HomeMy WebLinkAboutBLD2003-00610 Cancelled Decking, Window, Front Entry, and Bath - BLD Permit / Conditions - 5/13/2003 Inspection Line(360)427-7262
MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352
Mason County Bldg. 3 426 W. Cedar P.O. Box 186
Shelton, WA 98584 tfous-e m 3 ?.;13& $-f d4--10 / 7
IP10
RESIDENTIAL BUILDING PERMIT BLD2003-00610
OWNER: JAMES DYER TRUST RECEIVED: 5/13/2003
CONTRACTOR: DOGWOOD CONSTRUCTION 360-898-6102 LICENSE: DOGWOC1990R4 EXP: 12/24/2003 ISSUED: 6/16/2003
SITE ADDRESS: 10091 E STATE ROUTE 106 UNION EXPIRES: 12/16/2003
PARCEL NUMBER: 322365100018
LEGAL DESCRIPTION: PEBBLE BEACH PARK SWLY 1/2 TR 16, TRS 17-18, AND T.L. SWLY OF R/W
PROJECT DESCRIPTION: DIRECTIONS TO SITE:
WINDOW REPLACEMENT, ENLARGE MASTER BATH, REWORK APPROX. 6 MILES NORTH OF UNION, ON HWY 106 OR 2 MILES SOUTH
FRONT ENTRY, DECKING OF TWANOH STATE PARK.
General Information Construction &Occupancy Information Square Footage Information
No.of Bedrooms: Type of Constr.: V-N
Type of Use: SF Insp.Area: No.of Bathrooms: Occ. Group: R-3 Lot Size: Deck: 648
Type of Work: ALT Fire Dist.: 6 No.of Stories: 1 Occ. Load: Building:
Valuation: Building Height: 18 Occ. Status: Primary Basement: remodel 155
Manufactured Home Information Setback Information Shoreline&Planning Information
Make: Length: Ft. Front: S 20.0 Ft. Shoreline: Ft. Water Body:
Rear: N 0.0 Ft. Slope: Ft. SEPA?:
Model: Width: Ft. Side 1: E 0.0 Ft. Shoreline Desig.: Urban
Year: Serial No.: Side 2: W 40.0 Ft. Comp. Plan Desig.: Rural
Plumbing Fixtures Mechanical Fixtures FEES
Type Qty. Type Qty. Type By Date Amount Receipt
Lavatories 1 Plan Check Fee KS 5/13/2003 $154.21 S12003
Planning Review Fee KS 5/13/2003 $150.00 S12003
EH Plan Review CEW 5/23/2003 $75.00 S22003
Building Permit Fee JRN 5/27/2003 $237.25 S22003
Building State Fee JRN 5/27/2003 $4.50 S22003
Plumbing Fee JRN 5/27/2003 $7.00 S22003
Plumbing Base Fee JRN 5/27/2003 $20.00 S22003
Total $647,96
BLD2003-00610 Please refer to the following pages for conditions of this permit. 1 of 5
CASE NOTES FOR
BLD2003-00610
CONDITIONS FOR
BLD2003-00610
1) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division.
There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at
1-800-647-g982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law.
X
2) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Departret prior to any further inspections being performed or approvals granted.
X
3) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contract fail to post the address on site prior to requesting inspections.
X i
4) Installation of heating equipment in single family residences shall meet the requirement of the current WSEC. The furnace to be installed shall not exceed
200% of the heating design load or prescriptive requirements of Chapter 9. Furnace efficiency shall be .78 AFUE or higher or rated 80% combustion
efficiency. All ducts shall be securely fastened and sealed with welds, gaskets, mastics (adhesives), mastic-plus-embedded-fabric systems or tapes
installed in accordance with manufacturers installation instructions. Duct tape is NOT permitted as a sealant on any ducts. Ducts in unheated spaces shall
be insulated to R-8. X
5) Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact
adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the
stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further
information regarding this ordinance and the REQUIREMENT to obtain an ACCESS PERMIT for the installation/construction of a driveway or access
connecting from a Mason County Road, Contact the Mason County Public Works Department prior to construction at Ext 450. For any construction which
is proposed to be located within 25'of a Mason County road right of way, it is suggested to contact that office to review future planned work which may
affect your project.
