Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SHX2017-00001 Bulkhead - SHX Permit / Conditions - 6/2/2017
P�0 14-STA FO MASON COUNTY C Department of Community Services o A�o N Planning Division r o h z 615 W Alder St, Shelton, WA 98584 w y (360)427-9670 OJ �O 1864 Exemption from Shoreline Management Act Case No.: SHX2017-00001 Substantial Development Permit Requirement The Proposal By: AUGUSTA GANNON 4839 S MEAD ST SEATTLE, WA 98118 Parcel Number: 122212400120 Site Address: 3800 E STATE ROUTE 302 BELFAIR To undertake the following development: GANNON BULKHEAD REPLACEMENT Within CASE INLET and/or its associated wetlands is exempt from the requirement of substantial development because the development is categorized under WAC 173-27-040(2) as being category: C-normal protective bulkhead Please contact Kell Rowen at ext 365 if you have any questions. �eu' :LTV0 Issued:6/2/2017 Authorized Local Government Official SHX2017-00001 June 02, 201; ----------------- t-g YEHVE-- iT AGENC fmDate received: JAN 0 5 2017 US WASHINGTON STATE ofEng years i 1 , Seattle District 615 W. Alder S eet Joint Aquatic Resources Permit Agency reference#: — u:J Application (JARPA) Form',2 hel Tax Parcel#(s): USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. 1 t t t -----------------t Part 1—Project Identification 1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) [help] Gannon bulkhead replacement Part 2—Applicant The person and/or organization responsible for the project. hel 2a. Name (Last, First, Middle) Gannon, Augusta 2b. Organization (If applicable) 2c. Mailing Address (Street or PO Box) 4839 South Mead street 2d. City, State, Zip Seattle, WA, 98118 2e. Phone(1) 2f. Phone(2) 2g. Fax 2h. E-mail 206-725-4046 360-275-8035 Additional forms may be required for the following permits: • If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of Engineers for application information(206)764-3495. • If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or prepare a Biological Evaluation. Forms can be found at http://www.nws.usace.army.mil/Missions/CivilWorks/Regulatory PermitG uidebook/E ndangered Species.aspx. • Not all cities and counties accept the JARPA for their local Shoreline permits. If you need a Shoreline permit,contact the appropriate city or county government to make sure they accept the JARPA. 2To access an online JARPA form with[help]screens,go to http://www.epermitting.wa.gov/site/alias resourcecenter/iarpa iarpa form/9984/iarpa form aspx. For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or helper-oria.wa.gov. ORIA-16-011 Page 1 of 14 Part 3—Authorized Agent or Contact Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this application.) hel 3a. Name (Last, First, Middle) Merrill, Dartagnan 3b. Organization (If applicable) Jesfield Construction 3c. Mailing Address (Street or PO Box) P.O box 1590 3d. City, State, Zip Allyn, WA, 98524 3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail 360-275-6684 360-649-3669 Merr4914@pacificu.edu Part 4—Property Owner(s) Contact information for people or organizations owning the property(ies) where the project will occur. Consider both upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. [heip"I Ex:1 Same as applicant. (Skip to Part 5.) ❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.) ❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for each additional property owner. ❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact the DNR at (360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to apply for the Aquatic Use Authorization. 4a. Name (Last, First, Middle) 4b. Organization (If applicable) 4c. Mailing Address (Street or PO Box) 4d. City, State, Zip 4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail ORIA-16-011 Page 2 of 14 Part 5-Project Location(s) Identifying information about the property or properties where the project will occur. hel ❑ There are multiple project locations (e.g. linear projects). Complete the section below and use DARPA Attachment B for each additional project location. 5a. Indicate the type of ownership of the property. (Check all that apply.) hel ® Private ❑ Federal ❑ Publicly owned (state,county, city,special districts like schools, ports, etc.) ❑ Tribal ❑ Department of Natural Resources (DNR) — managed aquatic lands (Complete JARPA Attachment E) 5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel 3800 E Hwy 302 5c. City, State, Zip(If the project is not in a city or town, provide the name of the nearest city or town.) hel Allyn, WA 98524 5d. County heI Mason 5e. Provide the section, township, and range for the project location. hei 1/4 Section Section Township Range NW S21 T22N R1W 5f. Provide the latitude and longitude of the project location. hem • Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83) 47.382737 N / -122.814297 5g. List the tax parcel number(s) for the project location. [heipJ • The local county assessor's office can provide this information. 