Loading...
HomeMy WebLinkAboutBLD2023-01135 ATF Bulkhead - BLD Inspections - 7/16/2024 MASON COUNTY 615 W.Alder St.Bldg 8,SHELTON,WA 98584 11f1mi SHELTON:360-427-9670,EXT 352 r COMMUNITY SERVICES BELFAIR:360-275-4467,EXT 352 Building,Plaruing,Environmental Health Community Healdi ELMA:360-482-5269,EXT 352 �— www.co.mason.wa.us INSPECTION CARD AND CERTIFICATE OF OCCUPANCY" To schedule an inspection call or visit http:/twww.co.mason.wa.us/community-services/bid-inspection.php Permit Number BLD2023-01135 Date Issued 07/11/2024 Issued By alt,/1G1 S - Project BULKHEAD REPAIR/REPLACEMENT ATF EMERGENCY REPAIR Site Address 23022 N US HIGHWAY 101 Applicant NYE TIDES LLC Contractor SEALEVEL BULKHEAD BUILDERS INC Contractor Phone 1.360.297.2401 Primary Code UPC IBC,IRC,IFC,IEC,IMC,& Type Permit Type BULKHEAD OR DOCK- Occupancy RESIDENTIAL -APPROVED PLANS MUST BE ONSITE FOR ALL INSPECTIONS. -DO NOT PROCEED BEYOND EACH STAGE OR COVER WORK UNTIL APPROVAL IS GRANTED. -THIS CARD MUST BE POSTED IN A CONSPICUOUS LOCATION,FRONT OF THE PREMISES IS BEST FOR MAKING ENTRY. -ALL PERMITS EXPIRE 180 DAYS AFTER THE PERMIT IS ISSUED OR 180 DAYS AFTER DATE OF LAST INSPECTION. -OWNER/AGENT IS RESPONSIBLE FOR REQUESTING ALL INSPECTIONS THROUGH FINAL INSPECTION. **THIS STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL ALL APPROVALS ARE GRANTED.". PRIOR TO CALLING FOR FINAL INSPECTION,ALL CONDITIONS OF THE PERMIT MUST BE MET Public Works Access/Driveway Other Health Septic Well Deptartment Planning Site Inspection Department Fire Marshall Fire Apparatus Access Fire Sprinkler Auto Fire Alarm Hood and Duct Other Final Building Building Official: Community Services Designee Department Concrete Setbacks 7 14, y Slab Footing Perimeter Point load Footing Footing Interior Footing Decks/Porches Foundation Stem Walls Other Rough-In Groundwork Plumbing Framing Groundwork Mechanical Plumbing Groundwork Gas Pipe Mechanical Gas Piping Shear Wall Nailing Underfloor Other Insulation Slab Ceiling Floor Vaulted Ceiling Walls Vapor Barrier Other Wallboard Interior Wall Brace Panels Fire Walls Nailing Other Final Building 7 /4. Z Manufactured Setbacks Setup Home Concrete Foot/Runners Final Other Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov FEMERGENCY 3-01135 BULKHEAD OR DOCK- RESIDENTIAL ESCRIPTION: BULKHEAD REPAIR/REPLACEMENT ATF ISSUED: 07/11/2024 REPAIR ESS: 23022 N US HIGHWAY 101 HOODSPORT EXPIRES: 01/07/2025 PARCEL: 422235000006 APPLICANT: NYE TIDES LLC OWNER: NYE TIDES LLC 6249 OLD OLYMPIC HWY SW 6249 OLD OLYMPIC HWY SW OLYMPIA,WA 98512 OLYMPIA,WA 98512 1.360.339.3039 CONTRACTOR: SEALEVEL BULKHEAD BUILDERS INC P O BOX 375KINGSTON,WA 98346 1.360.297.2401 GENERAL CONTRACTOR'S LICENSE: SEALEVEL BULKHEAD BUILDERS INC License: SEALEBB9931_7 P 0 BOX 375KINGSTON,WA 98346 Expires: 08/27/2025 1.360.297.2401 VALUATIONS: FEES: Paid Due Project Valuation (BID, 255675.00 $255,675.00 Technology Surcharge $67.58 $0.00 ESTIMATION..) Plan Check Fee $1,331.15 $0.00 Building Permit Fee $2,047.92 $0.00 State Fee-Residential $6.50 $0.00 Planning Review Fee $240.00 $0.00 Total: $255,675.00 Totals : $3,693.15 $0.00 REQUIRED INSPECTIONS Setback Inspection BLD-Final Inspection CONDITIONS Printed by:Anna Schaffran on:07/11/2024 02:01 PM Page 1 of 3 Mason County Mason County - Division of Community Development 615 W.Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2023-01135 * Contractor registration laws are governed under RCW 18.27 and enforced by the WA State Dept of Labor and Industries, Contractor Compliance Division. There are potential risks and monetary liabilities to the homeowner for using an unregistered contractor. Further information can be obtained at 1-800-647-0982. The person signing this condition is either the homeowner, agent for the owner or a registered contractor according to WA state law. " All permits expire 180 days after permit issuance, or 180 days after the last inspection activity is performed. The Building Official may grant a one time extention of 180 days, upon the receipt of a written extension request prior to permit expiration. Letter must indicating that circumstances beyond the control of the permit holder preventing action from being taken. No more than one extension may be granted. All surface water and potential runoff must be controlled on site and shall not adversely affect any adjacent properties nor increase the velocity flow entering or abutting to any state or county culverting/ditching system or road way. " All construction must meet or exceed all local and state ordinances in addition to the International Codes requirements as adopted and amended by Mason County and the State of Washington. Occupancy is limited to the approved and permitted classification. Any non-approved change