X
6) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X /!�
BLD2003-00610 Please referto the following pages for conditions of this permit. 2 of 5
7) Owner/applicant has been informed that there is a pending enforcement action ENF2000-00051 regarding non-permitted construction on the upland
parcel. There was extensive remodel work performed that requires after the fact permitting. Enforcement action is pending and will not be resolved until
the structure is demolished or ATF permits obtained. Mason County does not waive enforcement action against this parcel, structure or any parties of
legal interest.
X
8) New portions of structure are required to maintain a minimum 5'setback from side property lines/easements, planning department may require increased
setbacks. Any r 'del/repair work to the existing structure within 5'of the property line may require fire resistive construction and/or variance
proceedures.
9) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will
not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and must be collected by the Building
Department prior to any further inspections being performed or approvals granted.
X
10) In accordance with the Uniform Building Code, all sites shall have approved numbers or addresses located in such a position as to be plainly visible and
legible from the street or road fronting the property. Mason County Building Department requires that this be completed prior to calling for any site
inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the Uniform Building Code will be assessed if the owner and/or
contractor fail to post the address on site prior to requesting inspections.
X /' --
11) The plan review check list and corrections, along with the Energy Compliance Worksheet (when applicable)are part of the approved plans and must
remain thereto. It is the responsibility of the applicant to make the corrections indicated on the plans. Once the plans are marked "APPROVED", they
shall not be changed or altered without authorization from the Building Official. The permit holder is responsible to retain the complete approved set of
pla�po� ite for the duration of the project. Failure to comply and/or removal of approved documents will result in failure of required building inspections.
12) All replacement windows installed shall have a minimum .40 U-value. Replacement windows that do not meet current egree conditinos shall maintain the
same size opening or larger. X,f" -" __
13) All exterior wall cavities exposed during construction or remodeling work shall be insulated to the full depth of the wall cavity and inspected prior to
covering. X ?
14) THE FOUNDATION SYSTEM SHALL BE PLACED ON UNDISTURBED, NATIVE SOIL. X �t'
6
15) The"approved" plot plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" plot plan is not on site, then
approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the
Building FQkpartment prior to any further inspections being performed or approvals granted.
X ,
BLD2003-00610 Please refer to the following pages for conditions of this permit. 3 of 5
16) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building
Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached
thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be
charged a. shall be collected by the Building Department prior to any further inspections being performed or approvals granted.
X
17) All construction must meet or exceed all local ordinances and the 1997 Uniform Building Code requirements as adopted and amended by Mason County
and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would
result permit revocation.
X
18) All changes to"approved" building plans that effect compliance with the Uniform Codes as amended and adopted, or any other Mason County ordinance
or reg�Ifi , must be reviewed and approved by Mason County prior to construction.
X
19) The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance
with the Uniform Codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building
Inspect r shall be made prior to requesting additional inspections.
X �j�
V
20) THE D-MOLITION AND DISPOSAL OF DEMOLITION DEBRIS MUST MEET REQUIREMENTS AS PER MASON COUNTY REGULATIONS.
X j!✓_
21) All property lines shall be clearly identified at the time of foundation inspection. &
22) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure
to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with
Mason County ordinances and building regulations.
X
23) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for
action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit
holder have prevented action from being taken. No more than one extension may be granted.
X
24) The proposed project must be consistent with all applicable policies and other provisions of the Shoreline Management Act, its rules, and the Mason
County Shoreline Master Program.X
25) Approved per dimensions and setbacks on submitted site plan. X � ;
26) No expansion of existing structures, or construction of new structures along the shoreline is permitted within the minimum 35 foot shoreline buffer/
setback.X /-
BLD2003-00610 Please refer to the following pages for conditions of this permit. 4 of 5
This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is
commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied.
OWN ER OR AGENT: DATE:
BLD2003-00610 Please referto the following pages for conditions of this permit. 5 of 5
• BLD`�-'���J�"�J
E I y MASON COUNTY PERMIT NO.
