Exemption from Shoreline Management Act
Case No.: SHX2017-00063 Substantial Development Permit Requirement
The Proposal By: GREGORY HATTON
19410 NW 30TH AVE
RIDGEFIELD, WA 98642
Parcel Number: 322355201002
Site Address: 143 E MERRIMOUNT RD UNION
To undertake the following development.-
(SEE BLD2017-01132) "After the fact" repair and maintenance of existing bulkhead. Other work
includes replacement of beach access stairs; incorporating a decking storm water infiltration trench;
remove & replace safety railing on 3 sides of bulkhead; remove & replace fencing and a gate on one side
of bulkhead; demolition of a pre-existing water front legal non-conforming shed and subsequent
relocation of newly built non-conforming replacement water front storage shed (2017 enforcement case)
to the parcel across the street (SR 106) and build yet another legal non-conforming replacement shed
(same for same in terms of size, dimensions, height, and size) as the original shed that was demolished.
Note: the first attempted shed replacement was larger and closer to the shoreline than the original shed,
therefore it had to be torn down or relocated elsewhere via code enforcement. The proponent opted to
relocate the replacement shed to a parcel across the street under common ownership and build another
shed to replace the original shed on the water front parcel identical in size, dimensions, height and
placement.
Within HOOD CANAL and/or its associated wetlands is exempt from the requirement of substantial
development because the development is categorized under WAC 173-27-040(2) as being category:
2(L) /1orrn,,I Y(pair � Ma inJ-�o. nce .
Please contact Ron Buckholt at ext 287 if you have any questions.
Issued:12/5/2017 Authorized Local Government Official
SHX2017-00063 December 05, 201
R6CE/V&D
M r------------1EYY 0 ------------
ar ' S O>Q/��� 1
WASHINGTON STATE UArmy ores Daterec�6
SeztJe D'c,:;rict � t
Joint Aquatic Resources Permit
Ag`en'�,reference#:
Application (JARPA) Form hel ; �T17' fit- 03
USE BLACK OR BLUE INK TO ENTER ANSWERS IN THE WHITE SPACES BELOW. '
Tax Parcel#{s): �223$SZ'61002
t
=-------------------------------------
Part 1—Project Identification
1. Project Name (A name for your project that you create. Examples: Smith's Dock or Seabrook Lane Development) hel
a on 13o lk&a d 1�e air`
Part 2—Applicant
The person and/or organization responsible for the project. hel
2a. Name (Last, First, Middle)
2b. Organization (if applicable)
2c. Mailing Address (Street or PO Box)
194-10 11AV 30" vP_oQ Q_
2d. City, State, Zip
2e. Phon (1) 2f. Phone 2) 2g. Fax 2h. E-mail t J
360'9V -0069 -4"03 5 22 -0 t 2S IVIII t'e , `1o�`lT�'1 /��,
i c_ -H.com
tAdditional forms may be required for the following pen-nits:
• If your project may qualify for Department of the Army authorization through a Regional General Permit(RGP),contact the U.S.Army Corps of
Engineers for application information(206)764-3495.
• If your project might affect species listed under the Endangered Species Act,you will need to fill out a Specific Project Information Form(SPIF)or
prepare a Biological Evaluation. Forms can be found at
http://www.nws.usace.army.mil/Missions/CivilWorks/Regulatory/PermitGuidebook/EndangeredSpecies aspx.
• Not all cities and counties accept the JARPA for their local Shoreline permits.If you need a Shoreline permit,contact the appropriate city or county
government to make sure they accept the JARPA.
2To access an online JARPA form with[help]screens,go to
http://www.er)ermifting.wa.gov/site/alias resourcecenter/iarpa iaroa form/9984farpa form aspx.
For other help,contact the Governor's Office for Regulatory Innovation and Assistance at(800)917-0043 or heIPCcDoria.wa.gov.
