:9TGU %a' I WE V1FM Art i10.14itMIS of IIK JlbLf KCPMFA ACT Al lw 41WSV OF C • x• >•,••: • •_ l . a..�Nr Ir •cCP:CHBEz .ta3 ,� LE�tiN��: _-►/o.s'.oe, w-•.vofar�cfu.--_ c,••w` '- ,2! /•rov�wpcJvra'sxawJ Q^/'_' �'.. •, �•' �caf,co,,.... r y�7►=..� , .p'ttOLA1P illt YfY;N�'iw+f! :_, -j _ .. ', 7oJ. IfC J./fr , • L . N1f75YtO tN0 SUR1E100,O. •^Ar ccwrA• tAv*10 Obi Tt2N• tk ! Tdrow > �•: 4001rJd4(-C a ''<<,rr:• .`. .':} -.j _o rswvo dropGas f.or�a� y �l h. ro4,w,C o aa.s Vk MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER $Helton,Washinpon 96564 DATE:_ Febru= 8, 1999 INTER-t)EPARTMENTAL COMMUNICATIONS TO: Randy Neff, DCD - Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. DCD WO-## 9905 „ SUBJ: SEPAXPA Site Visit NAME: Ed Busch Randy,' Following our visit to the Ed Busch property on Thursday February 4, 1999,I would like to offer the following comments regarding the development of the property; 1) A Stormwater Site Plan (SSP)needs to be developed for the property which provides for the protection of neighboring properties, and waters of Washington State. Conversion of the temporary logging roads and development of home sites has a potential of creating in gcess of 5,000 square feet of impervious surface,which requires a stormwater plan to be developed by a licensed engineer. 2) Several creeks or surface drainages were observed traversing the property. An element of the SSP should be the hydraulic sizing of the road crossing culverts. Without an analysis supporting the sizes of the culverts installed, a potential for a washout quid delivery of mud and silt to adjacent properties and Hood Canal from the roads is present. The basins feeding the surface drainages need to be delineated and flows anticipated from a 100 year 24 hour event developed to determine what minimum pipe size is needed at each crossing. 3) During the rainy season(Oct. 1 thru April 30),all exposed and un-,vorked soils with erosion lJoteutial are required by Mason County's Surfaoe Water Ordinance to be stabilized by suitable application of BMPs. A temporary Erosion and Sediment (E&S) Plan is an element of the SSP that should be developed for this site. Please!feel free to contact me at County extension 461 if you have any question regarding these comments, or if you feel there are other issues that need to be addressed as engineering issues pertaining to this development. $incerely, T„ A n A. Tahja File: H_\WP\SZRMWTR\REVIEWS\BUSCH.IDC 3NOOW 'QelHHO I N Wd bS: Z T 3ni 6E-£Z-33d Storm Drainage Plan 3 -3 -99 g � A f Title:Photo No. 1 Title:Photo No.2 Title:Photo No.3 Date:March 3, 1999 Date:March 3, 1999 Date:March 3, 1999 Description: East stream crossing with Description:East stream with heavily Description:East stream flowing into 18" natural debris barrier vegetated valley dia.culvert Title:Photo No.4 Title:Photo No.5z Title:Photo No.6 Date:March 3, 1999 Date: March 3, 1999 Date:March 3, 1999 Description:East stream outlet Description:East stream looking down Description:West stream looking up from stream from culvert roadway t - Title:Photo No.7 Title:Photo No.8 Title:Photo No.9 Date:March 3, 1999 Date:March 3, 1999 Date:March 3, 1999 Description:West stream rock armored Description:West stream looking down Description:West stream rock armored inlet from roadway outlet Morta Engineering and Testing I'au I Storm Drainage Plan 3 -3 -99 Title:Photo No. 10 Title:Photo No.11 Title: Photo No. 12 Date:March 3,1999 Date:March 3, 1999 Date:March 3, 1999 Description:West stream road,view to Description:West stream looking down Description:View of home down stream- Hood Canal from road evidence of some flooding i f L P I Title:Photo No. 13 Date:March 3, 1999 Description:Convergence of east and west streams Morta Engineering and Testing Page 2 M. ■T DESIGNED DATE_2LZ-Z/9 5 -2 JOB N 4% MORTA ENGINEERING & TESTING