12221-24-00120 5h. Contact information for all adjoining property owners. (If you need more space, use JARPA Attachment C.) hel Name Mailing Address Tax Parcel #(if known) Jonas, Steven S & Victoria A 3830 E Sr 308 Allyn, Wa 98524 - 12221-24-90150 John J &V Judy Merlino 2980 761h Ave Se 202 Mercer island WA 98040 12221-24-00110 ORIA-16-011 Page 3 of 14 5i. List all wetlands on or adjacent to the project location. hei N/A 5j. List all waterbodies (other than wetlands) on or adjacent to the project location. hei Case Inlet 5k. Is any part of the project area within a 100-year floodplain? h ® Yes ❑ No ❑ Don't know 51. Briefly describe the vegetation and habitat conditions on the property. nei Native shrubs, maple trees, and pine trees are present on the property. Grass covers a majority of the landscape. 5m. Describe how the property is currently used. Eiheip] Single family residential summer home. 5n. Describe how the adjacent properties are currently used. hei Single family residential summer homes. 5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current condition. hei A cabin and two storage sheds are present on the property. The cabin is a vacation spot and the sheds are used for storage. 5p. Provide driving directions from the closest highway to the project location, and attach a map. hei From Allyn head straight onto E North Bay Road for 2 miles. Continue straight onto WA-302 E for 1.9 miles. Address is on the right. ORIA-16-011 Page 4 of 14 Part 6—Project Description 6a. Briefly summarize the overall project. You can provide more detail in 6b. hei Existing failing log bulkhead to be removed and hauled offsite for disposal. Using a large excavator 2-3 man basalt rock will be buried in line with old log wall a minimum of 18 inches into existing beach grade. Rock bulkhead to maintain the two existing pathways onto the beach for access. Rock bulkhead to span approximately 100 feet across homeowners beach front and will not protrude farther waterward than existing log wall is now. Rockwall to be backfilled with 4-8" quarry spall with a filter fabric membrane containing it and separating the rock wall from the native soil behind it. 6b. Describe the purpose of the project and why you want or need to perform it. hel The existing log wall is deteriorating and does not control erosion as it once did. Cables that hold down the log wall have rusted out and allowed the wall to drift away with high tides. The existing beach access points are being undermined and compromised by the diminishing protection the existing armoring offers. 6c. Indicate the project category. (Check all that apply) [helpj ❑ Commercial ® Residential ❑ Institutional ❑ Transportation ❑ Recreational ❑ Maintenance ❑ Environmental Enhancement 6d. Indicate the major elements of your project. (Check all that apply) (help] ❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall ❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland) ❑ Boat House ❑ Dike/ Levee / Jetty ❑ Geotechnical Survey ❑ Road ❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific Measurement Device ❑ Boat Lift ❑ Dock/ Pier ❑ Marina / Moorage ® Stairs ❑ Bridge ❑ Dredging ❑ Mining ❑ Stormwater facility ® Bulkhead ❑ Fence ❑ Outfall Structure ❑ Swimming Pool ❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin ❑ Utility Line ❑ Channel Modification ❑ Fishway ❑ Raft ❑ Other: ORIA-16-011 Page 5 of 14 6e. Describe how you plan to construct each project element checked in 6d. Include specific construction methods and equipment to be used. hel • Identify where each element will occur in relation to the nearest waterbody. • Indicate which activities are within the 100-year floodplain. All activities are within the 100 year floodplain and occur adjacent to Case Inlet. Cable will be cut with power tools and logs will be removed with a large excavator. Rock will be deposited onsite and placed by a large excavator. Excavation will occur as the wall is constructed. Filter fabric will be laid out for rock to rest upon with a layer of 4-8" rock, or quarry spall, will form a barrier between the rock wall and the natural bank behind it. Filter fabric will allow for the wall to drain without erosion occurring. Total height for rock wall to be an average of 6 feet. 6f. What are the anticipated start and end dates for project construction? (MonthNear) Lhelp] • If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase or stage. Start Date: May 1st 2017 End Date: May 15th 2017 ❑ See JARPA Attachment D 6g. Fair market value of the project, including materials, labor, machine rentals, etc. hel $39,785.00 6h. Will any portion of the project receive federal funding? Lwd • If yes, list each agency providing funds. ❑ Yes ® No ❑ Don't know Part 7—Wetlands: Impacts and Mitigation ❑ Check here if there are wetlands or wetland buffers on or adjacent to the project area. (If there are none, skip to Part 8.) 