ORIA-16-011 Page 1 of 14
Part 3—Authorized Agent or Contact
Person authorized to represent the applicant about the project. (Note: Authorized agent(s) must sign 11 b of this
application.) h[ elp)
3a. Name (Last, First, Middle)
3b. Organization (If applicable)
Cn T-Ae,k 15P1 Q(n W fo'tLC-
3C. Mailing Address (street or PO Box))
too i x 99+
3d. City, State, Zip
Ise (V,4
3e. Phone(1) 3f. Phone(2) 3g. Fax 3h. E-mail
275-937,1- 3 0-6g9-604S 11 en✓�r'�fec� t:77`�c� �ctr�u
Part 4—Property Owner(s)
Contact information for people or organizations owning the property(ies)where the project will occur. Consider both
upland and aquatic ownership because the upland owners may not own the adjacent aquatic land. hel
Same as applicant. (Skip to Part 5.)
❑ Repair or maintenance activities on existing rights-of-way or easements. (Skip to Part 5.)
❑ There are multiple upland property owners. Complete the section below and fill out JARPA Attachment A for
each additional property owner.
❑ Your project is on Department of Natural Resources (DNR)-managed aquatic lands. If you don't know, contact
the DNR at(360) 902-1100 to determine aquatic land ownership. If yes, complete JARPA Attachment E to
apply for the Aquatic Use Authorization.
4a. Name (Last, First, Middle)
4b. Organization (If applicable)
4c. Mailing Address (Street or PO Box)
4d- City, State, Zip
4e. Phone(1) 4f. Phone(2) 4g. Fax 4h. E-mail
ORIA-16-011 Page 2 of 14
Part 5—Project Location(s)
Identifying information about the property or properties where the project will occur. hel
❑ There are multiple project locations (e.g. linear projects). Complete the section below and use JARPA
Attachment B for each additional project location.
5a. Indicate the type of ownership of the property. (Check all that apply.) help
K Private
❑ Federal
❑ Publicly Owned (state, county,city, special districts like schools, ports,etc.)
❑ Tribal
❑ Department of Natural Resources (DNR) —managed aquatic lands (Complete JARPA Attachment E)
5b. Street Address (Cannot be a PO Box. If there is no address, provide other location information in 5p.) hel
3 F eY-Tl noun XOC(d
5c. City, State, Zip(if the project is not in anncity or town, provide the name of the nearest city or town.) hel
t,�Y1r0Y1 Wayvl�llG h r(�5-92
5d. County heI
.0
5e. Provide the section, township, and range for the project location. E?jPJ
1/4 Section Section Township Range
56 .35 Tz/t/ 3 [Al
5f. Provide the latitude and longitude of the project location. nel
• Example:47.03922 N lat./-122.89142 W long. (Use decimal degrees-NAD 83)
4-7,355g9 /V la . —12 .al6oq %an
5g. List the tax parcel number(s)for the project location. h[ !L10
• The local county assessor's office can provide this information.
3VZ3 S S2-0iOO; ,
5h. Contact information for all adjoining property owners. (if you need more space, use JARPA Attachment C.) hel
Name Mailing Address Tax Parcel #(if known)
_L944 /1/!A/ -w7h V0-
Cyr f-la f on 'e VVA 90 -2 32Z3S-52-o Jpn j
- —.—....-----
toil,s A. LL 0_M It � ��,Z Z-23S--.t1 ' Q
ORIA-16-011 Page 3 of 14
5i. List all wetlands on or adjacent to the project location. heM
Alone,
e
5j. List all waterbodies (other than wetlands) on or adjacent to the project location. n[�
5k. Is any part of the project area within a 100-year floodplain? n[d
❑ Yes ❑ No �K Don't knowAenorq f'O be, 1 q-f a Love, sp-C
51. Briefly describe the vegetation and habitat conditions on the property. hel
Ng0e 0V y- e- I ct Ceo �'r g/ /nG��J'e5 `�Y I Vec.127 i�J61
/ /
evc,'c c.
