Loading...
HomeMy WebLinkAboutBLD2006-01166 Cancelled Pier, Ramp and FLoat - BLD Permit / Conditions - 12/13/2007 Inspection Line(360)127-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670,ext.352 Mason County Bldg. III 426 W. Cedar P.O. Box 186 EP Shelton, WA 98584 �� RESIDENTIAL BUILDING PERMIT BLD2006-01166 OWNER: LINDA PALADIN RECEIVED: 6/30/2006 CONTRACTOR: LAKESHORE CONSTRUCTION (360) 275-5029 LICENSE: LAKESC"155JA EXP: 4/4/2007 ISSUED: 8/3/2006 SITE ADDRESS: 10230 E STATE ROUTE 106 UNION EXPIRES: 2/3/2007 PARCEL NUMBER: 322365100001 LEGAL DESCRIPTION: PEBBLE BEACH PARK TR 1 & T.L. EX TR 1-A PROJECT DESCRIPTION: DIRECTIONS TO SITE: Pier, Ramp and Float. Approx. 6 miles east of Union on St. Rt. 106. General Information Construction &Occupancy Information Square Footage Information No. of Bedrooms: Type of Constr.: Type of Use: SF Insp.Area: No. of Bathrooms: Occ. Group: Lot Size: Deck: Type of Work: ACC Fire Dist.: 6 No. of Stories: Occ. Load: Building: Valuation: Building Height: Occ. Status: Basement: dock Manufactured Home Information Setback Information Shoreline& Planning Information Make: Length: Ft. Front: Ft. Shoreline: Ft. Water Body: Hood Canal SEPA?: Yes j Rear: Ft. Slope: Ft. Model: Width: Ft. Side 1: Ft. Shoreline Desig.: Urban Year: Serial No.: Side 2: Ft. Comp. Plan Desig.: Rural Plumbing Fixtures Mechanical Fixtures FEES i Type Qty. Type Qty. Type By Date Amount Receipt Plan Check Fee KKK 6/30/2006 $287.14 S22006000 Planning Review Fee KKK 6/30/2006 $155.00 S22006000 Building Permit Fee KKK 6/30/2006 $441.75 S22006000 Building Permit Fee KKK 6/30/2006 $441.75 B12006000 Building State Fee RTB 7/14/2006 $4.50 612006000 Total $1,330.14 I i BLD2006-01166 Please refer to the following pages for conditions of this permit. 1 of 5 I' J CASE NOTES FOR BLD2006-01166 CONDITIONS FOR BLD2006-01166 1) Approved--�e-�r dimensions and setbacks on submitted site plan. Setbacks are measured from the furthest projection of the structure. X l ' 2) Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. X 3) The international code requires a fire apparatus access road for every facility, building, or portion of a building that is more than 150' from an approved access road. Roads are required to meet the minimum Mason County Fire Marshal standards for Fire Apparatus Access Roads up to the point where such roadlonnect with a county maintained public road or to another fire apparatus access road which connects to a county maintained public road. X 4) The pier, ramp, float, and associated moorings shall be loctated to avoid shading of eelgrass and other aquatic vegetation. X ��% Z 5) Floatation for the structure shall be entirely enclosed and contained to permanently prevent the breakup or loss of the floatation material into the water. X �ii 7 6) Water quality is not to be degraded to the detriment of the aquatic environment as a result of this project. X 7) Recreational piers shall be no higher than 11 feet above mean higher high water. Piers and docks shall have at least an eight foot span between pilings. X Z� 7 8) The surface of floating structures shall be a minimum of eight inches above the surface of the water. X l/ Z 9) All float9 / trures shall include intermittent supports which run parallel to the shoreline to keep structures off the tidelands at low tide. 10) A Hydra c Project Approval from the Washington State Department of Fish + Wildlife must be granted prior to construction. X �/ �— BLD2006-01166 Please referto the following pages for conditions of this permit. 2 of 5 11) A Section 10 Permit(Rivers and Harbor Act of 1899) or exemption must be granted by the Army Corps of Engineers prior to work within navigable waters y of the United States. X 12) All construction and demolition debris must be removed from the beach after project completion. Proper. sposal of construction debris must be on land in such a manner that debris cannot enter or cause water quality degredatiion of State waters. X /( 7 13) Dock facilities must be maintained in a safe and sound condition. X 14) The use of�Ivanized steel pilings is required for this project. X I / 15) All other necessary permits from Mason County, Washington State and/or Federal Agencies that arm d