HomeMy WebLinkAboutSEP94-217 Cancelled - SEP Determinations - 11/9/1994 MITIGATION MEASURES
Maurice Conklin
SEPA 94-217
Excavation/ 1500-1700 cubic yards
1. Excavation spoils shall be taken to an off-site location
approved by Mason County.
2 . Washington State Department of Transportation access permit
required.
3 . Temporary erosion control measures are to be utilized, to
include silt fencing, hay bales and/or other measures determined at
time of issuance of land modification permit.
4 . Permanent erosion control measures are to be utilized, as per
plans, to include replanting of the site with native vegetation
upon completion of project.