5m. Describe how the property is currently used. LkM
irvi
5n. Describe how the adjacent properties are currently used. NM
/ e 511,A -f u I
5o. Describe the structures (above and below ground) on the property, including their purpose(s) and current
condition, nel g
Qs CtWC - 0��1 CJOYa�i 9+ a r� ►^ i^2 - C��� C�f�Gt �j 1
t4,r, k lua FG,Y-
5p. Provide driving directions from the closest highway to the project location, and attach a map. heI
PryiN oV-) 106 - !I.� /'i
ORIA-16-011 Page 4 of 14
Part 6—Project Description
6a. Briefly summarize the overall project. You can provide more detail in 6b. hei
�� Oca ` �a� 5 ( 3 s� sot' 6�;��Kh J t e ,,v rl lci�-�
d ie 0y) J �al0t�)o, petviovt✓ - lace, �� ��v�(�f %fit, Al r-
t: one -I�' b� e ate d W(- re `�, a G� r'X S e i
2 M `�
e. fact?- 5cyrll `f, �UcAeke- ;r o(oc,iC vvl new t�vlrl � tqCR-,
to do
6b. Describe the urpose of the project and why you want or need to perform it. hei
6c. Indicate the project category. (Check all that apply) hei
❑ Commercial *Residential ❑ Institutional ❑ Transportation ❑ Recreational
`.Maintenance ❑ Environmental Enhancement
6d. Indicate the major elements of your project. (Check all that apply) [help]
❑ Aquaculture ❑ Culvert ❑ Float ❑ Retaining Wall
❑ Bank Stabilization ❑ Dam /Weir ❑ Floating Home (upland)
❑ Boat House ❑ Dike/ Levee/Jetty ❑ Geotechnical Survey ❑ Road
❑ Boat Launch ❑ Ditch ❑ Land Clearing ❑ Scientific
Measurement Device
❑ Boat Lift ❑ Dock/ Pier ❑ Marina/ Moorage ❑ Stairs
❑ Bridge ❑ Dredging ❑ Mining
9 Stormwater facility
V Bulkhead 4 Fence ❑ Outfall Structure ❑ Swimming Pool
❑ Buoy ❑ Ferry Terminal ❑ Piling/Dolphin [ Utility Line
❑ Channel Modification ❑ Fishway ❑ Raft
❑ Other:
ORIA-1"11 Page 5 of 14
6e. Describe how you plan to construct each project element checked in 6d. Include specific construction
methods and equipment to be used. LhLeM
• Identify where each element will occur in relation to the nearest waterbody.
• Indicate which activities are within the 100-year floodplain.
A 11 PVC Lpt. OOA-OW+-� ref(ac,-J/CO09+fU�co AO/I , ek c-P
(t ++ ,�/� ,jam, ' f - J ty
ell( �r�`�aY [�`5� �r ►h-) , I'�`t'a�-ton "�'l�'P,+'tC- � /"(a I �t"1 a y p��r veYei�1/ "'J
I�GI. r�I e ��4'� 1tJCtx ltir`f`�1n Z� of f� Gar,U I lc�U�
6f.What are the anticipated start and end dates for project construction? (Month/Year) h[eIP]
• If the project will be constructed in phases or stages, use JARPA Attachment D to list the start and end dates of each phase
or stage.
Start Date: OU91%Zt71-7 End Date: 11-/318017 ❑ See JARPA Attachment D
6g. Fair market value of the project, including materials, labor, machine rentals, etc. mipj
O ZO/O0JD
61h. Will any portion of the project receive federal funding? h( eip]
• If yes, list each agency providing funds.
❑ Yes V No ❑ Don't know
Part 7—Wetlands: Impacts and Mitigation
Check here if there are wetlands or wetland buffers on or adjacent to the project area.
(If there are none, skip to Part 8.) h[. ell
7a. Describe how the project has been designed to avoid and minimize adverse impacts to wetlands. hel
❑ Not applicable
7b.Will the project impact wetlands? hel
❑ Yes ❑ No ❑ Don't know
7c.Will the project impact wetland buffers? hei
❑ Yes ❑ No ❑ Don't know
ORIA-16-011 Page 6 of 14
7d. Has a wetland delineation report been prepared? hel
• If Yes,submit the report, including data sheets,with the JARPA package.