7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel ❑ Not applicable 7b. Will the project impact wetlands? LeM ❑ Yes © No ❑ Don't know 7c. Will the project impact wetland buffers? hel ❑ Yes ❑ No ❑ Don't know ORIA-16-011 Page 6 of 14 7d. Has a wetland delineation report been prepared? [hep] • If Yes, submit the report, including data sheets, with the JARPA package. ❑ Yes ❑ No 7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating System? help] • If Yes, submit the wetland rating forms and figures with the JARPA package. ❑ Yes ❑ No ❑ Don't know 7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hel • If Yes, submit the plan with the JARPA package and answer 7g. • If No, or Not applicable, explain below why a mitigation plan should not be required. ❑ Yes ❑ No ❑ Don't know 7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was used to design the plan. Lb,eid 7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a similar table, you can state (below) where we can find this information in the plan. [nelip] Activity (fill, Wetland Wetland Impact Duration Proposed Wetland drain, excavate, Name' type and area (sq. of impact' mitigation mitigation area flood, etc.) rating ft. or type (sq. ft. or category 2 Acres) acres) If no official name for the wetland exists,create a unique name(such as"Wetland 1"). The name should be consistent with other project documents,such as a wetland delineation report. 2 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System. Provide the wetland rating forms with the JARPA package. 3Indicate the days, months or years the wetland will be measurably impacted by the activity. Enter"permanent"if applicable. °Creation(C), Re-establishment/Rehabilitation(R), Enhancement(E), Preservation P), Mitigation Bank/In-lieu fee(B) Page number(s) for similar information in the mitigation plan, if available: ORIA-16-011 Page 7 of 14 7i. For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in cubic yards that will be used, and how and where it will be placed into the wetland. nei 7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in cubic yards you will remove, and where the material will be disposed. Lihelf�] Part 8—Waterbodies (other than wetlands): Impacts and Mitigation In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) nei ® Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.) 8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment. hel ❑ Not applicable All depressions where fish could become trapped will be filled in before tidal inundation can occur. Use of heavy equipment on the beach will be restricted to a small work corridor as determined by WDFW. Pea gravel mitigation will be spread after project completion for beach nourishment and disturbance to beach environments will be kept to a minimum when possible. Excavation will occur only as necessary so disturbance of beach habitat only occurs when necessary. Non woven drainage cloth, also known as filter fabric, will be placed to control erosion into Case Inlet. 8b. Will your project impact a waterbody or the area around a waterbody? hL ❑ Yes ® No ORIA-16-011 Page 8 of 14 8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland waterbodies? hel • If Yes, submit the plan with the JARPA package and answer 8d. • If No, or Not applicable,explain below why a mitigation plan should not be required. ❑ Yes ® No ❑ Don't know Impact on the waterbody environment should be minimal. I i 8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was used to design the plan. • If you already completed 7g you do not need to restate your answer here. [tpjpJ 8e. Summarize impact(s) to each waterbody in the table below. heI Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or dredge, fill, pile name' location of impact3 (cubic yards) to be linear ft.) of drive, etc.) placed in or removed waterbody from waterbody directly affected Bulkhead Approximately 80 cubic construction Case Inlet Adjacent 2 weeks yards of rock to be 100 linear feet placed If no official name for the waterbody exists,create a unique name(such as"Stream 1")The name should be consistent with other documents provided. 2 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and indicate whether the impact will occur within the 100-year flood plain. 3Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable. 8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards) you will use, and how and where it will be placed into the waterbody. hei Base rock to be buried into the beach and final height to be an average of 6 feet. 4-8" quarry spall fill will be placed directly behind large basalt rock, contained and wrapped with filter fabric. The material will be rock, and behind the filter fabric will be the existing material that makes up the waterfront bank. The rock wall will be constructed adjacent to the water body but not beyond the line of the existing log wall. ORIA-16-011 Page 9 of 14 8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging, type and amount of material you will remove, and where the material will be disposed. hel Excavation will be done with a large excavator. Staging for fill will be placed upland of the rock wall outside of the range of tidal inundation. Part 9—Additional Information Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of this section as you can. It is ok if you cannot answer a question. 