Loading...
HomeMy WebLinkAboutMIS96-0365 Cancelled Pier, Ramp and Float - MIS Permit / Conditions - 1/18/1999 MASON COUNTY Mason County Bldg, III 426 W. Cedar ` P.O, Box 186 Shelton, Washington 98584 M 1 c�;C. FE t- 1.... A N F_� C3 t,) :S p IFF� R M 1 -U FOR INSPECTIONS CALL 427--96 0 MIS96-0365 PARCEL :322365100008 PLAT :PEPLO DIV : BLK : LOT : JOB ADDRESSe F 10181 STATE ROUTE 106 UNION APPLICANT : STEPHEN DRUGGU 206-284-2111 PERMIT OWNER : STEPHEN DRUDGE 206-284 -2111 LEGAL : PEBBLE BEACH DANK TO 1 i T.L. i E 112 TO 9 1 T.L. M OF Ail i E 15' TO. 6 S OF Alt f Ififf #ov MULL & VPID BYl Ev 1AATIOt�I PRnJLC'f DESCRIPTION : rATE t3Y PIER, RAMP, FLOAT PROJECT LOCA'110N : TAKE SOUTH SHOOF RD t 1WY '106) APPROX 2 M i I ES WEST OF TWANOH STATE PARK TO 10111 ADDRESS, S 1 TF IS ALSO SITUATED APPROXIMATELY 2 .5 MILES EAST OF THE ALDFRBROOK DEVELOPMENT . PROJECT NOTES : TYPE AMOUNT BY DATE RECEIPT PRMT $ 145 .50 CPH 06/ 18/96 0000 STFE $ 4 .50 CPH 06/ 18/96 0000 / TOTAL. : 1509 00 OWNER OR AGENT nATE NIS_PONT, ,evr 14/1�1192 COMPLIANCE TO ATTACHED CONDITIONS IS REOUIRED CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date PLUMBING by date by date by Attic OTHER Groundwork date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by i MASON COUNTY Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 l U- RM 1 'T C0NIC) 1 `, 1 0NIS Case No . : MIS96-0365 For : STEPHEN DRUDGE Page r 1 1 ) Water quality is not being degraded to the detriment of the squatie. environment es a result of this project . r 2 ) Dock facilities must be maintained in a safe and sound condition . ^.3 3 ) Approved per �,; i te-plan . A ) Conditions attached to SHR95--0031 shall apply to this Perm I t . 15 ) All approved plans are required to be an-s1tes for inspection purposes . If Inspection is called for and plans are not on site, Approval WILL NOT be granted . In addition, a RA- Inspeotion fee in the amount of *30 .00 per hour (minimum 1 hour ) will be charged and must be collected by this department prior to any further inspections being performed or CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date FRAMING by date by date by Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by MASON COUNTY �- Mason County Bldg. III 426 W. Cedar P.O. Box 186 Shelton, Washington 98584 approval granted . X F' 6 ) PURSUANT TO 1991 UNIFORM BUILDING CODE , SECTION 305(C ) AND SECTION 513 , ALL SITES MUST NAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS 'TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STRF"ET OR ROAD FRONTING THE PROPERTY . MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS . .A REiNSPECTION FEE, BASED ON RATES IN TABLE 3A OF THE 1991 UNIFOPM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS . X 7 ) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL.. CODES, AND UBC REQUIREMENTS X.__ 8 ) Changes to approved building plans that effect aompli ,,nne to the 1991 Washington State Fnprgy Code, 1991 Ventilation and Indoor Air Quality Code, the Uniform Building Coda and/or a,"n County Regulations must be approved by Masan County prior to constructionX � 9) ALL CONSTRUCTION MUST MEED OR EXCEED LOCAL CODES . IF ANY QtIESTIONS, PLEASE CALL THIS Q�FFICE BEFORE CONSTRUCTION . 10) CONSTRUCTION PROCESS TO BE FIELD CORRECTED A5► RIyOU I RED PER MASON COUNTY BU 11.D I NG DEPARTMENT AND UNIFORM BUILDING CODE .x r CONCRETE MECHANICAL MOBILE HOME Footings-Setback date by Ribbons date by Gas Piping date b Foundation Walls date by Set Up date by INSULATION date by BG/SLAB Insulation Floors Final date by date by date by FRAMING Walls FIRE DEPT. date by date by date by PLUMBING OTHER Groundwork Attic date by date by D.W.V. WALLBOARD NAILING date by date by Water Line FINAL INSPECTION date by date by date by