❑ Yes ❑ No
7e. Have the wetlands been rated using the Western Washington or Eastern Washington Wetland Rating
System? hel
• If Yes,submit the wetland rating forms and figures with the JARPA package.
❑ Yes ❑ No ❑ Don't know
7f. Have you prepared a mitigation plan to compensate for any adverse impacts to wetlands? hM
• If Yes, submit the plan with the JARPA package and answer 7g.
• If No,or Not applicable, explain below why a mitigation plan should not be required.
❑ Yes ❑ No ❑ Don't know
7g. Summarize what the mitigation plan is meant to accomplish, and describe how a watershed approach was
used to design the plan. hel
7h. Use the table below to list the type and rating of each wetland impacted, the extent and duration of the
impact, and the type and amount of mitigation proposed. Or if you are submitting a mitigation plan with a
similar table, you can state (below) where we can find this information in the plan. hel
Activity (fill, Wetland Wetland Impact Duration Proposed Wetland
drain, excavate, Name' type and area (sq. of impact' mitigation mitigation area
flood, etc.) rating ft. or type° (sq. ft. or
category' Acres acres
'If no official name for the wetland e)asts,create a unique name(such as'Wetland 1"). The name should be consistent with other project documents,
such as a wetland delineation report.
1 Ecology wetland category based on current Western Washington or Eastern Washington Wetland Rating System.Provide the wetland rating forms
with the JARPA package.
'Indicate the days,months or years the wetland will be measurably impacted by the activity.Enter"permanent"if applicable.
4 Creation C,Re-establishment/Rehabildation(R),Enhancement(E),Preservation P,Mitigation Banklln-lieu fee B
Page number(s) for similar information in the mitigation plan, if available:
ORIA-16-011 Page 7 of 14
7L For all filling activities identified in 7h, describe the source and nature of the fill material, the amount in
cubic yards that will be used, and how and where it will be placed into the wetland. Lbeld
7j. For all excavating activities identified in 7h, describe the excavation method, type and amount of material in
cubic yards you will remove, and where the material will be disposed. g1p
Part 8—Waterbodies (other than wetlands): Impacts and Mitigation
In Part 8, "waterbodies" refers to non-wetland waterbodies. (See Part 7 for information related to wetlands.) h[ eV
'I'Check here if there are waterbodies on or adjacent to the project area. (If there are none, skip to Part 9.)
8a. Describe how the project is designed to avoid and minimize adverse impacts to the aquatic environment.
el
❑ Not applicable
Vll�' vt/3// be /oia'W Du sf'k- O-f tlAz' uV it' P�j-)o1.,.
WGt��t' {�ft�f✓t '�Y'+>il��� Lt.�E`t>✓ �� �r1�r �'� T� mil�rt�'► 1/�,11�D��
8b. Will your project impact a waterbody or the area around a waterbody? h[M
.)d Yes I] No
ORIA-16-011 Page 8 of 14
8c. Have you prepared a mitigation plan to compensate for the project's adverse impacts to non-wetland
waterbodies? Lhei
• If Yes, submit the plan with the JARPA package and answer 8d.
• If No,or Not applicable,explain below why a mitigation plan should not be required.
XYes ❑ No ❑ Don't know
8d. Summarize what the mitigation plan is meant to accomplish. Describe how a watershed approach was
used to design the plan.
• If you already completed 7g you do not need to restate your answer here. hel
A vja�et'
5u r--(�ce- vvo�4
71
8e. Summarize impact(s)to each waterbody in the table below. hel
Activity (clear, Waterbody Impact Duration Amount of material Area (sq. ft. or
dredge, fill, pile name' location of impact3 (cubic yards)to be linear ft.) of
drive, etc.) placed in or removed waterbody
from waterbody directly affected
r✓ (ac �,Vd Cgriol '- ce repr1 I
'If no official name for the waterbody exists,create a unique name(such as"Stream 1 The name should be consistent with other documents
provided.
