Loading...
HomeMy WebLinkAboutSEP2018-00083 Bulkhead - SEP Determinations - 10/24/2018 MASON COUNTY Department of Community Services Planning Division 615 W Alder St, Shelton, WA 98584 11 ,04 (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2018-00083 Description of Proposal: BULKHEAD REPAIR/RESETTING — CONSIST OF THE RESETTING OF 55' OF THE SITES APPROX. 110' OF BULKHEADED SHORELINE. EXISTING ROCK BULKHEAD WILL RESET AND AUGMENTED WHERE NECESSARY USING RECYCLED LARGE ANGULAR ROCK, ONE SET O INSET ROCK BEACH ACCESS STEPS WILL BE INSTALLED AT THE SOUTH END OF THE PROJECTAND BE SHARED WITH THE ADJACENT PROPERTY TO THE SOUTH (12228-44-90023) SEE BLD2018-00940 Proponent: JOHN SELFORS Site Address (If Assigned): 5659 E STATE ROUTE 302 BELFAIR Directions to Site: ST RT 3. R ON NORTH BAY RD, FOLLOW TO ST RT 302 THEN TO PROPERTY LOCATED ON THE WATER SIDE Parcel Number: 122284490024 Legal Description: TR 2-D OF GOUT LOT 4,E OF R/W PCL 4 BLA#97-04 AF#640530 Lead Agency: Mason County The Lead Agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed Environmental Checklist and other information on file with the Lead Agency. This information is available to the public upon request. MITIGATED MEASURES ARE ATTACHED. Please contact Ron Buckholt at ext. 287 with any questions. This DNS is issued under WAC 197-11-350. The Lead Agency will not act on this proposal for 14 days from the date shown below, when the determination is final. Comments must be submitted to Community Services Department, 615 W Alder St, Shelton WA 98584 by 11/7/2018. Appeal of this determination must be filed within a 14-day period following this final determination date, per Mason County Code Chapter 15.11 Appeals. Authorized Local Government Official Date SEP2018-00083 Page 1 of 2 MASON COUNTY Department of Community Services Planning Division 615 W Alder St, Shelton, WA 98584 Not (360)427-9670 MITIGATED DETERMINATION OF NONSIGNIFICANCE (WAC 197-11-350) SEP2018-00083 CONDITIONS OF THIS DETERMINATION 1) Proponent shall obtain all necessary state and federal permits prior to the commencement of any work. 2) Proposed bulkhead repair - replacement shall not occur waterward of the existing bulkhead. 3) Erosion control measures shall be in place in order to prevent sediment run-off. SEP2018-00083 Page 2 of 2 From: Frank Stevick <fstevick@skillings.com> To: "ssteltzner@squaxin.us" <ssteltzner@squaxin.us> CC: Grant Gilmore <ggilmore@skillings.com>, "Grace Miller(Gbm@co.mason.wa.us... Date: 9 11:10 AM Subject: SEP2018-00084 an P 0 - 083 Attachments: i e uestions S�EPM18-00084 HAYS.pdf; Squaxin Tribe Comments SEP2018-00083 -00084.pdf; Selfors.pdf; image001.jpg Mr. Steltzer, I'm emailing you to address some questions about two SEPA applications that were submitted for a Mr. Hays (SEP2018) and a Mr. Selfors(SEP2018). Initially these two projects included a bulkhead, which you had a number of questions about. Currently the scope of the project has changed from involving a bulkhead to the construction of a 25 x 28 access on the shoreline side of Mr. Selfors property. A WWO'Wiger involved=ice p4oject. I've attached the email corresponded that included your questions. Since the scope of work has change you should find most of the questions are no longer applicable. Please review the documents and let me know if you still have any concerns. In addition, I've attached a permit for the parking area that Mr. Selfors received from the county for you to review. Lastly, going forward what is the standard or agreed upon way to address questions from your tribe and the County? Is a letter and or email to the tribe sufficient or should we route all documents and correspondence through the County to be forwarded to you? Please advise us on this process so we can follow the appropriate protocol in the future. Sincerely, P. Frank Stevick Project Scientist fstevick@skillings.com<mailto:fstevick@skillings.com> [SC Logo GREEN] 5016 Lacey Blvd SE Lacey, WA 98503 Office: 360-491-3399 Fax: 360-491-3857 Page 1 of 1 Ronald Buckholt - Re: Fwd: RE: SEP2018-00083 - 00084 From: <bmci20@comcast.net> To: "Ronald Buckholt" <rbuckholt@co.mason.wa.us> Date: 1/3/2019 1:46 PM Subject: Re: Fwd: RE: SEP2018-00083 -00084 Ron, We had a site meeting today and will have something together next week to address the questions. Please do not cancel the SEPA or exemption at this time and continue to hold until we have the information together. Thank you so much and if you have any questions, please do not hesitate to contact our office. John Bay Marine Contractors, Inc. 360-956-3451 From: Ronald Buckholt Sent: Wednesday, January 02, 2019 10:14 AM To: bmci20@comcast.net Cc: Stephen Scott Subject: Fwd: RE: SEP2018-00083 - 00084 Mr. John Evans, Just a follow-up note to you regarding a request for a project status? My last correspondence received from you was a voice mail message back in November of 2018, requesting additional time to respond and coordinate with the Squaxin Tribe and their associated SEPA comments. Please be advised that the SEPA process cannot be completed until the above SEPA comments are adequately addressed. Please provide a project update status at your earliest convenience to avoid cancellation of the preliminary SEPA determination and associated Shoreline Exemption. Thank you in advance. Ron Buckholt Senior Planner Mason County Community Services Department 615 W. Alder St., Bldg 8 Shelton, WA 98584 360.427.9670 x287 rbuckholt(abco.mason.wa.us file:///C:/Users/rbuckholt/AppData/Local/Temp/XPgrpwise/5 C2E 123 BMasonmai 110017673... 1/3/2019 Page 1 of 1 Ronald Buckholt - Fwd: RE: SEP2018-00083 - 00084 From: Ronald Buckholt To: bmci20@comcast.net Date: 10/25/2018 11:32 AM Subject: Fwd: RE: SEP2018-00083 - 00084 CC: ssteltzner@squaxin.us Attachments: Fwd: RE: SEP2018-00084 HAYS; Buckholt, Ronald.vcf Dear Sirs, Mason County received the attached email from Scott Steltzner, Fisheries Biologist, representing the Squaxin Tribe,with a number of questions associated with the SEPA comment period pertaining to the proposed bulkhead repair-replacement projects located along SR 302. Can you please provide responses to these questions and forward them to both the Squaxin Tribe biologist (cc'd in this email) and myself. The SEPA process may not be completed until these questions are adequately addressed. Please respond. Thank you in advance. Ron Buckholt Senior Planner Mason County Community Services Department 615 W. Alder St., Bldg 8 Shelton, WA 98584 360.427.9670 x287 rbuckholt@co.mason.wa.us file:///C:/Users/rbuckholt/AppData/Local/Temp/XPgrpwise/5BD 1 A9DDMasonmai11001... 10/25/2018 Page 1 of 3 Ronald Buckholt - Fwd: RE: SEP2018-00084 HAYS From: Mariah Frazier To: Buckholt, Ronald Date: 10/25/2018 11:00 AM Subject: Fwd: RE: SEP2018-00084 HAYS Mari a� Frame U r Community Development-Planning Clerical 11 615 W Alder St Shelton, WA 98584 360.427.9670 ext 365 >>> Scott Steltzner <ssteltzner@squaxin.us> 10/25/2018 9:46 AM >>> Hi Mariah, We are having a hard time trying to review SEP2018-00084 HAYS and SEP2018-00083 Selfors. Maybe you can answer a few questions that will help. 1. What are the applicants trying to protect?There are no structures at risk. 2. It is apparent from photos that most of the shoreline vegetation has been removed. If this is the case, replanting should be required that will help hold the bank together. 3. Calling this a bulkhead rebuild seems to be a stretch. It appears there is some rock present but is/was it a functioning bulkhead? 4. The applications call this a "resetting" of a bulkhead. We are unfamiliar of the use of this term in relation to a bulkhead repair. Please define this. 5. The drawings and application state the total volume new rock and spalls is unknown.This is not acceptable and does not allow for review. I understand they will be trying to use the existing large angular rock but an engineer estimate can and should be provided. 6. The drawings and application state the total volume new rock and spalls is unknown but then goes on to state that up to 50%new rock and spalls will be added. 50%of new materiel is not a reasonable amount for what we believe a "resetting" entails.At that point it is essentially a replacement. 7. Are the drawings attached for both supposed to represent the existing and proposed conditions? If so we don't know how to interpret this and they are not reviewable. If you have adequate photos of existing conditions that may suffice. 