of use or occupancy would result in permit revocation. * The stamped approved site plan is required to be on-site for inspection purposes. If an inspection is requested and the approved site plan is not on site, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. All other necessary permits from Mason County, Washington State and/or Federal Agencies that are required for this proposed development and construction must be obtained PRIOR TO SAME DEVELOPMENT AND CONSTRUCTION. " All building permits shall have a final inspection performed and approved by Mason County Building Department prior to permit expiration.The failure to request a final inspection or to obtain approval will be documented in the legal property records on file with Mason County as being non-compliant with Mason County ordinances and building regulations. * Owner/Agent is responsible to post the assigned address and/or purchase and post private road signs in accordance with Mason County Title 14.28 and 14.17. " All changes to"approved" building plans that effect compliance with the international codes as amended and adopted, or any other Mason County ordinance or regulation, must be reviewed and approved by Mason County prior to construction. OWNER/BUILDER acknowledges submission of inaccurate information may result in a stop work order or permit revocation.Acknowledgement of such is by signature below. I declare that I am the owner, owners legal representative, or contractor. I further declare that I am entitled to receive this permit and to do the work as proposed. I have obtained permission from all the necessary parties, including any easement holder or parties of interest regarding this project. The owner or authorized agent represents that the information provided is accurate and grants employees of Mason County access to the above described property and structure(s)for review and inspection. This permit/application becomes null & void if work or authorized construction is not commenced within 180 days or if construction work is suspended for a period of 180 days. PROOF OF CONTINUATION OF WORK IS BY MEANS OF INSPECTION. INACTIVITY OF THIS PERMIT APPLICATION OF 180 DAYS WILL INVALIDATE THE APPLICATION. Provisions for surface/subsurface drainage control must be implemented with new construction or development on site and MUST NOT adversely impact adjacent parcels. Under the requirements of Mason County Stormwater Ordinance, either private ditches and drains will meet requirements of the stormwater ordinance or prior approval will be granted to use an existing utility and drainage easement dedicated for that specific purpose. For further information regarding this ordinance contact the Mason County Public Works Department prior to construction at Ext 450 Any changes in proposed construction shall be reviewed by the engineer or architect of record and submitted in writing to the Mason County Building Department prior to construction. All engineering and/or architectural documents are a part of the approved set of plans and shall remain attached thereto. If documents are removed, approval will not be granted. In addition, a re-inspection fee (refer to current fee schedule, minimum 1 hour)will be charged and shall be collected by the Building Department prior to any further inspections being performed or approvals granted. " Engineered has provided an inspection report addressing/approving structural element installation. Printed by:Anna Schaffran on:07/11/2024 02:01 PM Page 2 of 3 Mason County Mason County - Division of Community Development 615 W. Alder St. Building 8 Shelton, WA 98584 360-427-9670 ext 352 www.masoncountywa.gov BULKHEAD OR DOCK- RESIDENTIAL BLD2023-01135 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state/Vocal law regulating construction or the performance of construction. Issued By: 1'l'n,�--? Contractor or Authorized Agent: Date: j Printed by:Anna Schaffran on:07/11/2024 02:01 PM Page 3of3 Mason County Permit Document BLD2023-01135 Austin Engineering Civil Engineering Services 2182 NE Eton Lane, Bremerton, Washington 98311-9529 Voice: 360-698-1661 email: austinengr@gmaii.com Date: 19 Jan 23 Subject: Inspection of completed Bulkhead replacement. Mr. Daniel Nye 6243 Old Olympic Hwy SW Olympia, WA 98512 Dear Mr..Nye I have inspected the completed work on the subject project and fine that the repairs have been completed in accordance with the approved design and the issued permit. If there are any questions please contact the undersigned. ( -1.Q WAS 0 E. Paul Austin PE&LS WA u� -f�0'�` # 16968 z InyF8 cc: File: Nye,Hoodsport PoX S10NAl t Sealevel Bulkhead Builders P.O. Box 375 Kingston, WA 98346 Attn: Ms. Jenny Rolsten E rmuviuED APPROVING UCTRUAL ELEMENTSTED WITHOUT MASON INSPECTION-