for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. X 16) All approved plans are required to be on-site for inspection purposes. If an inspection is called for and plans are not available on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and must be collected by the Building Department rior to any further inspections being performed or approvals granted. X Z2 17) In accordance with international codes and Title 14, Mason County Building Code, "Standards for Fire Apparatus Access Roads," all new structures that require an address shall have approved numbers or addresses located at the beginning of long driveways when the address is not clearly visible from the access road. The numbers shall also be plainly visible and legible from the street or road fronting the property and shall contrast with their background. Mason County Building Department requires that this be completed prior to calling for any site inspections. A re-inspection fee based on rates as adopted by the jurisdiction and the international codes will be assessed if the owner and/or contractor fail to post the address on site prior to requesting X inspections,--, 18) The "approved" site plan is required to be on-site for inspection purposes. If an inspection is requested and the"approved" site plan is not on site, then approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building D�rtment prior to any further inspections being performed or approvals granted. X f�l 19) This structure is limited to U-occupancy use only (private garages, carports, sheds, and agricultural buildings.) Any other use will be in violation of the international codes and Mason County Regulations unless a "Change of Use" permit is applied for, reviewed and approved. X 222, 20) Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour) will be charged and s be collected by the Building Department prior to any further inspections being performed or approvals granted. X�/� Z BLD2006-01166 Please referto the following pages for conditions of this permit. 3 of 5 21) International Building Code. In addition to the inspections required by Chapter 1 of the International Building Code, the owner or the engineer or architect of record acting as the owner's agent shall employ one or more special inspectors who shall provide inspections during construction on the types of work listed undeLLEC section 1704. The special inspectors' duties & responsibilities shall be as specified in Chapter 17. X /L 22) All construction must meet or exceed all local ordinances and the international codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. X Re 23) All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance orregulation, must be reviewed and approved by Mason County prior to construction. 24) CONSTRUCTION PROCESS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND THE ADOPTED BUILDING CODE. The construction of the permitted project is subject to inspections by the Mason County Building Department. All construction must be in conformance with the international codes as amended and adopted by Mason County. Any corrections, changes or alterations required by a Mason County Building X Inspector shabeL made prior to requesting additional inspections. 25) Alf property lines shall be clearly identified at the time of foundation inspection. X 26) All building permits shall have a final inspection performed and approved by the Mason County Building Department prior to permit expiration. The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason Count ordinances and building regulations. X 27) All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may extend the time for action for a period not exceeding 180 days, upon the receipt of a written extension request indicating that circumstances beyond the control of the permit holder have prevented action from being taken. No more than one extension may be granted. X -/—,/_Z, 28) Pressure treated wood manufactured after January 1, 2004 may contain high concentrations of copper which could quickly corrode metal fasteners, connectors, and flashing. Install metal connectors approved for contact with the new types of pressure treated material. X ��% — BLD2006-01166 Please refer to the following pages for conditions of this permit. 