MAY 4 2 BUILDING PERMIT APPLICATION
�03 426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton(360)427-9670 Belfair(360)275-4467 Elma(360)482-5269 Seattle(206)464-6968
*-EDAP 4ZZ, On the Web www.co.mason.wa.us
APPLICANT INFORMATION _ CONTRACTOR INFORMATION
Owner �YF�Z T2u.S 1 cl I+MEj �, +�L/SJ�tI� Contractor Name DO!�iuOed (yh <iV u r-fiex,
Mailing Address HOOP ID F . Z, 2TE4 10b Mailing Address qD _raWcr La44
City L-(N I o N State WA Zip Code c,£35 q,—. City + C kA Stated Zip Code Q59
Phone (, b9 9 5 7 Other Ph. Phone (_) '`9-(o 1 Other Ph. C__j
Lien/Title Holder J-A 04F Contractor Reg.# bC(7W U+-1 Li`i yR Exp.,_�A.�J/ L,.
E-mail Address '50 d 'i n r '' ^a'^ E-mail Address
SEPTIC/WATER SYSTEM INFORMATION -Connect to New Septic Existing Septic -7C Connect to Sewer
System_Name of Sewer System Well Water System
Name of Water System :/-+,
PARCEL INFORMATION - 12 digit Tax Parcel No. A-2 / / Fire District.
Legal Description fV,4 CN fAR)(i LVI-X % TR 4,L /2:Z 4VO 77% J LdL,./ of &wp
Site Address (Please include street name,street number and city) 0496'rfl ywy ►�d/NI/n64,#,04 `?859,
Directions to site fAox• d11 t< NLEd7H JW AA 1,0 Al u;44&6e` //O 6 7-wo n 4A_5
Will timber be cut and sold in parcel preparation? (Yes/No) hic?
Lake River/Creek Pond Wetland Seasonal Runoff Stream
,Slopes or Bluffs
PERMANENT RESIDENCE❑ SEASONAL RESIDENCE❑
TYPE OF JOB- New Add Aft -< Repair Other Use of Building
Is this permit submittal the result of a Stop Work Notice, Correction Notice or other enforcement action? (Yes/No) IUD
Describe Work ulNyo ', WAI T,4461- e /!`kqf-e- 1 , 4wigAA r 'All- EVlRy.aftA1,A1 a
No. of Bedrooms 3 No.of Bathrooms SQUARE FOOTAGE- 1st Floor 2, 30c 2nd Floor
3rd Floor Loft Basement Deck Other sq.ft.
Garage Ft Attch) Detached Carport Attached Detached
MOBILE HOME INFORMATION - Make Model Model Year
Length Width Serial No. No.of Bedrooms No.of Bathrooms
Type of Heat Purchase Price$ Replacement Unit? (Yes/No)
Installer Name Certification No.
NOTICE:THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION.The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and inspection
of this project.Owner/Builder acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgment
of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
the Contractor Registration Law RCW 18.27 and am aware of the ordi- contractor in the State of Washington and that I am aware of the ordinance
nance requirements for which this permit is issued and that all work will be requirements regulating the work for which this permit is issued and all
done in conformance therewith. No changes shall be made without first work shall be done in conformance therewith.No changes shall be made
obtaining approval. without first obtaining approval.
X Date -<-17 X /�/ y �/-(.�' � �/ Date ?1,
FOR OFFICIAL USE BEYOND THIS POINT
`l
Accepted by Date r/ `� Submittal Amount Due 1 L' ` 1/ ) Receipt No.
