Loading...
HomeMy WebLinkAboutSEP2011-00028 Bulkhead - SEP Determinations - 5/27/2011 �,srRrt 4 l. STATE OF WASHINGTON DEPARTMENT OF ECOLOGY PO Box 47775 •Olympia, Washington 98504-7775 •(360)407-6300 711 for Washington Relay Service •Persons with a speech disability can call 877-833-6341 June 10, 2011 Mtt"AL Borden r `1 Your address r , Mason County is in the Department of Community Development PO Box 279 watershed Shelton, WA 98584 Dear Mr.Borden: Thank you for the opportunity to comment on the determination of nonsignificance for the Skewis Bulkhead Replacement project(SEP2011-00028) located at 3710 East State Route 302 in Belfair as proposed by Eric Skewis. The Department of Ecology(Ecology)reviewed the environmental checklist and has the following comment(s): WASTE 2 RESOURCES: Mike Drumright(360)407-6397 Property owners, design professionals, and contractors are encouraged to consider how building materials might be salvaged and reused. Buildings may also be completely deconstructed to maximize material recovery and recycling. Doors,windows,cabinets and other valuable fixtures and materials may be salvaged for reuse prior to demolition. Local salvage and reuse organizations provide services to evaluate,purchase,remove,and re-sell used building materials;a federal tax deduction may be available for donating building materials. For assistance in finding local reuse and recycling options for building materials, contact Ariona at(360)407-6351. Demolition with Specifically Treated Wood: The applicant proposes to remove a structure(s)that may contain treated wood. Please refer to Ecology's publication"Focus on Treated Wood Exclusion,"available at: httD://www.ecv.wa.goy/pubs/0304038.pdf, for suggested best management practices and disposal requirements for treated wood. For additional information or clarification,please contact Dee Williams with Ecology's Hazardous Waste and Toxics Reduction program,at (360)407-6348. Property owners, developers, and contractors are encouraged to recycle all possible leftover construction,demolition, and land clearing(CDL)materials and reduce waste generated. Recycling construction debris is often less expensive than landfill disposal. Please visit Ecology's 1 800 Recycle Hotline database at: http:Hl800regycle.wa.gov or call the 1-800- RECYCLE hotline to find facilities that that will accept your CDL materials for reuse or recycling. SEPA REVIEWER: Sonia Mendoza WATER QUALITY CONTACT: Bruce Barbour(360)407-6554 Erosion control measures must be in place prior to any clearing, grading, or construction. These control measures must be effective to prevent soil from being carved into surface June 10,2011 Page 2 water by stormwater runoff. Sand, silt,clay particles, and soil will damage aquatic habitat and are considered pollutants when discharged to waters of the state. Any discharge of sediment-laden runoff or other pollutants to waters of the state is in violation of Chapter 90.48, Water Pollution Control,and WAC 173-201A, Water Quality Standards for Surface Waters of the State of Washington, and is subject to enforcement action. During construction,all releases of oils,hydraulic fluids, fuels,other petroleum products, paints, solvents,and other deleterious materials must be contained and removed in a manner that will prevent their discharge to waters and soils of the state. The cleanup of spills should take precedence over all other work on the site. Proper disposal of construction debris must be on land in such a manner that debris cannot enter water of the state or cause water quality degradation of state waters. All trenches,depressions,or holes created in the intertidal area shall be backfilled prior to inundation by tidal waters. Fresh uncured concrete in direct contact with the water is toxic to aquatic life. All concrete shall be poured in the dry and allowed to cure a minimum of seven(7)days before contact with water. Shoreline armoring(e.g.,hardening with rock)can result in adverse impacts to the natural character of the shoreline,but can be avoided. Ecology recommends the applicant use appropriate