8. Thanks, Scott file:///C:/Users/rbuckholt/AppData/Local/Temp/XPgrpwise/5BD 1 A258Masonmail 10017... 10/25/2018 Page 2 of 3 a r a r , Scott Steltzner Fisheries Biologist Natural Resources Squaxin Island Tribe 200 S.E. Billy Frank Jr. Way Shelton,WA 98584 D 360-432-3803 ssteltzner@squaxin.us From: Mariah Frazier<mfrazier@co.mason.wa.us> Sent:Wednesday, October 24, 2018 3:49 PM To: Chris Waldbillig<Chris.waldbillig@dfw.wa.gov>; SEPA<sepacenter@dnr.wa.Rov>; WA Ecology <separegister@ecy.wa.gov>; Erica Marbet<emarbet@squaxin.us>;Jeff Dickison<Idickison@squaxin.us>; Stephanie Neil<sneil@squaxin.us>; Sarah Zaniewski<szaniewski@squaxin.us>; Sweeney Jason <Jason.t.sweenev@usace.army.mil> Cc: Ronald Buckholt<RBuckholt@co.mason.wa.us>; bmci20@comcast.net Subject:SEP2018-00084 HAYS Good Day, Please see attached documents regarding SEP2018-00084 file:///C:/Users/rbuckholt/AppData/Local/Temp/XPgrpwise/5BD 1 A258Masonmail 10017... 10/25/2018 Page 3 of 3 Proponent: Don Hays Parcel: 12228-44-90023 If you have any questions, please direct them to Planner Ron Buckholt at rbuckholt@co.mason.wa.us Thank you, Mo ri,a4--., Frovz er Community Development- Planning Clerical 11 615 W Alder St Shelton, WA 98584 360.427.9670 ext 365 file:///C:/Users/rbuckholt/AppData/Local/Temp/XPgrpwise/5BD 1 A258Masonmai110017... 10/25/2018 MASON COUNTY DCD SEPA Contact List i r= Sent SEPA ?,0V nf3 to (check all that apply)on 0 �' Skokomish Tribal Nation, Nat.Res.Dept. WA Department of Commerce ATTN: Randy Lumper reviewteam@commerce.wa.gov N 541 Tribal Center Rd., Skokomish Nation,98584 rlumper@skokomish.org U.S.Army Corps of Engineers SEPA Reviewer-Jason Sweeney Skokomish Tribal Historic Preservation Officer PO Box C-3755,Seattle,98124 ATTN: Kris Miller Jason.t.sweeney@usace.army.mil 80 N Tribal Center Rd,Skokomish Nation,98584 shlanay1@skokomish.org WA Dept.of Fish and Wildlife Quinault Indian Nation SEPAdesk@dfw.wa.gov ATTN: Mark Mobbs PO Box 189,Tahola, 98587 WA Dept.of Fish and Wildlife mmobbs@quinault.org ATTN: Chris Waldbillig rM Squaxin Tribal Nation,Natural Res.Dept. 450 Port Orchard Blvd,Suite 290 2952 SE Old Olympic HWY,Shelton 98584 Port Orchard,WA 98366 jdickison@squaxin.us Chris.waldbillig@dfw.wa.gov emarbet@squaxin.us szaniewski@squaxin.us WA Dept.of Fish and Wildlife EDsneil@squaxin.us ATTN: Darrin Masters The Confederated Tribe of the Chehalis 450 Port Orchard Blvd,Suite 290 ATTN: SEPA Reviewer-Glen Connelly Port Orchard,WA 98366 420 Howanut Rd., Oakville,98568 Darrin.Masters@dfw.wa.gov gconnelly@chehalistribe.org WA DNR,South Puget Sound Region WA Dept.of Fish and Wildlife 950 Farman Avenue N, Enumclaw,98022-9282 ATTN: Margie Bigelow Southpuget.region@dnr.wa.gov (Habitat Biologist-S Puget Sound Watershed) WA DNR,Aquatic Resources 2391 W Deegan Rd.,Shelton,98574 PO BOX 47027,Olympia,98504-7027 margaret.bigelow@dfw.wa.gov and@dnr.wa.gov WA DNR,SEPA Center WA Dept.of Transportation ATTN: External Coordinator ATTN: Dale Severson PO BOX 47015,Olympia,98504-7015 P.O. Box 47440,Olympia 98504-7440 sepacenter@dnr.wa.gov OR-SEPA-REVIEW@wsdot.wa.gov Olympic Region Clean Air Agency ATTN: Lauren Whybrew City of Shelton 2940-B Limited Ln. NW, Olympia. 98502 ATTN:Jason Dose lauren.whybrew@orcaa.org 525 West Cota St.,Shelton 98584 Mason County Transit jasond@ci.shelton.wa.us ATTN: Danette Brannin 790 E Johns Prairie Rd,Shelton,98584 0 Port of Shelton dbrannin@masontransit.org ATTN: Brandon Palmer Mason County PUD#1 21 West Sanderson Way,Shelton 98584 ATTN: Steve Taylor BrandonP@portofshelton.com N 21971 Hwy 101, Shelton,98584 sntaylor@mason-pud1.org Dep't of Archaeology&Historic Preservation Mason County PUD#3 P.O.Box 48343,Olympia,98504-8343 ATTN: Kristin French SEPA@dahp.wa.gov kristin.french@masonpud3.org WA Department of Ecology Tacoma Public Utilities-Real Property Services Environmental Review Section ATTN: Dave Letterman PO BOX 47703, Olympia, 98504-7703 3628 S 35th St,Tacoma, 98409-3192 separegister@ecy.wa.gov dletterm@cityoftacoma.org WA Department of Health Mason Cty P.W.ATTN: ATTN: Kelly Cooper kelly.cooper@doh.wa.gov Mason Cty E.H.ATTN: Other: nil Mason Cty Bldg ATTN: Agent: Applicant: School District: C DCD last updated on 10/15/2018 MASON COUNTY ENVIRONMENTAL CHECKLIST 1 A VE D +&Zb0MI8 - 00 082018 MASON CO. ENVIRONMENTAL CHECKLIST 615 W. Alder Street A. BACKGROUND 1. Name of proposed project, if applicable: Selfors Bulkhead Repair/Replacement Project. 