Loading...
HomeMy WebLinkAboutBLD2003-00610 Cancelled Decking, Window, Front Entry, and Bath - BLD Permit / Conditions - 5/13/2003 Inspection Line(360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 Shelton, WA 98584 tfous-e m 3 ?.;13& $-f d4--10 / 7 IP10 RESIDENTIAL BUILDING PERMIT BLD2003-00610 OWNER: JAMES DYER TRUST RECEIVED: 5/13/2003 CONTRACTOR: DOGWOOD CONSTRUCTION 360-898-6102 LICENSE: DOGWOC1990R4 EXP: 12/24/2003 ISSUED: 6/16/2003 SITE ADDRESS: 10091 E STATE ROUTE 106 UNION EXPIRES: 12/16/2003 PARCEL NUMBER: 322365100018 LEGAL DESCRIPTION: PEBBLE BEACH PARK SWLY 1/2 TR 16, TRS 17-18, AND T.L. SWLY OF R/W PROJECT DESCRIPTION: DIRECTIONS TO SITE: WINDOW REPLACEMENT, ENLARGE MASTER BATH, REWORK APPROX. 6 MILES NORTH OF UNION, ON HWY 106 OR 2 MILES SOUTH FRONT ENTRY, DECKING OF TWANOH STATE PARK. General Information Construction &Occupancy Information Square Footage Information No.of Bedrooms: Type of Constr.: V-N Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: R-3 Lot Size: Deck: 648 Type of Work: ALT Fire Dist.: 6 No.of Stories: 1 Occ. Load: Building: Valuation: Building Height: 18 Occ. Status: Primary Basement: remodel 155 Manufactured Home Information Setback Information Shoreline&Planning Information Make: Length: Ft. Front: S 20.0 Ft. Shoreline: Ft. Water Body: Rear: N 0.0 Ft. Slope: Ft. SEPA?: Model: Width: Ft. Side 1: E 0.0 Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: W 40.0 Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Lavatories 1 Plan Check Fee KS 5/13/2003 $154.21 S12003 Planning Review Fee KS 5/13/2003 $150.00 S12003 EH Plan Review CEW 5/23/2003 $75.00 S22003 Building Permit Fee JRN 5/27/2003 $237.25 S22003 Building State Fee JRN 5/27/2003 $4.50 S22003 Plumbing Fee JRN 5/27/2003 $7.00 S22003 Plumbing Base Fee JRN 5/27/2003 $20.00 S22003 Total $647,96 BLD2003-00610 Please refer to the following pages for conditions of this permit. 1 of 5 CASE NOTES FOR BLD2003-00610 CONDITIONS FOR BLD2003-00610 1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-g982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 2) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Departret prior to any further inspections being performed or approvals granted. X 3) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contract fail to post the address on site prior to requesting inspections. X i 4) Installation of heating equipment in single family residences shall meet the requirement of the current WSEC. The furnace to be installed shall not exceed 200% of the heating design load or prescriptive requirements of Chapter 9. Furnace efficiency shall be .78 AFUE or higher or rated 80% combustion efficiency. All ducts shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes installed in accordance with manufacturers installation instructions. Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall be insulated to R-8. X 5) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may affect your project. X 6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X /!� BLD2003-00610 Please referto the following pages for conditions of this permit. 2 of 5 7) Owner/applicant has been informed that there is a pending enforcement action ENF2000-00051 regarding non-permitted construction on the upland parcel. There was extensive remodel work performed that requires after the fact permitting. Enforcement action is pending and will not be resolved until the structure is demolished or ATF permits obtained. Mason County does not waive enforcement action against this parcel, structure or any parties of legal interest. X 8) New portions of structure are required to maintain a minimum 5'setback from side property lines/easements, planning department may require increased setbacks. Any r 'del/repair work to the existing structure within 5'of the property line may require fire resistive construction and/or variance proceedures. 9) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building Department prior to any further inspections being performed or approvals granted. X 10) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or contractor fail to post the address on site prior to requesting inspections. X /' -- 11) The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable)are part of the approved plans and must remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of pla�po� ite for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections. 12) All replacement windows installed shall have a minimum .40 U-value. Replacement windows that do not meet current egree conditinos shall maintain the same size opening or larger. X,f" -" __ 13) All exterior wall cavities exposed during construction or remodeling work shall be insulated to the full depth of the wall cavity and inspected prior to covering. X ? 14) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X �t' 6 15) The"approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building FQkpartment prior to any further inspections being performed or approvals granted. X , BLD2003-00610 Please refer to the following pages for conditions of this permit. 3 of 5 16) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged a. shall be collected by the Building Department prior to any further inspections being performed or approvals granted. X 17) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result permit revocation. X 18) All changes to"approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance or reg�Ifi , must be reviewed and approved by Mason County prior to construction. X 19) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building Inspect r shall be made prior to requesting additional inspections. X �j� V 20) THE D-MOLITION AND DISPOSAL OF DEMOLITION DEBRIS MUST MEET REQUIREMENTS AS PER MASON COUNTY REGULATIONS. X j!✓_ 21) All property lines shall be clearly identified at the time of foundation inspection. & 22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. X 23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X 24) The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason County Shoreline Master Program.X 25) Approved per dimensions and setbacks on submitted site plan. X � ; 26) No expansion of existing structures, or construction of new structures along the shoreline is permitted within the minimum 35 foot shoreline buffer/ setback.X /- BLD2003-00610 Please refer to the following pages for conditions of this permit. 4 of 5 This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. OWN ER OR AGENT: DATE: BLD2003-00610 Please referto the following pages for conditions of this permit. 5 of 5 • BLD`�-'���J�"�J E I y MASON COUNTY PERMIT NO. MAY 4 2 BUILDING PERMIT APPLICATION �03 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton(360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 Seattle(206)464-6968 *-EDAP 4ZZ, On the Web www.co.mason.wa.us APPLICANT INFORMATION _ CONTRACTOR INFORMATION Owner �YF�Z T2u.S 1 cl I+MEj �, +�L/SJ�tI� Contractor Name DO!�iuOed (yh <iV u r-fiex, Mailing Address HOOP ID F . Z, 2TE4 10b Mailing Address qD _raWcr La44 City L-(N I o N State WA Zip Code c,£35 q,—. City + C kA Stated Zip Code Q59 Phone (, b9 9 5 7 Other Ph. Phone (_) '`9-(o 1 Other Ph. C__j Lien/Title Holder J-A 04F Contractor Reg.# bC(7W U+-1 Li`i yR Exp.,_�A.�J/ L,. E-mail Address '50 d 'i n r '' ^a'^ E-mail Address SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic Existing Septic -7C Connect to Sewer System_Name of Sewer System Well Water System Name of Water System :/-+, PARCEL INFORMATION - 12 digit Tax Parcel No. A-2 / / Fire District. Legal Description fV,4 CN fAR)(i LVI-X % TR 4,L /2:Z 4VO 77% J LdL,./ of &wp Site Address (Please include street name,street number and city) 0496'rfl ywy ►�d/NI/n64,#,04 `?859, Directions to site fAox• d11 t< NLEd7H JW AA 1,0 Al u;44&6e` //O 6 7-wo n 4A_5 Will timber be cut and sold in parcel preparation? (Yes/No) hic? Lake River/Creek Pond Wetland Seasonal Runoff Stream ,Slopes or Bluffs PERMANENT RESIDENCE❑ SEASONAL RESIDENCE❑ TYPE OF JOB- New Add Aft -< Repair Other Use of Building Is this permit submittal the result of a Stop Work Notice, Correction Notice or other enforcement action? (Yes/No) IUD Describe Work ulNyo ', WAI T,4461- e /!