plantings of native vegetation to stabilize shorelines,rather than hardening them with rock or concrete. Ecology can provide further information on request. Applicants should consider that placement of a bulkhead may in some cases accelerate erosion of the beach. Bulkheads are not truly permanent,and may require expensive maintenance, especially after storm events. Per Chapter 90.58 RCW(WA State Shoreline Management Act), local governments must also consider the cumulative impacts of armoring large stretches of currently natural shoreline. Ecology's comments are based upon information provided by the lead agency. As such,they may not constitute an exhaustive list of the various authorizations that must be obtained or legal requirements that must be fulfilled in order to carry out the proposed action. If you have any questions or would like to respond to these comments,please contact the appropriate reviewing staff listed above. Department of Ecology Southwest Regional Office (SM:11-2506) cc: Bruce Barbour,WQ Mike Drumright, W2R Eric Skewis(Proponent) Earl Lincoln(Contact) oN_STA MASON COUNTY n1C °� DEPARTMENT OF COMMUNITY DEVELOPMENT 0 s° Planning Division ~ O T 0P O Box 279, Shelton, WA 98584 �� Y Y (360)427-9670 1864 DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-340) SEP2011-00028 Description of Proposal: Replace existing wooden bulkhead with concrete structure; 4 ft. high by 83 ft. wide with 10 ft. long return wall on north end and 19 ft. long return wall on south end. Proponent: ERIC SKEWIS Location of Proposal: 3710 E STATE ROUTE 302 BELFAIR Parcel Number: 122212490050 Legal Description: TR 5 OF G.L. 2 & TAX 1113* & 12-X-8 PTN OF SP #437 Directions to site: From Allyn on North Bay Rd. to State Route 302 and then 2.5 mi. south to address. Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. Please contact Allan Borden at ext. 365 with any questions. This DNS is issued under WAC 197-11-340(2). The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Dept. of Community Development, P.O. Box 279, Shelton WA 98584 by 6/10/2011. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. t�2 u 512,7 zvC l Authorized Local Government Official Date r ;2.� ���l:ililll � ■ .��►�� ■ � YIU - r MAN AfAA '11111*111 � 'f .` ���t�.fit � ������■L■1�.� �: � • IF IVA •�v�Ll •A<//�at+ivv! �f• � '♦�f���\� , Wj tag '1 Ih� *�"�► •' .►�1��� NOIMMI fa —11 ' 122212100030 122212100020. .3 - L 122211200000 ` j 122212100010 i Silk 122212400014 122212180123 P Ik 122212400012 `= 1 2221 24000 1 5 r 'r 1 ,"11.300010 122212400011 _ T22NR1 W 122212400013� ti ' • 122210060000 1 122212490170 r+ 1222124900so OL 4'• 122212400060 C — 12221i5001,n o ^r 12221240009! S 122212400100 - r. N `�C-,° 1 inch = 100 feet 1 inch = 0.02 miles EXISTING CONCRETE SCALE, 1 INCH = 40 FEET BULKHEADS ON BOTH 0 5 10 20 0 NEIGHBORING PROPERTIES APPRX, LOCATION OF EXISTING WOOD EXISTING EXISTING HOUSE BULKHEAD AND WING BOAT RAMP APPRX, L❑CATI❑N OF WALLS TO BE 10, EXISTING GUEST REPLACED WITH HOUSE CONCRETE BULKHEAD I CONCRETE STEPS DRIVEWAY WITH 1 WEEP HOLE MIN, BOTTOM �o STEP I H w APPRX MHHW I o co c CLI w w CASE INLET l- 19, EXISTING BOAT RAMP PROPERTY LINE PROJECT/ OWNER, ERIC SKEWIS CONCRETE BULKHEAD DESIGN ERIC SKEWIS 3710 STATE ROUTE 302 E BELFAIR, MASON COUNTY, WASHINGTON C.LYU/:�. W vj/l rVj ENGINEER- .i1 ENVIROTECH ENGINEERING PO BOX 984 BELFAIR, WASHINGTON 98528 PHONE, (360) 275-9374 FAX, <360) 275-4789 yl� ' DRAWN BYi DATEi Uf k 0 45 4 MCS 5/4/11 p. N�,�` DESIGNED BY, DATE, 5r�1NAL.V Michael Staten, P.E, 5/4/11 SHEET 1 SHEET I F 8 IN 6.0 FT± #4 REINFORCEMENT STEEL a COMPACTED GRAVEL, HORIZONTAL @ 12 IN D.C. SAND, SILTY SAND (TYP) OR SILTY GRAVEL BACKFILL #4 REINFORCEMENT STEEL VERTICAL @ 12 IN O.C. (TYP) - CONCRETE RETAINING WALL AND FOOTING, 2500 psi : :- 6 FT a NATIVE, UNDISTURBED SOIL cd �. "a e ' POORLY GRADED GRAVEL (GP) MINIMUM 6 IN, COVER ABOVE 1 FT WEEP HOLES, WRAP WITH FILTER FABRIC 4 IN DIA WEEP HOLES 12 IN @ 8 FT D.C. #4 REINFORCEMENT STEEL 10 IN ,67 FT @ 12 IN O.C. TWO #4 REINFORCEMENT,,,"""' EINFORCEMENT (4) #4 REINFORCEMENT STEEL STEEL IN FOOTING 4 FT IN FOOTING EQUALLY SPACED SPACED 6 IN MIN SEAJ RETAINING WALL-DETAIL PROJECT/ OWNER, ERIC SKEWIS CONCRETE CONTINUOUS 'L' BAR NOT TO SCALE BULKHEAD DESIGN NOTES 1. RETAINING WALLS CALCULATED USING AT-REST EARTH PRESSURES. ERIC SKEWIS RETAINING WALL DETAILS ARE PROVIDED FOR WALL HEIGHTS LIMITED TO 3710 STATE ROUTE 302 E 6.0 FEET FROM THE BOTTOM [IF THE FOOTING TO THE TOP OF THE WALL. BELFAIR, MASON COUNTY, WASHINGTON LEVEL EARTH RETENTION (BACKFILL) IS REQUIRED. 