7 Indicate whether the impact will occur in or adjacent to the waterbody. If adjacent,provide the distance between the impact and the waterbody and
indicate whether the impact will occur within the 100-year flood plain.
'Indicate the days,months or years the waterbody will be measurably impacted by the work. Enter"permanent"if applicable.
8f. For all activities identified in 8e, describe the source and nature of the fill material, amount (in cubic yards)
you will use, and how and where it will be placed into the waterbody. hel
�re*-)ck /O&4ed V�-a Owl fwyl t v �oJy vldt
con EJ-rrnG��i �Jlli►�� �S�ir�SrT_j `�� �1 t� 1 �(dL'i� UV, � eocrkG/'t
Ca tv, ,( +✓
ORIA-16-011 Page 9 of 14
8g. For all excavating or dredging activities identified in 8e, describe the method for excavating or dredging,
type and amount of material you will remove, and where the material will be disposed. hel
`ram �X C�VUW by (n;�1I - �i�CatUa - i, A i9xrrMok��/ �G� of
Pi7� 1l 4ed f vi c41� a l /w i�I 1 e�i o' (-y-O j2 x� /t—�1" Creek Ov or✓/
Ot(Jrl a O' V� 0(f 5 �� 19,
1
Part 9—Additional Information
Any additional information you can provide helps the reviewer(s) understand your project. Complete as much of
this section as you can. It is ok if you cannot answer a question.
9a. If you have already worked with any government agencies on this project, list them below. h[ elp]
Agency Name Contact Name Phone Most Recent
Date of Contact
G r4c 27-
e,
'tom�d ? rI � 7 J - 2P/7
ar*vo CoU M v'rinw �'4-?7- 6 /0 � 2J17
9b. Are any of the wetlands or waterbodies identified in Part 7 or Part 8 of this JARPA on the Washington
Department of Ecology's 303(d) List? hel
• If Yes,list the parameter(s)below.
• If you don't know, use Washington Department of Ecology's Water Quality Assessment tools at
http://www-ecy.wa.gov/programs/M/303d/.
❑ Yes V No
9c.What U.S. Geological Survey Hydrological Unit Code (HUC) is the project in? hf M
• Go to http://cfoub.epa.gov/surf/locate/index.cfm to help identify the HUC.
�7 jl�Jvl�
9d. What Water Resource Inventory Area Number (WRIA#) is the project in? h[ elp]
• Go to http://www.ecy.wa.gov/water/wria/index.html to find the WRIA#.
1�
ORIA-16-011 Page 10 of 14
9e.Will the in-water construction work comply with the State of Washington water quality standards for
turbidity? hel
• Go to http://www.ecy.wa.gov/programslwq/swgs/criteria.htmi for the standards.
❑ Yes ❑ No X Not applicable
9f. If the project is within the jurisdiction of the Shoreline Management Act, what is the local shoreline
environment designation? hel
• If you don't know,contact the local planning department.
• For more information,go to: http://www.ecy.wa.gov/programs/sea/sma/laws rules/173-26/211 designations.html.
17 Urban ❑ Natural ❑ Aquatic ❑ Conservancy ❑ Other: f-a
9g.What is the Washington Department of Natural Resources Water Type? Lftgjpj
• Go to http://www.dnr.wa.gov/forest-practices-water-typing for the Forest Practices Water Typing System.
Shoreline ❑ Fish ❑ Non-Fish Perennial ❑ Non-Fish Seasonal
9h. Will this project be designed to meet the Washington Department of Ecology's most current stormwater
manual? heI
• If No, provide the name of the manual your project is designed to meet.
�(Yes ❑ No
Name of manual: of EC9 0 qm orb czl
9L Does the project site have known contaminated sediment? hel
• If Yes, please describe below.
❑ Yes X No
9j. If you know what the property was used for in the past, describe below. hel
9k. Has a cultural resource (archaeological) survey been performed on the project area? hem
• If Yes,attach it to your JARPA package.