4 of 5 I This permit becomes null and void if work or construction authorized is not commenced within 180 days,or if construction or work is suspended for a period of 180 days at anytime after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupied. Proof of continuation of work is by means of a progress inspection.The owner or the agent on the owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structur for review and inspection. OWNER O GENT DATE 'S BLD2006-01166 Please referto the following pages for conditions of this permit. 5 of 5 AMY R. LEITMAN MARINE SURVEYS & ASSESMENTS 521 SNAGSTEAD WAY PORT TOWNSEND WA 98368 Tel.360.385-4073 •Fax.360.385- 1724 email .seana.cablespeed.com RECEIVLD January 30, 2006 JUN 19 2006 .MASON COUNTY Mason County Building Department 426 W. Cedar P.O. Box 186 Shelton, WA 98584 Hello, Here is the building permit application for The Paladin/Brady joint use pier, ramp and float project along with the required copies and a check for the permit fee. Respectfully Amy R. Leitman Naval Depotamcti Reference:Paladin/Brady Kitsap C�ks p„ a App:Marine Surveys&Assessments Crosby In:Hood Canal near Union Purpose:New pier,ramp&float "�.. HintZVill@ Bra O Datum:MLLW �-304+ ° \ k Adjacent Property Owners: HOuy / Gold ountain I)Kenneth McKay 2)Norman&Maylene Kyburz Bremerton 160 K I T S A P I 166) Junction Sheet I of 4 Date:April 27 2005 ( - �-� ..__.-•---._...�� Beth Ak Sun 16 remerton National Airport i 3 a '. M f;'�S O N W A H I G T O N. 1 ! 6Wild ood IIi1�Yj 14 on a V, rr; ')ahuya �F. Glen od u . a B rleY Oo sport co �(. Ot�7 J I �JEI ' if:G�tl :. jy O 101, Wau a C �i orest Beach''` Vi for E EI in O e 9 Z �' PotuttCh„ Tatiuya a '302) o -� � l yR �; •Gad. 106' Project Site Fair j �'rt�V i gh Glaovp eUnion ao f{et nr' �t�F` e dal Sk omish i10 U+Oi Grapeview,7 r . x.. 4•. ;� rl,., 101``,' t _ 7 " H 1\ >Fiartsjetr}ltslahtl i+ �t ;,. ,bHerron �x,F r 'd7iuh 0Mi 2 4 6 8 10 . � l r _ y _J i' r t rr _1J-�'� t'L?ock �jP _ � Y.t'•`-.�r Boat 24 Shady Beach Av (S V TS C 1 2 21 r'• 9 y' l� Project Site . i 1/it � O -—�.-..�► ID �/r J (� Paladin/Brady Project Location Reference:Paladin/Brady f App:Marine Surveys&Assessments Section 36,Township 22N,Range 03W ( - In:Hood Canal near Union 10230 E State Route 106 Union,WA ( ✓/ - Purpose:New pier,ramp&float Lat:47°21.68'Long: 123°00.55' �' Datum:MLLW t l Adjacent Property Owners: 1)Kenneth McKay 2)Norman&Maylene Kyburz Sheet 2 of 4 Date:April 27,2005 Scale: 1 inch equals 20DO feet HOOD CANAL rE 200' I i 220' 3; f Proposed TN .� PRF �•r a, 50' 34' f HIGHWAY 106 0' 50' 100' t 1 � Reference:Paladin/Brady j I App:Marine Surveys&Assessments In:Hood Canal near Union Purpose:New pier,ramp&float Mqterials Datum:MLLW Adjacent Property Owners: Piles: 14,ACZA treated,class B Douglas ()Kenneth McKay fir 2)Norman&Maylene Kyburz Floats:2,ACZA framing lumber, floatation is polystyrene foam enclosed in El I I Sheet 3 of 4 Date:April 27 2005 polyethylene resin shells. Pier:ACZA framing lumber,galvanized fastenings. (tamp:pre-fabricated aluminum. BRADY PALADIN Construction and site details are contained in the project Biologipal Evaluation. 4' X 40' RAMP Existing deck MHHW FIXED PIER MHW u.e' 10.8' 8' FLOATS MLLW Stub piling Float stops on -0.5' (one of three) all float pilings 115' from existing deck Reference:Paladin/Brady Site Plan App:Marine Surveys&Assessments In:Hood Canal near Union Purpose:New pier,ramp&float Datum:MLLW Adjacent Property Owners: I)Kenneth McKay �"4 8 10 2)Norman&Maylene Kyburz 5' Sheet 4 of 4 Date:April 27,2005 MN -- TN 0' 4' MHHW;�- 12' x 12' 10 existing deck 4' 0 g' 4' x 40' fully grated ramp 2'-wide grating 6' O 35' 60' 115' (7/2.5/2006) Kell McAboy- Email Revised Plan and elevation 7 20 06.jpg Page 1 f Pier railing-5.5 cable 4'X 40'RAMP Existing deck wiifw FIXED PIER MHw tie 8, 10.e AT ' — FLOS 10' MU.1Y all pilings and stub piles will be 8"diameter 5 gale,steel The pier end will be Stub piling Float stops on P b steel -0.5' 1 of 2 supported all float pilings 0' Y 15 from pilin sane will deck fisting deck abut e k sting MN TN MHH W� �—20' l2'x 12' existing deck 4' 0 8 4'x 40'fully grated romp 2'-wide grating 6 35 60' 4' 20 REVISED PALADIN AND BRADY PROJECT PLAN AND ELEVATION VIEWS JULY 20,2006 IE 116' APPROVED OVED Frii-^%SG