Loading...
HomeMy WebLinkAboutBLD99-00957 Tenant Improvement - BLD Permit / Conditions - 2/28/2001 Inspection Line (360)427-7262 MASON COUNTY DEPT. OF COMMUNITY DEVELOPMENT Phone: (360)427-9670, ext. 352 Mason County Bldg. 3 426 W. Cedar P.O. Box 186 114 Shelton, WA 98584 1 RESIDENTIAL BUILDING PERMIT BLD99-00957 OWNER: JOSEPH GIORDANO RECEIVED: 10/19/99 CONTRACTOR: ASSURED FIRE PROTECTI SITE ADDRESS: 24230 NE STATE ROUTE 3 BELFAIR ISSUED: /28/01 8/28/01 PARCEL NUMBER: 123282390003 EXPIRES: LEGAL DESCRIPTION: SW NW, E OF R/W+ TR A SP#457 TR C OF SP#2487 PROJECT DESCRIPTION: DIRECTIONS TO SITE: TENANT IMPROVEMENT HWY 3 TO BELFAIR MAKE A RIGHT AT MCDONALDS ONL EFT IN WESTBAY AUTO PARTS BLDG. General Information Construction & Occupancy Information Square Footage Information No. of Bedrooms: 0 Type of Constr.: 5N Type of Use: COM Insp. Area: 2 No. of Bathrooms: 2 Occ. Group: B Lot Size:O Deck: 0 Type of Work: NEW Fire Dist.: 2 No. of Stories: 1 Occ. Load: 19 Building:1,913 0 Valuation: Building Height: 0 Occ. Status: Basement:0 Manufactured Home Information Setback Information Shoreline& Planning Information Make Length: 0 Ft. Front: 0.0 Ft. Shoreline: 0.0 Ft. Water Body: SEPA?: Unkn Model: Width: 0 Ft. Rear: 0.0 Ft. Slope: Ft. Shoreline Desi own Side 1: 0.0 Ft. g.. Year: Serial No.: Side 2: 0.0 Ft. Comp. Plan Desi .: Plumbing Fixtures Mechanical Fixtures FEES Type Qty. Type Qty. Type By Date Amount Receipt Lavatories 2 Ventilation Fan 1 Building plan check' KW $100.00 51898 Water Heaters ? Building State Fee $4.50 BELFAI UFC Plan Check $50.00 BELFAI EH Plan Review CEW 1/29/01 $50.00 BELFAI Planning Review Fee KS 1/30/01 $38.00 BELFAI Mechanical Fee SKIM 2/2/01 $6.50 BELFAI Mechanical Base Fee SKIM 2/2/01 $22.00 BELFAI Plumbing Base Fee SKM 2/2/01 $20.00 BELFAI Plumbing Fee SKM 2/2/01 $21.00 BELFAI Total $312.00 I I BLD99-00957 Please refer to the following pages for conditions of this permit. 1 of 3 CASE NOTES FOR BLD99-00957 CONDITIONS FOR BLD99-00967 1) All approved plans are required to be on-site for inspection purposes. If inspection is called for and plans are not on site, Approval WILL NOT be granted. In addition, a Re-Inspection fee in the amount of$42.00 per hour(minimum 1 hour) will be charged and must be collected by this department prior to any further inspections being performed or approval granted. X�O�,t 2) PURSUANT TO 1997 UNIFORM BUILDING CODE, ALL SITES MUST HAVE APPROVED NUMBERS OR ADDRESSES PROVIDED IN SUCH A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. MASON COUNTY BUILDING DEPARTMENT REQUIRES THAT THIS BE COMPLETED PRIOR TO CALLING FOR ANY SITE INSPECTIONS. A REINSPECTION FEE, BASED ON RATES AS ADOPTED BY THE JURISDICTION AND THE 1997 UNIFORM BUILDING CODE WILL BE ASSESSED IF OWNER/CONTRACTOR FAILS TO POST ADDRESS ON SITE PRIOR TO REQUESTING INSPECTIONS. X 3) UMC Chapter 7. In buildings of unusgally tight construction, fuel burning appliances shall obtain combustion air from outside (excluding cooking appliances and clothes dryers). X 4) ALL CONSTRUCTION MUST MEET OR EXCEED ALL LOCAL CODES AND UBC REQUIREMENTS AND OCCUPANCY IS LIMITED TO THE PERMITTED AND APPROVED CLASSIFICATION. ANY CHANGE OF USE OR OCCUPANCY WOULD RESULT IN PERMIT REVOCATION. CHANGE OF USE MUST BE APPROVED PRIOR TO CHANGE. x 5) Changes to approved building plans that effect compliance to the 1991 Washington State Energy Code, 1991 Ventilation and Indoor Air Quality Code, the Uniform Building Code and/or Mason County Regulations must be approved by Mason County prior to constructionX T_ 6) CONSTRUCTION PRi C,�SS TO BE FIELD CORRECTED AS REQUIRED PER MASON COUNTY BUILDING DEPARTMENT AND UNIFORM BUILDING CODE.x % 1 7) Fuel piping shall be inspected after the installation of gas piping is complete, and before the attachment of fixtures, appliances, or shut-off valves. At the time of inspection the test pressure shall be no less than 10 psi held for no less than 15 minutes. Appliances attached to the piping shall not be used until the final inspection has been approved by the building inspector. 8) THE GAS HEATING UNIT SHALL;BE INSTALLED IN CONFORMANCE WITH THE MANUFACTURERS MANUAL AND THE 1997 UMC, UBC, UPC, AND WAC. AMENDMENTS. X�: .. 9) 1. PROVIDE ONE 2A 10 BC RATED FIRE EXTINGUISHER ADJACENT TO THE EXIT DOOR. 2. IF TENANT IMPROVEMENT AFFECTS THE COVERAGE OF THE SP, I�R SYSTEM OR FIRE ALARM SYSTEM, MODIFICATION MAY BE REQUIRED. CONTACT THE FIRE MARSHAL FOR QUESTIONS. X - BLD99-00957 Please refer to the following pages for conditions of this permit. 2 of 3 This permit becomes null and void if work or construction authorized is not commenced within 180 days, or if construction or work is suspended for a period of 180 days at any time after work is commenced. Evidence of continuation of work is a progress inspection within the 180 day period. Final inspection must be approved before building can be occupie OWNER OR AGENT: / � DATE: �� BLD99-00957 Please refer to the following pages for conditions of this permit. 3 of 3