9a. If you have already worked with any government agencies on this project, list them below. hel Agency Name Contact Name Phone Most Recent Date of Contact 9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington Department of Ecology's 303(d) List? Le!e] • If Yes, list the parameter(s) below. • If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at: hftp://www.eC-y.wa.gov/programs/wq/303d/. ❑ Yes ® No 9c.What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hei • Go to http://cfpub.et)a.gov/surf/locate/index.cfm to help identify the HUC. 17110019 9d. What Water Resource Inventory Area Number (WRIA#) is the project in? hel • Go to http://www.ecy-wa.gov/watertwria/index.htmi to find the WRIA#. 14 Kennedy-Goldsborough ORIA-16-011 Page 10 of 14 9e. Will the in-water construction work comply with the State of Washington water quality standards for turbidity? hem • Go to http://www.ecy.wa.gov/programs/wq/swgs/criteria.htmi for the standards. ❑ Yes ❑ No ® Not applicable 9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline environment designation? tn2lj • If you don't know, contact the local planning department. • For more information,go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html. ® Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other: 9g. What is the Washington Department of Natural Resources Water Type? LheM • Go to http://www.dnr.wa.gov/forest-practices-water-typing for the Forest Practices Water Typing System. ® Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal 9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater manual? hel • If No, provide the name of the manual your project is designed to meet. ® Yes ❑ No Name of manual: 9i. Does the project site have known contaminated sediment? LhLeM • If Yes, please describe below. ❑ Yes ® No 9j. If you know what the property was used for in the past, describe below. [ne1p] Single family residential 9k. Has a cultural resource (archaeological) survey been performed on the project area? LheM • If Yes, attach it to your JARPA package. ❑ Yes ® No ORIA-16-011 Page 11 of 14 91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the project area or might be affected by the proposed work. heI Bald eagles are common in the area. No trees will be taken down during construction. 9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and Species List that might be affected by the proposed work. hei N/A Part 10—SEPA Compliance and Permits Use the resources and checklist below to identify the permits you are applying for. • Online Project Questionnaire at http://apps.oria.wa.gov/opas/. • Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or help(cD-oria.wa.gov. • For a list of addresses to send your JARPA to, click on agency addresses for completed JARPA. 10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) hel • For more information about SEPA, go to www.ecy.wa.gov/programs/sea/sepa/e-review.ht[Ti1. ❑ A copy of the SEPA determination or letter of exemption is included with this application. ® A SEPA determination is pending with Mason County (lead agency). The expected decision date is January 2017 ❑ I am applying for a Fish Habitat Enhancement Exemption. (check the box below in yob.) heI ❑ This project is exempt (choose type of exemption below). ❑ Categorical Exemption. Under what section of the SEPA administrative code (WAC) is it exempt? ❑ Other: ❑ SEPA is pre-empted by federal law. ORIA-16-011 Page 12 of 14 10b. Indicate the permits you are applying for. (Check all that apply.) [hel LOCAL GOVERNMENT Local Government Shoreline permits: ❑ Substantial Development ❑ Conditional Use ❑ Variance ® Shoreline Exemption Type (explain): Other City/County permits: ❑ Floodplain Development Permit ❑ Critical Areas Ordinance STATE GOVERNMENT Washington Department of Fish and Wildlife: ® Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption —Attach Exemption Form You must submit a check for $150 to Washington Department of Fish and Wildlife, unless your project qualifies for an exemption or alternative payment method below. Do not send cash. Check the appropriate boxes ❑ $150 check enclosed. Check# Attach check made payable to Washington Department of Fish and Wildlife. ❑ My project is exempt from the application fee. (Check appropriate exemption): ❑ HPA processing is conducted by applicant funded WDFW staff. Agreement# ❑ Mineral prospecting and mining ❑ Project occurs on farm and agricultural land. (Attach a copy of current land use classification recorded with the county auditor,or other proof of current land use) ❑ Project is modification of an existing HPA originally applied for, prior to July 10, 2012. HPA# Washington