2. Name of applicant: Lisa & John Selfors. 3. Address and phone number of applicant and contact person: Bay Marine Contractor's, Inc. 360.956.3451. 4. Date checklist prepared: 6-20-18. 5. Agency requesting checklist: Mason County. 6. Proposed timing or schedule (including phasing, if applicable): No phasing. Work to be completed ASAP after receiving all required permits. 7. Do you have any plans for future expansion, or further activity related to or connected with this proposal: if yes, explain. No. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. None have been prepared yet. An HMP will be prepared for a tree removal violation on the site. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. No. 10. List any government approvals or permits that will be needed for your proposal, if known. A Mason County shoreline exemption permit, a Mason Environmental Permit(MEP), a HMP, a JARPA, a Mason County Building Permit, and an HPA from WDFW. 11. Give a brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead MASON COUNTY ENVIRONMENTAL CHECKLIST 2 agencies may modify this form to include additional specific information on project description). Fifty-five feet(55') of an existing 110' rock bulkhead will be reset/repaired using recycled large angular rock. One set of inset beach access steps will be installed at the south end of the project site and be shared with the adjacent property to the south (parcel # 12228-44-90023). Base and Lower half rock size will be four and five man sized. Upper half rock will be two man or larger. The bulkhead will be approx. five feet above grade in height. Base rock to be keyed into the beach a minimum of 18-24" below the existing beach grade. Bulkhead to be backed with 6"-8" quarry spalls and filter fabric as necessary. Quarry spalls are the appropriate drainage rock for a marine bulkhead as smaller rock or gravel will be sucked through the interstitial spaces of the bulkhead, causing it(bulkhead)to fail. Some overhanging vegetation will need to be trimmed to facilitate construction. Existing large woody debris on the beach will be left on the beach. All manmade debris on the beach will be removed from the site and disposed of at a licensed disposal facility following construction. All activities are within the 100-year flood plain. The nearest waterbody is North Bay/Case Inlet. Equipment and materials will be transported to the site by barge. 12. What is the location of the proposal? Give sufficient information for a person to understand the precise location of your proposed project including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. The site is located at 6659 E SR 302. Section 28, Township 22N, Range 01W. The legal description is: TR 2-D OF GOVT LOT 4, E OF R/W PCL 4 BLA#97-04 AF#640530. B. ENVIRONMENTAL ELEMENTS: 1. EARTH: a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other. b. What is the steepest slope on the site (approx. percent slope)? Greater than 15 percent from the top of the shoreline bank to the beach toe. MASON COUNTY ENVIRONMENTAL CHECKLIST 3 C. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know classification of agricultural soils, specify them and note any prime farmland. Sand, gravel, and clay. d. Are there surface indications of history of unstable soils in the immediate vicinity: If so, describe. Yes, the stretch of SR 302 that the site is located on has a history of being unstable, and it was closed last summer for almost one month while WSDOT conducted repairs. e. Describe the purpose,type, and approximate quantities of any filling or grading proposed. Indicate source of fill. To protect the bank toe, an existing rock bulkhead will be reset and augmented with approx. 