COUNTY DCQ PLA'•NING SITE PLAN REQUIRED TO BE ON SITE CHANGES SUBJECT TO A'PROVAL Gy -- Date �'LS bL'( Tl T2 T3 T4 T5 200 G U G G C U f -11.1 — 20 5 20 10 10 5 SUBSTRATE C u ALONG C G U 5 5 T3 5 2510 Macoralgae present SAND SMALL 180 _ G at 5%or greater COBBLE .8.1 20 densities G PU 10 5 5 U G G C= Chondracanthus _ 5 20 7 exasperta G= Gracilaria 160 P= Palmaria -6.0 G U = Ulva 10 G 5 G G 5 20 5 G 140 G 10 SAND -3.9 5 COBBLE OYSTERS 120 _ l -1.9 100 _ 2.2 100% OYSTERS PRO R SED 80 _ TN 4.3 Ile- COBBLEMN 60 _ GRAVEL 6.3 MUD OYSTERS 0 10 20 40 _ 8.0 e GRAVEL I SHELL 20 COBBLE 10.0 DISTANCE ALONG ROCK l T3 AND BULKHEAD MHHW CORRECTED DEPTH BRADY IPL PALADIN PL LPL REVISED PALADIN AND BRADY PROJECT HABITAT MAP-JULY 20,2006 N 0 N O O REVISED PALADIN AND BRADY PROJECT ;K, SITE PLAN m JULY 20, 2006 K D HOOD CANAL o �E 200' I �E 220' m I � d (D CD I Proposed TN CL PRF CD The pier end will be supported 13 by two steel pilings 0) and will abut the �-0 existing deck structure -4 I N O 50' 34' O OII� HIGHWAY 106 0' 50' 1 00' t I � 1 l BRADY PALADIN \ .o co cD ' MASON COUNTY PERMIT NO. � BUILDING PERMIT APPLICATION 426 W. Cedar - P.O. Box 186, Shelton, WA 98584 Shelton (360) 427-9670 - Belfair (360) 275-4467 - Elma (360) 482-5269 On the web www.co.mason.wa.us APPLICANT INFORMATION CONTRACTOR INFORMATION Owner ll rrIT,R NFtLN%)H\J _) CFI"- P)P11U✓ Company Name -TiM Zr-CH - 1_41'SWK[ Can►ST 1 Mailing Address `TPrTE. WuuM ioc'oMailing Address PC AQV /n5R' City tt `► State L4/A Zip Code 3591 City State WA Zip Code 73543 Phone j(o0)"Al%-rL , Other Ph.+ ;3'SS-41D13 Phone ! 3(00)a_'5 - 5041 Other Ph. Lien/Title Holder Contractor Reg.# LA KC Sc'* ; Exp. 1 E mail address E Mail Address Drivers Lic.# DOB Drivers Lic.# DOB SEPTIC /WATER SYSTEM INFORMATION - Connect to New Septic 'xisting Septic Connect to Water System Name of Water System Well Water System Name of Water System PARCEL INFORMATION - 12 Digit Parcel No" ' nLo r,I - 0 1 Fire District Legal Description `tV III -,F I" T ) � 7 h 0 Site Address (Please include street name, street number and city).1D,�'�U /CQ3-) F `ti /0(0 Ut,111)1J'1,/14 Directions to site S 1 TE 1 , L MI 'L F S _A ,E r"'E LL,116nl ON '716 C RuuTC Will timber be cut and sold in parcel pre aration?Yes No Is property within 200'of Saltwater _Lake River/Creek Pond Wetland Seasonal Runoff Stream Slopes or Bluffs > 15% Is this permit submittal the result of a Stop Work Notice,Correction Notice or other enforcement action?Yes/No TYPE OF JOB - New Add Alt Repair Other PRIMARY RESIDENCE ® SEASONAL ❑ Use of Building Describe Work -<L','+; �— 10r' f t nAT'J 1.' No. of Bedrooms No. of Bathrooms Square Footage - 1 st Floor 2nd Floor 3rd Floor Basement Deck Covered Deck Other Sq.ft. Garage Attached Detached Carport Attached Detached MANUFACTURED HOME INFORMATION - Make Model Year Length Width Serial No. No. of Bedrooms No. of Bathrooms Type of Heat Purchase Price $ Replacement Unit? Yes/ No Installer Name Certification No. OWNER/BUILDER Acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below.I declare that I am the owner,owners legal representative,or the contractor.I further declare that I am entitled to receive this permit and to do the work as proposed in the application.I declare that I have obtained the permission from all the necessary parties.If permission is required from any easement holder or any other party in interest regarding this application or the work proposed in the application, I have obtained permission from them to apply for this permit and conduct the work proposed. The owner or agent on owners behalf, represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure for review and inspection. PROOF OF CONTINUATION OF WO K IS BY MEANS OF A PROGRESS INSPECTION. X Date- Owner/Owners Representative/Contractor indicate which one FOR OFFICIAL USE BEYOND THIS POINT Accepted by: Date DEPARTMENTAL REVIEW APPROVED DENIED NOTES Building Department a 6 Planning Department Environmental Health Department Public Works Department Fire Marshal FEES Buildinq Permit Fee Site Inspection Plan Review Fee 7- / EH Review Fee Plumbing & Base Fee PlanningReview Fee Mechanical & Base fee Other Wood /Gas/ Pellet Stove Fee State Fee Violation Fee - 1f Cl-66 Pre-Paid at Submittal Valuation $ TOTAL FEES