Department of Natural Resources: ❑ Aquatic Use Authorization Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources. Do not send cash. Washington Department of Ecology: ❑ Section 401 Water Quality Certification FEDERAL GOVERNMENT United States Department of the Army permits (U.S. Army Corps of Engineers): ❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters) United States Coast Guard permits: ❑ Private Aids to Navigation (for non-bridge projects) ORIA-16-011 Page 13 of 14 dmerrill@jesfieldconstruction.com From: Kelly McAboy <KMCAboy@co.mason.wa.us> Sent: Friday, December 16, 2016 2:50 PM To: dmerrill@jesfieldconstruction.com; merr4914@pacificu.edu Subject: SPI2016-00117 Pre-inspection for GANNON for the purpose of determining required permits for bulkhead replacement. Shorelines: Shoreline Designation under the Mason County Shoreline Master Program (MCSMP) 17.50.070 is Urban. Normal protective bulkheads are exempt from Shoreline Substantial Development permits and shall be required to receive a letter of Shoreline Exemption using the Joint Aquatics Resources Permit Application (DARPA)form. In addition, a State Environmental Policy Act (SEPA) checklist is required for review. Mason County Building department will require a building permit including detailed site plan. Check with the building department to determine the level of engineering required based on the height of the rock bulkhead proposed. The JARPA form is also used to apply for your Hydraulic Project Approval (HPA)from the Department of Fish &Wildlife. Summary of permits/documents required from Mason County: • Building permit • Shoreline Exemption (DARPA) • SEPA Specific development standards contained in County Codes may be found at the County web address http://www.co.mason.wa.us. If you have any questions please feel free to call. Thank you. Sincerely, Kell McAboy Senior Planner 360.427.9670 ext. 365 1 Part 11—Authorizing Signatures Signatures are required before submitting the JARPA package. The JARPA package includes the JARPA form, project plans, photos, etc. hel 11 a. Applicant Signature (required) hel I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work only after I have received all necessary permits. I hereby authorize the agent named in Part 3 of this application to act on my behalf in matters related to this application. i (initial) By initialing here, I state that I have the authority to grant access to the property. I also give my consent to the permitting agencies entering the property where the project is located to inspect the project site or any work related to the project. (initial) C AppliG&t Printed Name Applicant�Signature Date 11 b. Authorized Agent Signature �heip] I certify that to the best of my knowledge and belief, the information provided in this application is true, complete, and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work only after all necessary permits have been issued. J)U f+LA J," M P f'f,'l I Kx�►'ti " i - S- (& Authorized Agent Printed Name Authorized Agent Signature Date 11 c. Property Owner Signature (if not applicant) nel Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA). I consent to the permitting agencies entering the property where the project is located to inspect the project site or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the landowner. Property Owner Printed Name Property Owner Signature Date 18 U.S.0§1001 provides that:Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly falsifies, conceals, or covers up by any trick, scheme, or device a material fact or makes any false,fictitious, or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or entry, shall be fined not more than $10,000 or imprisoned not more than 5 years or both. If you require this document in another format,contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800) 917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call (877)833-6341. ORIA publication number: ORIA-16-011 rev.09/2016 ORIA-16-011 Page 14 of 14 12/16/2016 Allyn,Allyn-Grapeview,WA to 38M Hwy 302,Belfair,WA-Google Maps o gle MapS Allyn, Allyn-Grapeview, WA to 3800 Hwy 302, Belfair, Drive 4.1 miles, 6 min WA 777 ` x u 0 Washington 0 y ' 1 • i gle Imagery©2016 DigitalGlobe,Landsat,U.S-Geological Survey,USDA Farm Service Agency,Map data©2016 Google 2000 ft Allyn Allyn-Grapeview,WA t 1. Head north on WA-3 N toward Drum St 0.3 mi t 2. Continue straight onto E North Bay Rd 2.0 mi t 3. Continue onto WA-302 E 8 Destination will be on the right 1.9 mi 3800 Washington 302 Belfair,WA 98528 These directions are for planning purposes only.You may find that construction projects, traffic,weather,or other events may cause conditions to differ from the map results,and you should plan your route accordingly.You must obey all signs or notices regarding your route. httpsl/www.google.com/maps/dir/AIIyn,+AllyrrGrapeview,+WA/3800+Hwy+30Z+Belfair,+WA/@47.3973272;122.8439562,4813m/am=ttdata=!3m2!le3!4bl!4... 1/2