45 cu/yds of large/medium rock and quarry spalls that will be placed along the bluff toe. f. Could erosion occur as a result of clearing, construction, or use: If so, generally describe. The HPA provisions and the WDOE's BMPs shall be followed to prevent erosion during construction. g. About what percentage of the site will be covered with impervious surfaces after project constructions (for example, asphalt or buildings)? None. The rock bulkhead will be pervious to water. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any. The HPA provisions and the WDOE's BMPs will be implemented during construction. 2. AIR: a. What types of emissions to the air would result from the proposal (i.e. duct, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities, if known. N/A. b. Are there any off-site sources of emissions or odors that may affect your proposal? If so, generally describe. N/A. C. Proposed measures to reduce or control emissions or other impacts to air, if any: N/A. 3. WATER: MASON COUNTY ENVIRONMENTAL CHECKLIST 4 a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Yes, North Bay/Case Inlet. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes, approx. 55' of an existing 110-foot rock bulkhead will be reset/repaired on the shoreline. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. To protect the bank toe, an existing rock bulkhead will be reset and augmented with approx. 45 cu/yds of large/medium rock and quarry spalls that will be placed along the bluff toe. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. Yes, the proposed project is located on the Puget Sound shoreline. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. N/A. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: domestic sewage, industrial, containing the following chemicals...,agricultural, etc.). MASON COUNTY ENVIRONMENTAL CHECKLIST 5 Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. None will be discharged. C. Water runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this flow into other waters? If so, describe. Any runoff would be from precipitation. WDOE's BMPs shall be adhered to during construction 2) Could waste materials enter ground or surface waters: if so, generally describe. No. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: The HPA provisions and the WDOE's BMPs will be followed during construction. 4. PLANTS: a. Check or circle types of vegetation found on the site: x _deciduous tree: alder, maple, aspen, other x_evergreen tree: fir, cedar, pine, other x_shrubs _x_ grass pasture crop or grain wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other _water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? Some native trees and shrubs along the shoreline may need to be trimmed to facilitate construction. C. List threatened or endangered species known to be on or near the site. Unknown. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: A planting plan will be prepared for a tree removal violation on the site. MASON COUNTY ENVIRONMENTAL CHECKLIST 6 5. ANIMALS a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: hawk, heron, eagle, songbirds, other Mammals: deer, bear, elk, beaver, other Fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. The Chinook salmon, the bull trout, the Puget Sound steelhead, the killer whale, the leatherback turtle, the humpback whale, the marbled murrelet, the green sturgeon, and the Puget Sound rock fish are some of the ESA listed threatened or endangered species in the area. C. Is the site part of a migration route? If so, explain. Fish migrate through Case Inlet on their way to spawning streams. d. Proposed measures to preserve or enhance wildlife, if any: None at this time. 6. ENERGY AND NATURAL RESOURCES: a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. None. b. Would your project affect the potential use of solar energy by adjacent properties: If so, generally describe. No. C. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None. 7. ENVIRONMENTAL HEALTH: a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, which could occur as a result of this proposal? If so, describe. NIA. 1) Describe special emergency services that might be required. MASON COUNTY ENVIRONMENTAL CHECKLIST 7 An ambulance in the event of a construction accident. 2) Proposed measures to reduce or control environmental health hazards, if any: None. b. Noise: 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? None. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Noise related to the construction of the bulkhead will be present on a short-term basis. Construction noise will only occur during daylight hours. 3) Proposed measures to reduce or control noise impacts, if any" N/A. 8) LAND AND SHORELINE USE: a. What is the current use of the site and adjacent properties? Residential and Recreational. b. Has the site been used for agriculture? If so, describe. No. C. Describe any structures on the site. There is a SFR located on the site, on the east side of SR 302. d. Will any structures be demolished? If so, what? No. e. What is the current zoning classification of the site? Unknown. f. What is the current comprehensive plan designation of the site? Unknown. MASON COUNTY ENVIRONMENTAL CHECKLIST 8 g. If applicable, what is the current Shoreline Master Program designation of the site? Unknown. h. Has any part of the site been classified as an "Environmentally sensitive" area? If so, specify. Puget Sound. i. Approximately how many people would reside or work in the completed project? None. j. Approximately how may people would the completed project displace? None. k. Proposed measures to avoid or reduce displacement impacts, if any: N/A. i. Proposed measure to ensure the proposal is compatible with existing and projected land uses and plans, if any: Bulkheads are common to the marine shoreline. 9. HOUSING: a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. N/A. b. Approximately how many units, if any would be eliminated? Indicate whether high, middle, or low-income housing. N/A. C. Proposed measures to reduce or control housing impacts, if any: N/A. 10. AESTHETICS: a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? The bulkhead will be approx. 5' above grade in height. b. What views in the immediate vicinity would be altered or obstructed? None. C. Proposed measure to reduce or control aesthetic impacts, if any: None. MASON COUNTY ENVIRONMENTAL CHECKLIST 9 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? The project does not produce any light or glare. b. Could light or glare from the finished project be a safety hazard or interfere with views? NIA. C. What existing off-site sources of light or glare may affect your proposal: None. d. Proposed measures to reduce or control light and glare impacts, if any: None. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? Boating, fishing, hiking, etc. b. Would the proposed project displace any existing recreational uses? If so, describe. No. C. Proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the project or applicant, if any: None. MASON COUNTY ENVIRONMENTAL CHECKLIST 10 13. HISTORIC AND CULTURAL PRESERVATION: a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. Not that the applicants know of. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. None. C. Proposed measures to reduce or control impacts, if any: None. 14. TRANSPORTATION a. Identify public streets and highways serving the site and describe proposed access to the existing street system. Show on site plans, if any. SR 302. b. Is site currently served by public transit? If not, what is the approximate distance to the existing street system? Show on site plans, if any. Unknown. C. How many parking spaces would the completed project have? How many would the project eliminate? N/A. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). No. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. No. f. How many vehicular trips per day would be generated by the completed project. If known, indicated when peak volumes would occur. None. MASON COUNTY ENVIRONMENTAL CHECKLIST 11 g. Proposed measures to reduce or control transportation impacts, if any? None. 15. PUBLIC SERVICES a. Would the project result in an increased need for public service (for example: fire protection, police protection, health care, schools, other)? If so, generally describe: No. b. Proposed measures to reduce or control direct impacts on public services, if any: NIA. 16. UTILITIES a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. None. Signature: The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date submi