4. ALL FOOTING SUBGRADES SHALL BE ON COMPETENT UNDISTURBED SOIL, ENGINEER OR RE-COMPACTED TO AT LEAST 957 OF MAXIMUM DENSITY PER ASTM D1557. C LYL) ENVIROTECH ENGINEERING ALL CONCRETE SHALL HAVE A MINIMUM 28-DAY COMPRESSIVE STRENGT ASV Sj PO BOX 984 OF 2500 psi. CYO. F��.1S�1j 91• BELFAIR, WASHINGTON 98528 CONCRETE SHALL BE PLACED USING MECHANICAL VIBRATION. Q PHONE (360) 275-9374 7. REINFORCEMENT STEEL YIELD STRENGTH SHALL BE 60 ksL 2 y�~ a FAX- (360) 275-4789 S. CONCRETE COVER FOR STEEL MUST BE A MINIMUM OF L5 INCHES FOR v / WALLS, AND 3 INCHES FOR FOOTINGS. 3 INCHES IS RECOMMENDED FOR DRAWN BYi DATE- ALL. MCS 5/4/11 9. BRACES AND TIE-DOWNS SHOULD HAVE A CORROSIVE RESISTENT �1�1 C DESIGNED BY, DATE- COATING. 43045 Michael Staten, P.E. 5/4/11 0. FILTER FABRIC SHALL BE FILTER MATERIAL THAT HAS BEEN U 4tfilSlkKC� Wit. SPECIFICALLY DESIGNED TO IMPEDE THE ENTRANCE OF FINE PARTICLES % SHEET 1. ALL WORK ON BEACH SHALL BE DONE AT LOVER TIDES. 22. ALL WORK SHALL BE IN ACCORDANCE WITH PROPRIATE IBC, STATE AN: LOCAL CODES._ SHEET 2 OF 2 �v�v%rotecl� �wg�weer`>tig ]RECEIVED ceoteci�v Lca.L Ewv%rovwu.ev b9L°DraLv661n Roadway MAY 0 4 2011 426 W. CEDAR ST. May 4,2011 Earl Lincoln Construction PO Box 368 Belfair,Washington 98528 Reference: Bulkhead Replacement Assessment at 3710 State Route 302, Belfair,Washington, 98312 Dear Mr.Lincoln, Envirotech Engineering (Envirotech) has completed this engineering assessment of the bulkhead replacement for the referenced property. This assessment is based on observations during a site visit conducted by Envirotech on May 2, 2011. Based on existing property and neighboring property conditions, it is our opinion that soft shore protection is not viable for this project. An existing structure is located only 12 feet from the face of the existing bulkhead, and is susceptible to shoreline erosion without adequate protection. Furthermore, neighboring properties both have sea walls and boat ramps which may experience additional wave energy if the current sea wall alignment on the subject property is altered. Please contact Michael Staten at 360-275-9374 if you have any questions or require additional information. Sincerely, Envirotech Engineering CLYDg S s � �ww� �SSJoNALti�G~ Michael Staten, P.E. Project Director Po Aox,924 gel{aCr, wash%�tow 9Q.,2g C>ff: 360-2�593 4 eu.v ra`ech@aeoteetivucaI�-fo.cow 201 I - 0002-S RECEIVED MAY 0 4 2011 426 W. CEDAR ST, WAC 197-11-960 Environmental checklist. ENVIRONMENTAL CHECKLIST Purpose of checklist: The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement(EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal(and to reduce or avoid impacts from the proposal,if it can be done)and to help the agency decide whether an EIS is required. Instructions for applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly,with the most precise information known,or give the best description you can. You must answer each question accurately and carefully,to the best of your knowledge. In most cases,you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply." Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning,shoreline,and landmark designations. Answer these questions if you can. If you have problems,the governmental agencies can assist you. The checklist questions apply to all parts of your proposal,even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklistfor nonproject proposals: Complete this checklist for nonproject proposals,even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECt ACTIONS(part D). For nonproject actions,the references in the checklist to the words"project," "applicant," and"property or site" should be read as"proposal," "proposer,"and"affected geographic area,"respectively. A. BACKGROUND J 1. Name of proposed project,if applicable: _'VeW/-S' 2. Name of applicant: r/ s1re— Is 3. Address and phone number of applicant and contac'twt person: �j7f�11TRt 7- rel""5017 4. Date che�klist preparedW: *4 5. Agency requesting checklist: / f SDI �h � �v /T ✓� ! /+ 6. Proposed timing or schedule(including phasing,a pplicaTld e 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. A/O 8. List any environmental information you know about that has been prepared,or will be prepared,directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes,explain. fAl0 10. List any government approvals or permits that will be needed for your proposal.,if known. Ha5o/7 11. Give brief,complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) lfe lvhD tl e 4els—441 831Ge7-Lorl1 X < WiTA 8'3•�'t�To �o«� Te a-W& 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address,if any,and section,township,and range,if known. If a proposal would occur over a range of area,provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 3 t7/0 s7-'fTe�'T. 30�E SeC• �/� T-�,2 J 11�/'7- TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site(circle one):Srolling,hilly,steep slopes,mountainous, other. . . . . . b. What is the steepest slope on the site(approximate percent slope)? 2 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. What general types of soils are found on the site(for example,clay sand ave►'peat, muck)? If you know the classification of agricultural soils,specify them an note any prime farmland. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. yo e. Describe the purpose,type,and approximate quantities of any filling or grading proposed. Indicate source of fill. 14 /� �� alb f. Could erosion occur as a result of clearing,construction,or use? If so,generally describe. /Yo g.About what percent of the site will be covered with impervious surfaces after project construction(for example,asphalt or buildings)? h. Proposed measures to reduce or control erosion,or other impacts to the earth,if any: Mew ro a.Air a. What types of emissions to the air would result from the proposal(i.e.,dust,automobile, odors,industrial wood smoke)during construction and when the project is completed? If any,generally describe and give approximate quantities if known. (A1a4(f b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. �/ ( y c. Proposed measures to reduce or control emissions or other impacts to air,if any: 3 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site(including year-round and seasonal streams,saltwater,lakes,ponds,wetlands)? Ifyes,describe type and provide names. If appropriate,state what stream or river it flows into. yes - G'ase .r;1/e7- 2)Will the project require any work over,in,or adjacent to(within 200 feet)the described waters? If yes,please describe and attach available plans. 3)Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. /0 e�&' Xc0- �ea' Gi211vel 4)Will the proposal require surface water withdrawals or diversions? Give general description,purpose,and approximate quantities if known. NO 5)Does the proposal lie within a 100-year floodplain? If so,note location on the site plan. NO 6)Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. !v 0 b. Ground: 1) Will ground water be withdrawn,or will water be discharged to ground water? Give general description,purpose,and approximate quantities if known. /4/ D 2)Describe waste material that will be discharged into the ground from septic tanks or other sources,if any(for example: Domestic sewage;industrial,containing the following chemicals...;agricultural;etc.). Describe the general size of the system,the number of such systems,the number of houses to be served(if applicable),or the number of animals or humans the systems)are expected to serve. 