-' DEPARTMENTAL REVIEW APPROVED DENIED CONDITION CODES
Building Department
Occ Grou T e Constr. ' + CI
Planning D&Owrtment
Environmental Health Department
Public Works Department
Fire Marshal
Valuation$ G
FEES
Building Permit Fee ,` `ash Site Inspection
Plan Review Fee `�t EH Review Fee
Plumbing& Base Fee vo Planning Review Fee
Mechanical& Base Fee Other
Wood/Gas/Pellet Stove Fee State Fee Ll 66
Violation Fee Pre-Paid at Submittal ( )
TOTAL FEES
PERMIT NO.:
MASON COUNTY
PLUMBING/MECHANICAL PERMIT APPLICATION
426 W.Cedar/P.O.Box 186,Shelton,WA 98584
Shelton 360 427-9670 Belfair 360 275-4467 Elma 360 482-5269 Seattle 206 464-6968
APPLICANT INFORMATION CONTRACTOR INFORMATION
Owner ,�,c'a 7P,U6r, JAME5 5. 4 �u.5A4 40 , Contractor Name rx. m 1- C& g4 c 'o
Mailing Address 10096 E, l2TE. 106 Mailing Address T-owev L.. .. <.._ �—
City IL& ION State ijIL ZIP-Code r 85 City +h v H State WA Zip Code 91TScl,2
Phone(— 070-2 3 Other Ph. 4( 0b d-0&; Ph.0 8�1 — -Rther Ph.�
Lien/Title Holder �Am.r''. Contractor Reg. # y0w W O GT 9 o IZ
Address Expiration 17=/ X4 / O
SEPTIC INFORMATION-Connect to New Septic Existing Septic Connect to Sewer System Name of
Sewer System
PARCEL INFORMATION- 12 digit Tax Parcel No. 3,1A-Vo d / 00 a/7 Fire District Cr1,1�o
Legal Description `' AC �� ` - L• LaL� �FIQ
Site Address(Please include street name,street number and city) 4 1 —�• w /0
Directions to site / _X, 4 MI1E5 A/0RT4 Or 0 'A/ 0/,/e-14LVX1D4, o,Q A ,► iLlf %libf
Is your property within 200'of the following: Body of Water(Name) WOO D CA WA L.- Saltwater )4-
Lake River/Creek Pond Wetland Seasonal Runoff Stream
Slopes or Bluffs
f TYPE OF JOB New Add Alt Repair Other Use of Building
(Location of Fixtures/Units 1st Floor 2nd Floor Basement Garage Closet
PLUMBING FIXTURES (Show Number of each) MECHANICAL UNITS Fuel Type: Electric X
Type of Fixture No.of Fixtures Fees LPG Natural Gas Heatpump 2C.---.
Toilets Type of Unit No.of Units Fees
Bathroom Sink 3 'M Furnace r �e,ili✓G
Bath Tubs Heatpumps �+
Showers .7 Spot Vent Fan
Water Heater 2 +► Propane Tank
Clothes Washer 0 Gas Outlets
Kitchen Sinks n Wood/Gas/Pellet Stove
Dishwasher ( It Kitchen Exhaust Hood I �+
Hosebibs Dryer Vent �t
Other Other
Base Fee Base Fee
TOTAL PLUMBING TOTAL MECHANICAL
A FLOOR PLAN AND PLOT PLAN MAY BE REQUIRED DEPENDING ON THE TYPE OF FIXTURE/UNIT.
NOTICE: THIS PERMIT BECOMES NULL&VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF
CONSTRUCTION WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER THE WORK IS COMMENCED.
PROOF OF CONTINUATION OF WORK IS BY MEANS OF A PROGRESS INSPECTION. The owner or agent on owner's behalf,represents that the
information provided is accurate and grants employees of Mason County access to the above described property and structures for review and
inspection of this project. Acknowledgment of such is by signature below:
OWNER AFFIDAVIT-I certify that I am exempt from the requirements of the CONTRACTOR'S AFFIDAVIT-I certify that I am currently registered as a
Contractor Registration Law RCW 18.27 and am aware of the ordinance contractor in the State of Washington and that I am aware of the ordinance
requirements for which this permit is issued and that all work will be done in requirements regulating the work for which this permit is issued and all work
conformance therewith. No changes shall be made without first obtaining shall be done in conformance therewith. No changes shall be made without
approval. first obtaining approval.
X ✓ Date 7 497 X -D r f rl �r Date
FOR OFFICIAL USE BEYOND THIS POINT
Accepted by Date Submittal Amount Due Receipt No.
............. .. ...... . ...... ....
APFROED: ENIE}DEPARTMENTALREXIEW : _.. ...._. __ O..NDIT_.ION>CODES_' _
Building Department
Occ Group Type Constr.
Planning Department
Other
Other
_ ___m
:::..
Permit Fee Site Inspection
Plan Review Fee UFC Plan Review Fee
Plumbing&Base Fee Other
Mechanical&Base Fee Other
Wood/Gas/Pellet Stove Fee Pre-Paid at Submittal ( )
Violation Fee TOTAL FEES