❑ Yes 6 No
ORIA-16-011 Page 11 of 14
91. Name each species listed under the federal Endangered Species Act that occurs in the vicinity of the
project area or might be affected by the proposed work. hei
9m. Name each species or habitat on the Washington Department of Fish and Wildlife's Priority Habitats and
Species List that might be affected by the proposed work. hel
Part 10—SEPA Compliance and Permits
Use the resources and checklist below to identify the permits you are applying for.
• Online Project Questionnaire at http://apps.oria.wa.gov/opas/.
• Governor's Office for Regulatory Innovation and Assistance at (800) 917-0043 or helpCo)-oria.wa.gov.
• For a list of addresses to send your DARPA to, click on agency addresses for completed JARPA.
10a. Compliance with the State Environmental Policy Act (SEPA). (Check all that apply.) h[ lw
• For more information about SEPA,go to www.ecy.wa.gov/programs/sea/seoa/e-review.htmi.
❑ A copy of the SEPA determination or letter of exemption is included with this application.
gA SEPA determination is pending with a (lead agency). The expected decision date
is unkno'-vii
❑ 1 am applying for a Fish Habitat Enhancement Exemption. (Check the box below in yob.)
! ) This project is exempt (choose type of exemption below).
Categorical Exemp�t--irorn. Under 7hat section of the SEPA administrative code (WAC) is it exempt?
M�n^w heyJ cVe15YTo A,.ot-, Rf,MJ L I r901h4LaInC2 rfc��vi e5
❑ Other:
❑ SEPA is pre-empted by federal law.
ORIA-16-011 Page 12 of 14
10b. Indicate the permits you are applying for. (Check all that apply.) hel
LOCAL GOVERNMENT
Local Government Shoreline permits:
❑ Substantial Development ❑ Conditional Use ❑ Variance
%Shoreline Exemption Type (explain): Aoor non 94rfuc4oti i i fo=
Other City/County permits:
❑ Floodplain Development Permit ❑ Critical Areas Ordinance
STATE GOVERNMENT
Washington Department of Fish and Wildlife:
[Hydraulic Project Approval (HPA) ❑ Fish Habitat Enhancement Exemption—Attach Exemption Form
You must submit a check for$150 to Washington Department of Fish and Wildlife, unless your project
qualifies for an exemption or alternative payment method below. Do not send cash.
Check the appropriate boxes
$150 check enclosed. Check#
Attach check made payable to Washington Department of Fish and Wildlife.
❑ My project is exempt from the application fee. (Check appropriate exemption):
❑ HPA processing is conducted by applicant funded WDFW staff.
Agreement#
❑ Mineral prospecting and mining
❑ Project occurs on farm and agricultural land.
(Attach a copy of current land use classification recorded with the county auditor, or other proof of current land use)
❑ Project is modification of an existing HPA originally applied for, prior to July 10, 2012.
HPA#
Washington Department of Natural Resources:
❑ Aquatic Use Authorization
Complete JARPA Attachment E and submit a check for$25 payable to the Washington Department of Natural Resources.
Do not send cash.
Washington Department of Ecology:
❑ Section 401 Water Quality Certification
FEDERAL GOVERNMENT
United States Department of the Army permits (U.S. Army Corps of Engineers):
❑ Section 404 (discharges into waters of the U.S.) ❑ Section 10 (work in navigable waters)
United States Coast Guard permits:
❑ Private Aids to Navigation (for non-bridge projects)
ORIA-16-011 Page 13 of 14
Part 11—Authorizing Signatures
Signatures are required before submitting the JARPA package. The JARPA package includes the DARPA form,
project plans, photos, etc. hei
11 a.Applicant Signature (required) hel
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities, and I agree to start work
only after I have received all necessary permits.
I hereby author' ent named in Part 3 of this application to act on my behalf in matters related to this
application. (initial)
By initialing here, I state th t I have the authority to grant access to the property. I also give my consent to the
permitting agencies en t a property where the pr ' is locate in t the project site or any work
related to the project. (initial)
Applicant rinte Name Applican ign re Date
11 b. Authorized Agent Signature hel
I certify that to the best of my knowledge and belief, the information provided in this application is true, complete,
and accurate. I also certify that I have the authority to carry out the proposed activities and I agree to start work
only after all necessary permits have been issued.