1` Jh 4 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Water runoff(including stormwater): 1) Describe the source of runoff(including storm water)and method of collection and disposal,if any(include quantities,if known). Where will this water flow? Will this water flow int0 00Jother waters? If so,describe. /I! 2)Could waste materials enter ground or surface waters? If so,generally describe. /V/� d. Proposed measures to reduce or control surface,ground,and runoff water impacts,if any: 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder,maple,aspen,other evergreen tree: fir,cedar,pine,other shrubs y grass pasture crop or grain wet soil plants: cattail,buttercup,bullrush,skunk cabbage,other water plants: water lily,eelgrass,milfoil,other other types of vegetation b. What kind and amount of vegetation will be removed or altered? /v 617C- c. List threatened or endangered species known to be on or near the site. Ivime d. Proposed landscaping,use of native plants,or other measures to preserve or enhance vegetation on the site,if any: 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, o eagle ngbir ;other: mammals: r o fish: bass, mo o ' errin shellfis other: b. List any threatened or endangeredes known to be on or near the site. VO4/611 5 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY c. Is the site part of a migration route? If so,explain. /yD d. Proposed measures topreserve or enhance wildlife,if any: //re' 6. Energy and natural resources a. What kinds of energy(electric,natural gas,oil,wood stove,solar)will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing,etc. VIA b. Would your project affect the potential use of solar energy by adjacent properties? If so,generally describe. N j0 c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts,if any: N1 7. Environmental health a. Are there any environmental health hazards,including exposure to toxic chemicals,risk of fire and explosion,spill,or hazardous waste,that could occur as a result of this proposal? If so,describe. 1)Describe special emergency se/rv,i s that might be required. 2)Proposed measures to reduce or control environmental health hazards,if any: b. Noise 1)What types of noise exist in the area which may affect your project(for example: traffic,equipment,operation,other)? /A/0171- 2)What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis(for example: traffic,construction,operation,other)?Indi- cate what hours noise would come from the site. Call s7Me7-10/7 7i vU/9/ / 7 6 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 3)Proposed measures to reduce or control noise impacts,if any: w a/,A/-( �KIy Twe oo / 8. Land and shoreline use a. What is the current use of the site and adjacent properties? b. Has the site been used for agriculture? If so,describe. Y c. Describe any structures on the site. 11o/+Ie f"1 C, d. Will any structures be demolished? Ifso,what? O/l/ 9(11A1A1e41C/ /?1f1G1 lcd �j e-.,What is the current zoning classification of the site? f. What is the current comprehensive plan desi ation ofthe site? leif,5 t(,T`a FvY�I) g. if applicable,what is the current shoreline master program designation ofthe site? Rif s aleo7 74 (Cay�v %wetine ) h. Has any part of the site been classified as an"environmentally sensitive"area? If so,specify. No i. Approximately how many people would reside or work in the completed project? ��� j. Approximately how many people would the completed project displace? �1 k. Proposed measures to avoid or reduce displacement impacts,if any: Y-4 7 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans,if any: 9. Housing a. Approximately how many units would be provided,if any? Indicate whether high,mid- dle,or low-income housing. 1111114 b. Approximately how many units,if any,would be eliminated?Indicate whether high, middle,or low-income housing. )/� c. Proposed measures to reduce or control housing impacts,if any: 10. Aesthetics a. What is the tallest height of any proposed structure(s),not including antennas;what is the principal exterior building material(s)proposed? �/19 b. What views in the immediate vicinity would be altered or obstructed? 