CHECKED DATE P.O. Box 250 Ocean Shores, WA 98569 Business: (360) 289-0958 Toll Free: 1-800-590-0958 SHEET OF Fax (360) 289-9682 Testing Laboratory, Aberdeen, Washington (360) 538-1736 PROJECT EL //Y,,D e4611 /s A•/V yr-is 4­0•z N010rA/ (ft. Z- ,!:i.1r (= i ETEr�M IneF TI-J6 /'EA- /G JQUrv(p F/20M T/Ac AAT/0"4C- 7--/M/V7c '�'� Th�F UU�i�L✓J '!r, F 0 u� /ME ��0�"1 TiSCE l�g27VeS7' CO,2 /.rE2 TJ r2rACA/ (2uC.. T. f=9 o A k Fi 6 u2 G j �-� � ., o nor 1"s ciE"�T � C1 C = p_ Fa i2 p Go An n 4) m F /1�s-i�F.uTi�✓� redo LCs- 7- �. SEc EcT 4 PVe6-a ke e j'Z ST02� , 7W t- F O r(, A /4- Z L,� E �Y/MATE 7-/f �4lE� U Cv.uT�1i�3u7/ate/_ Ap" D/Q_ cv 6 UFO7 /s AU z Gt cry 7-0 SA Y 7 <T C UG(U=IL-r' ,f -L o 441 1 C, LL , T,�s F`T VL o cv /.7 7 F-r z (j� ._ �•lr� �$' p F-T�/-S 6 C Fe/Z /� N (� /Q , Cu G. U 2T SeeC Fat /"2- " D�Q. CCU SIlve r (o O < 3 �(, S�r F731SEG /S AtJ"aA7:5 M.E.T. DESIGNED DATE JOB MORTA ENGINEERING & TESTING CHECKED DATE P.O. Box 250 Ocean Shores, WA 98569 Business: (360) 289-0958 Toll Free: 1-800-590-0958 SHEET 2 OF 3 Fax (360) 289-9682 Testing Laboratory, Aberdeen, Washington (360) 538-1736 PROJECT G �'' t_` C/: �'%D��'^. S'�4 r -�� � Qr✓ //Y,oreVcrz/G 4"'J44 Y,-I r F0/Z Sours CI.�vF�lz' �• �s7El2M r^fE /C /2 W-,/ o PX F20 /V1 'Tim %�Q7/O�•,-c. MC-T/toC . r 7-//',1A; -E ! -Z G. T-4�f D U r G L.4-J 0 i=C 0 vV T/A✓!- F/2 9 P/\ ?v / �LN %/l-e �20M �C- eV z C/Y-00z-E T/V4ez' Qa••co FF CD -7; G� A1:7/261,-4 7, rluFI:-, A2E4 . l-e IQ 0 0/Y1 /'r',147'/0 A/ 0iC' s/.co A G E v.-7!L y reESi�Fi•_� �aL iQ�vp fU� 's>r� !z'a 2 T/ocE /�l�Fnc.r�ry F 4/0 /V\ STo M IJ vti-,7'/0� r.,^^ 47- 0,c C'O^�rl�y�r7oni A s pc�Es 7-,4,oLc- oPjE-,4 K CGS A _ D. z0) �J c TFi7 Nt -1 C / r- /Op " 014, C'G!L LJ 62T /-f Q42 uk V--V Tv n/ E Z_S-D F-7'--?Ir 'C O j=,e 0/01 o rz r C(-r c V E-<<r !/ P 4c/ .s 9 %?3/s E� Foy /�' `` DMA. c U C Lo,6'. ;je. DESIGNED DATE /� 9 JOB M.E.T. MORTA ENGINEERING & TESTING CHECKED DATE P.O. Box 250 Ocean Shores, WA 98569 Business: (360) 289-0958 Toll Free: 1-800-590-0958 SHEET, OF Fax (360) 289-9682 Testing Laboratory, Aberdeen, Washington (360) 538-1736 PROJECT 7 /%/U f2 Tip ES iJ e"c F /N 7-i4i r 0/2 scrio-v A .s �v�v�.v�• /�v �/�—� 2 4 C.l L !J C/z 7 t -T/2 LE-4 M F-C 0 rcJf !�r To 0,0 F w4-7r- !S C-L.l/Z 2 cr -r L `7 F� 04-w.v5 AA 20 u�vp 7/fE 4 - c & v1 e T' N S't/Q u► 2yN � PIZ _ d, ,5-7/C F,ti'M F4 owitiS ae-Ov�1,0 UQM Exisri�b /�i/�c �Ct Cu✓���,�Tc y v4��✓L �c yr // 4) GCS CACc.ti��/ L c v r L. � E/'[4 r G `` GVITN Zhu lot & ' /Js `y`yyy�,• �� fJ lie, t FRIDAY HARBOR, 40 IN E .� , �u. . . ATLAS 2, Volume Ix .• t „ i Prepertwd • • HARBORPC, At, FRIDAY 141� �'r1i�_ t7. 20 17.5 ., • ♦ ILI 'If0 ? f . STORMWATER MANAGEMENT MANUAL FOR THE PUGET SOUND BASIN 124 123 122 121 49 80 5 El Z s � o ' O 4S tam- 40C 1�4� \ 1 55 c FR16-+ HAR OR -PORT S1ANL' 4�pp r \ N5a0a5 \ 3 30 / t 0 ' 1 6 r. F 75' 21 ' ��� 3 55 48 �I AK�� 7 i l 75 so `" soy W IR 90 S AT40 a0 1 iC - � Jv 60 5 , r 55� c,�r.•. 3 47 T, ss 3 \ AEE E N ra � A 5-70 is E TR L ° 9 5 � 2 60, i°° ss 22 YAK ° ' ' 4 i 55 , 6 7t1 Tom) , 65 60 � w lO ADM 25. 46' �� 6 ,� WASHINGTON '° i , 5° `° "" • ' `GPLpEN E 10 0 10 20 30 40 2 MILES 40 �s35'— LMO uss � j Figure 30 ! 45 NOAA ATLAS 2, volume ix Z `�55 60 65 Pnwrad by U.S.Deparunent of aree ISOPLUVIALS F 100-YR 24HR PRECIPRgTION National Ocaanic and Atmospherxpdn„rnetrauon IN TENTHS OF N INCH National Weather Service,Office otlHydrolopr Prepared for ua Department of At0ncutture, Soil Conservation Service,Enpnseron`Division 124 123 122 121 III-1-46 FEBRUARY, 1992 ���e ac. tow �. IVA `Ic. . ,[���.'wd.•.��1W_ i�. MIL �.� ,/.lay �� e�ei.�,• 1i �' . l � � ���.—{tip 5, Tw t� ! ' 1 `_' ../ ®j�I��� � �� u � ���� ✓/�'ii�1� �M,om.- �� � - 'u..3��.'.�..�`���JII►�:Z�N�1\�c���`��.�.•�_.����N • - •--. �. Y. LEI or NEW OF NO- 0 t��54 Ira 11 IN%;_ MAl 5% MR VAY WIN NO ..s.. .. r� _� ram•.: , ,