Loading...
HomeMy WebLinkAboutPAR Belfair Sand Gravel - PAR Application - 12/31/1990 MASON COUNTY PRE-SUBMISSION CONFERENCE APPLICATION Mason County uses the pre-submission conference to assist applicants in preparing proposals which are consistent with all Mason County, City of Shelton (when applicable) and PUD concerns and regulations. At the pre-submission conference representatives of all relevant departments will be in attendance and will be able to inform you of the regulations and standards with which your proposal must comply. Pre-submission conferences are only held on Wednesdays and are approximately 60 minutes in length. Seven copies of a detailed site plan shall be submitted one week prior to the conference. The site plan must contain all setbacks between proposed and existing structures and the property lines. If applicable, please show all critical areas (shorelines, wetlands, landslide hazard areas). All existing and proposed structures must be shown and labeled with their use and the type of construction materials to be used (i.e. stick built, modular, etc). PLEASE PRINT when completing this application. Applicants Name: E)C-L(f v�I R S Avu V GV YAVLL. Contractor: // Contact: WIQ11 kV J. Cro t +_ Telephone # 3G 0 - �'T New Project: Expansion or remodel of existing use: /\ Describe Project: S_�i rQ. U�,badt l�J�.S� p }��u pep( �v �t'� C Gi Ycm n d U)o C vO VYI i�(20 LA.r)-��i Sad l o�) Site , 8 S'e 1 I 4-og so,I 4'011r Ic-t cvv S0-t_4 'X I( (J Z�? k hob_d uls is i -r\ a0Vi KA 40 SC\rcd a 5 lC.va� 0 P PfG Site Address: N �7 Z 4 cj3 Old g_'4,, " ywW / Tax Parcel Number: I Z 3I 7 - ) I -000 0 * * * For Official Use * * ** * * Meeting Date & Time: s C' Location: ✓ �� 1 ����VVI, c�C JD cc,, 1,4 , AIIG, X% 34� Oct Effect on aquifer recharge areas Wells: survey of neighboring wells; static water levels, depths; affect of project on wells (individual and community water systems). Impacts to watershed. Include an enumeration of the anticipated volume for consumptive use of any waters of the state. Water rights are needed for groundwater withdrawal of 5,000 gallons per day or more. Location in Aquifer Recharge Area may require wastewater discharge permit. Impact of mining practices on water quality. NPDES permit application required through Department of Ecology. Ecology, Plants and Animals: Impacts to unique ecological features Impact of vegetation/land clearing on wetland habitat and buffer. Impacts to wildlife, domestic animals in area. Biologist should visit site in both the spring and fall to identify affected species. Wildlife identified in comment letters include: coyote, fox, raccoons, squirrels, chipmunks, frogs, salmon, bass, trout, deer, hawk, vulture, bald eagle - roost trees observed, otter, muskrat, rabbit, bobcat, duck, goose, swan, blackbird, jay, pileated woodpecker, ruffed grouse, herons, western pond turtle, Shelton pocket gopher, olympic mudminnow. Impacts to waterfowl migratory patterns and habitat use. Potential for introduction of undesirable (exotic?) species. Effects of impacts to species balance and array over time, e.g. impact of loss of predators on other animal populations (also links with previous comment). Existing Human and Built Environment Impact to existing human and built environment, including impact to current activities in the area which include the raising of livestock, horses, equestrian activities. Provide an enlarged buffer. Impacts to any agricultural uses in the area. Impacts to recreational use of surrounding area. Environmental Health Leaching of contaminants issues. The EIS should dentify any polluting activities and their proposed measures for mitigation. The SWPP plan for protection against spills and contamination needs review by Mason County Environmental Health prior to approval. The plan should address containment procedures and spill monitoring. Noise: effect of noise on wildlife, human and built environment, livestock and domestic animals. Air Quality: Impact and distribution of dust, taking into account weather patterns of the area Impact of hours of operation on surrounding area, and likelihood of expanding hours in the future. Impact to existing human environment -- allergy/asthma sufferers, children and elderly people. Truck traffic impact on air quality Approval by Olympic Air Pollution Control Authority required- add to the list of required approvals, item 10. Allergy related impacts of project. Stress related: impact of project on wildlife, people (including impact on sleep), domestic pets and livestock Artificial lighting - impact on human and natural environment, impact on animals and livestock. Land Use Hours of operation, potential for extended hours, impact on surrounding natural and built environment. Transportation Impact of increased traffic on human safety, roads Details on traffic volume including type of traffic (size truck?), traffic patterns and anticipated routes Impact on air traffic navigation, including magnetic irregularities Reclamation plan: How will proponent ensure that reclamation and habitat restoration will occur at completion of project's life? Impact of reclamation plan on aquifer. Other project comments Concern over lack of detail of maps in SEPA package EIS must identify and evaluate the total proposal, which includes reclamation plans and any anticipated future development of use of site other than its current use. Impacts to unique ecological features. Any activities appurtenant to the proposal, whether on or off-site, such as road widening, disposing of waste materials, etc., must be identified and eveluated in the EIS. Concerns regarding size limit of proposal, future expansion plans. Is this project the scope of the proposal, or will there be future expansions. Please also refer to comment letters for the SEPA issuance