1�19 c. Proposed measures to reduce or control aesthetic impacts,if any: /VA 11. Light and glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? /�o b. Could light or glare from the finished project be a safety hazard or interfere with views? c. What existing off-site sources of light or glare may affect your proposal? hji d. Proposed measures to reduce or control light and glare impacts,if any: 1/A 8 TO BE COMPLETED BY APPLICANT EVALUATION FOR AGENCY USE ONLY 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? tlgj�i^ c�TiGiT�s. b. Would the proposed project displace any existing recreational uses? If so,describe. //0 c. Proposed measures to reduce or control impacts on recreation,including recreation op- portunities to be provided by the project or applicant,if any: I/ 13. Historic and cultural preservation a. Are there any places or objects listed on,or proposed for,national,state,or local preser- vation registers known to be on or next to the site? If so,generally describe. NO b. Generally describe any landmarks or evidence of historic,archaeological,scientific,or cultural importance known to be on or next to the site. 11/A c. Proposed measures to reduce or control impacts,if any: �// 14. Transportation a. Identify public streets and highways serving the site,and describe proposed access to the existing street system. Show on site plans,if any. b. Is site currently served by public transit? If not,what is the approximate distance to the nearest transit stop? �/A 7 r c. How many parking spaces would the completed project have? How many would the project eliminate? d. Will the proposal require any new roads or streets,or improvements to existing roads or streets,not including driveways? If so,generally describe(indicate whether public or private). IYA 9 TO BE COMPLETED BY APPLICANT EVALUATION FOR • AGENCY USE ONLY e. Will the project use(or occur in the immediate vicinity of)water,rail,or air transporta- tion? If so,generally describe.N NO V f. How many vehicular trips per day would be generated by the completed project?If known,indicate when peak volumes would occur. 1J/14 g. Proposed measures to reduce or control transportation impacts,if any: 15. Public services a. Would the project result in an increased need for public services(for example: fire pro- tection,police protection,health care,schools,other)? If so,generally describe. b. Proposed measures to reduce or control direct impacts on public services,if any. 16. Utilities a. Circe currently available at electrici atural gas, ater refuse sery ice telepho ,sanitary sewer, eptic system, er. b. Describe the utilities that are proposed for the project,the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. �/1� C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on t m to make its decision. Signature: ........ .. ... . ..... ...............C......N..... 4........................................................... DateSubmitted: ..........v1.......... ... ........1 f...................................................................................................................... 10 ESA LISTED SALMONIDS CHECKLIST This worksheet was designed to help project proponents, and government agencies, identify when a project needs further analysis regarding adverse effects on ESA (Endangered Species Act) listed salmonids. Salmonids are salmon, trout and chars, e.g. bull trout. For our purposes, "ESA Listed Salmonids" is defined as fish species listed as endangered, threatened or being considered for listing. If ESA listed species are present or ever were present in the watershed where your project will be located, your project has the potential for affecting them, and you need to comply with the ESA. The questions in this section will help determine if the ESA listings will impact your project. The Fish Program Manager at the appropriate Department of Fish and Wildlife (DFW) regional office can provide information for the following two questions. 1. Are ESA listed salmoni/ds currently present in the watershed in which your project will be located? YES NO v Please describe. 2. Has there ever been an ESA listed salmmoonid stock present in this watershed? YES— NO_ Uncertain Y Please describe. If you answered "yes" to either of the above questions, you should complete the remainder of this checklist. PROJECT SPECIFICES: The questions in this section are specific to the project and vicinity. 