Loading...
HomeMy WebLinkAboutBLD5441 Pier, Ramp, and Float - BLD Application - 7/8/1977 BUILDING PERMIT APPLICATION MASON COUNTY P.O. Box 186 Shelton, Washington 98584 177 DATE ISSUED Zlf PERMIT NO. OWNER NAME MAIL ADDRESS CIrr��&�STATE ZIP P�+ONE Dean A. Biggs and Roy J. Correa, Jr. POB 140, Union, Wa. 98592 898-2557 DIRECTIONS TO JOB SITE approx. 5 mi. N.L Union LEGAL (LP16EE ATTACHED SHEET) DESCR. CONTRACTOR NAME MAIL ADDRESS CITY&STATE LICENSE NO. PHONE D-A Construction Co. Inc. , POB 140, Union, Wa. DA-CO-299 Ml 898-2555 USE OF BUILDING Class of work: ? NEW ❑ ADDITION ❑ ALTERATION ❑ REPAIR ❑ MOVE ❑ REMOVE Describe work: construct pier, ramp & float Valuation of work: $ 109000 PLAN CHECK FEE PERMIT FEE SPECIAL CONDITIONS: APPLICATION ACCEPTED BY PLANS CHECK BY APP VIED FO SSUANCE Type of Occupancy Division BY Const. Group CKh�`i< t. old a Size of Bldg. No. of Max CONTRACTOR AFFIDAVIT (Total) Sq. Ft. Stories Occ. Load PERMANENT SEASONAL E.D.NUMBER I certify that I am a currently registered Contractor In RESIDENCE the State of Washington and I am aware of the MOBILE HOME ordinance requirements regulating the work for which the permit is issued and all work done will be in Special Approvals Required Received Not Required conformance therewith. ZONING HEALTH DEPT. Firm D—A Construction Co. Inc. PUBLIC WORKS By 1 ROAD DEPT. Lic. No. DA-CO-299 Ml Date L 2 Z OWNERS AFFIDAVIT I certify that I am exempt from the requirements of the N O T I C E contract or registration law RCW 18.27, and am aware of the Mason County ordinance requirements for SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, which this permit is issued and that all work done will VENTILATING OR AIR CONDITIONING. be In conformance therewith. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 120 DAYS AT ANY TIME AFTER mer Date. WORK IS COMMENCED. 'HECK VALIDATION CK. M.O. CASH PERMIT VALIDATION CK. M.O. CASH