Loading...
HomeMy WebLinkAboutSEP94-217 Cancelled - SEP Determinations - 11/9/1994 MITIGATION MEASURES Maurice Conklin SEPA 94-217 Excavation/ 1500-1700 cubic yards 1. Excavation spoils shall be taken to an off-site location approved by Mason County. 2 . Washington State Department of Transportation access permit required. 3 . Temporary erosion control measures are to be utilized, to include silt fencing, hay bales and/or other measures determined at time of issuance of land modification permit. 4 . Permanent erosion control measures are to be utilized, as per plans, to include replanting of the site with native vegetation upon completion of project.