3117
Authorized Agent Printed Name Authorized Agent Signature Date
11 c. Property Owner Signature (if not applicant) LtLeg
Not required if project is on existing rights-of-way or easements (provide copy of easement with JARPA).
I consent to the permitting agencies entering the property where the project is located to inspect the project site
or any work. These inspections shall occur at reasonable times and, if practical, with prior notice to the
landowner.
Property Owner Printed Name Property Owner Signature Date
18 U.S.0§1001 provides that:Whoever,in any manner within the jurisdiction of any department or agency of the United States knowingly
falsifies,conceals,or covers up by any trick, scheme,or device a material fact or makes any false,fictitious, or fraudulent statements or
representations or makes or uses any false writing or document knowing same to contain any false,fictitious, or fraudulent statement or
entry, shall be fined not more than$10,000 or imprisoned not more than 5 years or both.
If you require this document in another format, contact the Governor's Office for Regulatory Innovation and Assistance(ORIA)at(800)
917-0043. People with hearing loss can call 711 for Washington Relay Service. People with a speech disability can call(877)833-
6341. ORIA publication number: ORIA-16-011 rev. 0912016
ORIA-16-011 Page 14 of 14
SCALEi 1 INCH = 50 FEET
50
REPLACE 10'X10
STORAGE SHED
EXISTING 8' CONCRETE BULKHEAD (3 SIDES) 318F7t PROPERTY LINE
W/ NEW 6'X32'X24'
SLAB ABOVE
0
APPRX, HIGH _...........
WATER
HOOD ELEVATI❑N
CANAL --PROPOSED 2'X13' WATER QUALITY
r- INFILTRATION TRENCH
EXISTING
RESIDENCE
312F-T f
EXISTI
NG
WOOD DOCK
PROJECT/ OWNER/ LOCATION,
HATT❑N BULKHEAD REPAIR
GREG HATTON
145 E MERRIMOUNT ROAD
PARCEL 32235-52-01001
MASON COUNT WASHINGTON
ENGINEER,
ENVIROTECH ENGINEERING
PO BOX 984
BELFAIR, WASHINGTON 98528
360-275-9374
SITE PLAN - S1 0F 2
V •i�, '���t 6•DEER,
� SLAB
r
� wyati��
8 FT=
65 FT
•.!! PRDPOSED VATER
QUALITY INFILTRATION
TRENCH,SEE DETAILS,
EXISTING
CONCRETE
BULKHEAD
•4•
CROSg„,ET CTIGN
N.T.S,
PMOUS GRAVEL Od RATIO OF
CRUSHED SURFACING BASE
COURSE ILENDED Vlhl 037
ROCK)OR TRAFFIC GRATE,OR
OTHER PERVIOUS PAVEMENT
GROUND
SURFACE
ENCOMPASS
DRAINROCK VITH
FILTER FABRI 6'MIN
3/4'—1 1/21 .�G�'CLYDF S
WASHED DRAIN 2'MIN P T
ROCK NVASftf 'YIN
SPECIFICATIONS E
43045
�2'FOR----�
SSfnNALV'l as/s/n
SAND INFILTRATION TRENCH TI TAIIR
SAND FILTER MATERIAL REQUIREMENTS, N.T.S. PROJECT/ OWNER/ LOCATIONi
US STAND.SIEVE WINER(BY WT.)
NO.4 95—ID
HATTON BULKHEAD REPAIR
NG.a To-toOo
NO,16 40-90 GREG HATTON
No;No 30 �2-23 145 E MERRIMOUNT ROAD
Nil N0.loo 2 PARCEL 32235-52-01001
MASON COUNTY, W S INGTON
ENGINEERi
ENVIROTECH ENGINEERING
PO BOX 9B4
BELFAIR, WASHINGTON 98328
360-275-9374
DETAILS - S2 OF 2