1. Name of watershed: Z' -e Z-11—I sf 2. Name of nearest waterbody: 3. What is the distance from this project to the nearest body of water: SwaH-Ilec -'U— Often a buffer between the project and a stream can reduce the chance of a negative impact to fish. 4. What is the current land use between the project and the potentially affected water body (parking lots, farmland, etc.)? 171ON (f- 5. Is the project above a: natural permanent barrier(waterfall) YES_ NO !r natural temporary barrier(beaver pond) YES— NO v man-made barrier(culvert, dam) YES_ NO v • other (explain): 6. If yes, are there any resident salmonid populations above the blockage? YES_ NO_ Don't know _ �( 7. What percent of the project will be impervious surface (including pavement& roof area)? Mason County SEPA Checklist 11 FISH MIGRATION: The following questions will help determine if this project could interfere with migration of adult and juvenile fish. Both increases and decreases in water flows can affect fish migration. 1. Does the project require the withdrawal of: a. Surface water? YES_ NO L- Amount ---------- —_—---__------ --... Name of surface water body b. Ground water? YES_ NO Amount From where Depth of well / 2. Will any water be rerouted: YES_ NO v If yes, will this require a channel change? 3. Will there be retention or detention ponds? YES_ NO v If yes, will this be an infiltration pond or a surface discharge to either a municipal storm water system or a surface water body? If to a surface waterbody, please give the name of the waterbody. YES_ NO 4. Will this project require the building of new roads? YES_ NO C/ Increased road mileage may affect the timing of water reaching a stream and may impact fish habitat. 5. Are culverts proposed as part of this project? YES_ NO v 6. Will topography changes affect the duration/direction of runoff flows? YES_ NO v If yes, describe the changes. 7. Will the project involve any reduction of the floodway or floodplain by filling or other partial blockage of flows? YES_ NO (� If yes, how will the loss of flood storage be mitigated by your project? WATER QUALITY: The following questions will help determine if this project could adversely impact water quality. Such impacts can cause problems for listed species. Water quality can be made worse by runoff from impervious surfaces, altering water temperature, discharging contaminants, etc. 1. Do you know of any problems with water quality, in any of the streams, within this watershed? YES_ NO !/ If yes, describe. Mason County SEPA Checklist 12 2. Will your project either reduce or increase shade along or over a waterbody? YES— NO_Z If yes, describe. Removal of shading vegetation or the building of structures such as docks or floats often results in a change in shade. 3. Will the project increase nutrient loading or have the potential to increase nutrient loading or contaminants (fertilizers, other waste discharges, or runoff)to the waterbody? If yes, describe. YES — NO 4. Will turbidity be increased because of construction of the project or during operation of the project? YES— NO In-water or near water work will often increase turbidity. 5. Will your project require long-term maintenance, i.e. bridge cleaning, highway salting, and chemical sprays for vegetation managem.ent,.clearing of parking lots? YES_ NO vnt If yes, please describe. VEGETATION: The following questions are designed to determine if the project will affect riparian vegetation, thereby, adversely impacting salmon. 1. Will the project involve the removal of any vegetation from the stream banks: YES _ NO !/ If yes, please describe the existing conditions, and the amount and type of vegetation to be removed. 2. If any vegetation is removed, do you plan to re-plant? YES NO_ If yes, what types of plants will you use? r The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relyingAonm to make its decision. �) ......................................................... Signature: ...............c--r..1.... ....... � Date Submitted: ....... .�...11 Mason County SEPA Checklist 13