Loading...
HomeMy WebLinkAboutHydraulic Project Application - PLN General - 12/16/1994 E ETA r 9� rApv an State of Washington DEPARTMENT OF FISH AND WILDLIFE Mailing Address: 600 Capitol Way N, Olympia, WA 98501-1091 - (206) 902-2200-1 TDD (206) 902-2207 Main Office Location: Natural Resources Building, 1111 Washington Street SE, Olympia, WA December 16, 1994 James Clow c/o Japhet Bulkheading, Inc. DEC 2 2 1994 ATTENTION: Floyd Japhet 2121 Summit Lake Shore Road Northwest MASON CO. PLANNING DEFT. Olympia, Washington 98502 SUBJECT: Hydraulic Project Application - Concrete Bulkhead Footing Repair- Hood Canal, Tributary to Admiralty Inlet, Section 04, Township 23 North, Range 03 West, Mason County, WDFW Log No. 00-A4259-01, WRIA 16.MARI Dear Mr. Japhet: Washington Department of Fish and Wildlife (WDFW)received the above-referenced Hydraulic Project Application on November 10, 1994, but we are unable to complete processing at this time for the following reason(s): State Environmental Policy Act (SEPA) - Compliance with SEPA is required by law prior to issuance of the Hydraulic Project Approval. Please contact your local city or county planning department for information regarding SEPA procedures. As soon as the SEPA process has been completed, please provide written notification of compliance from your local jurisdiction, so your application may be processed in a timely manner. Your proposal is placed on hold until we receive the above-identified information. Your application will be processed after the information has been received. We appreciate your cooperation in our efforts to protect, perpetuate, and manage the fish resources of the state of Washington. If you have any questions regarding the status of your application, please call me at (206) 902-2574. Sincerely, l Neil Rickard Area Habitat Biologist Habitat Program cc: Dave Gufler, WDFW, Region 6 Don Brush, Mason Co. DCD OF W Asy/ 5C { 01 40 HYDRAULIC PROJECT m APPLICATION - F�5 (R.C.W. 75.20.100) T OF DEPARTMENT OF WILDLIFE (R.C.W. 75.20.103) DEPARTMENT OF FISHERIES 600 Capitol Way North PLEASE PRINT OR TYPE General Admin. Bldg. Olympia, Washington 98504 Olympia, Washington 98504 (206) 753-5897 DO NOT WRITE IN SHADED AREA (206) 753-6650 10 LAST NAME FIRST 19 CONTACT PHONE(S) 51 CONTROL NUMBER G<> cJ F B 6 0 3 7 7 19 STREET OR RURAL ROUTE 7 I 9 9 WRIA - -'z o o c CITY STATE ZIP /, /// w 'qs 4• `? 11';555 r-21 WATER � � � �� � 4 TRIBUTARY TO P PROJECT /n'') (. Li� ( •` h� � QUARTER SECTION TOWNSHIP RANGE (E-W) COUNTY 13 SECTION ' 5'0 - 0 t 0 r$ DESCRIPTION OF WORK METHOD AND EQUIPMENT ..0... ......i4.N...........8.��....X........310".....dE. E.e wit//. . F� /.. .f'F �I'.-S6-_...v.�................. __ . �.s.. .�k y.. ....... .; Xe/c- ..bu f. - P... ..w `s...I.. ..o k f .... .......................................................... ..... ... ............. ... .............. .. ........... .. .......... .............. ................... ............ ...................................... .............. ..... . ...... PROPOSED STARTING DATE PROPOSED FINISHING ATE / S SDO A( �'¢ 20 SEPA AGENCY/DATE OF DETERMINATION 21 OTHER PERMITS s ® �G p-+ /� /� I� IT IS UNDERSTOOD THAT NO WORK WILL I ,T SIGNATURES DATE BE STARTED UNTIL A SIGNED APPROVAL ( � /I IS RECEIVED w TIME LIMITATIONS: GAM I I I (Rev. 10 87) 771- INSTRUCTIONS FOR COMPLETING HYDRAULIC PROJECT APPLICATION FORM The Hydraulic Code (RCW 75.20.100 and 75.20.103) provides that in the event any person or government agency desires to construct any form of hydraulic project or other work that will use, divert, obstruct, or change the natural flow or bed of state waters or that will utilize any of the salt or fresh waters of the state or materials from the beds, must submit plans for the proposal to either the Department of Fisheries or the Department of Wildlife. These plans shall contain the general plans for this overall project and complete plans and specifications for work within the ordinary high water line. Written approval must be secured from the Department having jurisdiction over the site before commencing construction or work. For projects located in the following areas an application shall be submitted to the Department of Fisheries: Western Washington, which includes all lands lying west of the summit of the Cascade Mountains. All mainstream Snake River projects and all mainstream Columbia River projects downstream of Chief Joseph Dam. For projects located in the following areas an application shall be submitted to the Department of Wildlife: Eastern Washington, which includes all lands lying east of the summit of the Cascade Mountains including Klickitat County, except as noted above. The application shall be mailed to the address of the appropriate agency. PP Department of Fisheries Department of Wildlife 115 General Administration Building 600 North Capitol Way Olympia, Washington 98504 Olympia, Washington 98504 (206) 753-6650 (206) 753-5897 The application shall include a vicinity plan and site plan of the project (cross-sections and profile shall be included when necessary). These should be attached. The reverse side of the form may be used as needed. An incomplete application may delay issuance of the approval. BLOCK 11. Enter only that portion of the project within the ordinary high water line, i.e., Culvert Installation, Bank Protection, etc. BLOCK 12. Identify water by legal or common name (if unknown, enter unknown) and first named receiving water. (i.e., Jones Creek, tributary Skagit River.) BLOCK 13. Enter legal description (section, township, range). If unknown, check with county auditor's office. BLOCK 20. The State Environmental Policy Act (SEPA) may require a determination of the environmental impacts of your proposal. If your project also requires a permit from another agency (state, city, or county) you may be required by them to complete an environmental checklist. If not, removal of 50 or more cubic yards of streambed material or a channel realignment may require a completed checklist. A determination of the impacts will be made from the information on this checklist as required by SEPA. Modifications to your project may be required to lessen any impacts. If this process has been completed, attach a copy of the determination or specify the agency and date. BY LAW,THE HYDRAULIC PROJECT APPROVAL CANNOT BE ISSUED PRIOR TO COMPLETION OF THE SEPA PROCESS. BLOCK 21. List other permits required. Identify by title and identification number. Examples are: Corps of Engineers (Federal) Water Rights; Flood Zone (Department of Ecology) Forest Practices (Department of Natural Resources) Shorelines, Building, Conditional Use (County or City) Water Quality Modifications — Any project which will affect water quality, including turbidity, may require an order from the Department of Ecology (DOE) authorizing a short-term modification of water quality standards. Applications for authorization should be submitted to the appropriate DOE regional office at least 30 days prior to starting your project. For additional information call (206) 459-6000. The completed forms should be submitted as far in advance as possible. Up to 45 days should be allowed for investigation and processing of the application. If you require information concerning your application, you should write or phone the appropriate department. GAM 11126 OX 183