Loading...
HomeMy WebLinkAboutGeoTech Assessment for BLD2000-01425 - BLD Engineering / Geo-tech Reports - 1/11/2001 MASON COUNTY PUBLIC WORKS DIRECTOR/COUNTY ROAD ENGINEER Shelton,Washington 98584 DATE: Jan. 11", 2001 INTER-DEPARTMENTAL COMMUNICATIONS TO: Shandra O'Haleck, DCD -Planner FROM: Alan A. Tahja, P/W- Co. Hydr. Engr. DCD/Planning WO# 0 1-0 111 SUBJ: Geo-Tech Assessment Review NAME: Grant Mauer(cry, Mirrimont-Union BLD2000-01425 Shandra, A geotechnical assessment prepared for the proposed Grant Maurer garage at East 143 Merrimont Road has been received and reviewed by Public Works. The report conforms to standards of sound engineering principles and practices and conforms to the requirement of DCD for geotechnical assessment reporting. Recommendations regarding backfill material and backfill drainage should be made conditions for project acceptance. In reviewing the building plans, only 2 horizontal rebars are specified for the foundation walls. The geologist references the back foundation wall as being a retaining structure with a surcharge reaction resulting from vehicle parking, and recommends a value for use in designing the wall. With these issues in mind, it appears that the basement walls should be designed by a licensed engineer. It also appears the floor joist sizes need to be identified. In short,the geotechnical assessment can be considered adequate, but other issues still need to be addressed by the applicant or his contractor. Please feel free to contact me at County extension 461 if you have any questions regarding these comments, or if you feel any features need further discussion or attention. Si cerely, 411, i—TolIZI, Al n A. Tahja O File: H:\WP\GEO\ASESMNTS\Maurer.doc WORK ORDER - PUBLIC WORKS DEPT. (A) Date: I- i c)_r) I �� n t (E) Work Order PERMIT#: RL-O act, _(pig at� (1la��r - Number. 1 Requested by: Authorized by: i� „�. Date: Type of Work: CHARGE TO: NAME T 1ciYaninC , AGENCY/COMPANY -- BILLING ADDRESS PHONE X (B) Pub. Works Person in Charge: 1f, h �o � I (c) Project Time Line: (from-to dates ( �P�til TO Prood Start date: EsBmated Fhfsh Date: Approximate hours: ESTIMATED TOTAL$*S: COST ESTIMATE _ (D) 2AtA Employee S Rate Hours Subtotal Fringe TOTAL$ 1A/01 l9 it um RAM TOTAL IS EQUIPMENT USED: MATERIAL USED: ...�.. 'ram'+���.V.�..VnLY. Yi:v.:::-.�n:•v:} .-..:...�. .:' I 7. .. ..........:. ':. .v:}.:iv' M: (F) Actual Cost $ BARS: PROJ : DATE Employee WORKED Name fit: Hours Subtotal Fdnae% TOTAL$ EQUIPMENT USED: Date P-DA Rate TOTAL MATERIAL USED: TOTAL ALL (G) BILLED DATE INV/ PAID DATE REC.x C►#