`kqf-e- 1 , 4wigAA r 'All- EVlRy.aftA1,A1 a No. of Bedrooms 3 No.of Bathrooms SQUARE FOOTAGE- 1st Floor 2, 30c 2nd Floor 3rd Floor Loft Basement Deck Other sq.ft. Garage Ft Attch) Detached Carport Attached Detached MOBILE HOME INFORMATION - Make Model Model Year Length Width Serial No. No.of Bedrooms No.of Bathrooms Type of Heat Purchase Price$ Replacement Unit? (Yes/No) Installer Name Certification No. NOTICE:THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION.The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project.Owner/Builder acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a the Contractor Registration Law RCW 18.27 and am aware of the ordi- contractor in the State of Washington and that I am aware of the ordinance nance requirements for which this permit is issued and that all work will be requirements regulating the work for which this permit is issued and all done in conformance therewith. No changes shall be made without first work shall be done in conformance therewith.No changes shall be made obtaining approval. without first obtaining approval. X Date -<-17 X /�/ y �/-(.�' � �/ Date ?1, FOR OFFICIAL USE BEYOND THIS POINT `l Accepted by Date r/ `� Submittal Amount Due 1 L' ` 1/ ) Receipt No. -' DEPARTMENTAL REVIEW APPROVED DENIED CONDITION CODES Building Department Occ Grou T e Constr. ' + CI Planning D&Owrtment Environmental Health Department Public Works Department Fire Marshal Valuation$ G FEES Building Permit Fee ,` `ash Site Inspection Plan Review Fee `�t EH Review Fee Plumbing& Base Fee vo Planning Review Fee Mechanical& Base Fee Other Wood/Gas/Pellet Stove Fee State Fee Ll 66 Violation Fee Pre-Paid at Submittal ( ) TOTAL FEES PERMIT NO.: MASON COUNTY PLUMBING/MECHANICAL PERMIT APPLICATION 426 W.Cedar/P.O.Box 186,Shelton,WA 98584 Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968 APPLICANT INFORMATION CONTRACTOR INFORMATION Owner ,�,c'a 7P,U6r, JAME5 5. 4 �u.5A4 40 , Contractor Name rx. m 1- C& g4 c 'o Mailing Address 10096 E, l2TE. 106 Mailing Address T-owev L.. .. <.._ �— City IL& ION State ijIL ZIP-Code r 85 City +h v H State WA Zip Code 91TScl,2 Phone(— 070-2 3 Other Ph. 4( 0b d-0&; Ph.0 8�1 — -Rther Ph.� Lien/Title Holder �Am.r''. Contractor Reg. # y0w W O GT 9 o IZ Address Expiration 17=/ X4 / O SEPTIC INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of Sewer System PARCEL INFORMATION- 12 digit Tax Parcel No. 3,1A-Vo d / 00 a/7 Fire District Cr1,1�o Legal Description `' AC �� ` - L• LaL� �FIQ Site Address(Please include street name,street number and city) 4 1 —�• w /0 Directions to site / _X, 4 MI1E5 A/0RT4 Or 0 'A/ 0/,/e-14LVX1D4, o,Q A ,► iLlf %libf Is your property within 200'of the following: Body of Water(Name) WOO D CA WA L.- Saltwater )4- Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs f TYPE OF JOB New Add Alt Repair Other Use of Building (Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Fuel Type: Electric X Type of Fixture No.of Fixtures Fees LPG Natural Gas Heatpump 2C.---. Toilets Type of Unit No.of Units Fees Bathroom Sink 3 'M Furnace r �e,ili✓G Bath Tubs Heatpumps �+ Showers .7 Spot Vent Fan Water Heater 2 +► Propane Tank Clothes Washer 0 Gas Outlets Kitchen Sinks n Wood/Gas/Pellet Stove Dishwasher ( It Kitchen Exhaust Hood I �+ Hosebibs Dryer Vent �t Other Other Base Fee Base Fee TOTAL PLUMBING TOTAL MECHANICAL A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT. NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED. PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection of this project. Acknowledgment of such is by signature below: OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without approval. first obtaining approval. X ✓ Date 7 497 X -D r f rl �r Date FOR OFFICIAL USE BEYOND THIS POINT Accepted by Date Submittal Amount Due Receipt No. ............. .. ...... . ...... .... APFROED: ENIE}DEPARTMENTALREXIEW : _.. ...._. __ O..NDIT_.ION>CODES_' _ Building Department Occ Group Type Constr. Planning Department Other Other _ ___m :::.. Permit Fee Site Inspection Plan Review Fee UFC Plan Review Fee Plumbing&Base Fee Other Mechanical&Base Fee Other Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( ) Violation Fee TOTAL FEES